PZC Packet 081125AVON PLANNING & ZONING COMMISSION
MEETING AGENDA
MONDAY AUGUST 11, 2025 ` ,O
PUBLIC MEETING BEGINS AT 5:30 PM V
ZOOM LINK: httDs://us02web.zoom.us/i/85116989689 C O L O R A D O
1. CALL TO ORDER AND ROLL CALL (CHAIRPERSON) - 5:30 PM
2. APPROVAL OF AGENDA
3. DISCLOSURE OF ANY CONFLICTS OF INTEREST OR EX PARTE COMMUNICATION RELATED TO AGENDA ITEMS
4. PUBLIC COMMENT — COMMENTS ARE WELCOME ON ITEMS NOT LISTED ON THE FOLLOWING AGENDA PUBLIC
COMMENTS ARE LIMITED TO THREE (3) MINUTES. THE SPEAKER MAY BE GIVEN ONE (1) ADDITIONAL MINUTE SUBJECT TO
PLANNING AND ZONING COMMISSION APPROVAL.
5. JOINT WORK SESSION WITH AVON TOWN COUNCIL MEMBERS
5.1 SLOPESIDE COMMUNITY HOUSING: CONCEPTUAL DESIGN— PATTI LIERMANN, HOUSING PLANNER
6. WORK SESSION
6.1 PEDESTRIAN MALL UPDATES — MAX MORGAN, PLANNER II
7. CONSENT AGENDA
7.1. REFERRAL COMMENTS — REFR25002 VILLAGE AT AVON PARCEL 1, PLANNING AREA A
7.2. DULY 7, 2025 PLANNING AND ZONING COMMISSION MEETING MINUTES
8. FUTURE MEETINGS
8.1. AUGUST 25, 2025
8.2. SEPTEMBER 8, 2025
9. STAFF UPDATES
10. ADJOURN
MEETING AGENDAS AND PACKETS ARE FOUND AT: WWW.AVON.ORG
AGENDAS ARE POSTED AT AVON TOWN HALL, AVON RECREATION CENTER, ONLINE AND AVON PUBLIC LIBRARY
IF YOU HAVE ANY SPECIAL ACCOMMODATION NEEDS, PLEASE, IN ADVANCE OF THE MEETING,
CALL MATT PIELSTICKER AT 970-748-4413 OR EMAIL MATT@AVON.ORG WITH ANY SPECIAL REQUESTS.
TO: Planning and Zoning Commission A
FROM: Patti Liermann, Housing Planner Avon
RE: Slopeside Conceptual Design Review
DATE: August 5, 2025 C o 1 o H A [�
SUMMARY: This report presents revised conceptual designs to Avon Planning and Zoning Commission
("PZC") and members of Town Council ("Council") who may be in attendance for this meeting. This is the
second round of preliminary conceptual designs by Ulysses Development Group ("Ulysses") and their team.
PZC reviewed two conceptual designs at its regular meeting on June 23, 2025 and provided comments and
direction for further revision, including. -
Maintain adequate parking for the number of units
• Extend the drive and site further to the east
• Reduce the height and mass of buildings
PZC is requested to provide direction on the mass, scale and layout so that Ulysses can finalize a conceptual
design for PZC and Council review. Ulysses is depicting roof forms with more variation compared to the last
presentation; however, the focus of this review is on mass, scale and layout and not architectural design
elements. Once a conceptual design is approved that defines the mass, scale, layout, and density, then Avon
and Ulysses will contract for developer services which will include construction drawings that will be subject to
PZC and Council review for site planning and architectural design.
(970) 748-4091 pliermann@avon.org
BACKGROUND: The Property is part of the original Benchmark at Beaver Creek Subdivision (Benchmark at
Beaver Creek Tract Y). The Property was previously zoned for Open Space, Landscaping, Drainage ("OLD").
Council took action in 2024 to rezone the Property to Community Housing High Density-1 ("CHHD-1"). The
smaller Parcel 2, to the east was rezoned for "public use" and is part of the 1997 Swift Gulch Addition subdivision
creating the public works/transit/fleet campus. Parcel 2 is described as Lot 2: Swift Gulch Addition. Both parcels
are owned by the Town of Avon. Parcel 1 is approximately 3.41 acres.
The Property also contains a portion of the pedestrian/bike trail that runs between Avon Road and Post Blvd, and
the existing Nottingham Puder Ditch. The Community Housing project, currently known as "Slopeside", will
primarily be located within Parcel 1 and may have some overflow, signage, or other limited uses on Parcel 2.
The Zoning on this parcel is as follows:
Community Housing High Density —1. The CHHD-1 district is established to accommodate multi-
family development in cost effective configuration, construction type, and density that permits a high
number of residential units with a maximum of four (4) stories of residential or three (3) stories of
residential above one (1) level of at grade parking.
Table 7.20-7
Community Housing High Density -1
Dwelling
Max.
Max.
Min.
Max. Lot
Min. Front
Min. Side
Min. Rear
Max.
