PZC Packet 040792STAFF REPORT TO THE PLANNING AND ZONING COMMISSION
April 7, 1992
Lot 9, Block 3, Benchmark at Beaver Creek Subdivision
Sunridge at Avon, Phase I
Request For Release From Previous Planning and Zoning Commission
Condition of Approval
INTRODUCTION:
Tom Casteel, of Vail Management Company, on behalt of Sunridge at
Avon Phase I, is requesting release from a previous Planning and
Zoning Commission condition of approval relating to the painting
of the Sunridge buildings on Lot 9, Block 3, Benchmark at Beaver
Creek Subdivision.
On June 18, 1991, the Sunridge at Avon Phase I Condominiums
received approval to restain their buildings. The stain on the
buildings at the time was an oxford brown colored semi --transparent
stain. The applicants wished to restain with a Benjamin -Moore
"buckskin" colored solid body stain. The buildings trim and doors
would remain oxford brown. During the meeting Mr.Casteel was
asked if the building's breezeways were going to be stained. Mr.
Casteel stated that he didn't believe that the contract with the
painters included the restaining of the breezeways. After further
discussion of the issue, the Planning and Zoning Commission went
on to approve the building color change requested, with the
condition that the breezeways also be stained the exterior color.
As the restaining of the buildings was completed, each of the
buildings breezeways were left unstained and no further work has
been done since late June.
On March 19, 1992, the Sunridge Condominium Association was
notified (see attached letter) that immediate action must be taken
to resolve this issue.
On March 31, 1992, Mr. Casteel contacted the Town and requested to
be put on the Planning and Zoning Commission agenda so that he may
formally request a release from the condition requiring the
breezeways to be stained. Mr. Casteel has indicated that they do
not have sufficient funds at this time to stain the breezeways.
STAFF RECOMMENDATION:
Review and discussion of proposed release of previous Planning and
Zoning Commission condition of approval.
1•
STAFF REPORT TO THE PLANNING AND ZONING COMISSION
April 7, 1992
a Page 2 of 2
Lot 9, Block 3, Benchmark at Beaver Creek Subdivision
Sunridge at Avon Phase I
Request For Release From Previous Planning and Zoning Commission
Condition of Approval
RECOMMENDED ACTION
1. Presentation of application
2. Applicant's Presentation
3. Commission Neview
4. Commission Action
Respectfully submitted,
Jim Curnutte
Town Planner
PLANNING AND ZONING ACTION
Approved as submitted Approved with Recommended
Conditions ( ) Approved with Modified Conditions (
Continpied( ) Denied ( ) Withdrawn ( )
Date �-,I�Patti Dixon, Secretary
The Commission denied tha applicant's request for release of the condition of
painting the Areezeways, stating that the breezeways must be painted to match
the existing color on the building and the project must be completed no later
than October 1, 1992.
STAFF REPORT TO THE PLANNING AND ZONING COMMISSION
April 7, 1992
Lot 8, Block 3, Benchmark at Beaver Creek
Eagle River Condominiums
Design and Construction Services, Tony Seibert
Proposed Building and Site Design Changes
INTRODUCTION:
On December 19, 1991, Tony Seibert, on behalf of Design and
Construction Services, received Final Design Review approval for a
21 unit residential complex (Eagle River Condominiums) on Lot 8,
Block 3, Benchmark at Beaver Creek Subdivision. The lot is 1.08
acres in size and is presently zoned Residential High Density,
which allows for the proposed 21 units.
The approved development plan consists of three six-plex
buildings. The triplex building did not receive design review,
but will be brought in at such time as the applicant wishes to
proceed with its construction. At the time of approval, the units
in each of the six-plex buildings were approximately 800 square
feet in size. There were thirty-two uncovered parking spaces and
twenty-six covered parking spaces. This scheme met (actually
exceeded) the minimum required number of parking spaces which is
48. The approved site plan included two access drives to this
project.
