25.06.30 SCA Baker Builders, LLC CO-3 Form Approved by Town Attorney – 05/15/2024 CHANGE ORDER Order No.: 003 Date: June 30, 2025 Agreement Date: November 25, 2024 NAME OF PROJECT: East Nottingham Park Improvements OWNER: Town of Avon, Colorado CONTRACTOR: __Baker Builders, LLC dba Baker Constructors The following changes are hereby made to the CONTRACT DOCUMENTS : Justification: Changes detailed herein capture changes to the Utility Plan to route the Sanitary Sewer Main, additional tree demolition approved by Avon, relocation of one of the primary electric vaults, and updates to the modular building delivery schedule. See the spreadsheet in Attachment A for a summary of the revised plan quantities, resulting in a total contract adjustment of $48,663.62. None of adjustments herein result in a change to the contract time. See Attachment B for the revised drawing sheet and markups. DEMO & SITEWORK ($7,300.90): This item includes the additional tree demolition detailed in markup of Sheet C-02 in Attachment B. Removal of 10 additional trees was added to the existing 11 trees to be demolished as shown on Sheet C-02. Per contract demolition Line Item 7 Trees, the cost of each tree demos is $730.09, adding $7,300.90 to the contract. This item also includes adjustment to the demo plan for changes for sanitary sewer (SS) service line relocation See Revised Sheets C-02 in Attachment B. The relocated SS line reduces the amount of pavement cut and removal (-39 LF), basecourse place (-1.6 TN), and asphalt re-laid (-1 TN). However, the deep excavation is anticipated to impact additional asphalt, and was therefore these items were not adjusted. UTILITIES ($41,630.64): Avon provided the paint striping and will provide ADA thermoplastic markings for the parking along Lake Street, crediting the project $1,232.56 as detail below: - Line Item 37: Striping (4” White): 236 LF parking stall lines striping (11 at 21.5 LF) plus the 76 LF ADA cross hatching (8 stripes at 9.5 ft long), totaling 312 LF at $2.38 per LF crediting the project $742.56. - Line Item 38: Thermoplastic Pavement Marking: Avon will provide two 40 x 36-inch ADA thermoplastics totaling 20 SF. At 24.50 per SF, this credits the project $490. Additionally, revised Sheet C-04 in Attachment B details needed relocation and extension/replacement of the SS line. The changes increased the length of 4” SS line by +68 LF and requires deep excavation and booting at the existing penetration into the manhole. As detailed in marked up Baker PCO 001v4, Attachment C, change order cost for the SS Line (Baker PCO 001) increase the contract by $42,864 for the following additions: - Line Item 48: Extension of the 4” SDR35 SS line by 68 LF at $248.22/LF, adding $16,879 CO-3 Form Approved by Town Attorney – 05/15/2024 - Line Item 48a: Internal Manhole Drop: including ~16 LF of 4” PVC Pipe and a wye and 45 deg bends to redirect flow into the manhole invert flowline, increase of $3,972. - Deep excavation adjacent to the manhole increasing the cost of work by $16,480. - Utility potholing, additional time in confined space, compaction testing, and surveying ; adding $4,484. - A 5% margin and overhead of $1,893 at detailed. However, that cost built into the unit price on contract line items. Therefore, $844 and $199 of Margin & Overhead are disallowed from the contract increase for the 4” sewer line extension Line Item 48, leaving an increase of $1,049. It is acknowledged that a Union Pacific Railroad Permit needs to be located to add a barrel section to the manhole