Loading...
PZC Packet 030591STAFF REPORT TO THE PLANNING AND ZONING COMMISSION March 5, 1991 Lot 70, Block 1, Benchmark at Beaver Creek Mark Donaldson for Marino Construction, Inc. 16 Unit Residential Project Final Design Review INTRODUCTION Mark Donaldson, on behalf of Marino Construction, Inc., is proposing to construct a 16 unit residential project on Lot 70, Block 1, Benchmark at Beaver Creek Subdivision. Lot 70 is 1.312 acres (57,151 square feet.) in size and currently has 8 dwelling units on the property (Beacon Hill Condominiums). The building coverage of the new units is approximately 9,860 square feet. By adding this figure to the building coverage of the 8 existing units (8,440 sq. ft.) the total building coverage on the lot will be 18,300 sq. ft. for a building area ratio of 32%. The floor area of the new buildings is approximately 7,825 square feet. By adding this figure to the floor area of the 8 existing units (10,050 sq. ft.) the total floor area on the lot will be 17,875 sq. ft. for a floor area ratio of 31%. Nearly 56% of the lot area, or approximately 32,350 square feet is covered with impervious materials. The maximum building heignt is 45 feet from finished grade to the highest ridgeline. A landscape plan indicating plant species and size has been provided. The proposed plans indicate that an automatic drip irrigation system will be installed as per the soils engineers recommendation ( located at least 10 feet from foundation walls). The building is a three story, with basement, wood frame building with gable roofs. Exterior building materials include redwood siding, stucco, cedar shingles, aluminum clad windows and metal deck railings. The buildings will include recessed soffit lighting and spherical pendant lights. The proposed foundation system will utilize auger driven piers in lieu of conventional spread footings. A massing model of the proposed project has been provided by the applicant. The applicant will discuss proposed colors and materials at the meeting. STAFF COMMENTS The Commission shall consider the following items in reviewing the design of a proposed project: 6.11 - The conformance with the Zoning Code and other applicable rules and regulations of the Town of Avon. STAFF REPORT March 5, 1991 Page 2 of 5 TO THE PLANNING AND ZONING COMMISSION Lot 70, Block 1, Benchmark at Beaver Creek Mark Donaldson for Marino Construction, Inc. 16 Unit Residential Project Final Cesign Review COMMENT: This proposal is not the Avon Zoning Code and other applicable of the Town at the present time. No provided to show that the dwelling units plan have legal access across the Phase property. 6.12 - The suitability of including type and quality of materials of constructed and the site upon which it is in conformance with rules regulations evidence has been shown on the site I portion of the the improvement, which it is to be to be located. COMMENT: The type and quality of both the building and landscaping materials are suitable with Town guidelines. It would appear that the density of the proposed project may not be suitable considering the limited amount of developable area left on Lot 70. The circulation and parking areas on the site are extremely tight. Turn around and maneuvering areas are very limited. The Avon Town Engineer has the following concerns: - Approoriate erosion control should be shown for areas of concentrated runoff on steep slopes. - Plans should include minimum ditch sections for swales north of new buildings in accordance with drainage study. - Underground detention tanks would seem to be very difficult to clean and maintain as proposed. 6.13 - The compatibility of the design to minimize site impacts to adjacent properties. COMMENT: Architecturally, the proposed project appears to be compatible with the existing Beacon Hill Condominium project. The applicants intend to use a similar architectural style (recessed deck/patios, metal deck railings, exterior covered stairwaus, etc.) and building materials as the existing 8 units (with the exception of the STAFF REPORT March 5, 1991 Page 3 of 5 I TO THE PLANNING AND ZONING COMMISSION Lot 70, Block 1, Benchmark at Beaver Creek Mark Donaldson for Marino Construction, Inc. 16 Unit Residential Project Final Design Review addition of stucco). It would appear that a reduction in density would improve the compatibility of this project with the existing Beacon Hill Condominiums in terms of parking/access aisle circulation. Also, the applicant is proposing to regrade beyond their north property line and onto land currently owned by the Town of Avon. The Town will only grant approval of the regrading if the applicant agrees to be liable for any and all possible damage that may result from such regrading. The applicant should amend the site plan to relocate some of the trees along their eastern property line and within the easement fabled "access easement to Lot 70-A". It is reasonable to assume that this easement will be used by the owner of Lot 70-A to access his property and the trees, if located as currently shown, will impair that ability. 