Loading...
22.07.06 PSA Stolfus & AssociatesEXHIBIT B On-Call Agreement for Professional Services TASK ORDER 2.1 US6 Mobility Improvement Project: Preliminary Design This Task Order pertains to the On-Call Agreement by and between the Town of Avon (“TOWN”), and Stolfus and Associates (“CONTRACTOR”), dated On-Call Contract Execution of September 3, 2021 (“the Agreement”). CONTRACTOR shall perform services as provided herein and in the Agreement. This Task Order shall not be binding until it has been properly signed by both parties. Upon execution, this Task Order shall supplement the Agreement as it pertains to the project described below. Project Description: Provide preliminary engineering and concept analysis for the US6 Multimodal Safety and Mobility Improvements project. The project received the CDOT Revitalizing Main Street Grant to slow prevailing speed on US6 and potentially install 3 pedestrian crossings as shown on the project site below. Project Site: Proposed Tasks: See Attachment A. 1. Preliminary (30%) Design Plans for the roundabout and 3 pedestrian crossings. 2. Provide preliminary engineering analysis and design concepts. DocuSign Envelope ID: 312CF39A-CEE1-42A0-ABE9-990738ADF761 Budget/Proposal: ___$23,050 ____________________________________ Schedule: See Attachment B______________________________________ This Task Order is executed this __6th____ day of ___2022_________, YEAR. Stolfus and Associates Approved: ________________________________________President________________ Date: ______________ Name Title Town of Avon Approved: _____________________________________Public Works Director ____Date: ______________ Name Title DocuSign Envelope ID: 312CF39A-CEE1-42A0-ABE9-990738ADF761 7/6/2022 7/6/2022 5690 DTC Boulevard, Suite 330W Greenwood Village, CO 80111 phone:303-221-2330 • fax: 303-221-2331 www.stolfusandassociates.com July 5, 2022 Eva Wilson, PE, PTOE Public Works Director Town of Avon EWilson@Avon.org Dear Eva: Stolfus & Associates, Inc. (Stolfus) is pleased to amend our proposal to include additional design support for the roundabout about at US 6 and Stone Bridge Road and for three separate pedestrian crossings to serve adjacent bus stops at River Edge Crossing, Eaglebend Crossing, and Mountain Stream Crossing. Stolfus has completed the conceptual design and received support from CDOT to advance to preliminary and final design. This scope of services will include preliminary design for drainage to submit an FIR level submittal to the Town and CDOT. It is our understanding the project is funded through a Revitalizing Main Streets grant administered by CDOT and will follow the CDOT Local Agency process. In addition, the project is located on a US Highway, so CDOT design standards will apply. Compliance with CDOT Local Agency process, CDOT standards, and coordination with CDOT staff is included in the scope of services. Final Design, Lighting, Structural Design, ROW Plans, SUE, Geotechnical, Pavement Design, Environmental, ROW Acquisition, Advertisement Support, and Construction Management services are not included in this scope of services. SCOPE OF SERVICES The anticipated scope of services and deliverables for this project include: 1. Preliminary Design a. Preliminary (30%) Design Plans for the roundabout and 3 pedestrian crossings b. Conduct a Preliminary Design FIR Review meeting with CDOT (virtual) ADDED OR AMENDED ELEMENTS OF THE SCOPE OF SERVICES D. PRELIMINARY DESIGN (FIR) PLANS Stolfus will prepare project documentation including development of preliminary FIR plans and an opinion of probable cost. A CDOT Form 463 (Design Data) will be prepared and submitted