25.08.13 SCA Baker Builders, LLC
CO-4 Form Approved by Town Attorney – 05/15/2024 CHANGE ORDER Order No.: 004 Date: August 13, 2025 Agreement Date: November 25, 2024 NAME OF PROJECT: East Nottingham Park Improvements OWNER: Town of Avon, Colorado CONTRACTOR: __Baker Builders, LLC dba Baker Constructors The following changes are hereby made to the CONTRACT DOCUMENTS : Justification: Avon wishes to replace the water fountains and associate infrastructure at four (4) Town of Avon Park locations. Baker Constructors provided proposal PCO 011, Attachment A, for this scope. This includes the scope for Metcalf Cabin, Nottingham Playground, Wildridge Pock Park, and O’Neal Spur Park Water Fountains Replacements as detailed in the Attachment B design drawings by Yarnell Civil, dated 9/13/2023. However, the water fountains model specified at all four parks will instead be the Global Industrial™ Outdoor Bi-Level Drinking (WB761221BK). Due to change in the water fountain model, the Contractor shall coordinate with the Engineer to ensure the fountain is offset on the concrete pad to allow for adequate ADA access. This change order includes a plumbing permit, with waiver of Town of Avon permit fee. See the spreadsheet in Attachment C for an itemized summary of the revised plan quantities, resulting in a total contract adjustment of $88,727. No change to the contract time is required for this scope. Change to CONTRACT PRICE: $ $88,727.00 Original CONTRACT PRICE: $ 3,940,836.00 Current CONTRACT PRICE adjusted by previous CHANGE ORDER $ 3,939,621.59 The CONTRACT PRICE due to this CHANGE ORDER will be increased by $88,727.00. The new CONTRACT PRICE including this CHANGE ORDER will be $ 4,028,348.59. Change to CONTRACT TIME: The CONTRACT TIME will be (increased)(decreased) by 0 calendar days. The date for completion of all work will be May 20, 2026. CO-4 Form Approved by Town Attorney – 05/15/2024 APPROVALS REQUIRED: Approved by Engineer: Nicole Mosby, Avon Senior Engineer Accepted by Contractor: Terry Been, Baker Director of Construction Accepted and Approved by Owner: Eric Heil, Avon Town Manager Federal Agency Approval (where applicable): __________________ Nicole Mosby (Aug 14, 2025 09:39:37 MDT) Nicole Mosby Terry W. Been (Aug 14, 2025 10:55:12 MDT) Terry W. Been Eric Heil (Aug 14, 2025 12:14:44 MDT) Eric Heil CO-4 Form Approved by Town Attorney – 05/15/2024 Attachment A Peak Plumbing, Heating and Cooling 147 Airpark Unit 2D Gypsum, CO 81637 970-471-2757 Estimate 78165399 Job Estimate Date 7/15/2025 Billing Address Baker Builders 5660 Iris Parkway #Suite A Longmont, CO 80504 USA Job Address Nottingham Park Restrooms 1 Lake Street Avon, CO 81620 USA Estimate Details Water filler stations at other parks: - Excludes electrical connections. - Excludes landscaping and/or concrete/paver reconstruction. Service #Description Quantity Your Price Your Total PLUMB Plumbing Install: Install and provide the following plumbing & fixtures: - 4 x WB761221BK Global Industrial™ Outdoor Bi-Level Drinking Fountain with Bottle Filler & Pet Station, Black - Includes water and drain connections. - Includes dry well as per engineered drawings. - Includes demo and removal of existing