Type
Density
Units Per
Landscape
Coverage
Setback
Setback
Setback
Building
(units/
Building
Area
(%)
(feet)
(feet)
(feet)
Height
acre
(feet)
Multi-
25 du/
N/a
10%
80
10
7.5
10
48
family / TH
acre
PZC and Council held a joint meeting on May 12, 2025 as Step 1 of the conceptual design process to discuss the
unique physical characteristics of the site and to provide direction on design goals. PZC and Council held another
joint meeting on June 23, 2025 to review two initial conceptual designs as Step 2. The two conceptual designs
depicted four and five story buildings with 83 units and 111 units. PZC and Council provided comments and
direction at this meeting, which included the following details:
• Maintain adequate parking for the number of units (do not under park)
• Extend the drive and site further to the east to allow more parking and more buildings with less height
• Reduce the height and mass of buildings to three and four stories with three stories on the far east side
CONCEPTUAL DESIGN PHASE: The Conceptual Design agreement outlines a process with four steps, which
are listed below. We are on Step 3 at this meeting.
1. Introductory joint work session with Avon PZC and Council to review project goals, discuss site challenges
and opportunities, and discuss optimizing density balanced with appearance of entry to Town.
2. Initial presentation of at least 2 conceptual designs to Avon PZC and Council. Avon PZC and Council will
provide direction and comment on conceptual designs.
Slopeside — Conceptual Design Review
August 11, 2025
Page 2 of 3
3. Prepare revised and preferred conceptual design for presentation to Avon PZC and Council. Avon
PZC and Council will provide direction and comment to finalize the preferred conceptual design.
4. Present the revised conceptual design to Avon PZC and Council.
COMMUNITY HOUSING DEVELOPMENT STEPS: The development of Community Housing involves
several steps, which are described as follows:
1. Identification of land suitable for a Community Housing Project. COMPLETE
2. Zoning (or Rezoning) COMPLETE
3. Determination of Ownership and Initial Partners (i.e. public or private). PENDING
4. Determining whether to proceed as public development project or post Request for Proposal for private
developers. COMPLETE
5. Apply for Grant Funding for design, infrastructure and/or construction. ON GOING
6. Conceptual Design of housing project to determine density, layout, and feasibility.
7. Determination of specific housing type and goals (rent versus own, unit size, target AM levels)
8. Establishing development team (architect, owners representative, contract — if a public project, or selecting
developer if private project).
9. Securing financing and finalizing development agreements and deed restrictions.
10. Overseeing or administering construction of project.
11. Construction completion and sale or leasing per Avon Community Housing Policies or per terms with
private developer.
CONCEPTUAL DESIGN AS PRESENTED: The revised conceptual design (massing and density
designs) includes 24, 2-bedroom units, 54, 1-bedroom units, and 28 studio units. The revised design
allows for 106 units in total and accommodates 144 parking spaces, which is 1 parking space per bedroom
plus 14 guest spaces. The drawings also illustrate potential locations for snow storage, trash, storage, and
common areas.
TOWN MANAGER COMMENTS: This revised conceptual design reduces building height and massing and
appears to present a more compatible scale of development for the primary entry to the Town of Avon. The
additional buildings with less height and individual variation creates a more "village" aesthetic and less of a
large apartment building complex look, which I think is a strong improvement. The access drive on the
north side is at the 3rd and 4th level. Adding an additional 4th or 5th floor is cost effective because the
foundation work is the same and the additional floor will not trigger the requirement of an elevator. The
lower height, additional buildings, and individual variation of buildings and building segments will increase
the cost of construction. I point this out for awareness and I expected there would be a cost premium for
designing at a compatible scale and with quality architectural design on this gateway site.
REQUESTED DIRECTION: Your direction at this stage of the process will move the project into the next phase.
Please review the attached conceptual design materials and arrive at the meeting prepared to share your ideas.
This meeting will be used to review the density and massing of the development, layout of building locations, and
parking options.