work given its existing encroachment onto the railroad. Therefore, that work is unlikely to take place, and the cost is not addressed herein. Therefore, the total contract increase detailed herein is $41,630.64. OVERHEAD ELECTRIC BURY ($0): CO1 detailed that the length of Line Item 92 Electric Primary Trenching w/ Conduit between the railroad casing and the surface location of intercepting the conduit had not been resolved. - On the Northside of the Railroad Casing: It was determined that the Vault V3 installation location would be over the Heat Recovery Piping, which may be problematic in the future. Therefore, Vault V3 was relocated further east to eliminate this concern as shown in Attachment B. - On the Southside of the Railroad: The primary electric line crossed the heat recovery pipes and conduit bank of power and data lines that are encased in red concrete at a shallow depth. With Holy Cross Energy, it was determined that to best solution was to run the primary electric conduits shallow over the top of the Heat Recovery lines and encase them in red concrete. That extra work was completed and determined to be similar in value to the ~20LF of Line Item 92 electrical conduit work that did not need to be run between the railroad casing and surface vault locations. Therefore, these adjustments are a $0 and 0 day change to the contract and resolve the outstanding items around Line Item 92. Change to CONTRACT PRICE: $ $48,932.34 Original CONTRACT PRICE: $ 3,940,836.00 Current CONTRACT PRICE adjusted by previous CHANGE ORDER $ 3,890,689.25 The CONTRACT PRICE due to this CHANGE ORDER will be increased by $48,932.34. The new CONTRACT PRICE including this CHANGE ORDER will be $ 3,939,621.59. Change to CONTRACT TIME: The CONTRACT TIME will be (increased)(decreased) by 0 calendar days. The date for completion of all work will be May 20, 2026. APPROVALS REQUIRED: CO-3 Form Approved by Town Attorney – 05/15/2024 Approved by Engineer: Nicole Mosby, Avon Senior Engineer Accepted by Contractor: Terry Been, Baker Director of Construction Accepted and Approved by Owner: Eric Heil, Avon Town Manager Federal Agency Approval (where applicable): __________________ Nicole Mosby (Jun 30, 2025 16:47 MDT) Nicole Mosby Terry W Been (Jun 30, 2025 17:11 MDT) Terry W Been Eric Heil (Jul 7, 2025 07:57 MDT) Eric Heil CO-3 Form Approved by Town Attorney – 05/15/2024 Attachment A ITEM DESCRIPTION East Notthingham Park (Base Bid) UNIT QUANTITY UNIT PRICE TOTAL PRICE TOTAL – BASE BID 3,940,836.00$ CHANGE ORDER #1 8 Sawcut Asphalt Material LF 122 7.30$ 890.77$ 16 Excavation CY 8 138.77$ 1,110.13$ 18 Export CY 8 21.87$ 174.93$ 31 2' wide Concrete Curb & Gutter (Incl. Base Course) LF 122 58.51$ 7,138.17$ 66 Deciduous Shrubs - 5 Gal. EA -6 1,168.00$ (7,008.00)$ 72 River Rock Cobble Mulch - 3" Depth SF -88 7.30$ (642.40)$ 73 Kentucky Bluegrass Seed SF -21832 0.37$ (7,969.00)$ 74 Native Seed SF 21832 0.37$ 7,969.00$ 87 Sawcut Asphalt Material LF -20 7.30$ (146.00)$ 89 Aggregate Road Base, Cl 6 TN -94 36.50$ (3,431.28)$ 90 Asphalt (Grading SX PG 58-28) TN -64 109.51$ (7,008.48)$ 91 Install UM-30S Electric Vault EA 1 5,548.00$ 5,548.00$ 92 Electric Primary Trenching w/ Conduit* LF -161 461.10$ (74,236.66)$ 93 Connect to Existing RR Bore Conduit LS -0.9 18,971.11$ (17,074.00)$ 98 Exterior Finishes LS 1 3,169.30$ 3,169.30$ 99 Foundation (per structural plans) LS 1 13,973.58$ 13,973.58$ 102 Foundations (Shade Canopy) LS 1 2,618.18$ 2,618.18$ TOTAL – CHANGE ORDER #1 (74,923.75)$ CHANGE ORDER #2 46 Relocate FH & Gate Valve LS 1 