Loading...
24.07.10 SCA X Fields Services, LLCCHANGE ORDER Order No.:____ 4_____________ Date: ___7/10/2024______ Agreement Date: __5/2/2024___ NAME OF PROJECT: Recreation Trail Improvement Project ______ OWNER: Town of Avon, Colorado CONTRACTOR: __ X Fields Services, LLC__________________________________________ The following changes are hereby made to the CONTRACT DOCUMENTS: JUSTIFICATION: Unsuitable subgrade of several feet of clay was encountered on the lower athletic field of the Nottingham trails project. This change order is to remove and dispose of 18 inches of the unsuitable material and lay Tensar HX 5.5 geogrid with Class 2 and Class 6 road base over it to build a bridge layer that can support the trail over the poor subgrade materials. A second layer of geogrid may be required between lifts in areas of particularly poor subgrade. The additional work will be paid out per the attached itemization including description, CDOT item number, and unit price. Change to CONTRACT PRICE: $_161,189.80__ Original CONTRACT PRICE: $__902,314.20__ Current CONTRACT PRICE adjusted by previous CHANGE ORDER: $__956,672.90_ The CONTRACT PRICE due to this CHANGE ORDER will be increased by $_161,189.80. The new CONTRACT PRICE including this CHANGE ORDER will be $__1,117,862.70. Change to CONTRACT TIME: N/A The CONTRACT TIME will be (increased)(decreased) by ___0___ calendar days. The date for completion of all work will be __October 10, 2024__ (Date). APPROVALS REQUIRED: Approved by Engineer: Accepted by Contractor: Accepted and Approved by Owner: Federal Agency Approval (where applicable): N/A CO-4 Docusign Envelope ID: 9C73E92C-CF3D-4BD4-96D3-AB1433EEFCC9 P.O. Box 1313 Craig, CO 81626 970-629-2233 haskins2233@gmail.com Estimate ADDRESS Town of Avon. ESTIMATE #9241 DATE 06/28/2024 PROJECT Change order 4 DATE ACTIVITY DESCRIPTION QTY RATE AMOUNT 06/28/2024 Excavation 203-00050: Unsuitable Material (Unit: Cubic Yard) 422 188.50 79,547.00 06/28/2024 Materials 304-06000: Class 2 Aggregate Base Course (Unit: Ton) placed, compacted,watered,inspected 633 95.10 60,198.30 06/28/2024 Materials 420-00000: Geosynthetics (Tensar HX 5.5 geogrid) (Unit: Square Yard) 1,266 5.25 6,646.50 06/28/2024 Materials 304-06000: Class 6 Aggregate base Course (Unit: Ton) placed, compacted,watered,inspected if needed 151 98.00 14,798.00 Check and credit card SUBTOTAL 161,189.80 TAX 0.00 TOTAL $161,189.80 Accepted By Accepted Date Docusign Envelope ID: 9C73E92C-CF3D-4BD4-96D3-AB1433EEFCC9 BID ITEM # CDOT ITEM NO.BID ITEM QNTY UNIT UNIT COST EXTENDED COST 1 MOBILIZATION 1 LS 95,766.00$ 95,766.00$ 2 CONSTRUCTION SURVEYING 1 LS 4,000.00$ 4,000.00$ 3 AS-BUILT SURVEYING 1 LS 1,200.00$ 1,200.00$ 4 TRAFFIC CONTROL 1 LS 18,800.00$ 18,800.00$ 5 201-00000 