PZC Minutes 071691RECORD OF PROCEEDINGS
MINUTES OF PLANNING AND ZONING MEETING
JULY 16, 1991
The regular meeting of the Planning and Zoning Commission was
held on July 16, 1991, at 7:30 PM in the Town Council
Chambers of the Town of Avon Municipal Complex, 400 benchmark
Road, Avon, Colorado. The meet ng was called to order by
Chairman John Perkins.
Members Present: John Perkins, Henry Vest, Clayton McRory
Sue Railton, PaLti Dixon, Derek Pysher
Staff Present: Rick Pylman, Director of
Community Development;
Jim Curnutte, Planner;
Charlette Pascuzzi,
Recording Secretary
Chairman Perkins stated all members were present except Buz
Reynolds.
Lot 47 Block 2, WildridgeSubdivi_sion, Koehn Residence,
Final Design Review
Jim Curnutte stated that Mark Bornshein, on behalf of Mike
and Rhonda Koehn has requested des;gn review for a single
family home on Lot 47, Block 2, Wildridge Subdivision. Lot
47 is .78 of an acre (33,977 square feet) and is located at
2540 Old Trail Road. The lot slopes toward the southeast, at
approximately 25%.
The house has approximately 2200 square feet, not including
the garage and will feature a gas fireplace and a large
wraparound deck. Exterior building materials are 1 x 8
cedar siding, cedar trim, woodruf shingles, double pane
windows and concrete driveway. The grading/drainage plan and
landscape plan has been provided. The landscape plan does
show an adequate combination of trees and shrubs in a variety
of species and sizes. The prominent fea*.are of the landscape
plan are the two large planting areas, which will be covered
with bark and edged. All trees and shrubs will be drip
irrigation. The grading and drainage plan has not been
overlayed onto the existing topo so the full impacts of this
development cannot be assessed at this time. Driveway grade
appears to be approximately 5%.
PLANNING AND
July 16, 1991
Page 2 of 20
ZONING COMMISSION MEETING MINUTESF
Lot 47, Block 2. wildrid.ge__Subdivs_ion_�__hoehn___Residence,
Final Design Review, (contj_
Curnutte then reviewed the criteria for considering a final
design review.
Curnutte stated that the Staff recommendation is for approval
with the following condition:
1. Final Staff review and approval of the
grading/drainage plan and the driveway/road intersection
design prior to the issuance of a building permit.
Mark Bornshein then provided samples of the colors. The
siding will be a natural cedar and the trim will be a cinder
color.
Considerable discussion followed on the lack of grading and
drainage information and the amount of disturbed area shown.
Derek Pysher moved to approve final design for Lot 47, Block
2, Wildridge, Koehn Residence, contingent upon the acceptance
of the grading/drainage plan by the Staff and as much of a
minimum amount of disturbed areas as possible.
Sue Railton seconded, and the motion carried with John
Perkins voting nay.
Lot 4 Wildridge Acres, Corwin -Brown Res.idence_,__ Final Design
Review
Jim Curnutte stated that this is the 10th of the 12 homes in
this subdivision. He stated that Lot 4 is the largest lot in
the 12 lot subdivision. The building has a floor area of
about 2200 square feet and a building height of 34 feet, from
finished grade to its greatest height. Exterior builiing
materials are similar to those existing in Wildridge Acres.
The driveway will be Finished with asphalt. Colors have been
provided and a landscape plan has been provided which
complies with the overall landscape plan for the subdivision.
Curnutte then reviewed the criteria for considering a final
design review. He stated that the proposal does conform to
the zoning code with the exception that the portion of the
driveway within the right-of-way appears to have a grade in
excess of 4%. He then described the various grades of the
driveway. Also of a concern was the orientation of the
garage entrance which has caused the driveway to be located
right on the south property line and the rock wall support -ng
the driveway which encroaches into Lot 5. Curnutte stated
that no letter of authorization had been provided trom the
-IN
PLANNING AND
July 16, 1991
Page 3 of 20
ZONING COMMISSION MEETING MINUTES
Lot 4 Wildridae Acres, Corwin-Brown_Residence�_._Fi_nal_.Design
Review. (cont)
owner of Lot 5. In addition, the driveway and wall are
located within a drainage and utility easement.
Curnutte stated that Staff recommendation is for- approval
with the following conditions:
1. Final Staff review and approval of the
grading/drainage plan and the driveway/road intersection
design prior to the issuance of a building permit.
2. Written authorization must be provided for the
encroachments on Lot 5 and within the drainage and utility
easement prior to the issuance of a building permit.
Considerable discussion followed on this application, with
much concern voiced regarding the lack of grading and
drainage plans. Also of concern was the driveway
encroachments and grades. The Commission did not feel that
the driveway works the way it is shown. It was suggested
that this item be tabled to give the applicant time to rework
these problems.