Thank you, Patti
ATTACHMENT: Revised Slopeside Conceptual Design
Slopeside — Conceptual Design Review
August 11, 2025
Page 3 of 3
I
OUTER WEST
INNER
WEST
INNER EAST OUTER EAST
UNIT MIX:
106
STUDIOS: 8
STUDIOS:
8
STUDIOS: 6 STUDIOS: 6
STUDIOS:
28
1 BED: 15
1 BED:
16
1 BED: 12 1 BED: 11
1 BED:
54
2 BED: 7
2 BED:
6
2 BED: 6 2 BED: 5
2 BED:
24
VARIOUS PARKING REQUIREMENTS:
SPOTS PROVIDED: 144
1 SPOT / BEDROOM (130) + GUESTS (10): NEED 140 SPOTS
RETAINING WALL HEIGHT
\/ARIF.q FRnnn n' - 7'
SPACE AT ENTRY LEVEL & STORAGE
/ UTILITY AT EACH LOWER LEVEL
106 UNITS SITE PLAN
1.1 = 80'-0"
AD25004 106 UNITS
SNOW REMOVAL
An PnTFNTIAI nN-.qTRFFT PARAI I FI PARKINn
AVON SLOPESIDE HOUSING
14 J U LY 2025
Avon, CO
SNOW REMOVAL
NOT FOR CONSTRUCTION
EV-,tLAuik SD61
vecture : engineering: planning
AD25004 106 UNITS VIEW FROM 1-70
AVON SLOPESIDE HOUSING
14 J U LY 2025
Avon, CO
NOT FOR CONSTRUCTION
EV-.,tudloSD62
,_;r chitecture : engineering : planning
FA
f
9PFW--4,
:;
AD25004 106 UNITS VIEW FROM SOUTH
AVON SLOPESIDE HOUSING
14 J U LY 2025
Avon, CO
NOT FOR CONSTRUCTION
EV-,tudioSD64
tein
TO: Planning and Zoning Commission
FROM: Max Morgan, AICP, Planner II A
RE: Pedestrian Mall Design - I O
LEGAL: Tract G - Block 2 - Benchmark at Beaver Creek V
DATE: August 5, 2025 C O L 0 R A D 0
SUMMARY OF REQUEST: This report presents design options to the Planning and Zoning Commission
("PZC") for the for the Civic Plaza and Lake Street Crossing areas of the Pedestrian Mall ("Mall").
Lake Street Crossi
-yam � IV11
--'1*
Civic Plaza Area
The purpose of this work session is for PZC to review the design options and strategies for the Civic Plaza
and Lake Street Cross and provide direction to Staff and DHM Designs.
An
La Zona Approvals and
Subarea Design gnConcept Design Phase
Construction
BACKGROUND: Avon's revisioning of the Mall, extending from Possibilities Plaza to Nottingham Park,
kicked off following the completion of the La Zona Concept Plan in 2023. In 2025, Avon Town Council
("Council"), PZC, the Downtown Development Authority ("DDA"), Health & Rec Committee, and Cultural
Arts and Special Events Committee ("CASE"), reviewed and approved a new path layout and specific
concepts for the project, including a Civic Plaza at Town Hall and a relocated Lake Street Crossing with new,
additional features. This report includes links to previous staff reports for mall updates in January 2025 and
March 2025 here and here respectively (March 2025 update begins on document page 225).
C%1LI44i1612Y11:40AVl1WITA
Civic Plaza: A "Civic Plaza" is proposed at the south entrance of Town Hall, in and around the current
location of the Skier Statue. This area currently provides a connection from the Town Hall parking lot
and main entrance on the west side of the building, to the Pedestrian Mall. The south entrance to the
Town Hall from this plaza goes directly into Council Chambers.
970.748.4014 mmorgan@avon.org
Image 2 — South Town Hall Entrance Proposed for Civic Plaza with Statue Proposed for Relocation
The proposed update includes a relocation of the Skier Statue and reconstructing a larger plaza area
that utilizes the same design patterns and materials as the rest of the Mall. The concepts differ in
Pedestrian Mall Improvements — Work Session
August 5, 2025
Page 2 of 9
their inclusion and location of seating elements (picnic tables, statue, portable chairs, stone seat wall),
lighting / lamp poles, landscaping (permanent or removable planters, shrubs and flowers, additional
trees to screen parking areas), and space for special event tents and other elements intended to
activate the Civic Plaza (ATT A — Concepts for Review)
TOWN MANAGER COMMENTS: I have worked closely with Danita on size and configuration of the
Civic Plaza. Danita and I recommend Concept 5 (with the skier statue located as shown in either
Concepts 5.1 or 5.2). The Civic Plaza is roughly in the center of the Mall and is part of the Town Hall,
so this should be a larger usable area for hierarchy in design. Functionally, Danita and I believe this
space can be used for public events, private rental of Council chambers w/ plaza, and day to day
passive activation. We believe a "blank" plaza that is furnished with planters, picnic tables, benches,
etc., is much more functional so that we can move and rearrange the patio area as appropriate for
different uses. Concept 5.2 illustrates a special event tent layout that an accommodate 14 event tents.
Private rental, particularly on the week -ends, has a lot of community value because there are not
many convenient indoor/outdoor spaces with a kitchen and restrooms.
We are mindful of the importance of shade for large patio area, which can be provided by shade
structures or trees. This design consideration will require more attention to propose some amount of
shade for the Civic Plaza without infringing on the flexibility to rearrange the patio furnishing layout for
different uses.
REQUESTED DIRECTION FROM PZC: Civic plazas vary from community to community but often
reflect the values and interests of the community, as well as the form and function of the buildings and
spaces they help connect (ATT B — Examples of Civic Plazas and Spaces). PZC is requested to
provide comments and input on the different concepts for the Civic Plaza so that our designers can
proceed to construction drawings. PZC should determine if there are other elements that warrant
additional discussion or information.
