25.05.21 SCA Baker Builders, LLC CO-2 Form Approved by Town Attorney – 05/15/2024 CHANGE ORDER Order No.: 002 Date: May 21, 2025 Agreement Date: November 25, 2024 NAME OF PROJECT: East Nottingham Park Improvements OWNER: Town of Avon, Colorado CONTRACTOR: __Baker Builders, LLC dba Baker Constructors The following changes are hereby made to the CONTRACT DOCUMENTS : Justification: Changes detailed herein capture over-excavation and rework resulting from deeper utilities and irrigation main conflict of the Primary Electric Line under Lake Street, the Fire Hydrant Relocation (Sheet C-04 issued 5/5/2025), and removal of the Moveable Bike Racks from the project. See the spreadsheet in Attachment A for a summary of the revised plan quantities, resulting in a total contract adjustment of $24,777 and no change to the contract time. UTILITIES ($30,472): This item includes the site work changes to cap and relocate the fire hydrant to the south side of the Recreation Path (Sheet C-04, issued 5.5.25) for these design changes. As detailed in Baker PCO 002 & PCO 003. See Sheet and Proposals in Attachment B. - Fire Hydrant (Baker PCO 002): Cap the existing Fire Hydrant connection and cut in a new location south of the Rec Path adds $7,855 to Line Item 46. - Electrical Primary Over-excavation & Trench Rework (Baker PCO 003): During the installation of Vault V1 in Lake Street, it was discovered that the existing underground electric line was 9-feet below grade instead of the standard ~4-feet and almost directly below the Town of Avon’s raw water irrigation main. Therefore, it was decided that repulling the electrical wires from SW266 back to Vault V2 and eliminating Vault V1 would be quicker and more cost- effective than cutting open more of Lake Street to relocate the irrigation main. Baker’s subcontractor RPM Construction was impacted by the additional depth of excavation, backfill, and have to rework 32 LF of conduit in the trench between the V1 and V2 location to meet the 9’depth at the former location of Vault V1. Additionally, Avon requested the two 4” empty conduits discovered running across Lake Street be extended the width of the excavation prior to repaving. This over-excavation scope adds $22,617 to Baker’s contract as Line Item 94a. Note: Baker agreed not to charge Bonds and Insurance fees until the contract amount exceeds the original contract amount. Holy Cross Energy will provide credit for restocking Vault V1 but will have additional fees for their crews to complete the work. SITE FURNISHINGS (-$5,695): Line Item 82 Moveable Bike Racks are to be removed from the Project, crediting back $5,695. OVERHEAD ELECTRIC BURY ($0): During the installation of Vault V3, it was determined that CO-2 Form Approved by Town Attorney – 05/15/2024 the vault installation over the Heat Recovery Piping may be problematic in the future. Therefore, Vault V3 was relocated further east to eliminate this concern. See Attachment C for details and approval from Holy Cross Energy and Avon. This change reconciles the outstanding Primary Trenching w/ Conduit between the railroad casing and the surface location of conduit North