equipment. - Includes demo and removal of concrete pads/pavers at existing location. (Approximately 16sf per unit) 1.00 $63,668.00 $63,668.00 Potential Savings $0.00 Sub-Total $63,668.00 Tax $0.00 Total $63,668.00 Est. Financing $1,056.89 Thank you for choosing Peak Plumbing Heating and Cooling LLC! BID DATE 8/1/2025 BAKER CONCRETE SOLUTIONS 5660 Iris Parkway Frederick, CO 80504 720-978-4904 jrodriguez@bakerconcretesolutionsus.com RE: PROPOSAL 25-5093 Dear Terry PRICING BASED ON: Payment terms: 30 Days Net TOTAL 9,812.50$ Prices are valid for 30 days Baker Concrete Solutions’ services rates are shown below and apply to time-and-materials terms or additional work products beyond the scope of work identified in this proposal. Attached to this letter are Baker Concrete Solutions’ standard business Terms and Conditions. · Owner Furnished Drawings: Civil Drawings dated 09/13/2023 · 40 Hour Work Weeks · Acknowledged Addenda: No Addenda Acknowledged COST ESTIMATE SITE CONCRETE 9,812.50$ Water Fountain Replacements Avon Baker Constructors Terry Been Tbeen@bakerbuildersco.com Baker Concrete Solutions is pleased to present this proposal to Baker Constructors for the concrete scope of work as listed below. Page 1 of 7 CO-4 Form Approved by Town Attorney – 05/15/2024 Attachment B © 2023 Microsoft Corporation © 2023 Maxar ©CNES (2023) Distribution Airbus DS © 2023 TomTom © 2023 Microsoft Corporation © 2023 Maxar ©CNES (2023) Distribution Airbus DS © 2023 TomTom © 2023 Microsoft Corporation © 2023 Maxar ©CNES (2023) Distribution Airbus DS © 2023 TomTom © 2023 Microsoft Corporation © 2023 Maxar ©CNES (2023) Distribution Airbus DS © 2023 TomTom SHEET NO. SHEET TITLE NO . NA M E YA R N E L L C O N S U L T I N G & CI V I L D E S I G N , L L C P. O . B O X 3 9 0 1 , E A G L E , C O L O R A D O 8 1 6 3 1 (9 7 0 ) 3 2 3 - 7 0 0 8 IS S U E / R E V I S I O N DA T E : DA T E TH E D E S I G N S S H O W N H E R E I N I N C L U D I N G AL L T E C H N I C A L D R A W I N G S , G R A P H I C RE P R E S E N T A T I O N & M O D E L S T H E R E O F , A R E PR O P R I E T A R Y & C A N N O T B E C O P I E D , DU P L I C A T E D , O R C O M M E R C I A L L Y E X P L O I T E D IN W H O L E O R I N P A R T W I T H O U T T H E S O L E AN D E X P R E S S W R I T T E N P E R M I S S I O N F R O M YA R N E L L C O N S U L T I N G & C I V I L D E S I G N , L L C . DE S I G N B Y : DR A W N B Y : RE V I E W E D B Y : PR O J E C T N O . : WA T E R F O U N T A I N S RE P L A C E M E N T S NO T T I N G H A M P A R K , O ' N E A L S P U R P A R K , & W I L D R I D G E P O C K E T P A R K AV O N , C O L O R A D O J. Y A R N E L L J. Y A R N E L L J. Y A R N E L L 23 . 0 1 7 9/ 1 3 / 2 0 2 3 COVER SHEET C1 811 WATER FOUNTAIN REPLACEMENTS TOWN OF AVON, COUNTY OF EAGLE, STATE OF COLORADO SHEET NO. SHEET TITLE NO . NA M E YA R N E L L C O N S U L T I N G & CI V I L D E S I G N , L L C P. O . B O X 3 9 0 1 , E A G L E , C O L O R A D O 8 1 6 3 1 (9 7 0 ) 3 2 3 - 7 0 0 8 IS S U E / R E V I S I O N DA T E : DA T E TH E D E S I G N S S H O W N H E R E I N I N C L U D I N G AL L T E C H N I C A L D R A W I N G S , G R A P H I C RE P R E S E N T A T I O N & M O D E L S T H E R E O F , A R E PR O P R I E T A R Y & C A