In granting approval of the project on December 19, 1991, the
Planning and Zoning Commission attached the following conditions:
1. Final staff review of the grading/drainage plan prior to
the issuance of a building permit.
2. Final fire department review of hydrant locations prior
to the issuance of a building permit.
3. Written permission from the owner of Tract L authorizing
the improvements on the property be provide prior to construction
of any improvements.
4. Extension of the path on Tract L to the public
right-of-way.
5. Determination of proposed sign location and method of
'llumination.
6. Elimination of the two parking spaces from the 10'
setback. Elimination of the three parking spaces in the landscape
island not required.
7. The landscape plan be amended to match the architectural
Is
I
No
As&*, e`*.
STAFF REPORT TO THE PLANNING AND ZONING COMMISSION
April 7, 1992
Page 2 of 6
Lot 8, Block 3, Benchmark at Beaver C. -eek Sudivision
Eagle River Condominiums
Design and Construction Services, Tony Seibert
Proposed Building and Site Design Changes
site plan to remove the gravel
buildings. A better definition of
made. Additional trees and shrubs
northeast corner of the site and
additional trees or shrubbery be a
the front of any long fences and
appropriate in the front will be co
currently shown between the
the term shrubbery needs to be
should be provided along the
behind the garages. Also,
dded to the landscape plan in
that berming islands where
nstructed.
8. Written review and approval by all utility companies must
be provided authorizing the encroachment of the garage building
into the utility easements prior to the issuance of a building
permit.
9. At such time that the applicant wishes to proceed with
the tri-plex building, he will return to the Planning and Zoning
Commission for review.
10. Add a fourth trim or accent color. A teal has been
suggested and this could be a Staff approval.
11. A Staff approval of the specific roofing manufacturer and
product proposed. Recommendation is 300 lb. per square roofing
product.
12. Any excess of a fence height of six feet, Staff approval
is required.
13. The fourteen insh shoplap masonite sideing is
acceptable.
In March, 1992, Mr. Seibert submitted an application for a
building permit to start construction of this project. The
application was for the first six-plex building only. Also,
during the review of the application drawings, it became clear
that Mr. Seibert wished to construct a project that differed
substantially from the one previously approved by the Planning and
Zoning Commission on December 19, 1991. Mr. Seibert is now
requesting design review approval of his revised plans. Changes
to the previously approved plans are as follows:
DEVELOPMENT PHASING - With the exception of the tri-plex building
no discussion of development phasing was discussed at the December
meeting. It is Mr. Seibert's intention to proceed immediately
,.� 4.kk
STAFF REPORT TO THE PLANNING AND ZONING COMMISSION
April 7, 1992
Page 3 of 6
Lot S, Block 3, Benchmark at Beaver Creek Subdivision
Eagle River Condominiums
Design and Construction Services, Tony Seibert
Proposed Building and Site Design Changes
from one phase to the next, however, if sales are not adequate,
the rest of the subsequent phases will be delayed indefinitely.
The applicant does not wish to begin construction of a new phase
until all, or a certain percentage, of the units in a preceeding
phase have been sold. Staff agrees that the phas,ng of building
construction makes sense financially, however, we a -e concerned
with the conceptual nature of the phasing plan proposed. The plan
does not provide sufficient information for Staff to fully assess
the project if only phase I or phases I and II are completed.
Grading and drainage, landscaping, parking lot layout, trash
dumpster location, etc., are all improvements that will change
significantly if the nroject is halted before build out.
DRIVEWAY CLOSURE - The original project was approved with two
driveways on west Beaver Creek Blvd. The new proposal shows that
the southern driveway has been closed. Staff would prefer that
the southern driveway stay open for ease of access and improved
circulation, however, the applicant has indicated that there will
be a significant cost savings if it is closed.