6.14 - The compatibility of proposed improvements with site topography. COMMENT: The property slopes toward the south, southwest at approximately 25-35%. The lowest level of the buildings have been designed to be ;.,srtially below grade in order to minimize site disturbance. As mentioned previously, in order to eliminate the need for retaining walls, along their rear property line, the applicants are proposing to regrade Town property to the north. 6.15 - The visual appearance of any proposed improvement as viewed from adjacent and neighboring properties and public ways. COMMENT: The appearance of this residence from neighboring properties and public ways seems acceptable. The units will be located north of, and be partially screened by the existing Beacon Hill Condominium project. Adequate landscape clusters have been provided throughtout the property. 6.16 - The objective that no improvement be so similar or dissimilar to others in the vicinity that values, monetary or aesthetic will be impaired. STAFF REPORT TO THE PLANNING AND ZONING COMMISSION March 5, 1991 Page 4 of 5 Lot 70, Block 1, Benchmark at Beaver Creek Markdonaldson for Marino Construction, Inc. 16 Unit Residential Project Final Design Review 6.17 - The general conformance of the proposed improvements with the adopted Goals, Policies and Programs of the Town of Avon. COMMENT: The proposal is in general conformance with adopted Goals, Policies and Programs of the Town of Avon, with the exception that it is not the policy of Avon to grant approval to a proposed project until it has secured legal and functional access to all proposed dwelling units. STAFF RECOMMENDATIONS Staff recommends denial of this design review application as currently submitted. If the applicant desires to alieviate some of the previously listed concerns by providing proof of legal access for our review and mitigation of the Town Engineer's concerns, staff suggests that the application be tabled to allow additional review of the revised drawings (site grading and drainage, etc.). RECOMMENDED ACTION Introduce Application Applicant Presentation 3. Commission Review 4. Commission Action Respectfullsubmitted, hwCur'nu�t�te Planner COMMENT: Staff sees no conflict with this criteria. In fact, if the applicant improves the poor drainage conditions that currently exist on the property, as they have stated, physical conditions will actually be improved. 6.17 - The general conformance of the proposed improvements with the adopted Goals, Policies and Programs of the Town of Avon. COMMENT: The proposal is in general conformance with adopted Goals, Policies and Programs of the Town of Avon, with the exception that it is not the policy of Avon to grant approval to a proposed project until it has secured legal and functional access to all proposed dwelling units. STAFF RECOMMENDATIONS Staff recommends denial of this design review application as currently submitted. If the applicant desires to alieviate some of the previously listed concerns by providing proof of legal access for our review and mitigation of the Town Engineer's concerns, staff suggests that the application be tabled to allow additional review of the revised drawings (site grading and drainage, etc.). RECOMMENDED ACTION Introduce Application Applicant Presentation 3. Commission Review 4. Commission Action Respectfullsubmitted, hwCur'nu�t�te Planner STAFF REPORT TO THE PLANNING AND ZONING COMMISSION March 5, 1991 Page 5 of 5 Lot 70, Block 1, Benchmark at Beaver Creek Mark Donaldson for Marino Construction, Inc. 16 Unit Residential Project Final Design Review PLANNING AND ZONING ACTION Approved as submitted ( ) Approved with Recommended Conditions ( ) Approved with Modified Conditions ( ) Continued ( V) Denied ( ) Withdrawn ( ) Date J ' �' �� Clayton McRory, Secretary This item was tabled until the March 19, 1991 meeting to allow the applicant time to provide a revised plan showing the reduction in units. STAFF REPORT TO THE PLANNING AND ZONING COMMISSION March 5, 1991 Lot 70, Block 1, Benchmark at Beaver Creek Subdivision Mark Donaldson for Marino Construction 16 Unit Residential Project Fractionalization of Development Rights Public Hearing INTRODUCTION Mark Donaldson, on behalf of Marino Construction, Inc., is requesting approval of a Fractionalized Project on Lot 70, Block 1, Benchmark at Beaver Creek Subdivision. A request for Final Design Review approval has also been submitted in conjunction with this project. The lot currently has eight (8) units (Beacon Hill Condominiums) and ten (10) undeveloped Residential Development Rights on it. If approved, this fractionalization will result in the creation of sixteen (16) dwelling units from the ten (10) remaining development rights. CHRONOLOGY January 29, 1979 Final Subdivision plat of Benchmark at Beaver Creek Subdivision, Amendment No. 5 was signed, thereby creating the 1.5 acre Lot 70, where no lot had previously existed. September 25, 1979 The 0.2169 acre (9,450 sq. ft.) Lot 70-A was officially split off from Lot 70. January 21, 1981 The Beacon Hill Condo project (18 units) received DRB approval, however, the approval lapsed and became void after two years. May 12, 1983 The project received DRB approval again with the only change being a switch from metal to cedar shake roofing. June/July 1983 A Building permit was issued and the condominium plat was signed for phase I (8 units) of the project. 