[remainder of page is intentionally blank]
Pedestrian Mall Improvements — Work Session
August 5, 2025
Page 3 of 9
Lake Street Crossing: The design shows the existing Lake Street Crossing moved to a new location
as the preferred route for the Mall and connection to the Park. The approved Mall layout presents a
new path that hugs the north edge of the Library, crosses Lake Street further to the south than the
existing crossing, and connects to the south trail at the southeast corner of the main field and near the
new bathrooms (currently under construction). The design intent and goal is that the Lake Street
Crossing would establish a defined "gateway" into Harry A. Nottingham Park.
HARRYA.Au
NOTTINGHAh1
PARK r - ;ON REC -,
1 NTER. t
RESTR00 N
44�
PM PIAIA
(UNDER CUNSTRUCTI _ VON PU IC a w'
•IBRARY
SEASON
BUILDING
� -� , , *. • _,� BUILDING �„ w
- Existing Revised Mall
Lake New Crossing path
Street Location
Crossing
Image 3 - Map of Existing and Proposed Lake Street Crossing
The concepts show a circular open space plaza similar to the Civic Plaza, with the potential for
seating, vehicular barriers, shade sails, artwork, and updated lighting in and around the space. The
crossing itself will be raised with treatment and parallel white striping utilizing the same design as the
Lettuce Shed crossing on Benchmark Road.
The four corners of the Lake Street Crossing are proposed to incorporate the same design element to
establish this crossing as the gateway into the Park. The design elements on these four corners may
include Avon's four post custom street lights, stone pedestals with art work, standing stones, lighting,
signage, or combination of elements, or other design elements used in the vicinity. (see ATT C —
Existing Elements at Lake Street).
The Lake Street Crossing concepts include reconfiguring on -street parking on the east side of Lake
Street and reconstructing the parking on the west side of the Avon Recreation Center. This will
require the removal and relocation of two of the three electric vehicle ("EV") chargers on Lake Street
Pedestrian Mall Improvements — Work Session
August 5, 2025
Page 4 of 9
(two ports per charger). The concepts also show updated off-street parking north of the Library, with a
connecting path from the lot to the mall, and staff entrance for the Library. Staff confirmed with the
library staff that this area also houses their trash and recycling dumpster. One concept shows bench
seating along this section of the mall, and all concepts show a landscape buffer between the parking
lot area and the Mall path.
The west side of the crossing connects to an 11' wide sidewalk that will connect to the crossing area
as well. The triangular gravel pad immediately to the northwest is proposed for redesign and may
include elements like flagpoles or sculptures. The elements that frame the four corners of the crossing
and the triangular area, can be a point of discussion for this work session.
TOWN MANAGER COMMENTS: Staff and PZC have recognized the importance of a strong
"gateway" element into Harry A. Nottingham Park. A presentation was provided in January on
different design elements that can signify an entry into a park. A traditional arch gateway seemed
awkward for the entrance to the Park due to the limited area on the west side of Lake Street and the
desire to not impact views. The concept of using the four corners of the Lake Street Crossing was
introduced that would create a strong gateway element without an arch and would also emphasize the
pedestrian crossing priority at this location.
I suggest that appropriate design elements for the four corners would include:
1. Design can/should be a continuation of design themes elsewhere (standing stones, bronze art
works, custom umbrella street lights)
2. Design should reflect Avon's community values (outdoors, wildlife, nature, recreation,
community, events)
3. Design should incorporate signage (Monument sign? Signage on pedestals? Lit or unlit?)
4. Design can be function (pedestals can incorporate seating walls and be integrated into the
plaza rather than separate landscaping details)
Specific ideas include the following:
Wildlife Bronzes: Pedestals with seating walls and wildlife bronzes, Wolf (or coyote), Trout,
Mountain Lion and Eagle (these are four animals we don't have that I believe can be sized
appropriately for pedestals with close contact and picture taking opportunities). Danita pointed out
that a wolf might be politically controversial — still, kids would find a wolf statue pretty cool. I really
like elk and moose, but life size might be too big and overbearing at this location. Avon is well known
for its wildlife bronzes in the Avon Road round-abouts and this option would continue that theme.
Custom Umbrella Lamp Posts: Reuse or custom order 4 of the existing four post custom umbrella
lamp posts we already have to be placed on pedestals large enough to provide an informal seating
wall square. This would illuminate and emphasize the area with a tall elements that already exist in
our streetscape design. This might be somewhat boring and safe, but would be very effective at
delineating this gateway crossing. We also use these lamp posts for banners and would have the
ability to stretch banners or lights across the lamp posts for special events.
Pedestrian Mall Improvements — Work Session
August 5, 2025
Page 5 of 9
Standing Stones: We have standing stones at the corner of Lake Street and West Beaver Creek
Boulevard. If we use this design we should consider more limited placement of standing stones in
other locations on Lake Street for design pattern, and possibly in some of the landscaping along the
pedestrian path leading to the Lake Street crossing.
