PZC Minutes 030591RECORD OF PROCEEDINGS
MINUTES OF PLANNING AND ZONING MEETING
MARCH 5, 1991
The regular meeting of the Planning and Zoning Commission was
held on March 5, 1991, at 7:30 PM in the Town Council
Chambers of the Town of Avon Monicipal Complex, 400 Benchmark
Road, Avon, Colorado. The moeting was called to order by
Chairman Frank Doll.
Members Present: Frank Doll, Sue Railton, Jack Hunn,
John Perkins, Pat Dixon,
Clayton McRory, Buz Reynolds
Staff Present: Rick Pylman, Director of
Community Development;
Jim Currutte, Planner;
Charlette Pascuzzi,
Recording Secretary
Chairman Doll stated that all members were present except
Jack Hunn, John Perkins and Clayton McRory.
Clayton McRory arrived aL 7:40, John Perkins at 7:45 and Jack
Hunn at 7:55 PM.
for Bob
iew
Jim Curnutte stated that the lot is .17 of an acre, or 7,561
square feet. Building coverage is approximately 2,165 square
feet for a building area ratio of about 30 %. The floor area
of the building is about 2,140 square feet for a ratio of
about 28%. Slightly more than 1/3 of the lot is covered with
impervious materials. The maximum building height is 28 feet
from finished grade to the highest ridgeline.
A landscape plan has been provided, showing the drip
irrigation that will be provided to all the trees on the
plan. The proposed landscaping is in conformance with the
overall landscape plan for Wildridge Acres.
The building is a two story wood frame building with gable
roofs. Exterior building materials are similar to the other
PLANNING AND ZONING COMMISSION MEETING MINUTES
MARCH 5, 1991
Page 2 of 8
buildings, with 8" channel rustic cedar siding, stucco, and
masonite shingles. The driveway will be covered with asphalt
in conjunction with the street paving. The elevation
drawings show the apprcied colors for the total project.
Curnutte then reviewed the requirements for considering a
design review. He stated that the only comment that staff
has with regard to conformance with the Town's rules and
regulations would have to do with a slight discrepancy shown
on the site plan. He stated that the discrepancy is from the
plat and the property ling shown on this site plan. The
difference is about a font and a half and would cause some
portion of the buildings overhang to protrude into the
building envelope in three different locations.
Curnutte stated that Staff recommends approval of the design
review application with the following conditions:
1. Due to the relative tightness of the building
within the building envelope and the lot line distance
discrepancy, it is suggested that the applicant be required
to have the building corners staked by a professional land
surveyor to assure proper building placement and the building
corner locations should then be verified after the foundation
forms are set, but before the concrete is poured.
2. Final engineering review and approval of
driveway/road intersection design prior to the issuance of a
building permit.
Steve Riden stated that there was no problem about having
those things surveyed as it is a pretty tight site and would
be in everybody's best interest.
Discussion followed on the size of the windows on the east
elevation. They should be the same length. The Commission
also felt that there should be an additional window on the
north elevation. Discussion followed on the possible use of
trapezoid windows on the east elevation. Discussion
followed on using landscaping on the side of the garage where
the utilities are to screen them.
John Perkins moved to grant approval for final design review
to Lot 11, Wildridge Acres, with the following conditions:
1. The applicant be required to have the building corners
staked by a professional land surv;ayor to assure proper
PLANNING AND ZONING COMMISSION MEETING MINUTES
MARCH 5, 1991
Page 3 of 8
Lot 11, Wildridae Acres Subdivision, Steve_,Fi.denfor___Bob
a ; mnvink Residence. Final Design Review��contZ
building placement, and the building corner locations be
verified after the foundation forms are set, but before the
concrete is poured.
2. Final engineer's review and approval of driveway/road
intersection design prior to the issuance of a building
permit.
3. An additional window be added to the north elevation, and
as a recommendation only, trapezoid windows be used on the
east elevation.
Clayton McRory seconded.