1984 Serious soil, foundation and slab settlement occurs. Phases II and III are postponed. The right to development the remaining ten units on Phases II & III are later sold. January 15, 1991 Avon Planning and Zoning Commission reviews conceptual drawings of fractionalization project on lot 70. January 28, 1991 Marino Construction, Inc. submits application for final design review and fractionalization approval for 16 unit residential project. STAFF REPORT TO THE PLANNING AND ZONING COMMISSION March 5, 1991 Page 2 of 6 Lot 70, Block 1, Benchmark at Beaver Creek Subdivision Mark Donaldson for Marino Construction 16 Unit Residential Project Fractionalization of Development Rights Public Hearing The proposed project consists of two buildings containing eight dwelling units each. Both of the proposed eightplexes will house 4 two bedroom units and 4 three bedroom units. The two bedroom units are 799 square feet in size (1/2 of a development right each) and the three beiroom units are 1,157 square feet (3/4 of a development right). The residential portion of the buildings is located on the upper three levels with one car garages, a mechanical room and some storage space located on the lower level. All of the units include a gas fireplace. The Planning and Zoning Commission acts on fractionalization requests in conjunction with Final Design Review. A public hearing is held on each request for fractionalization of development rights. The Planning and Zoning Commission may prescribe appropriate conditions and safeguards to mitigate impacts related to proposed fractionalization. STAFF COMMENTS The Planning and Zoning Commission shall consider the following factors in addition to the Design Review Guidelines listed in Section 6.00 of the Design Procedures, Rules and Regulations for the Planning and Zoning Commission of the Town of Avon when reviewing a project involving the fractionalization of residential development rights: 1. The adequacy of access to the site with respect to the width of the adjacent streets, their grades, intersection safety, visibility and entrance into the lot to be developed. COMMENT: At first glance, access to the site appears to be adequate. The applicant intends to use the same road system and driveway currently serving Beacon Hill Condominiums. The problem, however, lies in the fact that when the right to develop phases II and III was sold no provision was made to allow for the shared use of the phase I access aisle. At the present time the only legal means of access to phases II and III is by way of a 30' wide access easement located on the far eastern side of the property. The applicant is currently negotiating with the Beacon Hill Homeowners Association to resolve this access issue. STAFF REPORT TO THE PLANNING AND ZONING COMMISSION March 5, 1991 Page 3 of 6 Lot 70, Block 1, Benchmark at Beaver Creek Subdivision Mark Donaldson for Marino Construction 16 Unit Residential Project Fractionalization of Development Rights Public Hearing The circulation and parking areas on the site are extremely tight. Turn around areas are limited and it appears that any vehicle larger than the average car will have difficulty manuevering on site. Although all required parking is met, any excess parking that may occur on the property will impact circulation lanes. 2. The need for, and availability of public or private transportation, to serve the proposed development; COMMENT: Access to public transportation is a desirable goal for all portions of the Town of Avon. The character of this project, however, will not necessitate the construction of new public or private transportation facilities. 3. The impact of the proposed project upon public and private services and facilities serving the area; COMMENT: There does not appear to oe any definable negative impact to public or private services that are a result of this fractionalization request. The ar)plicant is proposing to improve the drainage and treatment facilities on the site by removing and repaving the existing driveway. In addition, ;.:.e applicant has proposed to repaint some of the existing faci-ities and to upgrade site landscaping. The Avon Fire Chief has requested that the applicant install a new fire hydrant near the entrance to this project in order to assure the appropriate level )f fire protection. 