7,855.00$ 7,855.00$ 94a Lake Street Overexcavation & rework LS 1 22,617.00$ 22,617.00$ 82 Moveable Bike Racks EA -4 1,423.75$ (5,695.00)$ TOTAL – CHANGE ORDER #2 24,777.00$ CHANGE ORDER #3 7 Trees EA 10 730.09$ 7,300.90$ 37 Striping (4" White) LF -312 2.38$ (742.56)$ 38 Thermoplastic Pavement Marking SF -20 24.50$ (490.00)$ 48 4" SDR35 Sewer Service w/ CO LF 68 248.22$ 16,879.00$ 48a 4" SDR35 Sewer Service MH Drop to Invert (wye & 45 Bends) LF 16 248.22$ 3,972.00$ 42b Pothole 2 additional utilties EA 2 825.00$ 1,650.00$ 58b Extended Confined Space Entry HR 3 100.00$ 300.00$ 93a Deep Excavation EA 1 16,480.00$ 16,480.00$ 93b Testing of Deep Excavation (Allowance) HR 16 85.00$ 1,360.00$ 42a Surveying (Staking and As-builts Location) HR 3 391.25$ 1,174.00$ 103 Margin and Overhead (5% on non-contract line items) LS 1 1,049.00$ 1,049.00$ TOTAL – CHANGE ORDER #3 48,932.34$ TOTAL – CONTRACT PRICE w/ COs 3,939,621.59$ East Park Change Order 3 Summary Baker Construction CO-3 Form Approved by Town Attorney – 05/15/2024 Attachment B X X ? 1 Nicole Mosby From:Nicole Mosby Sent:Tuesday, April 29, 2025 9:33 AM To:'Terry Been' Cc:Jeff Vroom Subject:RE: [EXTERNAL] FW: Relocate Holy Cross Ok, well thank you for sorting that. I spoke with Operations, and they mentioned that there is a comcast box and a few irrigation boxes that may need moved or capped. Otherwise, this relocation is acceptable to us. I will work with Jeff Vroom on the easement update. Nicole Mosby, PE, CFM Senior Engineer O. 970.748.4076 | M. 970.471.4420 nmosby@avon.org From: Terry Been <tbeen@bakerbuildersco.com> Sent: Tuesday, April 29, 2025 8:44 AM To: Nicole Mosby <nmosby@avon.org> Subject: RE: [EXTERNAL] FW: Relocate Holy Cross They did have to spend an extra day potholing all the different utility crossings coming out of the railroad casing, but there will not be a cost impact other than any easement filings for yourself. Speaking of easements, does ERWSD have an easement for the manhole that would allow us to work in that area? Thanks, Terry W. Been Director of Construction Faith | Trust | Hard Work | Integrity | Respect | Responsibility | Community Cell: 970.313.3092 | email: TBeen@BakerBuildersCo.com www.bakercompaniesus.com From: Nicole Mosby <nmosby@avon.org> Sent: Tuesday, April 29, 2025 8:40 AM To: Terry Been <tbeen@bakerbuildersco.com> Subject: RE: [EXTERNAL] FW: Relocate Holy Cross 2 Let me go check with Gary & Luis. In the meantime, What do you think the cost impact of the change will be? Nicole Mosby, PE, CFM Senior Engineer O. 970.748.4076 | M. 970.471.4420 nmosby@avon.org From: Terry Been <tbeen@bakerbuildersco.com> Sent: Tuesday, April 29, 2025 8:20 AM To: Nicole Mosby <nmosby@avon.org> Subject: FW: [EXTERNAL] FW: Relocate Holy Cross Nicole: Are you ok with this location? Thanks, Terry W. Been Director of Construction Faith | Trust | Hard Work | Integrity | Respect | Responsibility | Community Cell: 970.313.3092 | email: TBeen@BakerBuildersCo.com www.bakercompaniesus.com From: Jeff Vroom <jvroom@holycross.com> Sent: Monday, April 28, 2025 10:44 AM To: Terry Been <tbeen@bakerbuildersco.com> Cc: Nicole Mosby <nmosby@avon.org>; John Wahrer <john@triphasecompany.com> Subject: Re: [EXTERNAL] FW: Relocate Holy Cross Yes, the new location is acceptable. Thanks, Jeffrey P. Vroom Engineer III HOLY CROSS ENERGY 3799 HWY 82 • P.O. Box 3350, Glenwood Springs, CO 81602-3350 Phone: 970-947-5425 • jvroom@holycross.com 3 Monday – Thursday 6:30 a.m. to 5:00 p.m. MT Holy Cross Energy provides safe, reliable, affordable, and sustainable