PZC Minutes 071790RECORD OF PROCEEDINGS
MINUTES OF PLANNING AND ZONING MEETING
JULY 17, 1990
The regular meeting of the Planning and Zoning Commission was
held on July 17, 1990, at 7:30 PM in the Town Council
Chambers of the Town of Avon Municipal Complex, 400 Benchmark
Road, Avon, Colorado. The meeting was called to order by
Chairman Frank Doll.
Members Present: Frank Doll, Buz Reynolds
Terri Jeppson, John Perkins
Sue Railton, Jack Hunn
Staff Present: Rick Pylman, Director of Community
Development, Jim Curnutte, Planner
Charlette Pascuzzi, Recording Secretary
Chairman Doll stated that all members were present except
Clayton McRory and Buz Reynolds.
Lot 63 Block 2 Benchmark at Beaver Creek Grand on Avony
Design Review Revised Porte Cochereand Building Colors
Rick Pylman provided drawings related to the revisions to the
porte cochere. He stated that originally they had
contemplated moving Benchmark Road to create more room for
the porte cochere. For various reasons that is no longer
being contemplated. Essentially they have brought the porte
cochere back in closer to the building to allow it to
function with the existing alignment of the road. Also, what
needs to be done at this meeting is the entry and exit
configurations.
Mark Donaldson stated that the roof forms have been revised
as requested. The color will be the Pratt and Lambert 1366
Blue Spruce. All the other changes are intact in terms of
what was requested. He stated that they will come back with
the lighting proposal. The signage will also be presented at
a later date. He gave a general description of what they
will be proposing.
Discussion then followed on the color scheme. The Commission
members have, just prior to this meeting, looked at the
samples painted on the building. Donaldson stated that the
owners prefered the mauve mist PL2035 as the basic color. He
stated that the blue spruce would be used on the metal roof
PLANNING AND ZONING COMMISSION MEETING MINUTES
JULY 17, 1990
Page 2 of 11
Lot 63 Block 2. Benchmark at Beaver Creek, Grand on Avon
Design Review Revised Porte Cochere and Building Colors,
cont
of the porte Cochere, the cap flashing for the upper roof
forms of the main building, the roof parapet of the lower
building, and the metal handrail at the retail level.
John Perkins moved to grant final, approval for the colors
presented. All colors will be Pratt and Lambert and are:
P12022, smoke stained rose for the inside of the
balconies and north facing corridors;
PL1366, blue spruce for the trim color;
PL2035, mauve mist for the basic building color.
Perkins also moved to grant approval to the revised porte
Cochere design as presented.
Terri Jeppson seconded.
The motion carried unanimously.
Buz Reynolds arrived at 7:50 PM.
Jim Curnutte stated that Robert Borg is proposing to
construct a mirror image duplex on Lot 38. The lot is a
quarter of an acre in size or about 10,890 square feet. The
building coverage being proposed is approximately 2800 square
feet for about a 26% building area ratio. The floor area of
the entire building, including the first floor which is
mostly garage level, is approximately 7,300 square feet,
which is about 68% ratio. Slightly over half of the lot is
covered by impervious materials. Maximum building height is
35 feet. A landscape plan has been provided that does show
approximately 7 trees and 16 junipers. Disturbed areas will
be reseeded. The applicant has indicated a landscape budget
of approximately $1,000.00. The plans show no information
regarding future irrigation of landscaping. The building is
a three story, wood frame structure with hip rcofs. The
exterior building materials are stucco, cedar decking, and
the roofing materials are proposed to be red cedar shake
shingles. The colors proposed for the stucco are sandlewood
beige and manor white. The first level of the building
contains four covered parking spaces. The second level
consists of four bedrooms with a bathroom for each bedroom,
and a laundry room. The third level contains a bedroom, two
bathrooms, a study, a kitchen, and the living room.
Curnutte stated that prior to the submittal of this design
review Mr. Borg talked to the staff about doing some sort of
PLANNING AND ZONING
JULY 17, 1990
Page 3 of 11
COMMISSION MEETING MINUTES
employee housing project on this property. That would
include six bedrooms on each side, inhabited by 12
individuals employed in the area. The applicant was informed
that the property is zoned duplex, which means that only a
single family may occupy each side. The applicant has
amended his plans to what is being presented and Mr. Borg
stated that a single family will occupy each side.
Curnutte reviewed the criteria stating that the type and
quality of materials do conform with the Town guidelines.
The site is suitable for development and water and sewer
lines are adjacent to the property. The proposed duplex is
positioned further back on the lot than most of the other
buildings to allow for a limited view corridor. Virtually
the entire front yard is proposed to be a paved parking lot.
Very little screening is being proposed. No landscape
materials are being proposed on the north, east or west sides
of the building to help break up the mass of the building.