CHANGE IN PARKING LOT LAYOUT - The parking lot layout and number
of parking spaces provided has changed. The applicant has
separated the three six-plexes a little more than shown previously
in order to attain the minimum code requirement of 10'. By moving
the B and C buildings toward the northwest they encroach into the
parking lot, displacing three parking spaces. Two of these spaces
were moved to the west end of the lot and one was eliminated
completely. Also, the three covered parking spaces at the west end
of the garage have been removed as well as the two uncovered
spaces previously shown in the front yard setback area. A parking
space was gained by taking the trash dumpster out of one of the
garage spaces. The applicant has eliminated the landscape
peninsulas that separated the north and south uncovered parking
areas for ease of snow removal. The site plan has also been
amended to show the proposed fire hydrant locations, project sign
and sidewalk connection to the public right-of-way.
TRASH DUMPSTER RELOCATION - As mentioned previously, the trash
dumpster has been relocated from one of the garage spaces to an
area north of Building B. No detailed drawings of the dumpster
enclosure have been provided for the Commission's review. The
applicant has indicated that the enclosure will match the
architectural style and materials of the buildings and garage.
�0
STAFF REPORT TO THE PLANNING AND ZONING COMMISSION
April 7, 1992
as Page 4 of 6
Lot 8, Block 3, Benchmark at Beaver Creek Subdivision
Eagle River Condominiums
Design and Construction Services, Tiny Seibert
Proposed Building and Site Design Changes
CHANGES IN ARCHITECTURE OF GARAGE BUILDING - The parapet wall/roof
form on the garage fronts, shown on the approved plans, have been
removed.
CHANGES IN THE ARCHITECTURE OF THE BUILDINGS - The architecture of
the buildings has changed as follows:
North
Elevastion
- Fenestration
and roof form changes.
South
Elevation
- Fenestration,
roof form and chimney
changes.
East
Elevation -
Fenestration,
rocf for) and siding changes.
West
Elevation -
Fenestration and roof form changes.
CHANGES IN UNIT SIZES - The floor area in all of the type B units
have have been increased by approximately 50 square feet.
STAFF COMMENTS
In addition to discussing the aforementioned changes to the
previously approved plans, Staff recommends that the following
issues be resolved:
- The Avon Metropolitan District recommends that the new 20'
wide water and sewer easement be recorded prior to the start of
construction on this lot.
- The applicant's water plan drawing dated 3/23/92 must be
amended, to reflect the comments noted by the Avon Metropolitan
District Engineer and fire hydrant locations must be changed as
specified by the Avon Fire Department.
- The grading and drainage plan must be amended to reflect
the comments of the Town Engineer.
- The site plan, landscape plan and grading and drainage
plans should be amended to show the same improvements on each.
The following are examples:
- The landscape plan shows 8" x 8" railroad tie
retaining walls between the buildings but they are not reflected
STAFF REPORT
April 7, 1992
Page 5 of 5
TO THE PLANNING AND ZONING COMMISSION
Lot 8, Block 3, Benchmark at Beaver Creek Subdivision
Eagle River Condominiums
Design and Construction Services, Tony Seibert
Proposed Building and Site Design Changes
on the site or drainage plans.
- The concrete walkway leading to the road
right-of-way is not reflected on the grading and drainage plan.
It does not appear that grades will allow the side walk to be laid
out as reflected on the site plan (straight line to right-of-way).
- The grading and drainage plan does not
accurately reflect the actual parking lot layout proposed for
construction.
- The new landscape plan should be amended to
remove gravel shown between the buildings and better define the
proposed "shrubbery" as required by condition #7 of the previous
approval.
Discussion of proposed time frame for
constructing the improvements on Tract L shown on the sit_ plan.