Clayton McRory moved to table this item until the August 6,
1991 meeting.
Patti Dixon seconded and the motion carried unanimously.
Lot50� Block 1. Wil_dridge_Subdivision, Schaub _Duplex,
Conceptual Desiq_n Review
Jim Curnutte stated that the Commission has looked at this
project once before, but it was so conceptually drawn that
the applicant was asked to come back with a more complete
application.
Curnutte stated that Lot 50 is one of the few flag lots in
Wildridge. The buildable portion of the lot is accessed by a
45' wide, 150' long strip of land, which is actually part of
the lot. The building is a two story, with loft, log home on
a concrete foundation. Maximum building height is 31 feet,
each unit has about 1800 square feet of floor area. It is a
log home with cedar shake shingles, there is some stucco
incorporated into the building. At the previous meeting the
Commission had asked for a more detailed topo survey, a more
detailed site grading and drainage plan, asphalt shingles
were discouraged, the applicant consider a professionElly
drawn landscape plan, the mirror image problem and asked the
applicant to consider the potential driveway problems.
PLANNIIIG AND
July 1E, 1991
Page 4 of 20
W
ZONING COMMISSION MEETING MINUTES
Lot 50, Block 1, WildridgeSubdivision, _Schaub Duplex,
Conceptual Design Review, (cont)_
Curnutte stated that it appears that the applicant has
addressed every one of the Commission's previous concerns.
As this is a conceptual design review, no recommendation will
be presented.
Wally Schaub presented a sample of the logs to be used and
stated that the color of the exterior trim will be the clear
finished cedar.
Discussion followed on the landscape plan and the retainage
for the driveway. Also discussed was the mirror image aspect
and the grading of the site. Discussion followed on the
access to Saddleridge Loop. Discussion followed on the use
of metal doors. It was suggested that the applicant work
with the north elevation a bit to sort of break the mirror
image problem. It was suggested that maybe landscaping
would help on this elevation. The Commission felt that this
was a good conceptual design. As this was conceptual, no
formal action was taken at this time.
Lot A. Block 2. Benchmark at Beaver_Creek_Subd_ivisio_n_,Avon
Center - Hot Tub Addition, Desi n Review
Jim Curnutte stated that Michael Hazard was representing the
Lodge at Avon Center Homeowners Association (the residential
portion of the building, floors 3 through d). Floors 1 and 2
are commercial and owned by RTC. The proposed hot tub
addition room and building is 16' wide x 24' long x 17' high
and located on the south side of the building on the second
story deck. It will house a mechanical room, a storage room
and the hot tub surrounded by some decking. The building
exterior will match the Avon Center building. In order to
meet code requirements a new egress stairway will be added to
the west side of the second story deck. Curnutte stated
that the applicant did provide detailed drawings of the
stairs. However, another applicant that was in the office
this afternoon apparently inadvertently picked up the
drawings along with his own.
Curnutte stated that the hot tub addition does appear to be
very compatible with the existing architecture of -, e
building, however the Staff does have two concerns, which
are:
1. The area where the deck will be located is
r• -'N
PLANNING AND ZONING COMMISSION MEETING MINUTES
July 16, 1991
Page 5 of 20
Lot A. Block 2, Benchmark at_Beaver Creek _Subdivision, _ A__v_on_
Center - Hot Tub Addition, Design_ -Rev _iey_ cont_
owned by the commercial portion of the building, not the
homeowners. Therefore, some written authorization will be
needed from the commercial owners before any permit could be
issued.
2. The new stairway proposed to be added to the
west wall of the first floor commercial area must not
interfere with the existing office entrance. The proposed
stairway detail must be approved by the Planning and Zoning
Commission. Curnutte stated that on the stairway plans, the
stairway has been designed to miss the door at about 6".
Staff recommendation is for approval with the condition that
the above concerns are resolved prior to the issuance of a
building permit.
Michael Hazard stated that the stair is a code requirement.
It 4s a steel stair, 44" wide. The concept is it allows
egress but not ingress. They are proposing to enclose the
base of the stair with a gate and enclosure to 8' in height.
The gate material will be a perforated steel sheet, with
apertures small enough that people cannot climb up.
Mr. Hazard stated that there is an agreement being drafted,
but doesn't have all the appropriate signatures at this time.
Considerable discussion followed on the location of the
stairs, the materials to be used for the stairs, etc. It
was suggested the stair be painted to match the wall. It was
also suggested that the stairs be enclosed in stucco. The
visibility of the stair was a concern of the Commission. The
Commission did not feel comfortable in approving the stairs
without some plans to look at. The Commission had no problem
with the hot tub addition.
Patti Dixon moved to approve the hot tub portion as
submitted, with the condition that the stair access come back
to the Commission for approval.
Derek Pysher seconded.
