The regular meeting of the Planning and Zoning Commission was
held on September 18, 1990, at 7:30 PM in the Town Council
Chambers of the Town of Avon Municipal Complex, 400 Benchmark
Road, Avon, Colorado. The meeting was called to order by
Chairman Frank Doll. to
Members Present: Frank Doll, Sue Railton, Jack Hunn,
Clayton McRory, Buz Reynolds
Staff Present: Rick Pylman, Director of Community
Development; Jim Curnutte, Planner;
Charlette Pascuzzi, Recording Secretary
Chairman Doll stated that all members were present except
John Perkins and Terri Jeppson.
Lot 23 75 [Tract B), Community Shopping Center, Common
Thread. Natures. Provide.rs_,_Cajun_ Boiler Sion_Var lance
Jim Curnutte stated that Donna Baskins of Common Thread, Tony
Jordan of Natures Providers, and Linda Scofield of Cajun
Boiler are requesting a variance from that portion of the
Avon Sign Code that deals with temporary signs.
Curnutte stated that the applicants have some temporary
banners up. The sign code for the building doesn't
adequately address temporary signage and the Town's sign code
only allows temporary signs to be up for one week at a time.
He stated that the applicants have indicated that, due to the
significant cost of the required signs, they must pay for the
signs in installments and wish to use the temporary signs
until the permanent signs arrive.
Curnutte reviewed the sign code allowances. He also reviewed
the wording in the sign program for the Shopping Center.
Curnutte stated that staff feels- the sign program itself
needs to be revised to better cover this matter. He stated
that a letter has been received from the owner stating that
permission for the signs are being applied for by the tenants
and those permits should be issued shortly.
PLANNING AND -ZONING COMMISSION MEETING MINUTES
September 18, 1990
Page 2 of 14
Curnutte then reviewed the criteria for considering a
variance. He reviewed the sizes of the proposed temporary
signs. He stated that Natures Providers expects his
permanant sign to be up in the next two wec=.!<s. Cajun Boilers
sign should be up within the next three weeks. Common Thread
has not even started the process for their permanent sign.
Curnutte stated the Commission must include the findings
provided in their action. He stated the staff recommendation
is that it would appear that the strict provisions of the
sign code would result in a practical difficulty for these
businesses and would result in an unnecessary hardship being
imposed upon them. The wording in the Comprehensive Sign
Program is too vague as it relates to the governing of
temporary signs. Staff recommends approval with the
following conditions: 1. The Comprehensive Sign Program for
the building should be amended by the owner to include
allowances for temporary signs with specific time and cuality
criteria; 2. That Natures Providers and Cajun Boilers
banners must be attached more securely to the building;
3. The temporary signs be allowed until November 15, 1990.
Linda Scofield of Cajun Boilers stated that Jim Curnutte had
covered everything that she would say and she would be happy
to answer any questions. She stated that, it will be
approximately three weeks before her sign would be ready and
she stated that she had spoken with Donna Baskins of Common
Thread and that she felt that she would probably have a sign
up in about three weeks.
Discussion followed on the use of banners for temporary
signs. It was suggested that maybe plywood signs painted to
match the permanent signs would work better. Also discussed
was the time frame for allowing the temporary signs.
Considerable discussion followed on both matters.
Buz Reynolds moved to approve this temporary sign variance
for Lot 23/75 (Tract B) Community Shopping Center, citing the
finding that the variance is warranted because the strict or
literal interpretation and enforcement of the regulation
would result in practical difficulty or unnecessary physical
hardship incorsistent with the objectives of this title, and
with the following recommendations:
1. The Comprehensive Sign Program for the building
should be amended by the owner to include allowances for
temporary signs with specific time and quality criteria;
^. An1
PLANNING AND ZONING COMMISSION MEETING MINUTES
September 18, 1990
Page 3 of 14
ty_Shopgi_ng__Center_,_. Common_ Thread,_
Boiler, Sign Var1ance (contV
2. The Natures Providers and Cajun Boiler banners
must, be attached more securely to the building;
3. The temporary signs be removed by November 15,
1990.
4. Staff contact the owners about the temporary
s gnage problem.
5. This approval applies to the above described
businesses only. No additional businesses will be included
in this variance.
6. The owner be notified that it is required in
the Comprehensive Sign Program that any signage of a former
tenant must be removed by the previous tenant, or owner, but
not at the expense of the new tenant.
Clayton McRory seconded.