to CDOT. Stolfus will provide QA/QC review for the project. We will also provide technical support throughout the project in an advisory capacity. Our review efforts will confirm appropriateness of methodologies used, accuracy of documents, reasonableness of conclusions, document completeness, and overall clarity. The Preliminary (30%) FIR Submittal will include: - Title Sheet, Standard Plans List, General Notes, Typical Sections, Survey Control Diagram, Geometric Control Plans, Removal Plans, Roadway Plans with drainage elements, Roadway Profiles Signing and striping will be displayed on the roadway plans. Tabulations, cross-sections, and specifications are excluded from this scope of services. J. DRAINAGE AND WATER QUALITY RESPEC will provide hydrology, hydraulics and water quality design for roundabout improvements at US 6 and Stone Bridge Road and at 3 proposed pedestrian crossings along US 6. Permanent water quality improvement features will be incorporated at Stone Bridge Road roundabout site but it assumed that water quality for the Attachment A: Statement of Work DocuSign Envelope ID: 312CF39A-CEE1-42A0-ABE9-990738ADF761 Eva Wilson, PE, PTOE June 24, 2022 Page 2 pedestrian crossings will not be required. The Eagle River floodplain is a FEMA Zone AE floodplain which flows parallel to US 6, but it is contained within the existing channel and the proposed project limits are outside of the floodplain limits. Eagle River floodplain permitting is not anticipated and excluded from the scope of work. RESPEC will summarize the hydraulic design criteria for the project and perform a site visit to evaluate the site. The FIR phase will include determining the contributing drainage basins, onsite and offsite, and perform surface runoff analysis. Peak flows will be developed using the rational formula calculations for all drainage basins and basin routing and associated flows will be completed. Roadside channels, culverts, inlets and/or storm sewer systems will be designed to meet the Town’s and CDOT’s requirements. The proposed drainage system will be developed in Microstation and provided to Stolfus for incorporation into their plan sheets. A drainage memo will include a figure for the drainage basins with basin boundaries, land use and existing drainage infrastructure. The peak flows will be shown on a separate figure that includes basins and routing elements. RESPEC will not develop plan sheets, quantities, or a SWMP for this phase due to the limited schedule and funding. FEE Stolfus and its subconsultants will perform these engineering services for an additional fee of $23,050 for a total project cost of $147,050. We appreciate the opportunity to work with the Town of Avon and would be happy to answer any questions you have on this Scope of Services. Sincerely, STOLFUS & ASSOCIATES, INC. Michelle R. Hansen, PE Senior Transportation Engineer DocuSign Envelope ID: 312CF39A-CEE1-42A0-ABE9-990738ADF761 ID Task Task Name Duration Start Finish Predecessors 1 NTP 0 days Fri 11/12/21 Fri 11/12/21 2 Data  Collection/Traffic  Anal sis 25 days Fri 11/12/21 Mon  12/20/21 3 Survey (includes  permits, PTE,  CDOT PreSurvey  Conference 25 days Fri 11/12/21 Mon  12/20/21 1 4 Traffic Counts 5 days Fri 11/19/21 Mon 11/29/1FS+5 days 5 Traffic Analysis 15 days Tue 11/30/2 Mon 12/20/4 6 Conceptual Design 105 days Tue 12/21/2 Thu 5/19/22 7 Conceptual  Roadway/Traffic  (3 crossin s 21 days Tue  12/21/21 Fri 1/21/22 3 8 Conceptual   Roadway/Traffic  (roundabout 21 days Tue  12/21/21 Fri 1/21/22 3,5 9 CDOT Scoping  Meetin 0 days Mon 2/7/22 Mon 2/7/22 8FS+11 days 10 Revise Concept 43 days Tue 2/8/22 Thu 4/7/22 9 11 CDOT