The motion was then amended to include the condition that
written permission from the commercial owners must be
received prior to the issuance of a building permit.
The motion carried unanimously.
PLANNING AND
July 16, 1991
Page 6 of 20
ZONING COMMISSION MEETING MINUTES
Lot 83. Block 1. Wildridge__Subdivision,_ Wahl/Degen Fourpl_ex,
Conceptual Design Review
Curnutte stated that the applicants are requesting conceptual
design review of a proposed fourplex building. The lot is
zoned fourplex and is approximately an acre in size. There
is a 50 foot Holy Cross Electric easement running across the
northern portion of the lot and the buildings have been laid
out away from the 50 foot easement. The building is, a two
story fourplex with a height of about 28 feet. Each unit has
a one car garage and a gas fireplace. Exterior building
materials include 8" cedar rustic siding, Woodruf shingles,
aluminum clad windows, insulated steel doors, concrete
walkways and steps and asphalt parking areas and driveway.
There are two guest parking spaces provided and individual
trash pick up is being proposed at this time. The site
grading/drainage/landscape plan is very conceptual. There
are no revised contour lines shown. There are only two
spruce and four aspen proposed on the entire lot. The area
in front of each unit will be seeded and sprinkled. No
infomation has been provided regarding site lighting for
parking areas or drive areas, project signage, or any kind of
reference to the treatment of the border between the asphalt
areas and the landscape areas. The perspective drawing and
the elevation drawings do not match.
As this is a conceptual review, no recommendation will be
presented.
Richard Wahl stated that the garages will stick out 6 feet
and will be a total of 36 feet long, making it a two car
garage. The garage will go all the way to the end of the
building. They want to leave all the sage and wildflowers
intact as much as they can. He discussed the builoing
siting. He stated that the lot, especially on the west side,
is sloped pretty well for drainage.
Considerable discussion followed on the lack of landscaping,
the roof line and scape, and the continuous form of the
building. It was suggested that the applicant work with the
design, possibly staggering the units, try to get a bit more
depth to the building, add more landscaping. Also discussed
was the potential parking problems and the proposed
individual trash pickup.
John Dunham spoke for the applicant, stating that he hoped
that the Commission would not want them to do anything behind
the units because there is natural growth. He felt that the
roof line could be improved upon.
-1% 0�\
PLANNING AND ZONING COMMISSION MEETING MINUTES
July 16, 1591
Page 7 of 20
Lot 83 Block 1, Wildridge Subdivisioy_Wanl�Degen Foulex_�
Conceptual Design Review, (cont).
Chairman Perkins reviewed the concerns voiced by the
Commission as follows:
- The roof scape and roof forms.
- The repetition of the project.
- The end elevations are a concern.
- The landscaping is obviously a concern.
- A floor plan, site grading, a full and very
complete package will be needed.
- The overall design needs to be considered.
Lots 5, and it, Block 5, _Wildridge Subdivision,.__Wi_ldwood
Townhomes, Design Revisions
Rick Pylman reviewed the history of this project, stating
that the Town of Avon received final design review approval
for the Wildwood Townhomes project, located on Lots 5 and 11,
Block 5, Wildridge in May of 1991. Lot 5 is a five unit
townhome project and Lot 11, has two six unit buildings, a
total of 17 units. This is a for sale affordable housing
project being developed by the Town of Avon. The objective
is to allow 17 local families the ability to own their own
housing in a high quality level. It has always been the goal
to be compatible with the neighborhood and Town of Avon
Guidelines.
Pylman then reviewed the design revisions as follows:
- The color has been deleted from the concrete
walkways. All walkways will now be a standard
grey concrete. He stated that they are the
small walkways that come off the garage and off
of the guest parking area into the front door
of each unit.
- The timber edging around the front planters has
been removed to facilitate snow removal. The
planter size and the landscape materials have
not been amended. This was a recommendation
from the contractor and from some maintenance
people that they talked to.
E,
PLANNING AND ZONING COMMISSION MEETING MINUTES
July 16, 1991
Page 8 of 20
Lots 5 and 11, Block5._ Wild_ridge Sub diyision._ Wildwood
Townhomes. Design Revisions�cont).
- Project signs have been simplified. The
previous signs were fairly elaborate. The
revised signs are reflected in the building
plans.
- Dumpster enclosures have been eliminated on both
lots. There was a very expensive dumpster
enclosure solution on Lot 11. After talking to
BFI, there will be individual unit trash
removal. All trash containers are to be stored
within each garage.
- The custom round window in the stairwell has
been changed to a standard rectangle.
- Siding has been changed from a 8" lap to a 12"
lap. The material has not changed, although
they are proposing an embossed siding instead of
the smooth siding.
- The custom round attic vents have been changed
to a triangular vent.