The motion carried unanimously.
rankiin Residence,
Sue Railton stepped down as a voting member of the Commission
due to a conflict of interest.
Rick Pylman stated that the Commission has looked at this
project on a conceptual basis about a month ago. He stated
that the architecture has been detailed out, but other than
that there is very little change from the conceptual review.
Pylman state.i that it is a fairly large duplex lot. He
described where the house would be sited stating that Mr.
FranKlin hopes to build the second duplex unit at a future
date. He described the location for the second unit. He
described the drive and parking areas. He stated that it is
a steep gable roof form with shiplap cedar siding with a
heavy trim. A bit of stucco has been used on some of the
walls and chimney as an accent element. Colors have been
provided, there is a landscape plan that is good, irrigation
is specified for it. Building height conforms. Building
area ratio meets the zoning. Pylman stated he had one
question regarding the retaining wall around the asphalt,
that encroaches into the setback and into the utility
easement. He asked how much of a retaining wall that would
be.
PLANNING AND ZONING COMMISSION MEETING MINUTES
September 18, 1990
Page 4 of 14
Lot 52, Block 4. Wildridge Subdivisions_ Franklin Resi_dence_,_
Final Design Review_ cont_
John Railton stated than it is really more of a border than a
structural retaining wall. Pylman stated that he had no
problem with that, however a letter of authorization would be
needed from the utlities for the encroachment into the
easement.
Pylman then reviewed the criteri<•. for approval, stating that
on the landscape plan materials were specified as one to two
inch caliper. Staff recommends a 2 inch caliper. Staff
recommendation is for approval with the conditions regarding
the increase in caliper of trees and that more detaii on the
timbers lining the parking area be provided. He feels this
last one has been explained.
John Railton stated that there have not been many changes
made since the conceptual review. He stated that the
applicant will try to obtain a letter from the utility
companies and if they can't get the letter then they would
change the parking area. They would like to have it as
proposed, as it makes it easier for parking. He stated that
they would change the aspen trees to 2" caliper.
Railton described the colors, the areas of stucco, the white
clad windows, the roof material. The basic color will be tan
with the white as trim and on the clad windows. The stucco
will be white also. The roof will be a machine cut cedar.
Discussion followed on the regrading to be done and whar
would be done with the excess soils.
Jack Hunn moved to grant final approval to Lot 52, Block 4,
Wildridge Subdivision, with the following conditions:
1. The caliper of the aspen trees be a minimum of
two inches.
2. The proposed encroachment into the easement
receive the approval of the utility companies.
3. Any excess soil from the construction be hauled
off the site.
e. No disturbance during construction below the
9130 contour or on the site of the future unit.
Clayton McRory seconded.
The motion carried unanimously.
PLANNING AND ZONING COMMISSION MEETING MINUTES
September 18, 1990
Page 5 of 14
Lot 8. Filing 1. Eaglebend Subdivis,ion_,__ Seibert -Residence,-
Final
Residence,_Final Design Review
Sue Railton also stepped down on this item due to a conflict
of interest.
Rick Pylman stated that Tony Seibert is requesting final
design approval for a single family residence on a duplex
lot. He stated this is not a duplex, but does include a
caretakers unit above the garage and is part of the approval.
The lot shares a driveway with the driveway with the duplex
on the adjacent lot. It also serves as an access to the
diversion structure for Metc :lf Ditch. Pylman described the
driveway and the access to the diversion structure.
Pylman stated that he recommends 2" caliper trees on this lot
also. He stated thatthere are quite a bit of improvements
shown in the easement for the diversion structure and
permission from the owner will be required for any
disturbance or construction to take place there. The redwood
deck is the main concern. Pylman stated that other than this
concern the architecture is suitable.
Pylman reviewed the criteria and stated that this project is
in conformance with the zoning code and that the project is
compatible with the neighborhood and with the design
guidelines.
Pylman stated that recommendation is for approval with the
condition of the caliper of the aspen trees and the
requirement of approval for the encroachment into the
easement.
John Railton stated that apparently Tony Seibert has spoken
with the auti„rity about being able to put a redwood deck
over the concrete structure and they were receptive to the
idea, but it still has to be formalized. The deck would have
to be built in panels so that they could be removed for any
maintenance to the concrete work. ?t would also have to have
lift -out or hinged panels for the access ways.
Railton stated that the colors are a pale gray, opaque stain
siding for the basic color with a darker gray, opaque stain
for the trim. The windows are a white clad window and the
stone is a reconstructed stone.
