Loading...
2024 Street Improvements – Upper Buck Creek Road Asphalt Overlay Project: Construction Change Order 1 CO-1 CHANGE ORDER Order No.:___1__________________ Date: ___05 June 2024____________ Agreement Date: __26 February 2024__ NAME OF PROJECT: 2024 Street Improvements – Upper Buck Creek Road Asphalt Overlay OWNER: Town of Avon, Colorado CONTRACTOR: __Grand River Construction Company________________________________ The following changes are hereby made to the CONTRACT DOCUMENTS: Removal of unsatisfactory subgrade material near station 61+00. Then placement of geogrid, new subgrade material, and 6-inch asphalt pavement. Justification: The existing subgrade was in exceptionally poor condition. Placement of new asphalt on this material would have resulted in near immediate failure. Change to CONTRACT PRICE: $_3,533.00_______________ Original CONTRACT PRICE: $_649,465.76_____________ Current CONTRACT PRICE adjusted by previous CHANGE ORDER $__649,465.76__________ The CONTRACT PRICE due to this CHANGE ORDER will be increased by $__3,537.00____________. The new CONTRACT PRICE including this CHANGE ORDER will be $__653,002.76__________. Change to CONTRACT TIME: The CONTRACT TIME will be increased by __one___ calendar days. The date for completion of all work will be ___01 July 2024____________________. APPROVALS REQUIRED: Approved by Engineer: Accepted by Contractor: Accepted and Approved by Owner: ______ Federal Agency Approval (where applicable): Not Applicable __________________ DocuSign Envelope ID: 9C6C108E-F63F-440D-95D2-8384F8931B8D DocuSign Envelope ID: 9C6C108E-F63F-440D-95D2-8384F8931B8D