- All the retaining walls have been deleted. With
working with the contractor and sub -contractor
they have been able to redesign the grading plan
to compensate. He described the areas on the
plan.
- The shed roof over the stair towers has been
changed to a flat roof feature, with an
interior drain system.
- The wood shake roof has been replaced with a
Timberline 360 pound per square asphalt shingle.
- The foundation plan has been simplified. There
were a lot of building jogs, paticulariy around
the stairwells and they have straightened out
some of the walls and made the foundation
construction easier and eliminated some of the
concrete work that was needed.
Pylman stated that there is still relief at each building.
The building does still step back nicely. Staff feels that
they are still maintaining the architectural integrity of the
project and are comfortable with the revisions and feel that
PLANNING AND
July 16, 1991
Page 9 of 20
.10%k
ZONING COMMISSION MEETING MINUTES
Lots 5 and 11,_Block 5. Wildridge Subdivision, Wil_dwood
Townhomes, Design Revisions (contl
they still meet the Town of Avon Design Guidelines.
Pylman stated that the roofing material change is certainly
an issue that needs to be discussed. He stated that this
Board has followed a policy that was set by the previous
Board, not long ago, on roof materials and that policy allows
a wood shake, a woodruf masonite material, sod and tile.
They are asking for an asphalt roof tonight. He stated that
they cannot look at this as a special consideration to this
project. They are not asking for it in that way. This has
to be looked at as readdressing the set policy, as to whether
the product itself is acceptable in Wildridge or not. The
Board cannot approve the product for just this project and
not others in Wildridge. The Board should be comfortable
with the probable future requests for use of this product in
Wildridge. This request is driven by budgetary reasons and
is important for the project. However, there are other
reasons for readdressing this matter. There are a lot of
people coming in asking for asphalt roofing material. Cedar
shakes seem to be becoming more expensive and they may be
harder to come by in the future. The asphalt roof product
industry is responding to design concerns and they are making
a better looking roof. An additional concern is coming from
the Fire Department and fire safety. Chief Moore is present
to talk to the Board on this matter. Examples of the asphalt
roof material will be presented for discussion.
Mark Donaldson stated he would like to discuss all the other
items first, before the roof material, since this is
basically a policy decision and not a unique design
consideration.
Chairman Perkins asked if the Board had any problems with the
change in the color of the sidewalks. The Commission members
had no problem with this change. He then asked if anyone had
a problem with the removal of the timber edging around the
planters. There was no problem. He asked if there was a
problem with the change in the project signs. There were
none. Regarding the dumpster enclosure elimination, Derek
Pysher stated he would like to discuss this. Chairman
Perkins asked if there were any p-oblems with the change of
the custom round window in the stairwell being changed to
rectangle. Patti Dixon stated she had a problem with this
matter. The Co.mission also wanted to discuss the change in
the siding. The change in the custom round vents posed no
problems. The change in the retaining walls and compensation
of grading posed no problems with the Commission.
PLANNING AND
July 16, 1991
Page 10 of 20
ZONING r'',MMISSION MEETING MINUTES
Lots 5 and 11. Block 5, _Wild_ridgye__Subdi_v_isi on_, __W_i_ldwood
Townhomes Design Revisions, (Conti
The change of the shed roof to a flat roof over the stair
tower should be discussed. The foundation changes posed no
problems for the Commission.
Discussion followed on the elimination of the dumpster
enclosures. Concern was voiced regarding the accumulation of
trash and it not being properly handled.
Mark Donaldson stated he might be concerned if garages were
not being provided. He stated that control could be handled
through the covenants, etc. He felt that since these would
be owners instead of renters more care will be taken.
Discussion followed on the possibility of the owners having
renters. Staff stated that there would be no renters. It
will not be allowed in the deed restrictions. Discussion
followed on having some sort of enforcement to keep the
owners from letting the trash blow around, etc. Donaldson
stated that there will be a homeowners association and the
owners w -ll rotate in serving on the board. This will be the
policing agency. It was suggested that there be penalties
applied if people don't keep their garbage covered, etc.
Concern was voiced that they would be setting a precedent for
other multi -family projects, with garages, and they would not
have to include a dumpster. Chairman Perkins asked for a
straw vote on this matter and it was four to two for the
elimination of the dumpsters.
Discussion followed on the custom round window of the
stairwell being changed to a standard roctangle and the round
vent being changed to a triangle. Patti Dixon felt that this
was what gave the project the charm.
Donaldson stated that they have had to work with the
contractor on this, but he feels that they have been able to
maintain the gracefulness of the individuality of the units.
They still have the distinctive style of the roof pitches and
there are things that follow through from roof to grade
levels that work well together. Basically we were faced
with having to eliminate non-standard building materials.
Originally there was a round arched soffit that complimented
the round vent. Thdt has been changed so the triangular vent
is compatible with the roof.