Discussion followed on the driveway that will be partially
gravel and partially asphalt. Discussion followed on the
landscaping on this side of the house and that there needs to
be some to screen between the two houses.
PLANNING AND ZONING COMMISSION MEETING MINUTES
September 18, 1990
Page 6 of 14
Lot 8 Filing 1 EagIebend Subdivision. _Seibert _Residence,
Final Design Review (cont)
Clayton McRory moved to grant final design review to Lot 8,
Filing 1, Eaglebend, with the following conditions:
1. The minimum size for the aspen trees be 2
caliper.
2. No improvements be made within the Metcalf
Ditch easement without written permission.
3. Detailed drawings of tie deck area over the
Metcalf Ditch easement be completed, showing how the
dismantling of the deck will be accomplished.
4. Additional landscaping be added to the east
side of the house.
Jack Hunn seconded.
The motion carried unanimously.
Sue Railton returned as a voting member of the Commission.
amity__ Final
Jim Curnutte stated that the Town Council has approved the
Wildridge Acres Preliminary Plan and SPA Amendment. The
applicant is in the process of submitting the Final Plat for
the subdivision.
The applicant would like to start construction as soon as the
final plat and subdivision improvements agreement is signed,
therefore he is submitting this final design review and also
one for Lot 8.
He reviewed the size and building area ratios, building
height, etc. He stated that there is an overall landscape
plan for the entire subdivison.
The building is a two story wood frame structure, with gable
roof. Cedar siding will be used with stucco and Woodruff
shingles. The driveway will be asphalt and will be done in
conjunction with street paving.
Curnutte then reviewed the criteria to be considered and
staff comments regarding each criteria.
Staff recommendation is for apporval with the following
PLANNING AND ZONING COMMISSION MEETING MINUTES
September 18, 1990
Page 7 of 14
Lot 7 Wildridge Acres Subdivision,__Single--- Family, _ F_inal_
Design Review (cont)
conditions:
1. No building permit will be issued until the
Final Plat for Wildridge Acres Subdivision and the
Subdivision Improvements Agreement have been s'gned.
2. Final staff review and approval of proposed
drainage and driveway/road intersection plans.
Steve Riden, representing Bob Kedrowski, stated that most of
the homes will be, not identical, but similar in their
texture and form. However, the matters within the form will
be varied. The colors will vary. Olympic 900 and 901 have
bFen picked for the siding colors. Stucco will be a rolled
texture off-white or arsper� white or a color to match 900 or
901 Olympic stain. The contrasting element will be a 920
Olympic stain for the fascia and triru. The windows will be a
highlighted white clad window.
Riden stated that there will be plenty places that will need
fill, so they will be stockpiling on site.
Considerable discussion followed on th plans being so
similar. The Commission was concerned with having a tract
homes look. It was suggested that each time the applicant
submits a new design review, he also provide what has also
been approved on the adjacent properties, so that the
Commission can be aware of any drastic similarity. It was
suggested that more than two colors be used, a variety be
used on the windows, etc. It was suggested the applicant
look at some different roof forms, etc., or run the siding a
different way. There needs to be a balance in the 12 houses,
however. Riden stated that the houses would vary in form.
Further discussion followed on all these matters.
Discussion followed on the landscaping. Jack Hunr stated he
would like to see an overall landscape plan for the
subdivision and then a site specific landscape plan for each
house. He feels the current landscape plan is pretty sparse.
Considerable discussion followed on landscaping that would be
compatible in the area. It was suggested that the applicant
introduce some shrubs into the landscaping plan. Discussion
followed on the locations of the trees on the plan.
Discussion followed on the windows on the west elevation
design and maybe a better way to make them work. The
applicant showed the Commission another idea they had and
PLANNING AND
September 4,
Page 8 of 14
bg
ZONING COMMISSION MEETING MINUTES
1990
Lot 7, Wildridge Acres Subdivision, Single Family, Final
Design Review (cont)
the Commission agreed it looked much better.
It was suggested that the landscape architect find some way
to deal with the drip line.
Discussion followed on the time schedule of the final plat
approval. The applicant stated that in order to submit the
final plat the surveyor has to set the pins and in order for
the surveyor to do this some grading needs to be done.
Rick Pylman stated that staff ha:: been working with the
applicant on this matter. A road cut permit will be applied
for. The applicant will provide a letter of credit, or etc.,
and then the applicant can do the grading and the Town will
have the security so that if necessary the Town can go in and
restore it. This security would be given back at the time of
final plat and subdivision improvement agreement approval.