Other Ideas?: Other ideas are welcome. I would encourage some connection to Avon and our
community values in the selection of design elements.
Examples of Arch Gateways into Parks
REQUESTED DIRECTION FROM PZC: PZC is requested to provide comments and suggestions
on the design approach and design elements for the Lake Street Crossing with particular attention to
creating a strong "gateway" element.
Pedestrian Mall Improvements — Work Session
August 5, 2025
Page 6 of 9
I
y\BAKER
04,
!llCCf `l �
��Ot
Image 6 - New Lake Street Crossing Location with Performance Pavilion and Nottingham Park in background
Image 7 - Existing Lake Street Crossing Looking Southeast — The new crossing is proposed in a different location further south
Pedestrian Mall Improvements — Work Session
August 5, 2025
Page 8 of 9
^" r - axis tla;
-i
Image 8 - Existing Lake Street Crossing Looking West
NEXT STEPS: Stolfus and DHM have nearly completed the 30% design work. Based on comments and
direction from PZC, our designers will proceed to prepare construction drawings that can go out to bid. We
are generally striving for completion of construction drawings to go out to bid by November to support a
potential construction start in spring of 2026. PZC may desire additional design work to explore more options
and/or additional time to discuss design elements. If additional design work to explore more options is
desired then this may affect the completion of construction drawings and bidding the project for construction
next summer. Final designs for the Mall will come back to PZC for review and comment and will be reviewed
and finalized by Avon Town Council.
Thank you, Max
ATTACHMENTS:
A. Stolfus Engineering / DHM Designs Concepts for Review
B. Examples of Civic Plazas and Spaces
C. Existing Elements at Lake Street
D. Bronze Sculpture Examples
Pedestrian Mall Improvements — Work Session
August 5, 2025
Page 9 of 9
ATT A - CONCEPTS FOR REVIEW
yrV c ^1 -r-ow N HA.LL
C■O■■�
r■■■■v in ._
� � mruNN NINr ■�
as
010101
-� • rra■■fiili�■+■■rai=i■�ii
moms ::�y;.a=sue
tN■!N■ . ■MUMM
Oaza silica 2-700 sr-+i_
sI=— 4 S o N c A -1- 74 V ca r4
AVON TOWN HALL PLAZA PLAN - CONCEPT 1
AVON MAL L
AVON, COLOR ADO
G
cde Ilkf' ptks
ltm
ll i
shro%o pla4irr fa fr^+te fIaZa
,2
�v s-hr Ia►^�e c amp � -}ems
V
sp for 4-005
0 5 10 20
UHM Hi TC-)5
ATT A - CONCEPTS FOR REVIEW
W�IWaKi e—ameo tin,.
4*um +'Ct'. 4hwios -
r�l��+ swtpty�
pia z 2 Sp ace 4620
Sr=ASor4S
AVON TOWN HALL PLAZA PLAN -CONCEPT 2
AVON MAL L
14Y o N
A v O 14
T O W N H 4 L l.-
W/ -pOwet.
w� jighfi fo
�vc-l
plaza I 't+ -
slmve P (,►� s 1a f 1z+,�e plaza
is +awes
UHM DESIGN
0 5 10 20
SCALE: 1" =10'4'
AVON, COLOR ADO
ATT A - CONCEPTS FOR REVIEW
pl=2to sr Ice, J;qo w 9--
ST--,4<.aNs
AVON TOWN HALL PLAZA PLAN - CONCEPT 3
AVON MAL L
AVON, COLOR ADO
Ta W N H A L
Wl-aowevs
- s 1u-j6 tw4cNrlo *-fry T)taLa
�js�d lz�;Fw wl relac
0 5 10 20
UHM S
ATT A - CONCEPTS FOR REVIEW
gl* 2(A e~e'ZAW�
Medium kIF s 6joS
tr�c�� '�►►rS�,�t�
stagy w?tl
Mlacaul S4* 01ffijrz:
rwovab(c ivio(eg
pia" 9Q xc *.,tco w-t/-
e:' T A S a N% A-t- A y o r4
AVON TOWN HALL PLAZA PLAN - CONCEPT 4
AVON MAL L
' a c Pl2,n,•-i�vs w�—�,�,k,,,�
i=� racy ■a■■■.i■a. "�` r •
-- irrli r - ► - `
in•i�ilr�iti�iir,r�iiii�� r �%iaa�il�� ,
".i`i■�""■iiii rrNi i� u rr■a• ' a
�.■• ��_ � .�iaa' 'fie=D.r...■�i:
e■■sr��wr �%. .■�■ras■■■� � • f I!