The motion carried unanimously.
Jim Curnutte stated that the lot currently has eight units on
the property and to und-veloped residential development
rights remaining. If approved this project would result in
16 new units as submitted.
Jim Curr,utte reviewed the chronology of Lot 70, Block 1, from
1979 through this cu: -rent application.
Curnutte described the proposed project as being two
buildings, each containing 4 two bedroom units and 4 three
bedroom units. The residential portion of the buildings is
located on the upper three levels with one car garages,
mechanical rooms and some storage space located on the lower
level. All units include a gas fireplace.
Curnutte reviewed the criteria for consideration of
fractionalization, describing the problem with the access and
stating that the applicant is currently working with the
Beacon Hill Homeowners Association to resolve the issue.
Circulation and parking areas on the site are extremely
tight.
The applicant is proposing to improve the drainage and
treatment facilities on the site by removing and repaving the
driveway. In addition, the applicant has proposed to repaint
some of the existing facilities and to upgrade site
landscaping. The Avon Fire Chief has requested that the
applicant install a new fire hydrant near the entrance to
PLANNING AND ZONING COMMISSION MEETING MINUTES
MARCH 5, 1991
Page 4 of 8
Hearing, (cont)
this project in order to assure the appropriate level of fire
protection.
Curnutte then reviewed the density of the projects along
Nottingham Road, stating that the average density of the lots
is one dwelling unit per 5,200 square feet of lot area, which
equates to 8.3 units per acre. The RMD zone district states
that average density should not exceed 7.5 units per acre.
He stated that Lot 70 is already the most dense lot in the
area at one dwelling unit per 3,710 square feet of lot area
(1.31 acres/18 units), which equates to 13 units per acre.
This fractionalization request, as submitted would increase
the density of Lot 70 to one dwelliing unit per 2,377 square
feet, or 18 units per acre.
Curnutte stated that at the time of the report Staff
recommendation was for denial.
Rick Pylman stated that a couple changes have been made
regarding the two main concerns on the project, the access
and the density. The applicant has submitted a letter, signed
by Jeff Maddox, President of the Beacon Hill Homeowners
Association, Phase I that indicates that they are willing to
provirl uthorization for access across their property.
Pylm sated that the applicant has provided written
response to the other concerns. Regarding the major issue of
density, the applicant is willing to remove two units, making
the total number of units proposed at 14. Pylman stated
that, in concept, there does not seem to be a problem with
this project anymore.
Discussion followed on which units would be deleted.
Mark Donaldson first thanked the Staff for working with them
on this project and then he reviewed his written responses
to the Staff concerns.
Discussion followed on the possibility of gaining access from
the west side. The adjacent property is zoned commercial and
the owner has not been contacted regarding access, however,
the applicant stated that they would be open to a possible
arrangement that would permit access. The applicant stated
that the width of the proposed access drives, the backing
space required for double loaded access drives and the size
and configuration of the parking spaces appears to strictly
PLANNING AND
MARCH 5, 1991
Page 5 of 8
ZONING COMMISSION MEETING MINUTES
Lot 70, Block 1, Benchmark at Beaver Creek Subdivision. Mark
Donaldson for Marino Construction, 16 Unit Residential
Project, Fractionalization of Development Rights, Public
Hearing, (cont)
adhere to the Town of Avon Zoning Code.
Considerable discussion followed on the parking, and
manuevering space. The Commission asked that the applicant
use the space from the units that are to be removed as
additional guest parking.
The applicant stated that they will install the fire hydrant
as requested.
The applicant stated that with the reduction of the two
units, the density concern has been addressed. He stated
that the east building would remain intact, as presented,
with 4 two bedroom units and 4 three bedroom units. The west
building would be reduced by two units creating 4 two bedroom
units and two three bedroom units.
Chairman Doll opened the public hearing.
Gary Hand, owner of Lot 70-A, stated that he felt that this
will be a very massive project on the hillside and he is
concerned that it will lower his property value in the long
run. He is limited to building a duplex.