Discussion f0l1L1wed on the change in the siding from e",
smooth lap to 12" embossed lap. Donaldson provided a sample
of the siding color and the trim color. Donaldson stated
that with the larger board they felt more comfortable with
PLANNING AND
July 16, 1991
Page 11 of 20
ZONING COMMISSION MEETING MINUTES
WiIdwood
the embossed texture. Donaldson stated that they could go to
the smooth if so desired. The pros and cons of embossed
versus smooth were discussed. Concern was voiced that the
embossing would lessen the quality of the project. Donaldson
stated that if you have a good concept and forms, it will
withstand some design changes or detailing modifications. and
he feels that this project has a gocd concept and good forms.
He stated that he would follow the lead of the Board on
smooth versus textured. He feels the natural cedar trim
would be more compatible with the embossed. Chairman
Perkins asked for another straw vote regarding this matter,
with a vote of four to two for the embossed siding.
Derek Pysher asked for a clarification of the shed roof
change to a flat roof. Donaldson stated that this began
because of it being less lumber, etc. One of the things that
was happening is each of the pitched roofs on either side of
the stairwell was, dumping on to those stairwell roofs and it
created a large saddle coming from each side to keep the
water draining in both directions and most of the water ended
up running off of the back of the building. What they were
able to accomplish is a much less complex roof form in terms
of flashing, waterproofing and long term durability. By
eliminating saddles, the pitched roof of the stairwells, what
they now have is the major roof forms still dump onto the
stairwells, but they are controlled by the interior roof
drain which goes down a warm wall and out to daylight or a
dry well. What they have really accomplished is dumping
about 75% less water over the back of the building.
The next item to be discussed was the matter of the asphalt
shingles. Mark Donaldson stated that the wood shakes come
with no warranty. What this means is that they will last as
long as they last and then you pay to have another put on.
The fiberglass reinforced self sealing Timberline type
shingles come with 20, 30 and 40 year warranties. In
metropolitan areas there is a discount on insurance if
asphalt shingles are used. At this time this is not
available in this area due to the prevalent use of shake
shingles. He stated that the real issue to focus on is the
perception of quality. They are now making a better quality
of asphalt shingles. He described the colors, and the weight
of the shingles proposed. He stated that the idea of mixing
in roofing materials in Wildridge is certainly an important
issue. Wildridge is unique because it is a tiered
subdivision down a mountain side and roof forms are of the
utmost importance in architecture. If you like the
PLANNING AND
July 16, 1991
Page 12 of 20
ZONING COMMISSION MEETING MINUTES
Lots 5 and 11. BioGl, 5. Wildrid e _Subdivision,,_ . Wild -wood
Townhomes Design Revisions (cont)
architecture, he cannot accept the criticism that this
product is not as good as another product, because if the
concept is good, the forms are correct or compatible or
acceptable, the substitution of building materials really
don't effect it a great deal. What they are trying to
achieve is a more long lasting effect. They have looked into
the homeowners association operational costs, everything
about it, the maintenance reserve, everything that goes along
with a project like this, trying to get these first time new
owners into a project that they can live with and not get
overtaken with costs and mainte-ante. The masonite siding is
going to provide a lot of long term durability in that
regard. This is another product that should be considered.
This matter should be considered as a policy change not a
single project matter. The covenants in Wildridge should be
considered for amendment to allow this type of product. He
stated that he feels that they are kidding themselves if they
try to hold on to certain higher standards because it is
written somewhere, or it has been the policy for 12 or 18
months, etc. He stated that in looking at Wildridge there is
a myriad of architectural styles. There are some very clumsy
forms, there are some thins, that are very graceful, there
are some things that really blend into the environment. We
have to look ahead and be more ,attentive to what the real
outcome will be in Wildridge. :here is probably a place in
Wildridge for a good range of styles and finishes and
materials, so long as there is an element of compatibility.
Charles Moore, the Fire Chief of the Town of Avon, stated
that he believes that the average homeowner views fire
protection in terms of fire department assets, i.e., number
of trucks and number of firemen. He thinks there are a lot
of issues that the Commission deals with tf it have a
significant influence on the long term fire safety in
Wildridge. Those issues are landscaping, issues, site
planning issues, and certainly aesthetic and building
material issues. The response and actual firefighting is
only a small portion. He stated that on July 9, 1989, a
significant fire occurred outside of Boulder which destroyed
ten million dollars worth of property. Forty four homes were
destroyed and it left the environment devestated. There are
many similarities with that subdivision and Wildridge that he
would like the Commission to consider. One is the hot windy
conditions; the type of vegetation; similar types of
architecture in terms of building materials, wood shingle
roofs; and another factor is the distance of vegetation to
the structure. In response to the gentleman who spoke
PLANNING AND
July 16, 1991
Page 13 of 20
ZONING COMMISSION MEETING MINUTES
Lots 5 and 11. Block 5,Wi1_d_ri_.dge._Subdivi_sion_,___Wildwood
Townhomes Design Revisions,-(contl
earlier about not dis*urbing Wildridge vegetation, Chief
Moore stated that in terms of fire protection, that is
probably the worst thing you could do. If the brush is close
to the structure there is probably not much the fire
department can do to try to save the structure. Site
planning and landscaping is important. Firebreaks need to be
created around the home and some of the natural vegetation
needs to be removed, away from the homes. The other issue,
of course, is wood shingles. The greatest single risk factor
in saving a. home in a wild wind fire is the roof treatment.
