PZC Minutes 110789RECORD OF PROCEEDINGS
MINUTES OF PLANNING AND ZONING MEETING
NOVEMBER 7, 1989
The regular meeting of the Planning and Zoning Commission was
held on November 7, 1989, at 7:30 PM in the Town Council
Chambers of the Town of Avon Municipal Complex, 400 Benchmark
Road, Avon, Colorado. The meeting was called to order by
Vice Chairman Buz Reynolds.
Members Present: John Perkins, Jack Hunn,
Buz Reynolds, Clayton McRory,
Denise Hill, Terri Jeppson
Staff Present: Rick Pylman, Director of Community
Development, Jim Lamont, Acting Planner,
Norm Wood, Engineer
Charlette Pascuzzi, Recording Secretary
Lot 72 Block 2, Benchmark at Beaver_Cr_e_ek,._Buck.Creek Plaza
Building, Parking Variance, Continued from_1_OJ17%89 Meeting
Rick Pylman reported that the Avon Town Council has
determined that the Buck Creek Plaza Building is a legal
non -conforming structure and no increase in parking is
necessary for the additional 1405 square feet. Therefore,
the Council agreed to repeal the Special Review Use to allow
the leasing of those spaces. Formal action will be completed
at the November 14th Avon Town Council meeting. No action on
the part of the Planning and Zoning Commission is necessary,
therefore the application is being withdrawn.
Lot 8 Block 1 Benchmark at Beaver Creek, Sonnen Halde
Condominiums, Landscape Plan
Jim Lamont stated that the applicant wishes to reque"t the
approval of a supplementary landscape plan as was requested
in the prior design reviev.. approval of the Sonnen Halde
Condominium project. He also stated that the driveway access
from Nottingham Road has been altered per Staff
recommendations.
Regarding the landscaping design, Lamont commented that the
landscape design appears to be similar and is compatible with
other site improvements and with landscape improvements on
neighboring properties. Regarding the criteria that not less
Planning and Zoning
November 7, 1989
Page 2 of 9
Commission Meeting Minutes
Lot 8 Block 1 Benchmark at Beaver_ Creek,_ SonnenHalde
Condominiums Landscape Flan ReviewcontJ_
than 5o% of the useable open space area required, shall
consist of pervious landscape areas and the remaining useable
landscape requirements being satisfied by impervious patio or
mall type areas, Lamont stated that the design is compatible
with the requirement.
He stated that the landscape materials and their location has
been used to create snow fencing, visual screening and
windbreaks. Lamont stated that the plant materials appear to
be adaptable to the climatic conditions of the area. The
selection and placement has taken into consideration the
function and color coordination of each species.
Identification of specific plant material and seed mix has
been indicated as well as the means of irrigation.
Staff recommendation is that wildflower seed should be
considered as an augument to native grass mix and ground
cover and flower plants should be indicated in larger
planting areas surrounding or beneath tree species and in
rock retaining wall areas.
Lamont provided two drawings, one showing the change in the
access/parking lot, and the other the landscape plan and
irrigation.
John Dunn described the various features of the plan,
including the pet walk sections. Discussion followed on snow
storage also. Discussion followed on the policing of the pet
walk sections. Mr. Dunn stated that the management will be
responsible for that duty. Discussion followed on the
location and screening of the trash dumpster.
Discussion followed on the schedule for the completion of the
other half. Mr. Dunn stated that they are planning on
starting again in early spring with completion in early July.
They will backfill and fence the area at this time.
Rick Pylman stated that they need more detail on the trash
enclosure. Further discussion followed on the planting beds
and the location of some of the plants.
John Perkins moved to grant final approval to Lot 8, Block 1,
Beaver Creek, Sonnen Halde Condominiums, with the
recommendation that the shrubbery planted along the south
property line be broken in as much of a manner as possible to
break the continuous line and also that a feature tree be
planted in the circular landscape feature at the entry to the
Planning and Zoning Commission Meeting Minutes
November 7, 1989
Page 3 of 9
Lot 8 Block 1. Benchmark At Beaver_Creek�_ Sonnen-Halde
Condominiums Landscape Plan Review (cont)
project and this approval be conditional on the staff
approval of the detailing of the trash enclosure and the
screening fence along the north side.