The four plants on the south side of the building would not
do much to help break up the mass of the building. The lot
is virtually flat. The amount of impervious coverage on the
lot can be significantly reduced by eliminating several of
the proposed parking spaces and reducing the driveway width.
There are far more parking spaces than are needed for two
single families. The property is highly visable from I-70,
Nottingham Road, and West Beaver Creek Blvd. The
architecture exhibits very little interest, character, or
diversity. The Avon guidelines specifically discourages
mirror image duplexes. Landscaping does not appear to be
compatible with the improvements or neighboring properties.
The siding material of entirely stucco, building design,
color, surface parking and landscaping all appear to be very
dissimilar to other buildings in the vicinity. Regarding the
general conformance with the adopted goals, policies and
programs of the Town, this proposal does not appear to
conform to the recommendations contained in the Avon
Comprehensive Plain, i.e., "landscaping around buildings
could be enhanced"; "encourage existing development and
require new development to screen parking areas with plant
materials"; Require new development to be of the same quality
and character as existing development".
Curnutte stated that although the applicant has stated that
the future use of the building will be limited to single
families, the parking lot and floor plan of the building
would not lead you to believe that that will be the future
use.
PLANNING AND ZONING COMMISSION MEETING MINUTES
JULY 17, 1990
Page 4 of 11
v
Staff recommends that this application be tabled to allow the
applicant to resolve the following issues:
1. More information on grading and drainage should be shown
on the site plan.
2. Snow storage areas should be labeled on the site plan and
be of sufficient size to accomodate snow storage.
3. Landscaping materials appear to be insufficient and no
irrigation system has been proposed.
4. Mirror image duplexes are discouraged in our regulations.
5. Siding materials being proposed do not appear to be
compatible with surrounding properties.
6. Driveway entrance must be in conformance with Town
requirements.
7. Impervious coverage of the lot should be reduced and this
can be accomodated by a reduction of parking spaces.
8. The building should be redesigned to add architectural
diversity and character and break up the plain, square form.
Robert Borg stated that the design of the building is
motivated by a ski rental or ski use by himself and his
partner and their familes. They plan to keep one of the
units and either pre -sell or sell later the other unit. He
stated that regarding the irrigation, they did indicate, in
the written description on the landscaping, that it will be
sprinkled. Regarding the parking area in front, what they
sought to do is provide for two parking spaces for each side
and still maintain access to the garage units under the
building. Regarding the screening of the parking, he stated
that he has provided shrubs on both sides where the paving
exists and on the front side also. He feels the parking area
should be kept open. On the subject of stucco, there is a
building immediately across from this site, the Comfort Inn,
that is entirely stucco. There is more limited use of stucco
on all sides of the lot. He feels that stucco fits the
character of the design. He stated that there is very
limited pitch on the site. There is a total fall of about 3
feet. Snow storage will go around the perimeter of the
parking area. He feels that there is sufficient area to
address this matter.
PLANNING AND ZONING COMMISSION MEETING MINUTES
JULY 17, 1990
Page 5 of 11
Duplex,
Chairman Doll stated that you don't often see single family
homes with five bedrooms and five bathrooms. This is more
like a bed and breakfast unit.
Jack Hunn stated that he also felt this is an unusual floor
plan for a single family home. It is all bedrooms basically.
It is clear that the study could be converted to a sixth
bedroom in the future. He stated that the Commission has to
look it two ways. There is a stated intent, and then there
is a p?ssible intent. The concern is that a very active bed
base in a fairly established neighborhood would be
inappropriate. The number of cars and other attributes of an
active bed base would cause commotion in this established
neighborhood. He stated that he would have a problem with
this being an active ski rental boarding houso. In terms of
its scale, design, materials, all of those things are
appropriate, possibly on another site, but this is a very
established neighborhood. The other duplex structures on the
street are pretty compatible with each other. They are
predominantely wood. They are landscaped similar to what you
would find in a normal neighborhood. The landscape plan that
you are promoting is sensitive to the fact that you have a
large parking and a lot of snow removal and not much summer
use. It works well in the winter, but does not project what
is consistent with the neighborhood in the summer. The
building, in terms of its scale on a small site, is going to
look tight on that site.
Mr. Borg stated that he has to do something that will entice
a buyer, and since so many of the other units are not
selling, this could be an indication that something a little
different is needed. He stated he would bow to it the
Commission feels that a wood treatment would make it more
compatible.
Hunn stated that perhaps there is a way to tuild something
that is appropriate for today's market, without ignoring the
neighborhood, perhaps a stucco base with a wood siding. Hunn
also stated that the project being a mirror image is also
discouraged, even though most of the properties on the street
are mirror images. Many of them have made some effort to
disguise the fact that it is a mirror image and perhaps
something can be done to this project to change some
fenestration on one side, create a variety of materials, etc.