of the Railroad, which was detailed as Outstanding in CO1. There is no price change to the contract from this scope. Line Item 92 Electric Primary Trenching w/ Conduit between the railroad casing and the surface location of conduit to the South of the Railroad has not been determined and will be adjusted via future Change Order once that scope has commenced. Change to CONTRACT PRICE: $ 24,777.00 Original CONTRACT PRICE: $ 3,940,836.00 Current CONTRACT PRICE adjusted by previous CHANGE ORDER $ 3,865,912.25 The CONTRACT PRICE due to this CHANGE ORDER will be increased by $ 24,777.00. The new CONTRACT PRICE including this CHANGE ORDER will be $ 3,890,689.25. Change to CONTRACT TIME: The CONTRACT TIME will be (increased)(decreased) by 0 calendar days. The date for completion of all work will be May 20, 2026. APPROVALS REQUIRED: Approved by Engineer: Nicole Mosby, Avon Senior Engineer Accepted by Contractor: Terry Been, Baker Director of Construction Accepted and Approved by Owner: Eva Wilson, Avon Engineering Director ______ Federal Agency Approval (where applicable): __________________ Nicole Mosby (May 21, 2025 13:09 MDT) Nicole Mosby Terry W Been (May 21, 2025 13:22 MDT) Terry W Been Eva Wilson (May 21, 2025 13:53 MDT) ITEM DESCRIPTION East Notthingham Park (Base Bid) UNIT QUANTITY UNIT PRICE TOTAL PRICE 1 Mobilization (9%) LS 1 354,675.00$ 354,675.00$ DEMO, REMOVAL & DISPOSAL 2 Curb and Gutter LF 578 1.46$ 844.00$ 3 Concrete Walk / Concrete Stairs SF 3217 1.46$ 4,697.00$ 4 Asphalt SF 27454 1.20$ 32,931.00$ 5 Timber Stairs LS 1 1,460.00$ 1,460.00$ 6 Timber Walls LF 308 1.46$ 450.00$ 7 Trees EA 11 730.09$ 8,031.00$ 8 Sawcut Asphalt Material LF 511 7.30$ 3,731.00$ 9 Sawcut Concrete LF 29 7.31$ 212.00$ 10 Asphalt Milling SF 20075 1.83$ 36,640.00$ 11 Drainage Chase EA 1 1,095.00$ 1,095.00$ 12 Remove & Dispose of Elec. Vaults-Pads-Cabs-Recp LS 1 9,929.00$ 9,929.00$ 13 Remove & Dispose of Ex. Lights EA 6 1,460.17$ 8,761.00$ 14 Remove Flag Poles EA 2 730.00$ 1,460.00$ SITEWORK 15 Surveying LS 1 21,552.00$ 21,552.00$ 16 Excavation CY 2040 138.77$ 283,084.00$ 17 Embankment CY 1680 58.41$ 98,121.00$ 18 Export CY 360 21.87$ 7,872.00$ 19 Topsoil - 4" Import & Place CY 291 73.01$ 21,245.00$ 20 Aggregate Road Base Cl 6 (Parking, 12") TN 1289 41.54$ 53,540.00$ 21 Aggregate Road Base (Path-Sidewalk-Pavers 6") TN 447 41.54$ 18,567.00$ 22 Aggregate Road Base Cl 6 (Lake St. 4") TN 18 41.56$ 748.00$ 23 Aggregate Road Base Cl 1 (Lake St. 12") TN 54 41.54$ 2,243.00$ 24 Asphalt (Parking, Lake St., 5") (Grade SX PG 58-28) TN 589 287.65$ 169,424.00$ 25 Asphalt (Path 4") (Grd SX PG 58-28) TN 148 277.43$ 41,059.00$ 26 Asphalt (2" Overlay) (Grading SX PG 58-28) TN 273 68.59$ 18,726.00$ 27 Asphalt (2" under pavers) (Grd SX PG 58-28) TN 57 39.96$ 2,278.00$ 28 Asphalt Leveling TN 2 40.00$ 80.00$ 29 12" Wide, 2" Deep Asphalt Shear Step (Lake St.) LF 95 17.53$ 1,665.00$ 30 Rain Garden SF 309 28.35$ 8,761.00$ 31 2' wide Concrete Curb & Gutter (Incl. Base Course) LF 418 58.51$ 24,457.00$ 32 2.5' wide Conc. C/G (Lake Street) (Incl. Base Course) LF 27 108.15$ 2,920.00$ 33 5" Concrete Walks SF 1896 15.46$ 29,312.00$ 34 Concrete