Jack Hunn seconded.
The motion carried unanimously.
Lamont stated that the developer of Sonnen Halde on Lot 8,
Block 1, Benchmark at Beaver Creek wished to change the color
of asphalt roof shingles from the previously approved color
resembling a dark grey or similar to weathered shake shingles
to a light tan. Lamont then provided a sample of the
proposed shingle and asked that the Commission members review
the specifications provided. He stated that the color change
appears to meet the applicable rules and regulations of the
lown of Avon. The type and quality of materials are
compatible with the site. Existing structures in the
vicinity have roof color tones primarily in the gray to dark
brown color spectrum. The proposed color does not affect
site impacts, nor site topography, the improvement is
aesthetic in nature and is nct so similar or dissimilar to
others in the vicinity that values, monetary or aesthetic
will be impaired. The proposal is in general conformance
with adopted Goals, Policies and Programs for the Town of
Avon. The color name is cedar blend.
Discussion followed on the sample produced now and the one
previously shown and the fact that the previous one was of a
much heavier texture. Discussion followed on the
specifications of the proposed shingle. The proposed shingle
is fiberglass not asphalt. Franz Elsigan stated that if it
was the desire of the Board, they could change back to the
shake shingles. After considerable discussion, it was the
general consensus of the Commission that shake shingles would
be preferable.
McRory moved to deny approval of the proposed asphalt
(fiberglass?) shingle for Lot 8, Block 1, Sonnen Halde
Condominiums, and replace with shake shingle that was
originally submitted with the project and is so on record.
Jeppson seconded.
The motion carried unanimously.
Planning and Zoning Commission Meeting Minutes
November 7, 1989
Page 4 of 9
Lot 69. Block 2, Benchmark at Beaver Creek, 51_ BeaverCreek
Place, Trash Enclosure, Design Review
Rick Pylman stated that since the staff report was written,
he has spoken with the owner of 51 Beaver Creek Place, Bruce
Allen. Pylman stated that the owner had requested that he be
able to postpone the building an enclosure for the trash
dumpster until sometime next spring to allow him time to work
out a joint use with the bank. Pylman stated that Mr. Allen
has worked out an agreement with the bank and the dumpster
has been removed. Pylman suggested continuing this until a
letter is received from Mr. Allen stating that he will not
keep a dumpster on the property.
John Perkins moved to continue the Lot 69, Block 2, Benchmark
at Beaver Creek, trash enclosure, until such time that the
verification letter is received by the staff.
Denise Hill seconded.
The motion carried unanimously.
Single
Jim Lamont made some comments regarding some of the changes
made to the plans from the previous plans. However, due to
the noise of various conversations and papers rattling, those
comments are not transcribable.
Jim Lamont stated that Terence Allan wishes to construct a
single family residence with a detached garage on Lot 41,
Block 4, Wildridge Subdivision. According to information on
the application, the proposed structure is 3700 gross square
feet contained in a wood framed structure which is 31 feet
high from the grade to the top of the ridge line. Average
height is within estimated height limitations. The site
plan indicates that disturbed areas of land will be
revegetated with native grassers, sage and wildflowers. 2:1
slopes between house and garage are to be covered with
spreading junipers. Approximately 25% of the site will be
disturbed. Existing vegetation is native grasses and sage or
low indigenous brush. The building, deck and driveway
coverage of the site is approximately 10% of the site. The
usable open space is not specifically indicated on site plan.
However, sufficient site area is available to attain the 25%
requirement. Main drainage channel for the site is located
on the edge of the driveway. Driveway is at its steepest
7.6% grade.