STAFF RECOMMENDATION:
Staff recommends that the above changes and issues be discussed
and resolved to the satisfaction of the Commission. If the
discussion involves changes or additions to those issues presented
in this report, those changes or additions, along with those
suggested by staff, must be reflected in all drawings presented
for building permit application review.
rr:Rw
STAFF REPORT TO THE PLANNING AND ZONING COMMISSION
April 7, 1992
Page 6 of 6
Lot 8, Block 3, Benchmark at Beaver Creek Subdivision
Eagle River Condominiums
Design and Construction Services, Tony Seibert
Proposed P-ilding and Site Design Changes
RECOMMENDED ACTION
1. Presentation of application
2. Applicant's Presentation
3. Commission Review
4. Commission Action
Respectfully submitted,
d✓tish Cu-'LttU�%�
Jim Curnutte d n
Town Planner
PLANNING AND ZONING ACTION
Apr -roved as submitted ( ) Approved with Recommended
Conditions (Approved with Modified Conditions ( )
Continued ( ) Denied ( ) Withdrawn (
Date H 2 Patti Dixon, Secretar
SEE ATTACHED SHEET
STAFF REPORT TO THE PLANNING AND ZONING COMMISSION
April 7, 1992
Lot 8, Block 3, Benchmark at Beaver Creek Subdivision
Design Revisions
(cont)
The Commission granted design approval to the design revisions with the condition
that the following Staff comments are addressed to Staff satisfaction:
1. The Avon Metropolitan District recommends that the new 20' wide water and
sewer easement be recorded prior to the start of construction on this lot.
2. The applicant's water plan drawing dated 3/23/92 must be amender' to reflect
the comments noted by the Avon Metropolitan District Engineer and fire hydrant
locations must be changed as specified by the Avon Fire Department.
3. The grading and drainage plan must be amended to reflect the comments of the
Town Engineer.
4. The site plan, landscape plan and grading and drainage plans should be amended
to show the same improvements on each. The following are examples:
I. The landscape plan shows 8" x 8" railroad tie retaining walls between the
buildings, but they are not reflected on the site or drainage plans.
2. The concrete walkway leading to the road right-of-way is not reflected
on the grading and drainage plan. It does not appear that grades will allow the
sidewalk to be laid out as reflected on the site plan (straight line to right-of-way).
3. The grading and drainage plan does not accurately reflect the actual parking
lot layout proposed for construction.
4. The new landscape plan should be amended to remove gravel shown between
the buildings and better define the proposed "shrubbery" as required by condition
the previous approval.
5. Discussion of proposed time frame for constructing the improvements on
Tract L shown on the site plan — _._-___--- ____ _ .
STAFF REPORT TO THE PLANNING AND ZONING COMMISSION
April 7, 1992
Lot 46, Block 2, Wildridge Subdivision
Dan Karzen for KSO Development Group
Wildridge Townhomes
Final Design Review
INTRODUCTION
Dan Karzen, on behalf of KSO Development Group, is requesting
final design review of a proposed four-plex building
(Wildridge Townhomes) on Lot 46, Block 2, Wildridge
Subdivision. Lot 46 is 0.89 of an acre (38,768 sq. ft.) in
size and is located at 2530 Old Trail Road. The lot slopes
toward the southeast and has an average slope of aproximately
-25% over much of the proposed building site.
The proposed four-plex building will house four four-bedroom
units. One unit has 1,640 sq. ft. of habit;iule area and
three units have 1,610 sq, ft. of habitable area. Each unit
will include a two car garage ana a gas fireplace. This
building does not exceed the maximum building height
requirement of 35 feet from existing or finished grade.
Exterior building materials include channel rustic cedar
siding (grey) with 2" x 8" and 1" x 4' rough sawn cedar trim,
aluminum windows (white), 6 panel therma tru doors with side
light, 1" x 4" rough sawn cedar trim around windows and doors
(stained white). The redwood deck rail:, buildinq fascia and
garage doors will be stained a pewter color. The applicant
is proposing to use the Presidential Celotex asphalt shingle
(weathered wood) on the roof. This product represents a
change from the cedar shake shingle previously reviewed at
conceptual review. The applicant has indicated that the
weight per square of this product is 370 lbs. All driveway
and parking spaces will be finished with asphalt. The trash
dumpster is proposed to be screened on two sides by a 4' tall
treated timber retaining wall k8" x 8" timbers). A color
rendering of the building as well as material samples will be
presented.