John Dunham, representing Sonnen Halde, stated they were in
favor of this project.
Jeff Maddox, President of the Beacon Hill Homeowners
Association - Phase I, stated that he feels that Mr.
Donaldson has done an amazing job getting a project that was
compatible. They have no problems with the design. The
density is a concern of the homeowners.
Discussion followed on having one or two homeowners
associations. Mr. Maddox stated that there will probably be
two that will work together on maintenance, etc. They are
still working on this matter.
The Chairman then closed the public hearin.
Rick Pylman read into the record the letter from Beacon Hill
Phase I authorizing access, in principal, across the driveway
for this project. Pylman stated that this agreement must be
in place prior to issuance of a building permit.
PLANNING AND
MARCH 5, 1991
Page 6 of 8
ZONING COMMISSION MEETING MINUTES
Rights__ Public
Further discussion followed regarding all the above
mentioned parking, access, and density concerns. Landscaping
was also discussed. It was suggested that the landscaping at
the entries be raised. It w,:s suggested that the landscaping
at the driveway entry be protected from snowplows, etc., by
curbing or ties, etc. Discussion followed on requiring the
residents to park their cars in the garages. The applicant
was urged to pursue trying to get a western access also.
Clayton McRory moved to grant approval for fractionalization
of development rights on Lot 70, Block 1, Benchmark at Beaver
Creek for 14 units.
John Perkins seconded.
Discussion followed on placing
declarations/by-laws requiring the
their garages. It was decided that
include this in this motion.
The motion carried unanimously.
a restriction in the
residents to park only in
it was not appropriate to
k, Mark._ Donaldson
idential0ro,7ect�
Jim Curnutte reviewed the building area, floor area and
building height of this project. He stated that nearly 56%
of the lot area is covered with impervious materials.
Curnutte stated that the soils engineer recommended that no
irrigation system be any closer than 10 feet to the
foundation walls.
He stated that the building is a three story, with basement,
wood frame building with gable roofs. Exterior building
materials include redwood siding, stucco, cedar shingles,
aluminum clad windows and metal deck railings. The building
will include recessed soffit lighting and spherical pendent
lights. The proposed foundation system will utilize auger
driven piers in lieu of conventional spread footings. A
massing model has been provided. The applicant will present
proposed colors and materials.
Curnutte then reviewed the criteria for considering design
review.
PLANNING AND ZONING COMMISSION MEETING MINUTES
MARCH 5, 1991
Page 7 of 8
Lot 70 Block 1. Benchmark at Beaver Creek_
for Marino Construction, 16 Unit Residential
Design Review, (cont)
final
Curnutte stated that although staff recommended denial as
submitted, staff feels that since the applicant has reduced
the density, the application should be tabled until the next
meeting so that the applicant can show plans for the newly
proposed project.
Mark Donaldson responded to all comments made by staff.
The colors are - for wood siding, Moorewood SC61 solid body
:stain; Accent color on the handrails, cold roof vents, gas
Fireplace flue vents and fascias, is the Sherman Williams -
Myrtle SW1448; The window clad will match the stucco color
which is Stone 10612.
Further discussion followed on the design of this project.
The general consensus of the commission, since the reduction
in density, is that the project is acceptable, however, it
was felt that the Commission needed to see the revis•.:d plan
before granting final approval.
Buz Reynolds moved to table this item until the March 19,
1991 meeting.
Jack Hunn seconded.
The motion carried unanimously.
D__ Commission
Clayton McRory moved to approve the minutes of the February
19, 1991, meeting as submitted.
Jack Hunn seconded.
The motion carried unanimously.
Other Business
Due to the lateness of the hour, the scheduled worksession on
zoning code revisions was postponed.
Buz Reynolds moved to adjourn, John Perkins seconded.
The meeting was adjourned at 10:10 PM.
Respectfully sub itted,
Charlette Pascuzzi p
Recording Secretary
i
J