Lamont stated that the project appears to meet applicable
rules and regulations of the Town of Avon. No unusual
Planning and Zoning Commission Meeting Minutes
November 7, 1989
Page 5 of 9
Lot 4' Block 4, Wiidridge Subdivision_L_Tere_nce A_I_l.an,_Single
Family Residence Design Review—Ccontl
conditions occur, except the location of the lot on a sloping
corner turn of a thoroughfare. The type and quality of
materials are compatible with the existing structure in the
vicinity. The driveway entrance has been located at best
location to observe traffic conditions. An alternative
driveway location would increase the disturbed area on the
site. A detached garage has been provided which reduces the
danger from steep driveway in prior site plan layout. The
alteration of topography and removal of vegetation is
acceptable. Drainage is sufficient. Disturbed areas should
be reduced and fill areas consolidated. The visual
appearance of the residence does not appear to pose any
deleterious effects from adjacent neighboring properties and
public ways. The improvement is residential in nature and is
not so similar or dissimilar to others in the vicinity that
values, monetary or aesthetic will be impaired, and the
proposal is in general conformance with adopted Goals,
Policies and Programs for the Town of Avon.
Staff recommendations are: Deck railing material be
designated; Horizontal siding on garage; driveway should
include backing area so as to diminish conflict with usual
street traffic conditions; and the applicant has not
indicated method of irrigation. Method of maintaining
revegetated areas is not indicated, letter of maintenance
commitment included and trash storage not shown. Lamont
stated that a letter of commitment has been received
regarding the maintenance, stating that it will to maintained
for a period of three years.
Terence Allan stated that he thinks he will put in sprinklers
for the irrigation system. Mr. Allan clarified the
maintenance letter stating that he will maintain it forever.
Discussion followed on extending the driveway prevent backing
into the street. Discussion followed on the roof over the
garage and the fact that it will shed snow onto the driveway.
It was suggested that the roof be turned the other way.Due to
several conversations going on at the same time, actual
discussions are not transcribable.
Discussion followed on the use of a propane tank. Discussion
followed on the difference in the fascia of the house and the
garage.
Terri Jeppson moved to approve the design review for Lot 41,
Block 4, Wildridge Subdivision, Terence Allan, single family
Planning and Zoning Commission Meeting Minutes
November 7, 1989
,4W Page 6 of 9
IC 7
M
residence, with the conditions of the landscape design coming
•
for approval and the fascia on the house and garage be the
same and an alternate dormer be used, and the garage door be
8 feet rather than 9 feet, and that an additional turnaround
be provided to prevent backing into the street.
Jack Hunn seconded, however he asked to clarify the matter of
the garage roof, rather than add a dormer the roof should be
turned 90 degrees. Jeppson so amended the motion.
Hunn seconded the amendment.
The motion carried unanimously.
Lot 53 Block 3. Wildridge Subdivisign, Hans O_berlohr_Duplex
Residence Design Review
Lamont stated that Mr. Hans Oberlohr wishes to construct a
duplex residence on Lot 53, Block 3, Wildridge Subdivision.
According to information on the application the proposed
structure has a footprint of 3890.05 square feet contained in
a wood framed structure which is 32 feet high from the grade
to the top of the ridgeline at the highest point. Average
height is within height limitations.
He stated that the site plan indicates that disturbed areas
of land will be revegetated with native grasses, sage and
wildflowers. Approximately 40% of the site will be
disturbed. Existing vegetation is native grasses and sage or
low indigenous brush. The building area ratio of the site is
approximately 12.85%. The usable open space area is not
specifically indicated on the site plan. Sufficient site
area is available to attain the 25% useable open space
requirement. Main drainage channel for the site is located
on the edge of the driveway. Driveway is estimated to be an
average 4.8%.
Lamont stated the project appears to meet applicable rules
and regulations of the Town of Avon. No unusual conditions
occur, except side setback requirement. The building is
currently sited within 8 ft. of the property line. The type
and quality of materials are compatible with the existing
structures in the vicinity. The driveway entrance has been
located at best location to observe traffic conditions. An
alternative driveway location would increase the disturbed
area on the site. Retaining wall for driveway is at places
seven to ten feet in height. Materials and finishes for
retaining wall not indicated. The alteration of topography
and removal of vegetation is acceptable. Drainage is
Planning and Zoning Comm'ssion Meeting Minutes
November 7, 1989
Page 7 of 9
Lot 53 Block 3 Wildridge Subdivision, Hans Oberlohr, Duplex
Residence, Design Review, (cont)
sufficient. Disturbed areas should be reduced and fill areas
consolidated. The visual appearance of the residence does
not appear to pose any deleterious effects from adjacent and
neighboring properties and public ways. The improvement is
residential in nature and is not so similar or dissimilar to
others in the vicinity that values, monetary or aesthetic
will be impaired. The proposal is in general conformance
with adopted Goa's, Policies and Programs for the Town of
Avon.