■■■■riir• .■.■I� p3:...
r r■rrr■r �(■ ■Y 7!!■ \N ■• (�
■iri.liq a.eraq!■■Naa\ dlipar■■n■■
44�� !■aa■!!■■l. arr■ mer.■■'.� � 1
.■■■r■M�rr �.■ ■ _ire. 1N■L'■a ��
no
..■.■rr!! ■ rran rug
e r■■■■ ., ai■■!■pia+' Al■oar■■■
■ I •■■.-1■eta
on *is
■ ■ rols■rsr ■■■■■Iw so �i 1■■t
�rrili•eall ri■■■■■r`
YM■=laaaa !■!� lrrr■.►�■ ii �
.fir ■o■�!N■c. ■r�r ■■,r■■t�'
■■■■■n a
■■ �■ ■f■■■a .r CAL ■■I.sa■done
��■moan at ■!tlr■oil■rl
man ■■nn rrrrreru=■1 �iiriii�!'
v■!■ ■rNa. a!■R■■r
'MEN a, ■■i uq
.1■r.. �... ■■1 F■■, .
r!�!■sir■■' r+■■■
UHM DESIGN
C-)
0 5 10 20
SCALE: 1" =10'4'
AVON, COLOR ADO
ATT A - CONCEPTS FOR REVIEW
sl
AVON TOWN HALL PLAZA PLAN - CONCEPT 5
AVON MAL L
*rs
:olpwm
UHM DESIGN `'1
0 5 10 20
SCALE: 1" =10'4'
AVON, COLOR ADO
ATT A - CONCEPTS FOR REVIEW
sl
AVON TOWN HALL PLAZA PLAN - CONCEPT 5.1
AVON MAL L
vlefvm
UHM DESIGN `'1
0 5 10 20
SCALE: 1"=10'-0"
AVON, COLOR ADO
ATT A - CONCEPTS FOR REVIEW
AVON TOWN HALL PLAZA PLAN - CONCEPT 5.2
AVON MAL L
AVON, COLOR ADO
Iptu�
�vcictvva� � r,�',✓'�
0 5 10 20
UHM S
ATT A - CONCEPTS FOR REVIEW
r- -
---- i �-1 s f--t P-I
tl^42- le-
exiSh -*rr--S -ha KmoA2ai"
(-' i a Sites 100� tdws
�sw Syw�sb �l�fi��
�b 6 1 t�v�iQtures
re c rr a eel QaU
rai se cross; n�
�i
i f
�i
,J r1
LAKE STREET PLAZA PLAN - CONCEPT 1
AVON MAL L
ELAM!-:MrrA.J: _
Ala
0 5 10 20
HHm S
AVON, COLOR ADO
ATT A - CONCEPTS FOR REVIEW
1
exis-4i n� 4ireas -m� m wt:i ul
r,�vi� t-I�le
i"dam _
� b ►�nzc s4�lp�tvrrs
re rcsf*m" P
r� c rr
hai Sep
►-L- rnl-b
beAIvrlas
LAKE STREET PLAZA PLAN - CONCEPT 2
AVON MAL L
AVON, COLOR ADO
�o
w
0
)�)'' ( � I j I I
rmi:a F2�* K, 1121�?
la'*s'rc is-Fzmc.�
J
P
s is S?l�
' l
-l�zKdsc)n . vbu
eslYpiwo
l "C l
lap F-^N C--H
\'—i/
0 5 10 20
MDEIN\\5
ATT A - CONCEPTS FOR REVIEW
{' aT-r18H�4M
F.
e.>d sii ASbv -
�rc& { p
a ssVV'�►� 2W
b�'Y16V S
LAKE STREET PLAZA PLAN - CONCEPT 3
AVON MAL L
AVON, COLOR ADO
Ionic
pi
grip •�� �. .:`. /apt
,�
i FOSsibia ftl 61ic.00
�r1_
lan�ksare izo-�r�+�.�a
2)01 ;rl4i Z�05%t
N� �11'���5�'i�l
1 T �
�e 1l o t'J A, ?z ^ N
$a 12LAfz-r
0 5 10 20
HHM Hi TC—)s
ATT B - Examples of Civic Plazas and Spaces
Aurora, CO
Illll��p�
rmp m m
IP
City Hall-t
N O R T H G L E N N I Recreat
ion
CIVIC CENTER parsons Theatre- -
win
Ll
ATT B - Examples of Civic Plazas and Spaces
nl II ii I,'Goo i to of
I
II II10INw/
unlso x
11. A
Il �Il fl 11 ,. � Ibd
it �111
-- __
V i
,�..�11, -..'�+ 1�q�illTlIlI111I1➢D nnnn_n�n
ato N��a�le�nnn�nnln
'] Me�111nn➢nll lif lllnnilit
1 nllnr±lsrrnu
If I17 A "OVIR@ilW60F1111081l
ill MMENNOgl
Breckenridge, CO
1 M6 " 1�,�
ATT C - EXISTING ELEMENTS AT LAKE STREET
ATT C - EXISTING ELEMENTS AT LAKE STREET
LA
ry�77
76
4�t s 4 fi Z�u tx�3
. �� }�.• 5. n yil�y �'.f ..iY�1--+tica
ATT C - EXISTING ELEMENTS AT LAKE STREET
foal
s. �t
'dam 'TS'X 'Tt'
��
WK,oi
e
GONDOLA
TRANSIT CENTER
yy I
d� s
BATHROOMS 01tLov
} ��
S
-6,
ATT C - EXISTING ELEMENTS AT LAKE STREET
M
-koolll-j, - 40
ATT C - EXISTING ELEMENTS AT LAKE STREET
ATT C - EXISTING ELEMENTS AT LAKE STREET
� .$ �,.� _
'1'<
i.3 Y
,e.