Buz Reynolds stated he felt that they will have trouble with
the snow removal with the amount of area they have. The
PLANNING AND ZONING
JULY 17, 1990
Page 6 of 11
COMMISSION MEETING MINUTES
Lot 38 Block 2 Benchmark at Beaver Creek, Bob Bor-q—DuP—l_ex�.
Final Design Review, (cont)
building itself, the architecture should be changed from one
unit to the other to give it different character. Anything
to get rid of the mirror image. He also has a problem with
the massing of the asphalt. He also feels that this could be
a bed and breakfast project.
Sue Railton stated that she feels much the same as the
others. She is also concerned with the mass of asphalt. She
suggested planting up against the building.
Mr. Borg stated that he thinks that he could possibly do
something near the steps.
She felt that the mirror image is not acceptable She stated
that landscaping will be the main thing that will draw this
property towards the other properties.
Terri Jeppson stated that she agrees with all the comments
that have been stated. She feels the project is harsh. It
has very little interest. She is also concerned with each
unit having five bedrooms, each with their own bathroom.
That just lends itself so easily to a rental situation and if
she was a neighbor she would be very upset with that.
John Perkins stated that he thinks the applicant should make
another run at this. He feels the applicant should really
try to be sensitive to the neighborhood. He stated that the
stucco doesn't bother him as much as it does other people.
He feels it is superior to wood siding for a finish material.
He feels that with just integrating a little bit of wood
would make the materials work. He stated that he feels the
biggest problem with the project is that he thinks the third
floor requires a secondary exit. This could be a major
problem. He suggested the applicant contact the building
official regarding this matter. The landscaping material is
woefully undersized. He stated that the applicant will have
to load up the landscaping.
Chairman Doll reviewed the comments made by the Commission
members.
John Perkins moved to deny final approval for Lot 38, Block
2, Benchmark at Beaver Creek, as presented.
Terri Jeppson seconded.
The motion carried unanimously.
PLANNING AND ZONING COMMISSION MEETING MINUTES
JULY 17, 1990
Page 7 of 11
Jim Curnutte stated that Tony Seibert is proposing a single
family residence on Lot 6, Filing 1, Eaglebend Subdivision.
Curnutte stated Lhat on August 5, September 5, and October 5,
1989, the applicant received P & Z review on a proposed
duplex. It was tabled several times and after the October
meeting the appl4^ant withdrew the application. The
applicant is now requesting a single family residence on this
lot. The lot is about a third of an acre. The building
coverage is about 3,000 square feet for a ratio of almost
20%. Nearly 30% of the lot is covered by impervious
material. The maximum building height is 26 feet. There is
a landscape plan with revegetation shown. An irrigation
system is included. The building is a two story, wood frame
building with gable roofs. Exterior building materials
include wood, stucco and cedar shake shingles. Color samples
were not included. About 40% of the lot is located within
the 30 foot high water setback. This is not the mean high
water line, but the required 30 foot setback from the mean
high water line. Nearly half of the lot is within this 30
foot setback. Special provisions should be considered which
prevent any removal or destruction of the riparian zone.
Curnutte reviewed the criteria, stating that this proposal is
in conformance with the zoning code. The materials being
proposed are suitable with Town guidelines. The siting and
landscaping of the building is sympathetic to the adjacent
residential properties. Additional landscaping on the east
and west sides of the building would help break up the mass
of the building. The site slopes in a south/southeasterly
direction at about 5%. The house has been designed as if it
were a flat lot requiring considerable fill material to be
added to the southwest side of the house. The site plan
shows that a large amount of this fill material will encroach
into the high water setback area. The amount of impervious
coverage can be significantly reduced by eliminating the two
car surface parking area shown and replacing it with some
vegetation. The appearance seems acceptable. Lot
disturbance should not be permited within the high water
setback. Excessive disturbance of the riparian habitat will
cause long term irreparable damage to the river corridor.
The proposal is in general conformance with the adopted goals
and policies of the Town, with the exception of the amount of
fill being placed in the riparian zone as shown on the site
plan,
Staff recommendation is for approval with the following
conditions:
PLANNING AND ZONING
JULY 17, 1990
Page 8 of 11
COMMISSION MEETING MINUTES
Lot 6 Filing 1 Eaglebend Subdivision, South__, Harbor
Development Final Design Review, (cont)
1. Proposed driveway must be shown to comply with Town
standards prior to issuance of a building permit.
2. A more detailed drainage and grading plan must be
provided at building permit time.
3. Parking appears to be in excess for a single family home,
but this is the applicants right to propose as many spaces as
they would like. They could get more landscaping and less
impervious material by removing two parking spaces.
4. The applicant should consider moving the building
slightly to the north, to assure that the riparian habitat is
not affected.