CLEARING AND GRUBBING 2 L S 2,000.00$ 4,000.00$ 6 202-00010 REMOVAL OF TREE 2 EACH 1,800.00$ 3,600.00$ 7 202-00015 REMOVAL OF HEADWALL 1 EACH 4,574.00$ 4,574.00$ 8 202-00035 REMOVAL OF PIPE 15 LF 108.00$ 1,620.00$ 9 202-00207 REMOVAL OF BRICK PAVERS 10 SY 217.00$ 2,170.00$ 10 202-00220 REMOVAL OF ASPHALT MAT 918 SY 10.90$ 10,006.20$ 11 203-00010 UNCLASSIFIED EXCAVATION (COMPLETE IN PLACE)559 CY 34.00$ 19,006.00$ 12 208-00002 EROSION LOG TYPE 1 (12 INCH)80 LF 15.00$ 1,200.00$ 13 208-00013 EROSION LOG TYPE 1 (20 INCH)1078 LF 18.50$ 19,943.00$ 14 208-00035 AGGREGATE BAG 160 LF 15.80$ 2,528.00$ 15 208-00046 PRE-FABRICATED CONCRETE WASHOUT STRUCTURE (TYPE 1)1 EACH 600.00$ 600.00$ 16 208-00075 PRE-FABRICATED VEHICLE TRACKING PAD 1 EACH 3,200.00$ 3,200.00$ 17 304-06000 AGGREGATE BASE COURSE (CLASS 6)216 TON 98.00$ 21,168.00$ 18 403-34621 HOT MIX ASPHALT (GRADING SX) (50) (PG 58- 28)214 TON 450.00$ 96,300.00$ 19 504-08050 STONE LANDSCAPE WALL 25 SF 150.00$ 3,750.00$ 20 603-01245 24 INCH REINFORCED CONCRETE PIPE (COMPLETE IN PLACE)5 LF 286.00$ 1,430.00$ 21 603-10240 24 INCH CORRUGATED STEEL PIPE 5 LF 125.00$ 625.00$ 22 603-10300 30 INCH CORRUGATED STEEL PIPE 6 LF 168.00$ 1,008.00$ 23 604-30010 MANHOLE SLAB BASE (10 FOOT)1 EACH 8,410.00$ 8,410.00$ 24 PLACE TOPSOIL-4" DEPTH (ASSUME IMPORTED)200 CY 57.00$ 11,400.00$ 25 MISC. LARGE BOULDER RESETTING 1 LS 14,200.00$ 14,200.00$ 26 BLUEGRASS SOD WITH SOIL PREP 3800 SF 4.10$ 15,580.00$ 27 NATIVE SEEDING INCLUDING SOIL PREP. AND MULCH 15900 SF 1.65$ 26,235.00$ 28 SLOPE BLANKET (SLOPES 3:1 AND GREATER)1600 SY 3.50$ 5,600.00$ 29 DECIDUOUS ORNAMENTAL TREES 3 EA 1,000.00$ 3,000.00$ 30 QUAKING ASPENS (CLUMP FORM)18 EA 700.00$ 12,600.00$ 31 DECIDUOUS SHRUBS 117 EA 160.00$ 18,720.00$ 32 PERENNIALS 47 EA 72.00$ 3,384.00$ 33 IRRIGATION MODIFICATIONS/ADDITIONS (ASSUMES CONNECTION TO EXISTING CONTROLLER) 1 LS 36,000.00$ 36,000.00$ 34 ESTABLISHMENT PERIOD LANDSCAPE MAINTENANCE (1 YEAR) 1 LS 18,500.00$ 18,500.00$ 35 RELOCATION OF ELECTRICAL PANEL 1 EA 19,310.00$ 19,310.00$ 36 REWIRE ELECTRICAL PANEL 1 EA 1,300.00$ 1,300.00$ 37 RELOCATION OF ELECTRICAL TRANSFORMER 1 EA 18,000.00$ 18,000.00$ 38 REWIRE ELECTRICAL TRANSFORMER SERVICES 1 EA 1,800.00$ 1,800.00$ 39 RESET FIBER OPTIC BOX 1 EA 5,800.00$ 5,800.00$ 40 RELOCATION OF COMMUNICATIONS PEDESTAL 1 EA 5,800.00$ 5,800.00$ Original Contract Cost of Lower Athletic Field 542,133.20$ UNIT COST EXTENDED COST 7 202-00015 REMOVAL OF HEADWALL -1 EACH 4,574.00$ (4,574.00)$ 11 203-00010 UNCLASSIFIED EXCAVATION (COMPLETE IN PLACE)-350 CY 34.00$ (11,900.00)$ 17 304-06000 AGGREGATE BASE COURSE (CLASS 6)165 TON 98.00$ 16,170.00$ 19 504-08050 STONE LANDSCAPE WALL 117.4 SF 150.00$ 17,610.00$ 20 603-01245 24 INCH REINFORCED CONCRETE PIPE (COMPLETE IN PLACE)-5 