A grading and drainage plan and a landscape pian have been
submitted for the Commission's review. The grading plan
shows that the proposed berms have a finished grade in excess
of 50%. The landscape plan shows a good mixture of
decidious (two species) and coniferous (two species) trees,
shrubs (two species) and boulder groupings. All disturbed
areas will be reseeded with native grasses or a gravel
(natural color) ground cover. A common Bar-B-Que area has
been provided. Although not indicated on the plans,
J
•
•
STAFF REPORT TO THE PLANNING AND ZONING COMMISSION
April 7, 1992
Page 2 of 6
Lot 46, Block 2, Wildridge Subdivision
Dan Karzen for KSO Development Group
Wildridge Townhomes
Final Design Review
automatic irrigation will be provided to all
areas.
landscaped
This application received conceptual design review by the
Planning and Zoning Commission on January 21, 1992. The
Commission had the following comments:
1. The parking needs to be further addressed in
conjunction with access so that more of the spaces can be
located behind the garage doors;
2. Some sort of play area, or picnic area be
considered;
3. Consider giving the end elevations more character;
4. The landscaping be substantial, with larger
materials specified to break up the massing of the building.
STAFF COMMENTS
The Commission shall consider the following items in
reviewing the design of a proposed project:
6.11 - The conformance with the Zoning Code and other
applicable rules and regulations of the Town of Avon.
COMMENT: This proposal is in conformance with the Avon
Zoning Code. The property is zoned four-plex and proposed
building height, setback, lot coverage and parking
requirements ar^ being met. Certain provisions of the Avon
Design Guidelines however, do not appear to be complied with:
- Some finished grades exceed 50%;
- Trash receptacles should be screened from public
view and protected from disturbance;
- No project identification sign has been provided
for review.
6.12 - The suitability of the improvement, including
type and quality of materials of which it is to be
0
1b
� v
STAFF REPORT TO THE PLANNIONG AND ZONING COMMISSION
April 7, 1992
Page 3 of
Lot 46, Block 2, Wildridge Subdivision
Dan Karzen for KSO Development Group
Wildridge Townhomes
Final Design Review
constructed and the site upon which it is to be located.
COMMENT: The type and quality of both building and
landscape materials are in conformance with town guidelines.
The proposed building materials are commonly found throughout
Wildridge. The landscape plan has been upgraded in response
to the Planning and Zoning Commission conceptual review
comments. The applicant should be made aware that he will be
expected to install the landscape materials in the sizes
specified in the landscape legend.
6.13 - The compatibility of the design to minimize site
impacts to adjacent properties.
COMMENT: All grading will be contained within lot
lines. The applicant has added an additional architectural
element to the left side elevation and provided small roof
features over windows on the right side elevation in an
attempt to address a Planning and Zoning Commission
conceptual review comment. Also, the play or picnic area has
been added to the plan as suggested by the Commission. The
design of this project would be considerably more compatible
if the applicant would have redesigned the access aisle and
parking areas so that two parking spaces were located in
front of the garages, as suggested by Staff and the
Commission on January 21, 1992, instead of scattered
throughout the property Since the last meeting, the
applicant removed two of the parking spaces, thereby reducing
the overall number of parking spaces for this four-plex from
20 to 18 (8 covered and 10 uncovered). Any exposed
foundation tails should be painted to match the building.
6.14 - The compatibility of proposed improvement with
site topography.
COMMENT: The project appears to be compatible with site
topography with the exception that the leveling necessary to
create the exterior parking spaces appears to be excessive.
6.15 - The visual appearance of any proposed
improvement as viewed from adjacent and neighboring
properties and public ways.
COMMENT: The appearance of the proposed improvements as
STAFF REPORT TO THE PLANNING AND ZONING COMMISSION
April 7, 1992
Page 4 of 6
Lot 46, Block 2, Wildridge Subdivision
Dan Karzen for KSO Development Group
Wildridge Townhomes
Final Design Review
viewed from neighboring properties and public ways seems
acceptable with the following exceptions:
- The two sided timber retaining wall aumpster area
does not appear to adequately screen the
dumpster from neighboring properties, public ways,
or the residents of this project.