Stairs (Incl. Base Course) SF 123 95.15$ 11,703.00$ 35 Concrete Pavers (Incl. Sand) SF 4204 20.73$ 87,166.00$ 36 8" Concrete Edge Restraint (Pavers) LF 412 7.30$ 3,008.00$ 37 Striping (4" White) LF 2008 2.38$ 4,773.00$ 38 Thermoplastic Pavement Marking SF 62 24.50$ 1,519.00$ 39 Erosion & Sediment Control LS 1 25,969.00$ 25,969.00$ 40 Construction Fencing LF 1328 29.20$ 38,781.00$ 41 Concrete Washout Structure EA 1 4,380.00$ 4,380.00$ UTILITIES 42 Surveying LS 1 6,074.00$ 6,074.00$ 43 Traffic Control (Lake Street electric) LS 1 21,902.00$ 21,902.00$ 44 4" DIP Water Service LF 96 151.72$ 14,565.00$ 45 4" Gate Valve EA 1 2,190.00$ 2,190.00$ 46 Relocate FH & Gate Valve LS 1 14,820.00$ 14,820.00$ 47 6" DIP FH Waterline LF 17 194.18$ 3,301.00$ 48 4" SDR35 Sewer Service w/ CO LF 50 248.22$ 12,411.00$ 49 Fiber Optic-Trenching w/ Conduit* LF 141 51.78$ 7,301.00$ 50 Install UM-30S Electric Vault EA 2 5,549.00$ 11,098.00$ East Park Pay App Summary Baker Construction 51 Install UM1-13S Transformer Vault EA 2 5,549.00$ 11,098.00$ 52 Electric Primary Trenching w/ Conduit* LF 281 84.69$ 23,797.00$ 53 Electric Secondary Trenching w/ Conduit* LF 1606 50.00$ 80,308.00$ 54 Relocate Irrigation & Electric Handholes EA 3 511.00$ 1,533.00$ 55 18"x30" Handhole EA 4 2,190.00$ 8,760.00$ 56 8" Conduit Connecting Handholes LF 60 121.68$ 7,301.00$ 57 Adjust FO Handhole Elevation EA 1 730.00$ 730.00$ 58 Adjust Manhole Rim to Grade EA 2 219.00$ 438.00$ 59 4" SDR35 PVC Downspout Piping LF 149 248.22$ 36,985.00$ 60 4" SDR35 PVC Storm Pipe LF 114 248.22$ 28,297.00$ 61 12"x4" PVC Reducer EA 2 730.00$ 1,460.00$ 62 12" Ductile Iron Grate EA 2 292.00$ 584.00$ 63 6" SDR35 PVC Storm Pipe LF 197 144.51$ 28,468.00$ 64 8" SDR35 PVC Storm Pipe LF 40 29.20$ 1,168.00$ 65 2'x2' Area Inlet EA 1 1,752.00$ 1,752.00$ LANDSCAPING 66 Deciduous Shrubs - 5 Gal. EA 51 1,168.00$ 59,568.00$ 67 Coniferous Shrubs - 5 Gal. EA 3 1,095.00$ 3,285.00$ 68 Ornamental Grasses - 5 gal. EA 117 36.50$ 4,271.00$ 69 Perennials - 1 Gal. EA 724 21.90$ 15,857.00$ 70 Groundcover - 1 Qt Pots EA 354 21.90$ 7,753.00$ 71 Shredded Cedar Bark Mulch - 3" Depth SF 6195 2.19$ 13,568.00$ 72 River Rock Cobble Mulch - 3" Depth SF 333 7.30$ 2,431.00$ 73 Kentucky Bluegrass Seed SF 21832 0.37$ 7,969.00$ 74 Native Seed SF 1726 0.37$ 630.00$ 75 Soil Pep - 2" Depth SF 1300 0.37$ 475.00$ 76 Angular Boulders EA 10 2,190.00$ 21,900.00$ 77 Irrigation System and Equipment LS 1 171,102.00$ 171,102.00$ 78 Plastic Edging LF 207 14.60$ 3,022.00$ 79 Seat Walls with Stone Veneer and Stone Cap LF 463.25 484.86$ 224,613.00$ 80 Metal Handrails LF 100 174.12$ 17,412.00$ SITE FURNISHINGS 81 Removable Safety Bollards and Foundation EA 2 2,849.00$ 5,698.00$ 82 Moveable Bike Racks EA 4 1,423.75$ 5,695.00$ 83 Water Bottle Filler (including connection) EA 1 2,657.00$ 2,657.00$ SITE LIGHTING 84 Street Lights EA 7 26,149.00$ 183,043.00$ 85 Wall Lights EA 65 1,860.00$ 120,900.00$ OVERHEAD ELECTRIC BURY 86 Mobilization LS 1 7,300.00$ 7,300.00$ 87 Sawcut Asphalt Material LF 40 7.30$ 292.00$ 88 4" Topsoil Remove, Stockpile & Replace CY 19 36.53$ 694.00$ 89 Aggregate Road Base, Cl 6 TN 174 36.51$ 6,352.00$ 90 Asphalt (Grading SX PG 58-28) TN 67 109.51$ 7,337.00$ 91 Install UM-30S Electric Vault EA 2 5,548.00$ 11,096.00$ 92 Electric Primary Trenching w/ Conduit* LF 905 461.10$ 417,293.00$ 93 Connect to Existing RR Bore Conduit LS 1 19,274.00$ 19,274.00$ 94 Remove & Replace Fencing LS 1 2,190.00$ 2,190.00$ MODULAR RESTROOM HOOK UP & FINISHES 95 Electrical Hook Up LS 1 27,159.00$ 27,159.00$ 96 Sewer Hook Up LS 1 63,049.00$ 63,049.00$ 97 Water Hook Up LS 1 36,503.00$ 36,503.00$ 98 Exterior Finishes LS 1 178,137.00$ 178,137.00$ 99 Foundation (per structural plans) LS 1 286,775.00$ 286,775.00$ 100 Coordination of Modular Restrooms Delivery and Setting LS 1 7,301.00$ 7,301.00$ SHADE CANOPY 101 Materials - Roof, Posts, Fasteners LS 1 76,512.00$ 76,512.00$ 102 Foundations LS 1 32,744.00$ 32,744.00$ 103 Labor LS 1 114,769.00$ 114,769.00$ TOTAL – BASE BID 3,940,836.00$ CHANGE ORDER #1 8 Sawcut Asphalt Material LF 122 7.30$ 890.77$ 16 Excavation CY 8 138.77$ 1,110.13$ 18 Export CY 8 21.87$ 174.93$ 31 2' wide Concrete Curb & Gutter (Incl. Base Course) LF 122 58.51$ 7,138.17$ 66 Deciduous Shrubs - 5 Gal. EA -6 1,168.00$ (7,008.00)$ 72 River Rock Cobble Mulch - 3" Depth SF -88 7.30$ (642.40)$ 73 Kentucky Bluegrass Seed SF -21832 0.37$ (7,969.00)$ 74 Native Seed SF 21832 0.37$ 7,969.00$ 87 Sawcut Asphalt Material LF -20 7.30$ (146.00)$ 89 Aggregate Road Base, Cl 6 TN -94 36.50$ (3,431.28)$ 90 Asphalt (Grading SX PG 58-28) TN -64 109.51$ (7,008.48)$ 91 Install UM-30S Electric Vault EA 1 5,548.00$ 5,548.00$ 92 Electric Primary Trenching w/ Conduit* LF -161 461.10$ (74,236.66)$ 93 Connect to Existing RR Bore Conduit LS -0.9 18,971.11$ (17,074.00)$ 98 Exterior Finishes LS 1 3,169.30$ 3,169.30$ 99 Foundation (per structural plans) LS 1 13,973.58$ 13,973.58$ 102 Foundations (Shade Canopy) LS 1 2,618.18$ 2,618.18$ TOTAL – CHANGE ORDER #1 (74,923.75)$ CHANGE ORDER #2 46 Relocate FH & Gate Valve LS 1 7,855.00$ 7,855.00$ 94a Lake Street Overexcavation & rework LS 1 22,617.00$ 22,617.00$ 82 Moveable Bike Racks EA -4 1,423.75$ (5,695.00)$ TOTAL – CHANGE ORDER #2 24,777.00$ TOTAL – CONTRACT PRICE w/ COs 3,890,689.25$ 1 Nicole Mosby From:Terry Been <TBeen@bakerbuildersco.com> Sent:Wednesday, May 21, 2025 8:44 AM To:Nicole Mosby Cc:Eric Lepkowski Subject:PCO-003 - Lake Street Overex for Primary Attachments:PCO_003_Overex_at_Lake_streetr2.pdf Nicole: Attached is a proposed CO for the work that Tri-Phase/RPM has/is doing in Lake Street to remedy the deep Primary intersection. For the calcs I am assuming the following: South Vault Elevation: I think they are down about 2’ below expected so I have an added 2’ of Fill . The overall footprint of the excavation was roughly 10’ x 10’ and the vault takes up roughly 5’5 of that space. Robie thinks his crew was there about 4 extra hours for this work Deep Primary intersection. I have 16 hours total which is probably a little light but should cover the cost. Monday the 12th the set the barricades and got the excavation down to about 8’ vs 4’ Tuesday morning they re-called located to make sure they were digging in the right location Based on the location, they set the trench box and found the sleeve, they