An untreated wood roof increases the probability of a home
being lost significantly. In a situation where there is a
ten to fifteen mile an hour wind the probability of spreading
that fire increases by about seven times by having untreated
wood shingles. He asked that the Commission consider
Wildridge in the long term, when it is completely built out,
and they all have wood shingle roofs. There is always the
potential for a devastating fire in that area and they may
not be able to contain that fire. Chief Moore asked that the
Commission consider these factors in their decisions.
Jack Hunn, a resident of Wildridge, stated that all of the
things considered tonight are reasonable requests that would
typically be considered by any developer. He stated that
when he sat on the Commission they had said no to masonite on
a number of project. He feels the masonite siding is
appropriate on this project, but is suggesting that the
Commission find some criteria to justify the use of it and to
also allow you to say no to it when you feel it is not
appropriate. The fire hazard situation is a concern and
Charlie Moore brought up a couple of good points regarding
the things the Commission does. Irrigated lawns in the close
proximity to a home would help prevent the spread of a fire.
Also, the requests to subdivide and spread the density out on
the sites and put the building closer together and take
multi -families and break them down to single family units
decrease the amount of space between properties and would
contribute to a fire hazard in Wildridge. Asphalt is really
why he is here tonight. He stated that the Commission spent
a lot of time on this issue. They listened to expert roofing
individuals tell about different products. They listened to
developers. The Commission came up with a policy that they
have been consistent in enforcing that is fair and is
working. There are some alternatives that. allow for a more
budget conscious project to have an asthetically acceptable
roof. There are certainly some unknowns with regard to the
,AL
PLANNING AND ZONING COMMISSION MEETING MINUTES
July 16, 1991
Page 14 of 20
Lots 5 and 11. Block 5, Wildridge Subdivision_,__ Wildwood
Townhomes Design Revisions. icont-)
availability of cedar long term, but the market place will
respond to that over time. He stated that he feels that Rick
Pylman summarized it very well when he stated that the
Commission is not considering asphalt for just this project,
but for an approved product for every project that comes in.
He stated that this is certainly a worthwhile project and he
commended the Town and Rick Pylman and Jim Gurnutte for their
efforts. He stated that when this proje,t first came to the
Commission they challanged the Town to set an example. To be
a standard bearer for other developers to follow. The
Commission has the opportunity to set a standard for the
future of Wildridge in terms of asphalt roofs here tonight.
The Town is functioning as a developer on this project. As a
developer they should be expected to abide by all the same
rules that every other developer abides by, including the
covenants. The covenants are very specific. They simply
don't allow asphalt roofs. If there is compelling evidence
to reconsider that then the effort should be made to amend
the covenants to allow it, but to knowingly go out and
violate the covenants is distasteful and for the Town to be
doing it is a really negative message to send to Wildridge
property owners and to other developers. The Town enjoys a
number of advantages alre..idy on this project as compared to
the other developers that they are competing with. They have
access to the most favorable financing that is available in
the market place because of the strength of the financial
situation in the Town; it has waived all of its own fees
(design review fees, building permit fees, tap fees,) this
is a significant amount of money; it has negotiated
situations where they are deferring payments on the front end
costs; and it doesn't intend to make a profit on this
project. If you think about that for a minute, that is a
big advantage, and yet with all those advantages, the Town is
here before you asking you to make a concession and to
approve a material that is less than the standard that you
have set, for budgetary reasons. This Commission has been
very consistent in dismissing budgetary constraints as a
justification for diminishing the quality of a project below
certain standards. That is the justification for this
request. A variety of developers have come before this
Commission since these policies were established and asked
for asphalt roofs and were told no. Sonnen Halde was a good
example: HUD home, same target market. They delivered their
product and is an asset to the community, but without a cedar
shake roof on it, it would have been a plight in that
neighborhood. They got their project done and made some
money. Quite a few developers will be disappointed if you
?LANNING AND ZONING COMMISSION MEETING MINUTES
July 16, 1991
Page 15 of 20
Lots 5 and 11 Block 5y__W-il_dridge_ Subdivision,,. Wlldwood.