�� � f�•�'
T�"t.'SR� .. .,.
µ j * r
'1 �
a
,�, _
ATT D - Bronze Statue Images
r
r
ATT D - Bronze Statue Images
ATT D - Bronze Sculpture Images
A
Avon
COLORADO
July 16, 2025
Village (at Avon) DRB
Attn: Warner Hopkins
warner hopkins(@hotmail.com
Re: Town of Avon Planning and Zoning Commission Referral
Parcel 1, Planning Area A - Mixed -Use Development
Dear Warner and Members of the Village at Avon Design Review Board,
I hope this message finds you well. I am writing to convey the Town of Avon Planning and Zoning Commission's
insights and comments regarding the proposed Phase 1 Mixed -Use Development in the Village (at Avon) Planning
Area A - Parcel 1.
The Town of Avon Planning Staff referred the project plans and designs from Kensington (both the residential and
commercial retail packets) to the Planning and Zoning Commission ("PZC") under file #REFR25002 for our meeting
on July 7, 2025. The primary objective of this hearing was to present the project and gather valuable
recommendations and suggestions for the Village (at Avon) Design Review Board ("DRB") to consider during your
review process and the ongoing development of this area. We sincerely appreciate the opportunity to share our
observations with you and hope they will be beneficial in your deliberations
Below, you will find the comments and recommendations (next page) from the Commission to the DRB.
General PZC Comments:
• Overall, the PZC felt that the architecture and general design/style of both buildings was good and fit in well
• DRB should be mindful that the north facing residential is going to be significant as far as massing is
considered as seen from 1-70; however, the parking and amenity area is a great addition on the south side
• Because of the larger surface parking, (temporary) snow storage has to be considered, as should drainage
and stormwater controls (emphasis placed on use of drainage swales wherever practicable)
• PZC also wanted to emphasize considerations for bike parking locations near store exits, composting (this is
something City Market is currently doing), and additional architectural treatment of the west side of the
Whole Foods as it is visible and could be improved
This area left intentionally blank
Post Office Box 975 1 100 Mikaela Way I Avon, CO 81620-0975 1 970-748-4023 1 www.Avon.org
Recommendations:
Commercial/Retail Plan:
1. The proposed building does not include adequate architectural investment in the western side. Architectural
features and treatments shall not solely be focused on the front fagade, as the Whole Foods will be seen
from every direction;
2. Please provide bicycle parking areas, trash/recycling receptacles and other site features dedicated to each
retail location;
3. The dumpster locations for all commercial uses need to be identified on plans. Whole Foods needs to
consider waste diversion of compostable and recycling of materials as well, as these services are available
in our valley. The `other retail areas" will need a consolidated and dedicated area for trash and recycling
dumpsters, identified as early as possible, as currently, no space is available for waste haulers around these
pads;
4. The site plan needs to indicate where and how many electric vehicle capable, electric vehicle ready, and
electric vehicle installed spaces are being installed. At least one (1) EV-installed space must be available for
ADA parking. This includes the other retail areas as well;
5. Landscaping plans need to acknowledge conservative water use and irrigation, and vegetative material
should be "Waterwise" drought -tolerant native plants;
6. It is encouraged for the applicant to include use of bioswales to help manage stormwater, parking lot
drainage, and to accommodate snow storage needs;
7. ADA parking spaces need to be identified on the site plan for all retail locations;
8. Design considerations, implementing energy off -sets to reduce greenhouse gas emissions using PV / Solar
Panels or similar, need to be incorporated on plans;
9. Development plans to designate snow storage areas, and use of snowmelt; and
10. A lighting plan shall be submitted to the Town in accordance with DRB Guidelines and Town Criteria.
Post Office Box 975 1 100 Mikaela Way I Avon, CO 81620-0975 1 970-748-4023 1 www.Avon.org
Residential Plan:
.kT.11
MAk
-1.0
MEMBER— OWN
a t,
:� I M
- - T:*�'77
'IM
14®
1. Please provide bicycle parking areas, trash receptacles, benches, and other site features, dedicated to the
residents;
2. The site plan needs to indicate where and how many electric vehicle capable, electric vehicle ready, and
electric vehicle installed spaces are being installed for residents. At least one (1) EV-installed space must be
available for ADA parking;
3. Landscaping plans need to acknowledge conservative water use and irrigation, and vegetative material
should be "Waterwise" drought -tolerant native plants;
4. ADA parking spaces need to be identified on the site plan;
5. Design considerations, implementing energy off -sets to reduce greenhouse gas emissions using PV / Solar
Panels or similar, need to be incorporated on plans;
6. Development plans should indicate snow storage, snowmelt, and energy code off -sets; and
7. A lighting plan shall be submitted to the Town in accordance with DRB Guidelines and Town Criteria
Thank you for sharing this exciting project within the Village (at Avon) with the Town of Avon. Should you have any
questions or require further clarification regarding comments, please do not hesitate to reach out to me at 970-748-
4023.