- The amount of uncovered parking spaces appears to be
excessive for a four-plex with two car garages per
unit.
- The gravel ground cover at the Bar-B-Que area and
unit entry ways would be more attractive if
replaced with sod or other landscape materials.
6.16 - The objective that no improvement be so similar
or dissimilar to others in the vicinity that values, monetary
or aesthetic will be impaired.
COMMENT: As mentioned previously, the landscape and
building materials proposed for this project are similar to
those approved previously in the Wildridge Subdivision. The
amount of impervious surface for a four-plex building and the
proposed trash dumpster screening are very dissimilar to
other comparable project in Wildridge.
6.17 - The general conformance of the proposed
improvements with the adopted Goals, Policies and Programs of
the Town of Avon.
COMMENT: The proposal is in conformance with the adopted
goals, policies and programs of the Town of Avon, with the
exceptions previously noted.
STAFF RECOMMENDATION
Staff recommends approval of this final design review
application with the condition that the following issues are
discussed and resolved to the satisfaction of the Commis on.
The amount of impervious surfaces on this property
should be reduced.
p
.'-\
STAFF RLPORT TO THE PLANNING AND ZONING COMMISSION
April 7, 1992
Page 5 of 6
Lot 46, Block 2, Wildridge Subdivision
Dan Karzen for KSO Development Group
Wildridge Townhomes
Final Design Review
- The landscape plan should be amended to include a
reference to the proposed method of irrigation and
replacement of the gravel areas with sod or other landscape
materials.
- A redesign of the trash dumpster enclosure should be
considered in order to provide more effective visual
screening.
- A project identification sign must be provided which
includes the project name and physical address.
- Any exposed foundation walls should be painted to
match the building.
- No finished grades should exceed a maximum of 50%.
RECOMMENDED ACTION
1. Introduce Application
2. Applicant Presentation
3. Commission Review
4. Commission Action
Respectfully submitted,
.Jim Curnutte
Town Planner
STAFF REPORT TO THE PLANNING AND ZONING COMMISSION
April 7, 1992
Page 6 of 6
Lot 46, Block 2, Wildridge Subdivision
Dan Karzen for KSO Development Group
Wildridge Townhomes
Final Design Review
PLANNING AND ZONING ACTION
Approved as submitted ( ) Approved with Recommended
Conditions ( ) Approved with Modified Conditions
Contin��u��e��d((yy( ) Denied ( ) Wi
Date Patti Dixon, Secre
The Co Im�islsion granted final design approval with the following conditions:
1. That the landscape plan should be amended to include reference to an
automatic irrigation system and replacement of the gravel areas with sod
or other landscape materials. Z. A project identification sign must be
provided which includes a project name and physical address. 3. All
2xposed-€9ur aEion-wal-ls-sHoua-d-be-pa4eEed--te-matsH-the-bu-i-l44a}.--4 -No-
f4pifY�ed_e-s+icrod=eiceeed� lna�rttwfli-39-.---Tile-barb-Que s#�a>1 -
be removed and the landscaping of that area shall be moved to one side or
the other. 6. That the color of the asphalt shingles will be weathered
wood.
STAFF REPORT TO THE PLANNING AND ZONING COMMISSION
April 7, 1992
Lots 2-12, Filing 4, Eaglebend Subdivision
Jeff Spane' for Eaglebend Partnership
Eaglebend ll,abhouse
Conceptual Design Review
INTRODUCTION
Jeff Spanel, on behalf of Eaglebend Partnership, is proposing
to construct a Community Center building (Eaglebend
Clubhouse) on Lots 2-12, Filing 4, Eaglebend Subdivision.