Townhomes, Design Revisions-,_(con�_
bend the rules for this project. The Commission will have a
hard time explaining why they were told that they couldn't
have asphalt and this project can. If you bend the rules for
this project you will not be able to deny another applicant
an asphalt roof anywhere in Wildridge. It is his
understanding that the differential cost between the asphalt
roof and the cedar shake is $27,000.00 and that number could
be reduced if the woodruf product were used, to some extent.
$27,000.00 on a project with a budget in excess of a million
dollars is not a deal breaker. He vrged the Commission to
uphold the standards which they have established for
Wildridge, because they are consistent with the covenants and
they are fair and they are working. If there is a
justification, today, or in the future, to change these
standards, the correct procedure is to amend the covenants.
If there are 75% of the property owners in Wildridge that
support the use of a high quality asphalt roofing product,
then it should be allowed, but to propose to violate the
covenants on a model project being proposed by the Town is a
very distastful message to the community.
Mark Donaldson stated that he agrees with Jack that criteria
needs to be established for any of these issues that some
policy has involved in the past. He would urge the
Commission to consider that when contemplating this in the
long run. He thinks that in this instance Wildridge has
special features and is a special subdivision in that sense.
It has always been touted as the "Potato Patch" of Avon. It
is high up in the mountains, it overlooks the valley, it has
similar views of the ski runs, it has a certain remoteness,
etc., unfortunately it has no trees. When you consider
criteria for this kind of product it would be appropriate to
allow certain types of asphalt shingles, a certain weight, or
a certain character or a certain color and disallow others.
He stated that yes, it is true that they are trying to save
money for the Town on this project. They are very limited
with the buyer group and with the time schedule. What he is
asking them to consider tonight is the design solution. Is
this compatible, is this an acceptable material for this
solution. By developing criteria, by modifying the
guidelines, you simply set criteria so that you don't set
yourselves up for an open door policy. Any public board is
always concerned with the precedent setting nature of any
action. He feels that the criteria should be derived from
the design sensibility and the design solution. They feel
that they are still setting a good standard with proposing
the products that they have. In terms of the material he
PLANNING AND
July 16, 1991
Page 16 of 20
ZONING COMMISSION MEETING MINUTES
Lots 5 and 11 Block 5. Wildridge__..Subdiv_is.ion,_ Wildwood
Townhomes Design Revisions, (cont)
feels that the evidence is very clear from a property
protection standpoint, fire safety, life safety, etc. Is
this place so special that only wood shingles can be allowed
on roofs? It doesn't last very long, there are no
warranties, they are known to be more combustible. Even the
treated shakes have to be retreated every year. What they
are asking tonight is to consider the quality of the project.
Does this kind of material, as proposed, with the texture,
the 350 pounds per square, the manufacturers color, does it
help the concept, does it wor'< with the design solution?
Donaldson stated that the Town and Staff have been very
sensitive about any competition with other developers. They
have a pricing structure that is far L, iow units that. are
available in the market today. In Wildridge, with gas heat,
with garages, proper floor plan layout, all the normal
ameni..ies, individual units, townhouse style design. We have
held on to all those qualities of home ownership that they
are trying to pass along to the local people. The waiving of
the fees by the Town is something that the Town decided that
they could do and that was just one more way to assist this
project in not competing with private sector developers. By
keeping those fees out, by taking no profit, by selling them
directly through the Town Staff and by local advertising,
there was no real estate commissions, building permit fees,
plan check fees, water tap fees, and that comes to any
estimates from nine to twelve dollars per square foot.
There are a lot of things going for them to keep them from
competing with the other developers. Donaldson stated that
the developers of Sonnen Halde have had a most difficult time
making a profit on that project. The idea of this project
going ahead is certainly not contingent upon the approval of
the asphalt shingles, but they have been fifteen hundred
dollared to death on these things and every item included in
the staff report has been able to be addressed or justified.
He feels that the asphalt shingles are a good quality
solution and a long lasting solution and meet a lot of the
standards that the community of Avon is trying to achieve in
terms of a home community.
Chairman Perkins asked Jack Hunn how would someone go about
changing the covenants. He was wondering if that process
could be initiated and the project proceed, if that process
could be in before time to put a roof on these buildings.
Jack Hunn stated that any property owner in Wildridge could
petition the other owners to amend the covenants and the Town
PLANNING AND ZONING
July 16, 1991
Page 17 of 20
COMMISSION MEETING MINUTES
Lots 5 and 11 . Block 5_,__Wildrid_ge.__ Subdivls_on,___Wi ldwgod_
Townhomes, Design RevisionS,_,(contI
being a property owner could take the lead. Each property
owner would have to be contacted (probably just under 400) in
order to get them to support an amendment. The first thing
would be to draft the amendment, and then educate people as
to why the amendment would be good. You must have written
agreement from 75% of the property owners. In amendments to
covenants that he has been involved in it took almost nine
months in one case and over a year in another case and there
were only 185 property owners to contact. There is a lot of
effort and a lot of leq work involved.