Jack Hunn moved to grant final design approval to Lot 7,
Wildridge Acres Subdivision with the following conditions:
1. The applicant reconsider the palette of
materials and colors and the design of the subsequent homes
to provide a variety of architectural design within the
context of these materials and colors.
2. The applicant reconsider the landscape plan and
specifically consider the introduction of shrubs as well as
additional plant materials between houses and some technique
to manage the drip line.
3. The applicant reconsider and add fenestration
to the north elevation.
4. The applicant modify the window design on the
west elevation and provide an alternative design for that
elevation.
Clayton McRory seconded.
Discussion followed on the chimney detail and the other
vents.
The motion carried unanimously.
•
PLANNING AND ZONING COMMISSION MEETING MINUTES
September 18, 1990
Page 9 of 14
Lot 8 Wildridge Acres_ Subdivision,__Sinn le_ Fami-ly, _Flna�
Design Review
Jim Curnutte stated that one of the differences between this
project and Lot 7 is that the driveway on this project is
currently shown as about 12 % and Staff recommends that it
not exceed 10%. The deck on this project does encroach 5'
into the rear setback, which was approved during the SPA
prpcess. He stated that the stairway also encroaches into
the setback.
Staff recommends approva' with the following conditions:
1. No building permit will be issued until the
Final Plat for Wildridge Acres Subdivision and the
Subdivision Improvements Agreement rave been signed.
2. Final staff review and approval of proposed
urainage and driveway/road intersection plans. The driveway
should not exceed 10%.
3. More detailed information of the proposed
driveway retaining wall should be provided prior to the
issuance of a building permit.
Discussion followed on the different,)s of this applicatior
and the previous design review, architecturally.
Clayton McRory moved to grant final design approval to Lot 8,
Wildridge Acres Subdivision with the following conditions:
1. The applicant reconsider the palette of
materials and colors and the design of the subsequent homes
to provide a variety of architectural design within the
context of these materials and colors.
2. The applicant reconsider the landscape plan and
specifically consider the introduction of shrubs as well as
additional plant materials between houses and some technique
to manage the drip line.
3. No building permit will be issued until the
Final Plat for Wildridge Acres Subdivision and the
Subdivision Improvements Agreement have been signed.
4. More detailed information of the proposed
driveway retaining wall should be provided prior to the
issuance of a building permit.
Sue Railton seconded.
The motion carried unanimously.
PLANNING AND ZONING COMMISSION MEETING MINUTES
September 18, 1990
Page 10 of 14
Lot 2 Block 5 Wildridge Subdivision, 4 Unit Com lex, Final
Design Review
Jim Curnutte stated that this is for a four unit residential
complex, being two duplexes. He described the sizes and area
ratios. He stated that a landscape plan has been submitted,
however staff has some concerns since there are no
quantities, sizes or discussion of irrigation shown on the
plan. The applicant has indicated that the landscape
materials will be manually watered. The buildings are two
story wood frame buildings with gable roofs. Exterior
materials are T-1-11 wood siding and Woodruff shingles. The
siding will be stained with a semi -transparent stain. The
applicant would like to leave the driveway and the parking
areas gravel for a period of up to one year to allow for
compaction, then cover it with asphalt.
Regarding the conformance with the zoning code, the type and
quality of the proposed buildings and landscape materials are
in conformance, the siting and landscaping of the buildings
is sympathetic to the adjacent residential property. The
buildings are sited in the most logical building area of the
lot. The property slopes toward the west/southwest at an
average of 35%. There is a fairly level bench area on the
property which would accommodate the proposed nuildings.
Approximately 1/2 of the basement level will be below
finished grade. Insufficient information has been provided
to adequately determine visual impacts of the development for
the following reasons:
- The landscape plan does not provide the size or
quantity of materials.
- The gradings and drainage plan is not accurately
drawn. Cross sections through the lot would be helpful. The
grading plan does not appear to match the elevation drawings
very well.
- Insufficient retaining wall detail provided.
Apparently a 12' foot high retaining wall is proposed. AV
walls over 4' high must be structurally designed.
- No trash or snow storage areas are shown on
either site plan.
- No windows or landscape materials have been
provided along the south sides of the buildings.