LF 286.00$ (1,430.00)$ 20a 24 INCH REINFORCED CONCRETE PIPE (CAST- IN-PLACE BEND)1 EA 3,074.00$ 3,074.00$ 21 603-10240 24 INCH CORRUGATED STEEL PIPE -5 LF 125.00$ (625.00)$ 21a Spec Provided 24 INCH ADS N-12 WT HDPE PIPE 33 LF 126.00$ 4,158.00$ 22 603-10300 30 INCH CORRUGATED STEEL PIPE -6 LF 168.00$ (1,008.00)$ 23 604-30010 MANHOLE SLAB BASE (10 FOOT)-1 EACH 8,410.00$ (8,410.00)$ CO 1 Cost 13,065.00$ Nottingham Park Lower Athletic Field Path CHANGE ORDER 1 Docusign Envelope ID: 9C73E92C-CF3D-4BD4-96D3-AB1433EEFCC9 UNIT COST EXTENDED COST 15 208-00046 PRE-FABRICATED CONCRETE WASHOUT STRUCTURE (TYPE 1)-1 EACH 600.00$ (600.00)$ 41 Subgrade Issue / Asphalt Standby 1 LS 15,000.00$ 15,000.00$ CO 2 Cost 14,400.00$ UNIT COST EXTENDED COST 42 203-00050 UNCLASSIFIED EXCAVATION (COMPLETE IN PLACE)422 CY 188.50$ 79,547.00$ 43 304-06000 AGGREGATE BASE COURSE (CLASS 2)633 TON 95.10$ 60,198.30$ 44 420-00000 GEOSTYNTHETICS (TENSAR HX 5.5)1266 SY 5.25$ 6,646.50$ 17 304-06000 AGGREGATE BASE COURSE (CLASS 6)151 TON 98.00$ 14,798.00$ CO 4 Cost 161,189.80$ Subtotal w /COs 730,788.00$ BID ITEM #BID ITEM QNTY UNIT UNIT COST EXTENDED COST Project Area 1: Hurd Lane Recreation Path 1 Mobilization 1 LS 9,100.00$ 9,100.00$ 2 Pedestrian and Traffic Control 1 LS 4,230.00$ 4,230.00$ 3 Asphalt Patching 271.0 SY 147.00$ 39,837.00$ Subtotal 53,167.00$ 3 Asphalt Patching - Hurd Ln Final Quantities 2.4 SY 147.00$ 352.80$ 1 Mobilization - HA Nott NP & Hurd Remob 1 LS 3,300.00$ 3,300.00$ 2 Pedestrian & Traffic Control - HA Nott NP 1 LS 500.00$ 500.00$ 3 Asphalt Patching - HA Notthingham North Park 33.7 SY 147.00$ 4,953.90$ CO 2 Cost 9,106.70$ Subtotal w /COs 62,273.70$ Project Area 2: Eagle Valley Trail (West) 1 Mobilization 1 LS 29,475.00$ 29,475.00$ 2 Pedestrian and Traffic Control 1 LS 6,100.00$ 6,100.00$ 3 Asphalt Patching 961 SY 147.00$ 141,267.00$ Subtotal 176,842.00$ Project Area 3: Eagle Valley Trail (Central) 1 Mobilization 1 LS 22,530.00$ 22,530.00$ 2 Pedestrian and Traffic Control 1 LS 3,860.00$ 3,860.00$ 3 Asphalt Patching 706 SY 147.00$ 103,782.00$ Subtotal 130,172.00$ 3 Asphalt Patching - Final Quantities (Central)88.4 SY 147.00$ 12,994.80$ CO 1 Cost 12,994.80$ 3 Asphalt Patching - Final Quantities (West)32.6 SY 147.00$ 4,792.20$ CO 3 Cost 4,792.20$ Subtotal w /COs 324,801.00$ 360,181.00$ 902,314.20$ 26,059.80$ 23,506.70$ 4,792.20$ 161,189.80$ 1,117,862.70$ CHANGE ORDER 1 Eagle Valley Trail ORIGINAL TOTAL CONTRACT PRICE CHANGE ORDER 3 Recreation Trail Maintenance Bid Tabulation CHANGE ORDER 2 Hurd Lane Recreation Path CHANGE ORDER 2 CHANGE ORDER 4 CHANGE ORDER 1 CHANGE ORDER 2 CHANGE ORDER 4 REVISED TOTAL CONTRACT PRICE ORIGINAL CONTRACT COST OF TRAIL REPAIRS CHANGE ORDER 3 Docusign Envelope ID: 9C73E92C-CF3D-4BD4-96D3-AB1433EEFCC9