On July 19, 1990, and July 26, 1990, the Planning and Zoning
Commission and Town Council, respectively, approved the
Design Review, Fractionalization, and SPA Amendment requests
for the Eaglebend Apartment complex. The approved plan
consisted of 20-12 unit buildings, a community center
building, approximately 450 covered and uncovered parking
spaces, laundry and storage facilities and various
recreational and open space amenities. Since the community
center building had not been fully designed at the time the
rest of the project was presented to the Planning and Zoning
Commission, their approval included a condition that the
applicant present the plans for the center for final design
review prior to its construction.
The community center building is two stories high (35') and
will be set back 30 feet from the east property line. The
building will have approximately 5,120 square feet of
habitable area and will house a day care operation, social
room, laundry room, offices (managers, day care, etc.) and
storage space. The day care facility will be accessed on the
south side of the building at grade, however, direct access
to the 2nd level social room will be accomplished with
berming on the north side of the building. The day care
facility will have a play yard on the east side of the
building. The play area will be surrounded with a 4' cedar
fence. A 4' wide concrete walk will be installed along the
entire south, east and half of the north sides of the
building.
Exterior building materials include diagonal hardboard siding
(meteor color) wood doors and attic vents (norway aqua) SGD
windows (Olympic white) and asphalt shingles. All wall caps,
roofcaps, flashing, etc., will be painted to match adjacent
surfaces. There will be two sky lights on the south
elevation.
10
v
STAFF REPORT TO THE PLANNING AND ZONING COMMISSION
April 7, 1992
Page 2 of 2
Lots 2-12, Filing 4, Eaglebend Subdivision
Jeff Spanel for Eaglebend Partnership
Eaglebend Clubhouse
A conceptual Design Review
STAFF COMMENTS
As this is a conceptual review, no staff recommendation will
be made at this time. However, staff would like to point out
the following items for further discussion.
- The sidewalk, light fixtures and grading work on
the far east side of the property are located in the public
right-of-way.
- The parking spaces shown on the site plan do not
meet the Town's minimum size requirements.
- The boiler flue should be painted to match the
building.
- No detail has been provided for the proposed
light fixtures.
- No detailed landscaping plan has been submit'.ed
for the clubhouse area.
- The final plat for this property has never been
recorded.
RECOMMENDED ACTION
1. Introduce Application
2. Applicant Presentation
J. Commission Review/Discussion
Respectfully submitted,
j;;F1, cv
Jim Curnutte
Planner
STAFF «T TO THE PLANNING AND ZONING COMMISSION
April 1992
Lot 42, Block 4, Wildridge Subdivision
Doug DeChant for ,i. D. McKean M.D.
Single Family Residence
Discussion on Proposed Windows
Conceptual Design Review
INTRODUCTION
On March 17, 1992, Doug DeChant, on behalf of J. D. McKean
M.D. received concept�ual design review of a single family
residence on Lot 42 and part of Lot 43, Block 4, Wildridge
Subdivision. The building is proposed to be two and one half
stories high and have a habitable area of approx-rately 7,600
square feet. The exterior of the building will ce finished
with stucco, stone and slate.
In response to a Commission comment regarding the windows
being proposed for the building, Mr. De Chant brought in a
sample for the Commission's review. These aluminL-T windows
are manufactured by Kawneer and feature cu.;tom three part
curved profile covers in various anodized finishes.
STAFF COMMENTS
Review and discussion of proposed windows.
RECOMMENDED ACTION
1. Introduce Application
2. Applicant Presentatirn
3. Commission Review/D'scussion
Respectfully suumitted,
Jim Curnutte
Planner
STAFF REPORT TO THE PLANNING AND ZONING COMMISSION
APRIL 7, 1992
Lot 101, Block 1, Wildridge Subdivision
Randy Johnson for Ski Vista Townhomes
Material Change Request
Design Review
INTRODUCTION
Ski Vista Townhomes (two tri-plexes) located or. Lot 101,
Block 1, Wildridge Subdivision received final design review
approval on May 1, 1990 The approved building materials were
cedar lap siding (stained blue -grey, cedar trim (blue) and
stucco (tan). The approved roof material was a #2 medium
cedar shake.