Kind Regards,
BY: DATE:
PZC Chairperson
Post Office Box 975 1 100 Mikaela Way I Avon, CO 81620-0975 1 970-748-4023 1 www.Avon.org
AVON PLANNING & ZONING COMMISSION
MEETING MINUTES avon
MONDAY JULY 7, 2025
PUBLIC MEETING BEGINS AT 5:30 PM C 0 L 0 R A D 0
PUBLIC MEETING: 5:30 PM
1. CALL TO ORDER AND ROLL CALL (CHAIRPERSON)
MEETING COMMENCED AT 5:30PM. A ROLLCALL WAS TAKEN, AND PLANNING COMMISSIONERS CARLY HANSEN,
BRAD CHRISTIANSON, RICK SUDEKUM, ELIZABETH WATERS, BRIAN SIPES, NANCY TASHMAN AND NICOLE MURAD
WERE PRESENT. ALSO PRESENT WERE COMMUNITY DEVELOPMENT DIRECTOR MATT PIELSTICKER, PLANNING
MANAGER JENA SKINNER, AICP, PLANNER II MAX MORGAN, AICP, AND DEVELOPMENT COORDINATOR, EMILY
BLOCK.
2. APPROVAL OF AGENDA
ACTION: COMMISSIONER SIPES MADE A MOTION TO APPROVE THE AGENDA. COMMISSIONER WATERS SECONDED
THE MOTION, AND THE MOTION PASSED UNANIMOUSLY, 7-0.
3. DISCLOSURE OF ANY CONFLICTS OF INTEREST OR EX PARTE COMMUNICATION RELATED TO AGENDA ITEMS
THERE WERE NO CONFLICTS OF INTEREST OR EX PARTE COMMUNICATION.
4. PUBLIC COMMENT- COMMENTS ARE WELCOME ON ITEMS NOT LISTED ON THE FOLLOWING AGENDA PUBLIC COMMENTS
ARE LIMITED TO THREE (3) MINUTES. THE SPEAKER MAY BE GIVEN ONE (1) ADDITIONAL MINUTE SUBJECT TO PLANNING AND ZONING
COMMISSION APPROVAL.
THERE WERE NO PUBLIC COMMENTS.
5. REFERRAL FROM VILLAGE (AT AVON) DESIGN REVIEW BOARD
5.1. REFR25002 VILLAGE AT AVON PARCEL 1, PLANNING AREA A - MIXED USE DEVELOPMENT - PLANNING
MANAGER, JENA SKINNER
6. CONSENT AGENDA
6.1. RECORD OF DECISION - CTA24002 AVON MUNICIPAL CODE UPDATES TO TITLE 7 DEVELOPMENT CODE
6.2. JUNE 23, 2025 PLANNING AND ZONING COMMISSION MEETING MINUTES
ACTION: COMMISSIONER CHRISTIANSON MADE A MOTION TO APPROVE THE CONSENT AGENDA. COMMISSIONER
SUDEKUM SECONDED THE MOTION, AND THE MOTION PASSED UNANIMOUSLY, 7-0.
7. FUTURE MEETINGS
7.1. JULY21,2025
7.2. AUGUST 11, 2025
8. STAFF UPDATES
MEETING AGENDAS AND PACKETS ARE FOUND AT: WWW.AVON.ORG
AGENDAS ARE POSTED AT AVON TOWN HALL, AVON RECREATION CENTER, ONLINE AND AVON PUBLIC LIBRARY
IF YOU HAVE ANY SPECIAL ACCOMMODATION NEEDS, PLEASE, IN ADVANCE OF THE MEETING,
CALL MATT PIELSTICKER AT 970-748-4413 OR EMAIL MATT@AVON.ORG WITH ANY SPECIAL REQUESTS.
9. ADJOURN
THE MEETING WAS ADJOURNED AT 6:40 PM
APPROVED:
X
CHAIRPERSON
MEETING AGENDAS AND PACKETS ARE FOUND AT: WWW.AVON.ORG
AGENDAS ARE POSTED AT AVON TOWN HALL, AVON RECREATION CENTER, ONLINE AND AVON PUBLIC LIBRARY
IF YOU HAVE ANY SPECIAL ACCOMMODATION NEEDS, PLEASE, IN ADVANCE OF THE MEETING,
CALL MATT PIELSTICKER AT 970-748-4413 OR EMAIL MATT@AVON.ORG WITH ANY SPECIAL REQUESTS.