Concept  Follow‐up  Meetin 0 days Fri 3/4/22 Fri 3/4/22 10SS+19 days 12 Public  Involvement by  Town 33 days Mon 3/7/22 Wed  4/20/22 11 13 CDOT Concept  Review 21 days Thu 4/21/22 Thu 5/19/22 10,12 14 Preliminary Design 91 days Thu 4/21/22 Mon 8/29/2 15 Update Scope for  Preliminary and  Final Design  (Drainage,  Lighting, Survey,  Walls, Geotech,  SUE,ROW Plans) 36 days Thu 4/21/22 Fri 6/10/22 10,12 16 Supplemental  Surve 10 days Fri 5/20/22 Fri 6/3/22 13 17 SUE QL‐B 25 days Mon 6/20/2 Mon 7/25/2 15FS+5 days 18 Preliminary  Roadwa 25 days Fri 5/20/22 Fri 6/24/22 13 19 Preliminary  Draina e 24 days Mon  6/20/22 Fri 7/22/22 15FS+5 days,12 20 Preliminary  Lighting 24 days Mon  6/20/22 Fri 7/22/22 15FS+5  days,18SS+10  21 Structure  Selection 20 days Mon  6/27/22 Mon  7/25/22 18 22 FIR Plans 20 days Mon 6/27/2 Mon 7/25/2 18 11/12 2/7 3/4 Septemb October Novembe Decembe January February March April May June July August Septemb October Novembe Decembe January February March April Task Split Milestone Summary Project Summary Inactive Task Inactive Milestone Inactive Summary Manual Task Duration-only Manual Summary Rollup Manual Summary Start-only Finish-only External Tasks External Milestone Deadline Progress Manual Progress Page 1 Project: stone bridge schedule Date: Tue 6/28/22 Attachment B: Project Schedule DocuSign Envelope ID: 312CF39A-CEE1-42A0-ABE9-990738ADF761 ID Task Task Name Duration Start Finish Predecessors 23 FIR QC 10 days Tue 7/26/22 Mon 8/8/22 22 24 FIR Submittal 0 days Mon 8/8/22 Mon 8/8/22 23 25 FIR Review 15 days Tue 8/9/22 Mon 8/29/2 24 26 FIR Meeting 0 days Mon 8/29/2 Mon 8/29/2 25 27 Final Design 90 days Tue 8/9/22 Thu 12/15/2 28 Environmental  Investi ation 90 days Tue 8/9/22 Thu  12/15/22 24 29 Final  Roadwa /Traffic 20 days Tue 8/30/22 Tue 9/27/22 26 30 Confirm ROW  Needs 0 days Tue 9/27/22 Tue 9/27/22 29,21 31 Structure Design 20 days Wed 9/28/2 Tue 10/25/2 29 32 Drainage Design 40 days Tue 8/30/22 Tue 10/25/2 26 33 Lighting Design 20 days Wed 9/28/2 Tue 10/25/2 29SS+20 days 34 SUE QL‐A 20 days Wed 9/14/2 Tue 10/11/2 26FS+10 days 35 Incorporate SUE  Data into Desi n 10 days Wed  10/12/22 Tue  10/25/22 34 36 FOR Plan  Production 20 days Wed  9/28/22 Tue  10/25/22 29 37 Specifications 10 days Wed 10/12/Tue 10/25/2 36FF 38 FOR QC 10 days Wed 10/26/Tue 11/8/22 36 39 FOR Submittal 0 days Tue 11/8/22 Tue 11/8/22 38 40 FOR Review 15 days Wed 11/9/2 Thu 12/1/22 39 41 FOR Meeting 0 days Thu 12/1/22 Thu 12/1/22 40 42 PS&E Plans 20 days Fri 12/2/22 Tue 1/3/23 41 43 CDOT Clearances 15 days Wed 1/4/23 Tue 1/24/23 42,28,51 44 Conditional Approval for Advertisement  (ROW) 0 days Tue 1/24/23 Tue 1/24/23 43 45 Advertisement 15 days Thu 1/26/23 Wed 2/15/2 44FS+1 day 46 Begin Construction 0 days Wed 3/29/2 Wed 3/29/2 45FS+30 days,52 47 ROW 122 days Wed 9/28/2 Thu 3/23/23 48 ROW Exhibits 15 days Wed 9/28/2 Tue 10/18/2 30 49 CDOT ROW  Review 10 days Wed  10/19/22 Tue 11/1/22 48 50 ROW Exhibit  Revisions 7 days Wed  11/2/22 Thu  11/10/22 49 51 ROW Acquisition  Approval 10 days Fri 11/11/22 Mon  11/28/22 50 52 ROW Acquisition 80 days Tue 11/29/2 Thu 3/23/23 51 8/8 8/29 9/27 11/8 12/1 1/24 3/29 Septemb October Novembe Decembe January February March April May June July August Septemb October Novembe Decembe January February March April Task Split Milestone Summary Project Summary Inactive Task Inactive Milestone Inactive Summary Manual Task Duration-only Manual Summary Rollup Manual Summary Start-only Finish-only External Tasks External Milestone Deadline Progress Manual Progress Page 2 Project: stone bridge schedule Date: Tue 6/28/22 DocuSign Envelope ID: 312CF39A-CEE1-42A0-ABE9-990738ADF761