Tony Seibert, representing South Harbor, provided color
samples. He then reviewed the history of the lot.
Previously they were going to have to cut, the bank, and
received strong reactions from both staff and the Commission.
Therefore, they stopped the P & Z process in order to revise
the entire building. It is essentially the same first floor
plan, but the bedrooms are now above. The exterior is still
the same. It is a board and batten. Since this is a single
family residence on a duplex lot, it will be priced more,
therefore, this is the reason that they have added more
parking. All of the rooms are basically oriented towards the
river. He stated that the drainage and grading should not be
a problem. They will address the grade on the driveway and
drainage in more detail on the construction plans. Most of
the lot is about the same level as the roadway. He stated
that the setback on the house is what the prior staff
requested they utilize. This was last year. That is
basically 10 feet away from the edge of the riverbank. They
could probably 1';ve with as much as a 12 to 15 foot setback
off of the top of the riverbank and still get good river view
sight lines.
Reynolds asked about the makeup of the board and batten.
Seibert stated that basically it is a sheet of 4x8 plywood
with 2x2 bats, spruce or pine. Discussion followed on this
matter. It was recommended that plywood not be used on such
an expensive house. Conventional lap was recommended,
especially with vertical lines.
The colors will be Colony Greystone D7995 for the basic
color, a lighter grey - Mink T20-53 for the trim, and for the
stucco a Spanish White P42. Only the fascia gets the trim
PLANNING AND ZONING COMMISSION MEETING MINUTES
JULY 17, 1990
Page 9 of 11
uth_ Harbor
color.
Perkins stated that he hopes that they can get the grade out
of the riparian area. He stated he thought that the building
could be setback some. Seibert stated that he thinks they
can rotate the house a bit more, the fill problem can be
alleviated. Perkins suggested that the deck on the southwest
corner be a rock patio. Seibert stated he has already asked
the architect to change it.
Hunn stated that he would like to promote some additional
landscaping in the vicinity of the surface parking, which is
adjacent to other surface parking next door and there is
nothing to screen one from the other. He also suggested some
additional foundation planting and perhaps some trees to
improve the view from lot 7.
Perkins moved to grant final design approval to Lot 6, Filing
1, Eaglebend Subdivision, with the following conditions:
1. That the applicant work with staff in the final siting of
the building, removing the fill material that is in the river
setback.
2. That the exterior siding be a conventional board and
batten application, meaning a 1 by 10 or 12 material
overlapped by 1 x 4 conventional material.
3. The deck on the southwest corner be changed from a wood
constructed deck to natural stone deck.
4. Staff work out additional landscaping , principally on
the side setback lines and in the area of the parking.
Buz Reynolds seconded.
The motion carried unanimously.
Buz Reynolds stated that he must step down, due to a conflict
of interest.
Curoutte stated that Mr. Louis VonOhlsen is proposing to
enclose an existing deck on the building. The addition is an
enlargement of the master bedroom. The new addition will
incorporate a bay window on one side and french door and
PLANNING AND ZONING
JULY 17, 1990
Page 10 of 11
COMMISSION MEETING MINUTES
Lot 5 Block 2 Benchmark at Beaver Creek, Louis VonOhlsen,
Buildira Addition. Final Design Review. (cont -1
balcony on the south side. The area of addition is
approximately 100 square feet. The proposal will not have any
negative effect on the building height, lot coverage or
setbacks. Staff is recommending approval of the addition as
submitted.
Louis VonOhlsen provided a photo of the site and showed the
Commission members the location of the addition.
Hunn stated that the bay window is somewhat out of character
with the other windows on the building. He suggest perhaps a
more expansive glass. Hunn stated he thought the addition
fits the building pretty well and his only concern is the bay
window. Mr. VonOhlsen stateJ he has already purchased the
window.
Perkins stated he agrees that the addition makes sense. He
asked if the bay window would require some sort of support.
Mr. VonOhlsen stated that the one he purchased does not.
Discussion followed on the roofing.
Terri Jeppson moved to grant final design approval for Lot 5,
Block 2, Benchmark at Beaver Creek, for the building addition
as proposed.
Jack Hunn seconded.
The motion carried unanimously.
Lot 7 Block 2 Wildridge Subdivision, Hangartner Residence,
Final Design Review
Since no representative for the applicant
Perkins moved to table this application
regularly scheduled meeting
Buz Reynolds seconded.
The motion carried unanimously.
John Perkins moved to adjourn.
Buz Reynolds seconded.
The motion carried unanimously.
The meeting was adjourned at 9 PM.
Respectfully submitted,
Charlette Pascuzzi
Recording Secretary
was present John
until the next
PLANNING AND ZONING COMMISSION MEETING MINUTES
JULY 17, 1990
Page 11 of 11
Cc
J,
S
r