Rick Pylman stated that he needed to respond to one comment
from Jack Hunn. He stated that he is not asking the
Commission to bend the regulations and would not ask them to
do that. He feels that they have made it very clear up front
that this needs to be addressed as a policy issue, not a
special concession to this project.
Chairman Perkins stated that his problem is that the
Commission did address this issue. The Commission did come
up with the policy that they were not going to allow asphalt
shingles in Wildridge. Keeping that in mind, there are
realities about Wildridge and what it is and in some cases
what it is becoming. Wildridge has always been a battle
ground and he has felt that they have had to stand for the
highest quality that they could secure. He stated that they
have been fighting development that has been consistently at
the lower end of the scale. He stated that it would not
matter to him what kind of shingles this project had. He
feels they all have to make up their own minds on this issue.
Patti Dixon stated that the cedar looks better, but as fcr
longevity and fire protection standpoint the better quality
asphalt would be called for. However, she feels that the lown
of Avon should not be the one to do asphalt shingles first.
She feels that the Commission and Town should abide by the
rules as they are now set. She feels that budget constraints
should not be a consideration since it is not with any other
developer that comes in.
Clayton McRory suggested that the Town should use the woodrut
product. He doesn't feel that asphalt should be used up
there.
Derek Pysher stated that to keep the integrity of the
Commission in all past decisions, he believes they should
continue to disallow asphalt and he does not feel that
PLANNING AND ZONING
July 16, 1991
Page 18 of 20
P", n
COMMISSION MEETING MINUTES
Lots 5 and 11. Block 5, Wildridae Subdiv_i_siony__W_i i_dwood_
Townhomes Design Revisions, (cont)
economic forces should be an issue.
Henry vest asked Mark why there was a time issue with the
project. He stated that he agrees with Jack that there
should be an amendment to the covenants. He also agrees with
Clayton that the woodruf shingles should be used. He did not
feel the asphalt would work with this particular roof line,
etc.
Sue Railton stated that the architecture of this building is
suitable for the asphalt shingles. Her problem is that they
have not allowed it in the past, although she has felt that
it should have been allowed. She feels that they should look
into changing this policy.
Chairman Perkins stated that his final comment is to agree
with the consensus that he hears and it is primarily driven
because we are the Town of Avon and there is a tremendous
conflict of interest working here that is inherent in this
thing. He would like this board, under other business
tonight, to make a motion to form a letter to address the
Town Council to consider initiating addressing changing the
Wildridge covenants. He hears a consensus of the Board that
the asphalt shirgles will not be allowed.
Mark Donaldson stated that they had presented the project to
the Council and the six members that were present all
supported the use of the asphalt shingles and recommended
that they bring it to the Commission. In answer to Henry's
question, there are some critical dates in the mortgage
lenders commitment,
Chairman Perkins stated that he feels that the Commission
has made the right decision and if the Council wants to
change it that would be their right.
Patti Dixon moved to approve all the changes except the
Timberline 360 pound per square asphalt roofing material and
recommend that a woodruf product be used. Clayton McRory
seconded. The motion carried unanimously.
PLANNING AND
July 16, 1991
Page 19 of 20
ZONING COMMISSION MEETING MINUTES
Reading and Approval of Planni_ng___and Zoning. Commission
Meeting of _July 2. 1991
Clayton McRory moved to approve the minutes of the July 2,
1991 minutes as submitted.
Henry Vest seconded and the motion carried unanimously.
Other Business
Chairman Perkins asked what the staff thinks about sending a
message to the Town Council inviting them to consider
initiating a change to the Wildridge covenants. Rick Pylman
stated that this had been discussed previously and this has
been put on a back burner for the time being. There would be
more than just the asphalt roof to be addressed. Subdivided
duplex lots and multi -family type of development would need
to be addressed and they are no where near prepared to
address these matters at this time and probably won't be
until maybe winter.
Chairman Perkins stated that he would back off for now, but
he would like the minutes to reflect that he feels that it is
time for the Town of Avon to address that issue as soon as it
can possibly be done.
Jim Curnutte stated that in the packets was a copy of the new
Woodburning Ordinance that is now law.
Also mentioned was the planning meeting in August and the
Commission members were urged to go and to let the Recording
Secretary know if they decide to go.
Clayton Mcrory moved to adjourn. Patti Dixon second and the
meeting was adjourned at 10:35 PM.
Respectfully submitted,
Charlette Pascuzzi
Recording Secretary
PLANNING AND ZONING COMMISSION MEETING MINUTES
July 16, 1991
Page 20 of 20
Commission
J. Perki s
S. Rail on
C. McRor
A. Reynolds
P. Dixon
H. Vest
D. Pysher _
go
to
to