N N O T B E C O P I E D , DU P L I C A T E D , O R C O M M E R C I A L L Y E X P L O I T E D IN W H O L E O R I N P A R T W I T H O U T T H E S O L E AN D E X P R E S S W R I T T E N P E R M I S S I O N F R O M YA R N E L L C O N S U L T I N G & C I V I L D E S I G N , L L C . DE S I G N B Y : DR A W N B Y : RE V I E W E D B Y : PR O J E C T N O . : WA T E R F O U N T A I N S RE P L A C E M E N T S NO T T I N G H A M P A R K , O ' N E A L S P U R P A R K , & W I L D R I D G E P O C K E T P A R K AV O N , C O L O R A D O J. Y A R N E L L J. Y A R N E L L J. Y A R N E L L 23 . 0 1 7 9/ 1 3 / 2 0 2 3 NOTES C2 SHEET NO. SHEET TITLE NO . NA M E YA R N E L L C O N S U L T I N G & CI V I L D E S I G N , L L C P. O . B O X 3 9 0 1 , E A G L E , C O L O R A D O 8 1 6 3 1 (9 7 0 ) 3 2 3 - 7 0 0 8 IS S U E / R E V I S I O N DA T E : DA T E TH E D E S I G N S S H O W N H E R E I N I N C L U D I N G AL L T E C H N I C A L D R A W I N G S , G R A P H I C RE P R E S E N T A T I O N & M O D E L S T H E R E O F , A R E PR O P R I E T A R Y & C A N N O T B E C O P I E D , DU P L I C A T E D , O R C O M M E R C I A L L Y E X P L O I T E D IN W H O L E O R I N P A R T W I T H O U T T H E S O L E AN D E X P R E S S W R I T T E N P E R M I S S I O N F R O M YA R N E L L C O N S U L T I N G & C I V I L D E S I G N , L L C . DE S I G N B Y : DR A W N B Y : RE V I E W E D B Y : PR O J E C T N O . : WA T E R F O U N T A I N S RE P L A C E M E N T S NO T T I N G H A M P A R K , O ' N E A L S P U R P A R K , & W I L D R I D G E P O C K E T P A R K AV O N , C O L O R A D O J. Y A R N E L L J. Y A R N E L L J. Y A R N E L L 23 . 0 1 7 9/ 1 3 / 2 0 2 3 CONSTRUCTION PLAN (LOCATION 1) C3 SHEET NO. SHEET TITLE NO . NA M E YA R N E L L C O N S U L T I N G & CI V I L D E S I G N , L L C P. O . B O X 3 9 0 1 , E A G L E , C O L O R A D O 8 1 6 3 1 (9 7 0 ) 3 2 3 - 7 0 0 8 IS S U E / R E V I S I O N DA T E : DA T E TH E D E S I G N S S H O W N H E R E I N I N C L U D I N G AL L T E C H N I C A L D R A W I N G S , G R A P H I C RE P R E S E N T A T I O N & M O D E L S T H E R E O F , A R E PR O P R I E T A R Y & C A N N O T B E C O P I E D , DU P L I C A T E D , O R C O M M E R C I A L L Y E X P L O I T E D IN W H O L E O R I N P A R T W I T H O U T T H E S O L E AN D E X P R E S S W R I T T E N P E R M I S S I O N F R O M YA R N E L L C O N S U L T I N G & C I V I L D E S I G N , L L C . DE S I G N B Y : DR A W N B Y : RE V I E W E D B Y : PR O J E C T N O . : WA T E R F O U N T A I N S RE P L A C E M E N T S NO T T I N G H A M P A R K , O ' N E A L S P U R P A R K , & W I L D R I D G E P O C K E T P A R K AV O N , C O L O R A D O J. Y A R N E L L J. Y A R N E L L J. Y A R N E L L 23 . 0 1 7 9/ 1 3 / 2 0 2 3 CONSTRUCTION PLAN (LOCATION 2) C4 SHEET NO. SHEET TITLE NO . NA M E YA R N E L L C O N S U L T I N G & CI V I L D E S I G N , L L C P. O . B O X 3 9 0 1 , E A G L E , C O L O R A D O 8 1 6 3 1 (9 7 0 ) 3 2 3 - 7 0 0 8 IS S U E / R E V I S I O N DA T E : DA T E TH E D E S I G N S S H O W N H E R E I N I N C L U D I N G AL L T E C H N I C A L D R A W I N G S , G R A P H I C RE P R E S E N T A T I O N & M O D E L S T H E R E O F , A R E PR O P R I E T A R Y & C A N N O T B E C O P I E D , DU