energy and services that improve the quality of life for our members and their communities. Holy Cross Energy is an equal opportunity provider and employer From: Terry Been <tbeen@bakerbuildersco.com> Sent: Monday, April 28, 2025 10:30:26 AM To: Jeff Vroom <jvroom@holycross.com> Cc: Nicole Mosby <nmosby@avon.org>; John Wahrer <john@triphasecompany.com> Subject: [EXTERNAL] FW: Relocate Holy Cross Jeff: Clayton from RPM stated that he has walked the location of the new vault with you and we are moving the vault so that it does not get installed over the top of the existing hot water recovery line. Are you OK with the revised location per the attached drawing? Thanks, Terry W. Been Director of Construction Faith | Trust | Hard Work | Integrity | Respect | Responsibility | Community Cell: 970.313.3092 | email: TBeen@BakerBuildersCo.com www.bakercompaniesus.com From: John Wahrer <john@triphasecompany.com> Sent: Monday, April 28, 2025 10:15 AM To: Terry Been <tbeen@bakerbuildersco.com>; Ezra Harris <triphaseco@hotmail.com> Subject: Relocate Holy Cross Terry This is the red line of moving the H/C vault to get it off the heat recovery lines Sent from my iPad CO-3 Form Approved by Town Attorney – 05/15/2024 Attachment C 1 Nicole Mosby From:Terry Been <TBeen@bakerbuildersco.com> Sent:Monday, June 23, 2025 2:03 PM To:Nicole Mosby Subject:RE: East Park - Revised Sewer Line Proposal COST BREAKDOWN Cost Code: Subcontractor Name: Description: Qty Unit Price Amount: Silverback 4" Sewer Line Extension 16 248.22 * 3,972 Rounding 0 -0.76 - Cost of Work 3,972 Margin & Overhead (5%) 199 Subtotal 4,171 Insurance Premium(.9%) - P&P Bond Premium(1.75%) - * Unit Price from Contract Total 4,171 Thanks, Terry W. Been Director of Construction Faith | Trust | Hard Work | Integrity | Respect | Responsibility | Community Cell: 970.313.3092 | email: TBeen@BakerBuildersCo.com www.bakercompaniesus.com From: Nicole Mosby <nmosby@avon.org> Sent: Monday, June 23, 2025 1:59 PM To: Terry Been <TBeen@bakerbuildersco.com> Subject: RE: East Park - Revised Sewer Line Proposal Please provide pricing support the $4,171 drop. Nicole Mosby, PE, CFM Senior Engineer O. 970.748.4076 | M. 970.471.4420 nmosby@avon.org 20250630_CO3_SS Revisions_Trees_Undgrnd E_Striping Final Audit Report 2025-07-07 Created:2025-06-30 By:Nicole Mosby (nmosby@avon.org) Status:Signed Transaction ID:CBJCHBCAABAAldPa1kjoOefoDaMXjJDVw68-sR3QwQY0 "20250630_CO3_SS Revisions_Trees_Undgrnd E_Striping" Hist ory Document created by Nicole Mosby (nmosby@avon.org) 2025-06-30 - 9:24:02 PM GMT Document emailed to Nicole Mosby (nmosby@avon.org) for signature 2025-06-30 - 9:25:36 PM GMT Document e-signed by Nicole Mosby (nmosby@avon.org) Signature Date: 2025-06-30 - 10:47:10 PM GMT - Time Source: server Document emailed to tbeen@bakerbuildersco.com for signature 2025-06-30 - 10:47:16 PM GMT Email viewed by tbeen@bakerbuildersco.com 2025-06-30 - 11:05:50 PM GMT Signer tbeen@bakerbuildersco.com entered name at signing as Terry W Been 2025-06-30 - 11:10:59 PM GMT Document e-signed by Terry W Been (tbeen@bakerbuildersco.com) Signature Date: 2025-06-30 - 11:11:01 PM GMT - Time Source: server Document emailed to eheil@avon.org for signature 2025-06-30 - 11:11:07 PM GMT Email viewed by eheil@avon.org 2025-07-07 - 1:57:15 PM GMT Signer eheil@avon.org entered name at signing as Eric Heil 2025-07-07 - 1:57:51 PM GMT Document e-signed by Eric Heil (eheil@avon.org) Signature Date: 2025-07-07 - 1:57:53 PM GMT - Time Source: server Agreement completed. 2025-07-07 - 1:57:53 PM GMT