- Desigr guidelines suggest that overhangs,
where they occur, shall be at least one and one-half feet"
I '00� /1
PLANNING AND ZONING COMMISSION MEETING MINUTES
September 18, 1990
Page 11 of 14
ex,_ Final
and one foot overhangs have been shown.
- Design guidelines discourages mirror duplexes.
Staff recommends the Commission review this project and
provide the applicant with a detailed list of information
necessary to receive final approval at the October 2, 1990,
regular meeting.
Al Connell stated that he is trying to build affordable type
housing. He would like to build the units next month. He
stated that he would be willing to mix in stucco to break up
some of the hard lines. Discussion followed on the use of
T-1-11 siding. Discussion followed on the plain design of
the buildings and the matter of the mirror images and the
fact that just changing colors etc. would not change the
mirror image. The Commission expressed concern regarding the
height of the retaining walls. Also of a concern was the
snow storage. The gravel drive, even for a year, on a
project of this size would be a problem. Also of concern
was the lack of an irrigation system for a project of this
size. It was suggested that a landscape architect be
employed to recommend what plant materials would be
successful in the area and develop a landscape plan. Further
discussion followed on ways to use the same floor plan, but
get away fron the mirror image duplex, especially since there
are not only one mirror image building, but two. It was
suggested that the applicant also use some horizontal
elements to make the building look shorter. There seems to
be problems with the roofs. There is snow shedding to qarage
doors, decks and entries. Discussion followed on how to
make the roof come down a bit. The Commission feels that
there is a need for the affordable housing, but there are
minimum standards to be met also.
Buz Reynolds moved to table the application for Lot 2, Block
5, Wildridge Subdivision, ur,til such time the applitAnt
wishes to return with a revised application.
Jack Hunn seconded.
The motion carried unanimously.
PLANNING AND ZONING COMMISSION MEETING MINUTES
September 18, 1990
Page 12 of 14
Lot 38 Block 2. Wildri_dae Ackerman.Residence�_ Subdivision
Sketch Plan
Chairman Doll stated that this peice of property has been
discussed for some time. One of the suggestions made to the
applicant was to subdivide this lot when he was talking about
doing a detached duplex.
Rick Pylman stated that the lot is a large lot and would be
adequate for two lots. He stated that the applicants stated
intention is to keep the driveway easement across the first
lot to access the second.
Pylman stated that the trend at this time is to come down in
sizes. He stated that there are 267 duplex lots in Wildridge
and 9 single family lots. This could bring in many more
requests of this type. He stated he would be more
comfortable with this if there was a minimum lot size and a
minimum buildable area established.
Staff recommendation is for approval.
Discussion followed on getting criteria in place as soon as
possible for future requests of this sort.
Chairman Doll suggested a motion to approve this sketch plan
as submitted be made.
Buz Reynolds seconded.
The motion carried unanimously.
Chairman Doll stated that the Commission did do a site visit
regarding the signs that are now in place.
Discussion followed on the window signs at Casa Bella.
Curnutte reviewed the allowances in the sign code, which
states that 25% of the window is allowed. Discussion
followed on the definition of a window sign.
Discussion followed on the allowances in the Comprehensive
Sign Program.
It was suggested that they go with the 34 square feet
allowance and grandfather all the rest of the signs that are
there and any more signs will conform with the signs that are
there now. This would include any new businesses that come
in later.
PLANNING AND ZONING COMMISSION MEETING MINUTES
September 18, 1990
Page 13 of 14
Discussion followed on having Casa Bella bring her signs down
to ground level.
A section shall be added to the Comprehensive Sign Program
which states: Window signs for the west end of the building
shall not exceed 34 square feet, and shall be at pedestrian
level height (8 feet from finished floor elevation).
All existing signs will be granufathered in.
Buz Reynolds so moved.
Clayton McRory seconded.
The motion carried unanimously.
Reading and Approval of Planning_ and Zoning_ Commission
Minutes for September 4. 1990
Jack Hunn moved to approve the minutes of the Septemoer 4,
1990 meeting as submitted.
Sue Railton seconded.
The motion carried unanimously.
Other Business
Jack Hunn inquired if the names of the street names had been
changed on the Kedrowski plans. Jim Curnutte stated that
they had been changed.
Discussion followed on some of the lighted signs along
Nottingham Road and how bright those lights are.
Jack Hunn moved to adjourned.
Clayton IAcRory seconded.
The meeting was then adjourned at 11:00 PM.
Respectfully submitted,
Charlette Pascuzzi
Recording Secretary