Randy Johnson (RJ Builders, Inc
from the cedar shake shingle to
proposing the Timberline Ultra
This product has a weight of 420
warranty. A sample of the
presented at the meeting.
STAFF COMMENTS
) is now proposing a change
an asphalt shingle. He is
to a weathered wood color.
lbs per square and a 40 year
proposed material will be
At the October 1, 1991 Planning and Zoning Commission meetinc
the Commission adopted a new policy regarding acceptabl3
roofing products in the Wildridge Subdivision. Specifically,
the Commission determined that asphalt shingles will be
considered an acceptable roofing material in the Nildridge
Subdivision depending on their compatibility with the
particular building(s) upon which they are proposed to be
installed. The Commission decided that requests for the use
of asphalt shingles on building would 0e reviewed for
compliance with the following minimum standards:
Weight - 300 lbs per square tmin.numi.
2. Texture - Appropriate relief and shadow effect.
3. Color - Darker earthtone colors with
appropriate color variation and pattern.
With these minimum standards in place the Commission went on
to consider three requests for changes from previously
approved roofing materials to asphalt shingles. The
Timberline Ultra shingle on Jan Livergood's stick built home
a+id the 300 lb per square (minimum) Tamko shingle on a
manufactured unit fourplex being built by Richard Wahl and
Tad Degen. The Commission denied Bruce Kelly's request to
change from wood shakes to a 300 lb per square (minimum)
STAFF REPORT TO THE PLANNING AND ZONING COMMISSION
April 7, 1992
Page 2 of 3
Lot 101, Block 1, Wildridge Subdivision
Randy Johnson for Ski Vista Townhomes
Material Change Request
Design Review
asphalt shingle on a log home. This denial was later
overturned on appeal to the Avon Town Council.
On November 26, 1991, the Avon Town Council approved
Resolution 91-31, which established a moratorium on design
review considerations of asphalt shingles in the Wildridge
Subdivision. The purpose of the resolution was to allow the
Wildridge Citizens to work with the other reside)ts and
property owners of Wildridge to examine and refine the
Covenants and Design Guidelines for Wildridge. The
moratorium became effective for any design review application
submitted after November 1, 1991 and continued until March 1,
1992.
On March 3, 1992, the Avon Planning and Zoning Commission
approved Buz and Monica Reynold's roof material change
request for their proposed residence on Lot 44, Block 1,
Wildridge Subdivision. The Reynold's approval involved a
change from #2 medium cedar shakes to the 420 lbs. per
square, Timberline Ultra asphalt shingles.
On March 17th, 1992 the Planning and Zoning Commission denied
the applicant's request to replace the previously approved
cedar shingles with the Tamko Heritage Premium asphalt
shingle in a Birchwood color. That product had a weight per
square of 340 lbs. The Commission felt that the Tamko
product did not have sufficient weight and texture to be
compatible with the Ski Vista Townhomes. The Commission
sugge.,Led that the applicant consider a higher quality
product.
STAFF RECOMM€NDATION
Review and discussion of proposed roof material change.
STAFF REPORT TO THE PLANNING AND ZONING COMMISSION
April 7, 1992
Page 3 of 3
Lot 101, Block 1, Wildridge Subdivision
Randy Johnson for Ski Vista Townhomes
Material Change Request
Design Review
RECOMMENDED ACTION
1. Presentation of Application
2. Applicant's Presentation
3. Commission Review
4. Commission Action
Respectfully E-allmitted,
an
Jim Curnutte
Planner
PLANNING AND ZONING ACTION
Approved as submitted (-�Approved with Recommended
Conditions ( ) Approved with Modified Conditions ( )
Continued ( ) Denied ( ) Withdra \ r
Date �— Patti Dixon, Secretary J
The Commission granted approval of the requested roof material change
as submitted.