spent about ½ of a day widening the trench for the trench box and hand digging below the irrigation main Monday the 19th the removed and reinstalled the primary from 32’ back in the trench, Spent the entire day prepping for Holy cross Tuesday the 20th, assisted as necessary for Holy Cross Today, spend most of the day backfilling the deeper part of the trench Tomorrow, back to scope work for the 32’ of replacement Friday will be clean up and prep for pavement They had two trench boxes on site that I saw. Structural fill calc: 9-4d x 5w x 32lf = 800/2 = 400 CF + 2 extra feet wide for the upper end of the trench (5’ wide vs 3’ wide) so 2’w x 4’d x 32 LF = 256 656 CF/27 = 24.3 CY x 1.65 to convert to tons = 40 Tons Let me know what questions you have and what you think is fair. Thanks, Terry W. Been Director of Construction Faith | Trust | Hard Work | Integrity | Respect | Responsibility | Community Cell: 970.313.3092 | email: TBeen@BakerBuildersCo.com www.bakercompaniesus.com 1 Nicole Mosby From:Jeff Vroom <jvroom@holycross.com> Sent:Monday, April 28, 2025 10:44 AM To:Terry Been Cc:Nicole Mosby; John Wahrer Subject:Re: [EXTERNAL] FW: Relocate Holy Cross Yes, the new location is acceptable. Thanks, Jeffrey P. Vroom Engineer III HOLY CROSS ENERGY 3799 HWY 82 • P.O. Box 3350, Glenwood Springs, CO 81602-3350 Phone: 970-947-5425 • jvroom@holycross.com Monday – Thursday 6:30 a.m. to 5:00 p.m. MT Holy Cross Energy provides safe, reliable, affordable, and sustainable energy and services that improve the quality of life for our members and their communities. Holy Cross Energy is an equal opportunity provider and employer From: Terry Been <tbeen@bakerbuildersco.com> Sent: Monday, April 28, 2025 10:30:26 AM To: Jeff Vroom <jvroom@holycross.com> Cc: Nicole Mosby <nmosby@avon.org>; John Wahrer <john@triphasecompany.com> Subject: [EXTERNAL] FW: Relocate Holy Cross Jeff: Clayton from RPM stated that he has walked the location of the new vault with you and we are moving the vault so that it does not get installed over the top of the existing hot water recovery line. Are you OK with the revised location per the attached drawing? Thanks, Terry W. Been Director of Construction Faith | Trust | Hard Work | Integrity | Respect | Responsibility | Community Cell: 970.313.3092 | email: TBeen@BakerBuildersCo.com www.bakercompaniesus.com 2 From: John Wahrer <john@triphasecompany.com> Sent: Monday, April 28, 2025 10:15 AM To: Terry Been <tbeen@bakerbuildersco.com>; Ezra Harris <triphaseco@hotmail.com> Subject: Relocate Holy Cross Terry This is the red line of moving the H/C vault to get it off the heat recovery lines Sent from my iPad 1 Nicole Mosby From:Nicole Mosby Sent:Tuesday, April 29, 2025 9:33 AM To:'Terry Been' Cc:Jeff Vroom Subject:RE: [EXTERNAL] FW: Relocate Holy Cross Ok, well thank you for sorting that. I spoke with Operations, and they mentioned that there is a comcast box and a few irrigation boxes that may need moved or capped. Otherwise, this relocation is acceptable to us. I will work with Jeff Vroom on the easement update. Nicole Mosby, PE, CFM Senior Engineer O. 970.748.4076 | M. 970.471.4420 