Staff recommendations ar,��: Snow storage areas should be
designated on the site plan; Front setback dimension not
indicated, information should be provided; Side setbacks not
consistent with provision of adopted plat, 10' minimum side
setback; Color ano materials sample not available for
review; Dimensions should be included on blueline drawings
accepted for building, code review; Define specific species
included in native grass m.:ture; Method of irrigation not
indicated; Method of maintaining revegetatec areas is not
indicated; Trash storage not shown; Legate existing
utilities and service lines; Indicate exterior liglting;
and Define usable open space.
Mark Donaldson provided a letter ac ressing the staff
recommendations as follows: A revised set of drawings
reflecting the responses; The snow storage area has been
designated; the front setback has now been indicated; the
sideyard setback has been r vised to reflect 10 ft. dimension
per the adopted plat; the colors are: stucco Kwal-Howells
5591 W Cauliflower,siding Olympic transparent 901 and the
fascia will be Olympic solid color pewter stain; provided the
dimensions on the revised floor plan drawings to supplement
the floor plan dimensions provided in original application;
specific species of native grasses will be: crested wheat
5.78%, smooth broam 39.32%, rye grass 16.39%, yellow blossom
sweet clover 8.32%, western wheat 3.85% and timothy 4.14%,
the native grass; mixture will be s!aed in 9 parts to 1 part of
native wildflowar mix. The area designated as "lawn" on the
site plan will be kentucky blue3rass; the formal landscaped
areas indicated on the drawings will be irrigated with an
automatic sprinkler system; the existing utilities are shown
on the survey submitted with the original application. The
utility service lines have now been noted on site plan; each
duplex owner will store his trash in containers in their
garages; the only exterior lighting being proposed are
recessed can lights, 100 watt maximum at each front porch
roof; and the backyard is labeled as "open space".
Planning and Zoning
November 7, 1989
Page 8 of 9
Commission Meeting Minutes
Lot 53 Block 3 Wildridge Subdivision Hans Ooerlohr, Duplex
Residence Design Review, (cont)
Discussion followed on the definition of usable open space.
Discussion followed on the building line and the problem of
the way the sewer line comes into the lot. Discussion
followed on the retaining walls for the drive and the
drainage. Discusion followed on perhaps putting landscape
material on the western side of the retaining wall. Donalsdon
stated that they would rather leave it as planned so that the
natural vegetation will come back. Discussion followed on the
parking spaces provided. The retaining wall color will be
the same as the stucco.
Jack Hunn moved to grant final approval to Lot 53, Block 3,
Wildridge Subdivision, Hans Oberlohr duplex residence, as
presented.
John Perkins seconded
The motion carried unanimously.
Reading and Approval of P & Z Minutes of 10/17/89 Re ug lar
Meeting
Jack Hunn moved to approve the minutes of 10/17/89, as
written.
Denise Hill seconded
The motion carried unanimously,
Other Business
The Christie Lodge satellite dishes were discussed and the
fact that they need screening.
Clayton McRory stated that he has re-enlisted in the Army and
`.n the spring he will have to be gone for further training
for two months, and he asked Norm Wood what he should do
about the time he will have to be gone. Wood stated that
probably all that would be needed would be a letter asking
for an excused absence, but he would check into it.
Discussion then followed on the asphalt shingle problem and
it was suggested that the Commission set some sort of a
minimum standard if they are to be allowed. Discussion
followed on the various types and weights of asphalt
shingles. Buz Reynolds stated he coulo provide more
information on this matter.
Planning and Zoning
November 7, 1989
Page 9 of 9
Commission Meeting Minutes
John Perkins moved to adjourn.
Terri Jeppson seconded.
The meeting was adjourned at 9:20 PM.
Respectfully submitted,
Charlette Pascuzzi
Recording Secretary
to //-v?/-CMZ