4. The compatibility of the proposed unit sizes and unit mix with existing and potential development in the vicinity; COMMENT: Architectually, the proposed project appears to be compatible with the existing Beacon Hill Condominium project. The applicants intend to use a similar architectual style (recessed deck/patios, metal deck railings, exterior covered stairways, etc.) and building materials as the existing a units (with the exception of the addition of stucco). Eight of the 16 proposed units will be similar in size to the existing Beacon Hill units which range from 1,230 sq. ft. to 1,295 sq. ft. The three Snowrun STAFF REPORT TO THE PLANNING AND ZONING COMMISSION March 5, 1991 Page 4 of 6 Lot 70, Block 1, Benchmark at Beaver Creek Mark Donaldson for Marino Construction, Inc. 16 Unit Residential Project Fractionalization of Development Rights Public Hearing Townhouse units on Lot 43 are approximately 1,900 sq. ft. and the three A -Y Townhouse units on Lot 44 are approximately 2,020 sq. ft. in size. Lot 70-A is approved for a duples building and if the proposed rezoning of Lot 42 is approved (IC to RMD), foru units may eventually be placed on the property. Existing and approved unit sizes along Nottingham Road fall into the following unit size ranges: Unit Sizes # of Units 450 sq.ft.---- 1,000 sq.ft. 36 1,001 sq.ft.---- 2,000 sq. ft. 42 2,001 sq.ft.---- and up 27 The average density of the lots along Nottingham Road is one dwelling unit per 5,200 square feet of lot area, which equates to 8.3 units per acre. The RMD zone district states that average density should not exceed 7.5 units per acre. The density of each lot is determined by dividing the size of the lot by the existing or approved number of dwelling units. Lot 70 is already the most dense lot in the area at one dwelling unit per 3,170 square feet of lot areR (1.31 acres / 18 units), which equates to 13 units per acre. This fractionalization request, as submitted, would increase the density of lot 70 to one dwelling unit per 2,377 square feet of lot area, or 18 units per acre. Finally, if you determined the density of this project by dividing the area described by the legal descriptions of just phase II and phase III by 18 units the resulting density is one dwelling unit per 1,580 square feet of lot area, or 27 units per acre; twice as dense as any other proje.c along Nottingham Road. STAFF RECOMMENDATION Staff recommends denial of this fractionalization request as currently proposed. Although the applicant has indicated that an access agreement with the Beac., Hill Homeowners Association is expected no such agreement I_-, been submitted for review to date. In addition, the proposed density of STAFF REPORT TO THE PLANNING AND ZONING COMMISSION March 5, 1991 Page 5 of 6 Lot 70, Block 1, Benchmark at Beaver Creek Mark Donaldson for Marino Construction, Inc. 16 Unit Residential Project Fractionalization of Development Rights Public Hearing this particular application far exceeds the density exhibited by all other existing and approved residential projects along Nottingham Road. Fractionalization was developed as a tool to allow diversity of unit sizes through an increase in density. Staff realizes that any fractionalized project, by its nature, will have a relative density greater than existing non -fractionalized projects. In this case, we feel that the degree of fractionalization proposed, 10 development rights to 18 units, is to great for both the lot size itself and the neighborhood in general. Staff recommends a density reduction of 2 to 4 units for this project. This reduction would allow greater compatibility with the neighborhood and would ease parking, circulation and landscape concerns with the proposed project. RECOMMENDED ACTION Introduce Application 2. Presentation by Applicant; 3. Open Public Hearing for Fractionalization 4. Close Public Hearing Consideration by Commission 6. Act on Request Respectfully submitted, ;'�� C44-n� Jim Curnutte Planner STAFF REPORT TC March 5, 1991 Page 6 of 6 THE PLANNING AND ZONING COMMISSION Lot 70, Block 1, Benchmark at Beaver Creek Mark Donaldson for Marino Construction, Inc. 16 Unit Residential Project Fractionalization of Development Rights Public Hearing PLANNING AND ZONING ACTION Approved as submitted ( /) Approved with Recommended Conditions ( ) Approved with Modified Conditions ( 40 Continued ( ) Denied ( ) Withdrawn ( ) i Date 6�6 Clayton McRory, Secretary_ The Commission granted )proval for fractionalization of develo rights on Lot 70, Block 1, Benchmark at Beaver Creek for 14 units. STAFF REPORT TO THE PLANNING AND ZONING COMMISSION March 5, 1991 Lot 11, Wildridge Acres Subdivision Steve Riden for Bob Kedrowski Novick Residence Final Design Review INTRODUCTION Steve Riden, on behalf of Bob Kedrowski, is proposing to construct a single family residence on Lot 5, Wildridge Acres Subdivison. Lot 5 is 0.17 of an acre (7,561 square feet) in size and the building coverage is approximately 2,165 square feet for a building ratio of 29%. The floor area of the building is approximately 2,140 square feet for a ratio of 28%. Slightly more than 1/3 of the lot area, or approximately 2,900 square feet is covered with impervious materials. The maximum building height is 28 feet from finished grade to the highest ridgeline. A