P L I C A T E D , O R C O M M E R C I A L L Y E X P L O I T E D IN W H O L E O R I N P A R T W I T H O U T T H E S O L E AN D E X P R E S S W R I T T E N P E R M I S S I O N F R O M YA R N E L L C O N S U L T I N G & C I V I L D E S I G N , L L C . DE S I G N B Y : DR A W N B Y : RE V I E W E D B Y : PR O J E C T N O . : WA T E R F O U N T A I N S RE P L A C E M E N T S NO T T I N G H A M P A R K , O ' N E A L S P U R P A R K , & W I L D R I D G E P O C K E T P A R K AV O N , C O L O R A D O J. Y A R N E L L J. Y A R N E L L J. Y A R N E L L 23 . 0 1 7 9/ 1 3 / 2 0 2 3 CONSTRUCTION PLAN (LOCATION 3) C5 SHEET NO. SHEET TITLE NO . NA M E YA R N E L L C O N S U L T I N G & CI V I L D E S I G N , L L C P. O . B O X 3 9 0 1 , E A G L E , C O L O R A D O 8 1 6 3 1 (9 7 0 ) 3 2 3 - 7 0 0 8 IS S U E / R E V I S I O N DA T E : DA T E TH E D E S I G N S S H O W N H E R E I N I N C L U D I N G AL L T E C H N I C A L D R A W I N G S , G R A P H I C RE P R E S E N T A T I O N & M O D E L S T H E R E O F , A R E PR O P R I E T A R Y & C A N N O T B E C O P I E D , DU P L I C A T E D , O R C O M M E R C I A L L Y E X P L O I T E D IN W H O L E O R I N P A R T W I T H O U T T H E S O L E AN D E X P R E S S W R I T T E N P E R M I S S I O N F R O M YA R N E L L C O N S U L T I N G & C I V I L D E S I G N , L L C . DE S I G N B Y : DR A W N B Y : RE V I E W E D B Y : PR O J E C T N O . : WA T E R F O U N T A I N S RE P L A C E M E N T S NO T T I N G H A M P A R K , O ' N E A L S P U R P A R K , & W I L D R I D G E P O C K E T P A R K AV O N , C O L O R A D O J. Y A R N E L L J. Y A R N E L L J. Y A R N E L L 23 . 0 1 7 9/ 1 3 / 2 0 2 3 CONSTRUCTION PLAN (LOCATION 4) C6 SHEET NO. SHEET TITLE NO . NA M E YA R N E L L C O N S U L T I N G & CI V I L D E S I G N , L L C P. O . B O X 3 9 0 1 , E A G L E , C O L O R A D O 8 1 6 3 1 (9 7 0 ) 3 2 3 - 7 0 0 8 IS S U E / R E V I S I O N DA T E : DA T E TH E D E S I G N S S H O W N H E R E I N I N C L U D I N G AL L T E C H N I C A L D R A W I N G S , G R A P H I C RE P R E S E N T A T I O N & M O D E L S T H E R E O F , A R E PR O P R I E T A R Y & C A N N O T B E C O P I E D , DU P L I C A T E D , O R C O M M E R C I A L L Y E X P L O I T E D IN W H O L E O R I N P A R T W I T H O U T T H E S O L E AN D E X P R E S S W R I T T E N P E R M I S S I O N F R O M YA R N E L L C O N S U L T I N G & C I V I L D E S I G N , L L C . DE S I G N B Y : DR A W N B Y : RE V I E W E D B Y : PR O J E C T N O . : WA T E R F O U N T A I N S RE P L A C E M E N T S NO T T I N G H A M P A R K , O ' N E A L S P U R P A R K , & W I L D R I D G E P O C K E T P A R K AV O N , C O L O R A D O J. Y A R N E L L J. Y A R N E L L J. Y A R N E L L 23 . 0 1 7 9/ 1 3 / 2 0 2 3 DETAILS C7 CO-4 Form Approved by Town Attorney – 05/15/2024 Attachment C ITEM DESCRIPTION East Notthingham Park (Base Bid) UNIT QUANTITY UNIT PRICE TOTAL PRICE TOTAL – BASE BID 3,940,836.00$ CHANGE ORDER #1 8 Sawcut Asphalt Material LF 122 7.30$ 890.77$ 16 Excavation CY 8 138.77$ 1,110.13$ 18 Export CY 8 21.87$ 174.93$ 31 2' wide Concrete Curb & Gutter (Incl. Base Course) LF 122 58.51$ 7,138.17$ 66 Deciduous Shrubs - 5 Gal. EA -6 1,168.00$ (7,008.00)$ 72 River Rock Cobble Mulch - 3" Depth