nmosby@avon.org From: Terry Been <tbeen@bakerbuildersco.com> Sent: Tuesday, April 29, 2025 8:44 AM To: Nicole Mosby <nmosby@avon.org> Subject: RE: [EXTERNAL] FW: Relocate Holy Cross They did have to spend an extra day potholing all the different utility crossings coming out of the railroad casing, but there will not be a cost impact other than any easement filings for yourself. Speaking of easements, does ERWSD have an easement for the manhole that would allow us to work in that area? Thanks, Terry W. Been Director of Construction Faith | Trust | Hard Work | Integrity | Respect | Responsibility | Community Cell: 970.313.3092 | email: TBeen@BakerBuildersCo.com www.bakercompaniesus.com From: Nicole Mosby <nmosby@avon.org> Sent: Tuesday, April 29, 2025 8:40 AM To: Terry Been <tbeen@bakerbuildersco.com> Subject: RE: [EXTERNAL] FW: Relocate Holy Cross 2 Let me go check with Gary & Luis. In the meantime, What do you think the cost impact of the change will be? Nicole Mosby, PE, CFM Senior Engineer O. 970.748.4076 | M. 970.471.4420 nmosby@avon.org From: Terry Been <tbeen@bakerbuildersco.com> Sent: Tuesday, April 29, 2025 8:20 AM To: Nicole Mosby <nmosby@avon.org> Subject: FW: [EXTERNAL] FW: Relocate Holy Cross Nicole: Are you ok with this location? Thanks, Terry W. Been Director of Construction Faith | Trust | Hard Work | Integrity | Respect | Responsibility | Community Cell: 970.313.3092 | email: TBeen@BakerBuildersCo.com www.bakercompaniesus.com From: Jeff Vroom <jvroom@holycross.com> Sent: Monday, April 28, 2025 10:44 AM To: Terry Been <tbeen@bakerbuildersco.com> Cc: Nicole Mosby <nmosby@avon.org>; John Wahrer <john@triphasecompany.com> Subject: Re: [EXTERNAL] FW: Relocate Holy Cross Yes, the new location is acceptable. Thanks, Jeffrey P. Vroom Engineer III HOLY CROSS ENERGY 3799 HWY 82 • P.O. Box 3350, Glenwood Springs, CO 81602-3350 Phone: 970-947-5425 • jvroom@holycross.com 20250521_CO2_OverEx_Hydrant_BikeRacks Final Audit Report 2025-05-21 Created:2025-05-21 By:Nicole Mosby (nmosby@avon.org) Status:Signed Transaction ID:CBJCHBCAABAAl7K8CWv-g73rmfm6erYHJLs2x5weg-tA "20250521_CO2_OverEx_Hydrant_BikeRacks" History Document created by Nicole Mosby (nmosby@avon.org) 2025-05-21 - 6:56:09 PM GMT Document emailed to Nicole Mosby (nmosby@avon.org) for signature 2025-05-21 - 7:06:46 PM GMT Document e-signed by Nicole Mosby (nmosby@avon.org) Signature Date: 2025-05-21 - 7:09:58 PM GMT - Time Source: server Document emailed to tbeen@bakerbuildersco.com for signature 2025-05-21 - 7:10:10 PM GMT Email viewed by tbeen@bakerbuildersco.com 2025-05-21 - 7:18:42 PM GMT Signer tbeen@bakerbuildersco.com entered name at signing as Terry W Been 2025-05-21 - 7:22:18 PM GMT Document e-signed by Terry W Been (tbeen@bakerbuildersco.com) Signature Date: 2025-05-21 - 7:22:20 PM GMT - Time Source: server Document emailed to Eva Wilson (ewilson@avon.org) for signature 2025-05-21 - 7:22:26 PM GMT Email viewed by Eva Wilson (ewilson@avon.org) 2025-05-21 - 7:52:56 PM GMT Document e-signed by Eva Wilson (ewilson@avon.org) Signature Date: 2025-05-21 - 7:53:27 PM GMT - Time Source: server Agreement completed. 2025-05-21 - 7:53:27 PM GMT