PZC Packet 121989STAFF REPORT TO THE PLANNING AND ZONING COMMISSION
December 19, 1989
Lot 4, Filing 1, Eaglebend Subdivision
South Harbor Development Corp
Single Family Residence
Design Review
INTRODUCTION
South Harbor Development Corporation is proposing to
construct a single family res,dence on Lot 4, Filing 1,
Eaglebend Subdivision.
Lot 4 is 16,703 square feet in size, the proposed building
footprint is 1980 square feet for a building area ratio of
11%.
The building is sited on the western edge of the property and
given a roof overhang of 18", meets all required setbacks,
including floodplain. The building does encroach 5 feet over
the riverbank to the south, with a deck extending an
additional 8 feet.
The maximum building height is 32 feet, within zoning
requirements.
Although the site plan does not specifically indicate usable
open space or snow storage, there is sufficient area to meet
these requirements.
The architecture is similar to existing South Harbor
developments. Exterior materials are: cedar siding, cedar
fascia, and aluminum clad windows.
The elevations do not appear to match the site plan for this
proposal. The south elevation does not match the grade lines
indicated on the site plan.
STAFF COMMENTS
The Commission shall consider the following items in
reviewing the design of a proposed project:
6.11 - The conformance with the Zoning Code and other
applicable rules and regulations of the Town of Avon.
COMMENT: The project, as designed, is in
conformance with the Zoning Code and other applicable rules
and regulations. In the area along the west elevation with a
Staff Report to the Planning and Zoning Commission
December 19, 1989
Page 2 of 4
Lot 4, Filing 1, Eaglebend Subdivision
South Harbor Development Corporation
Single Family Residence
Design Review
setback of 8'.6", the roof overhang may be no greater than
18".
6.12 - The suitability of the improvement, including type and
quality of materials of which it is to be constructed and the
site upon which it is to be located.
COMMENT: The type and quality of materials is
consistent with Town guidelines.
6.13 - The compatibility of the design to minimize site
impacts to adjacent properties.
COMMENT: The residence is sited on the extreme
western edge of the parcel and will present a relatively long
unbroken expanse to its neighbor, however, ail setback
requirements are met.
6.14 - The compatibility of proposed improvement with site
topography.
COMMENT: The Staff is concerned with the
encroachment of this structure over the bank of the river.
This encroachment is the result of a pre-set architectural
program. A more creative aporoach to site planning could
easily eliminate this encroachment. The proposed deck on the
south elevation should be eliminated or dramatically reduced
in size.
6.15 - The visual appearance of any proposed improvement as
viewed from adjacent and neighboring properties and public
ways.
COF.MENT: Staff is concerned with the visual
appearance of this proposal from the river and from
properties on the south side of the river. The building
elevations do not accurately portray the appearance of this
elevation, as it is sited on the property.
6.16 - The objective that no improvement be so similar or
dissimilar to others in the vicinity that values, monetary or
aesthetic will be impaired.
C�]
464` 001111111A�
Staff Report to the Planning and Zoning Commission
December 19, 1989
Page 3 of 4
Lot 4, Filing 1, Eaglebend Subdivision
South Harbor Development Corporation
Single Family Residence
Design Review
COMMENT: This proposal is very similar to existing
improvements in the vicinity, however, Staff sees no conflict
with this criteria.
6.17 - The general conformance of the proposed improvements
with the adopted Goals, Policies and Programs for the Town of
Avon.
COMMENT: The proposal is in general conformance
with adopted Goals, Policies and Programs for the Town of
Avon.
STAFF RECOMMENDATION
Staff recommends that the applicant submit a more unified
proposal; elevations should relate to the proposed site
planning; the encroachment over the river bank should be
eliminated or reduced; driveway material needs to be
specified, as does the method of landscape irrigation.
Staff suggests that this application be continued until such
time as all of the above recommendations have been submitted.
Staff Report to the Planning and Zoning Commission
December 19, 1989
Page 4 of 4
Lot 4, Filing 1, Eaglebend Subdivision
South Harbor Development Corporation
Single Family Residence
Design Review
RECOMMENDED ACTION
1. Introduce Application (Staff);
2. Presentation by Applicant;
3. Commission Review/Discussion;
4. Commission action.
Respectfullv submitted,
Rick Pylma.n
Director of Community Development
PLANNING AIJD ZONING ACTION
Approved as Submitted ( ) Approved with Recommended
Conditions ( ) Approved with Modified Conditions ( )
Continued ( ) Denied ( ) Withdrawn ( )
Date 9119/89 Denise Hill, Secretary & kla d
all
Since a revised site plan is required, this discussion was basically
conceptual regarding the architecture. No action was taken regarding
this application at this time.
STAFF REPORT TO THE PLANNING AND ZONING COMMISSION
DECEMBER 19, 1989
Lot 8, Block 1, Benchmark at Beaver Creek
Sonnen Halde Condominimums
Roof Material Change
Design Review
INTRODUCTION
The original design review approval for the Sonnen Halde
Condominimums included wood cedar shakes as the roof
material. At a Design Review hearing on July 18, 1989,
Sonnen Halde requested, and received, approval to substitute
an asphalt shingle material for the wood shakes, with the
condition that the applicant return to a future Design Review
hearing to specify color and quality of shingles.
At the Design Review hearing of November 7, 1989, the
applicant appeared before the Commission to present a
specific color of asphalt shingle. During the ensuing
discussion the applicant decided to amend his request and
utilize wood shakes as his roof material. This request was
approved by the Planning and Zoning Commission
The applicant is now requesting to amend the approved roof
material (cedar shakes) to a Tamko asphalt shingle of a
"weathered shake" color.
STAFF COMMENTS
The Staff reviewed an identical request on November 7, 1989,
and presented comments pertaining to the request. As we feel
those comments are still valid, please refer to the attached
Staff memo dated November 7, 1989.
STAFF REPORT TO THE PLANNING AND ZONING COMMISSION
DECEMBER 19, 1989
Lot 8, Block 1, Benchmark at Beaver Creek
Sonnen Halde Condominiums
Roof Material Change
Design Review
Page 2 of 2
RE;OMMENDED ACTION
1. Introduce Application
2. Applicant Presentation
3. Commission Review
4. Commission Action
Respectfully submitted,
la 7'
Rick Pylman
Director of Community Development
PLANNING AND ZONING ACTION
Approved as submitted ( ) Approved with Recommended
Conditions ( ) Approved with Modified Conditions ( )
Continued ( ) Denied (✓) Withdrawn ( )
Date�lg1fe Denise Hill, Secretary ['Y'Wt
The Commission denied the request for the color change and the asphalt
roof shingles on Lot 8 Block 1 Benchmark @ Beaver Creek, including the
findings regarding the suitability of the improvement, including type and
quality of materials of which it is to be constructed and the site it is
located and regarding the compatibility of the design to minimize site
impacts to adjacent properties.