Loading...
2024 Street Improvements – Swift Gulch Road Asphalt Overlay Project: Construction Change Order 1 CO-1 CHANGE ORDER Order No.:___1_________________ Date: ___09 September 2024______ Agreement Date: __26 February 2024__ NAME OF PROJECT: 2024 Street Improvements – Swift Gulch Road Asphalt Overlay OWNER: Town of Avon, Colorado CONTRACTOR: __GM Asphalt Repair LLC ________________________________ The following changes are hereby made to the CONTRACT DOCUMENTS :  Line item #22: Additional 25 linear feet of curb & gutter for an additional cost of $1,375.00.  Line Item #18: Additional sawcut of 25 LF of asphalt paving to construct the additional cub & gutter near the existing trailhead parking lot for an additional cost of $125.00.  We need to over-excavate and store in place approximately 230 cubic yards of unsatisfactory soils for an additional cost of $76.00 per CY. ($17,480.00)  We need to import approximately 246 cubic yards of structural fill material to replace over- excavated unsatisfactory soils for an additional cost of $47.00 per CY. ($16,215.00) Justification: Poor existing soil conditions beneath the proposed curb & gutter warranted over-excavation and replacement with structural fill material. Furthermore, additional curb & gutter was warranted near the trailhead parking lot to mitigate existing erosion issues. Change to CONTRACT PRICE: $35,195.00 Original CONTRACT PRICE: $616,810.57 Current CONTRACT PRICE adjusted by previous CHANGE ORDERS $616,810.57. The CONTRACT PRICE due to this CHANGE ORDER will be increased by $35,195.00. The new CONTRACT PRICE including this CHANGE ORDER will be $652,005.57. Change to CONTRACT TIME: The CONTRACT TIME will be increased by __zero__ calendar days. The date for completion of all work will be ___31 October 2024____________________. APPROVALS REQUIRED: Approved by Engineer: ,AGD G.:4җ1 +шѶспсурхѷпч2Ҙ Qicole Posby CO-2 Accepted by Contractor: Accepted and Approved by Owner: ______ Federal Agency Approval (where applicable): Not Applicable __________________ 9JLAF F Rҗ1 +шѶспсурхѷфц2Ҙ #JA& ADҗ1 +рчѶспсупшѷфш2Ҙ Hric .eil CO 001 Swift Gulch Road Asphalt Overlay Final Audit Report 2024-09-18 Created:2024-09-09 By:Nicole Mosby (nmosby@avon.org) Status:Signed Transaction ID:CBJCHBCAABAAvtX01hUT--PnQOSBLTq7PPkgFkSxJRJU "CO 001 Swift Gulch Road Asphalt Overlay" History Document created by Nicole Mosby (nmosby@avon.org) 2024-09-09 - 10:02:51 PM GMT Document emailed to Nicole Mosby (nmosby@avon.org) for signature 2024-09-09 - 10:03:58 PM GMT Document e-signed by Nicole Mosby (nmosby@avon.org) Signature Date: 2024-09-09 - 10:08:04 PM GMT - Time Source: server Document emailed to gmasphaltrepair@gmail.com for signature 2024-09-09 - 10:08:04 PM GMT Document shared with LUlasich@avon.org by Nicole Mosby (nmosby@avon.org) 2024-09-09 - 10:11:45 PM GMT Email viewed by gmasphaltrepair@gmail.com 2024-09-09 - 10:55:56 PM GMT Signer gmasphaltrepair@gmail.com entered name at signing as Martin Mendez 2024-09-09 - 10:57:20 PM GMT Document e-signed by Martin Mendez (gmasphaltrepair@gmail.com) Signature Date: 2024-09-09 - 10:57:22 PM GMT - Time Source: server Document emailed to eheil@avon.org for signature 2024-09-09 - 10:57:23 PM GMT Email viewed by eheil@avon.org 2024-09-10 - 1:54:11 PM GMT New document URL requested by eheil@avon.org 2024-09-18 - 3:56:33 PM GMT Email viewed by eheil@avon.org 2024-09-18 - 3:59:22 PM GMT Signer eheil@avon.org entered name at signing as Eric Heil 2024-09-18 - 3:59:46 PM GMT Document e-signed by Eric Heil (eheil@avon.org) Signature Date: 2024-09-18 - 3:59:48 PM GMT - Time Source: server Agreement completed. 2024-09-18 - 3:59:48 PM GMT