SF -88 7.30$ (642.40)$ 73 Kentucky Bluegrass Seed SF -21832 0.37$ (7,969.00)$ 74 Native Seed SF 21832 0.37$ 7,969.00$ 87 Sawcut Asphalt Material LF -20 7.30$ (146.00)$ 89 Aggregate Road Base, Cl 6 TN -94 36.50$ (3,431.28)$ 90 Asphalt (Grading SX PG 58-28) TN -64 109.51$ (7,008.48)$ 91 Install UM-30S Electric Vault EA 1 5,548.00$ 5,548.00$ 92 Electric Primary Trenching w/ Conduit* LF -161 461.10$ (74,236.66)$ 93 Connect to Existing RR Bore Conduit LS -0.9 18,971.11$ (17,074.00)$ 98 Exterior Finishes LS 1 3,169.30$ 3,169.30$ 99 Foundation (per structural plans) LS 1 13,973.58$ 13,973.58$ 102 Foundations (Shade Canopy) LS 1 2,618.18$ 2,618.18$ TOTAL – CHANGE ORDER #1 (74,923.75)$ CHANGE ORDER #2 46 Relocate FH & Gate Valve LS 1 7,855.00$ 7,855.00$ 94a Lake Street Overexcavation & rework LS 1 22,617.00$ 22,617.00$ 82 Moveable Bike Racks EA -4 1,423.75$ (5,695.00)$ TOTAL – CHANGE ORDER #2 24,777.00$ CHANGE ORDER #3 7 Trees EA 10 730.09$ 7,300.90$ 37 Striping (4" White) LF -312 2.38$ (742.56)$ 38 Thermoplastic Pavement Marking SF -20 24.50$ (490.00)$ 48 4" SDR35 Sewer Service w/ CO LF 68 248.22$ 16,879.00$ 48a 4" SDR35 Sewer Service MH Drop to Invert (wye & 45 Bends) LF 16 248.22$ 3,972.00$ 42b Pothole 2 additional utilties EA 2 825.00$ 1,650.00$ 58b Extended Confined Space Entry HR 3 100.00$ 300.00$ 93a Deep Excavation EA 1 16,480.00$ 16,480.00$ 93b Testing of Deep Excavation (Allowance) HR 16 85.00$ 1,360.00$ 42a Surveying (Staking and As-builts Location) HR 3 391.25$ 1,174.00$ 103 Margin and Overhead (5% on non-contract line items) LS 1 1,049.00$ 1,049.00$ TOTAL – CHANGE ORDER #3 48,932.34$ CHANGE ORDER #4 104 Remove and Replace Waterfountains (as specified in plans) LS 4 22,131.75$ 88,527.00$ 105 Rock Cobble (N Park Restroom) EA 1 200.00$ 200.00$ TOTAL – CHANGE ORDER #4 88,727.00$ TOTAL – CONTRACT PRICE w/ COs 4,028,348.59$ East Park Change Order 4 Summary Baker Construction 20250813_CO4_Offsite Water Fountains Final Audit Report 2025-08-14 Created:2025-08-14 By:Nicole Mosby (nmosby@avon.org) Status:Signed Transaction ID:CBJCHBCAABAANFQAft3CNMmvcZvxRHyQ7tTQZ3Ftij59 "20250813_CO4_Offsite Water Fountains" History Document created by Nicole Mosby (nmosby@avon.org) 2025-08-14 - 3:35:17 PM GMT Document emailed to Nicole Mosby (nmosby@avon.org) for signature 2025-08-14 - 3:38:07 PM GMT Document e-signed by Nicole Mosby (nmosby@avon.org) Signature Date: 2025-08-14 - 3:39:37 PM GMT - Time Source: server Document emailed to tbeen@bakerbuildersco.com for signature 2025-08-14 - 3:39:40 PM GMT Email viewed by tbeen@bakerbuildersco.com 2025-08-14 - 4:41:48 PM GMT Signer tbeen@bakerbuildersco.com entered name at signing as Terry W. Been 2025-08-14 - 4:55:10 PM GMT Document e-signed by Terry W. Been (tbeen@bakerbuildersco.com) Signature Date: 2025-08-14 - 4:55:12 PM GMT - Time Source: server Document emailed to eheil@avon.org for signature 2025-08-14 - 4:55:15 PM GMT Email viewed by eheil@avon.org 2025-08-14 - 6:14:01 PM GMT Signer eheil@avon.org entered name at signing as Eric Heil 2025-08-14 - 6:14:42 PM GMT Document e-signed by Eric Heil (eheil@avon.org) Signature Date: 2025-08-14 - 6:14:44 PM GMT - Time Source: server Agreement completed. 2025-08-14 - 6:14:44 PM GMT