landscape plan indicating plant species and size has been provided. Drip irrigation will be provided to all trees shown on the plan. The proposed landscaping is in conformance with the overall landscape plan for Wildridge Acres. The building is a two story wood frame building with gable roofs. Exterior building materials include wood siding (8" channel rustic cedar), stucco and masonite shingles (Woodruff). The driveway will be covered with asphalt in conjunction with the street paving. Color and material samples will be presented at the meeting. STAFF COMMENTS The Commission shall consider the following items in reviewing the design of a proposed project: 6.11 - The conformance with the Zoning Code and other applicable rules and regulations of the Town of Avon. COMMENT: The proposal is in conformance with the AvDn Zoning Code and other applicable rules and regulations of Town, with the exception that the distance of the north property line shown on the site plan does not match the approved plat. Since the proposed building touches the building envelope lines in three different places it would appear that by accurately reflecting the true distance of the lot line it would cause some portion of the buildings overhang to protrude into the building envelope. STAFF REPORT March 5, 1991 Page 2 of 4 TO THE PLANNING AND ZONING COMMISSION Lot 11, Wildridge Acres Subdivision Steve Riden for Bob Kedrowski Novick Residence Final Design Review 6.12 - The suitability of the improvement, including type and quality of materials of which it is to be constructed and the site upon which it is to be located. COMMENT: The type and quality of both building and landscaping materials are suitable with Town guildelines. The site is nearly flat and is very conducive to building. 6.13 - The compatibility of the design to minimize site impacts to adjacent properties. COMMENT: The siting and landscaping of the building is sympathetic to the adjacent residential property. All grading will be contained within lot lines. 6.14 - The compatibility of proposed improvement with site topography. COMMENT: The property is fairly flat at the present time. The lower level of the house has been designed to be partially below grade. 6.15 - The visual appearance of any proposed improvement as viewed from adjacent and neighboring properties and public ways. COMMENT: The appearance of this residence from neighboring properties and public ways seems acceptable. Adequate landscape clusters have been provided throughout the property. 6.16 - The objective that no improvement be so similar or dissimilar to others in the vicinity that values, monetary or aesthetic will be impaired. COMMENT: Staff sees no conflict with this criteria. 6.17 - The general conformance of the proposed improvements with the adopted Goals, Policies and Programs of the Town of Avon. STAFF REPORT TO THE PLANNING AND ZONING COMMISSION March 5, 1991 Page 3 of 4 Lot 11, Wildridge Acres Subdivision Steve Riden for Bob Kedrowski Novick Residence Final Design Review COMMENT: The proposal is in general conformance with the adopted Goals, Policies and Programs of the Town of Avon, with the exception of the previously mentioned lot line distance discrepancy shown on the site plan. STAFF RECOMMENDATION Staff recommends approval of this design review application with the following conditions: 1. Due to the relative tightness of the building within the building envelope and the lot line distance discrepancy, it is suggested that the applicant be required to have the building corners staked by a professional land surveyor to assure proper building placement. The building corner locations should then be verified after the foundation forms are set, but before the concrete is poured. 2. Final engineer's review and approval of driveway/road intersection design prior to the issuance of a building permit. RECOMMENDED ACTION 1. Introduce Application 2. Applicant Presentation 3. Commission Review 4. Commission Action Respectfully submitted, Jim Curnutte Planner STAFF REPORT TO THE PLANNING AND ZONING COMMISSION March 5, 1991 Page 4 of 4 Lot 11, wildridge Acres Subdivision Steve Riden for Bob Kedrowski Novick Residence Final Design Review PLANNING AND ZONING ACTION Approved as submitted ( ) Approved with Recommended Conditions ( ✓) Approved with Modified Conditions ( ) Continued ( ) Denied ( ) withdrawn ( ) i Date - <' Clayton McRory, Secretary The Commission granted final design review approval fo Lot 11, Id ridge Acres with the following conditions: 1. The applicant be required to have the building corners staked by a professional land surveyor to assure proper building placement, and the building corner locations be verified after the foundation forms are set, but before the concrete is poured. 2. Final engineer's review and approval of driveway/road intersection design prior to issuance of a building permit. 3. An additional window be added to the north elevation, and as a recommendation only, trapezoid windows be used on the east elevation. __