PZC Minutes 020288RECORD OF PROCEEDINGS
MINUTES OF PLANNING AND ZONING MEETING
FEBRUARY 2, 1988
The regular meeting of the Avon Planning and Zoning
Commission was held on February 21 1988, at 7:30 PM in the
Town Council Chambers of the Town of Avon Municipal Complex.,
400 Benchmark Road, Avon, Colorado. The meeting was called
to order, by Chairwoman Pat Cuny.
Members Present: Frank Doll, Char -lie Gersbach,
Tom Landauer, Mark Donaldson,
Mike Blair, Buz Reynolds, Pat Cuny
Staff Present: Norm Wood, Director of Engineering
and Community Development
Charlette Pascuzzi, Recording Secretary
Avon Commercial Buildinq._'ot 21 Block: 2. Benchmark: at
Beaver Creek: Parking Variance Request - Public Hearing
Charlie Gersbach stepped down due to a possible conflict of
interest.
Cuny stated that this is a public hearing.
Wood distributed information from a previous submittal which
shows the parking spaces. He stated that this was a variance
request filed by 182 Avon Corporation for the Avon Commercial
Building located on Lot 21, Block 2, Benchmark. Th= specific
variance request is for a variance of 3 parking spa -es for
the project. The parking variance is being requested in
order to allow additional retail space within the building.
The building was built lander an earlier zoning code with
15229 square feet of leasable area. The uses previously
approved in the building were for office space at one space
per 400 square feet which was the code at that time. The
Applicant is requesting approval for 5030 square feet of
retail space. The combined parking requirements for these
uses total 47 parking spaces. Under the current code of
4/1000 for retail space and 3/1000 for office space the total
requirement would be 52 parking spaces. They currently have
44 spaces. Wood stated that the Staff did not prepare the
resolution for the Commission to modify and react to, but
recommends that the Commission specifically review the
approval criteria and the findings required, make their
determination of what action the Commission wishes to take
regarding the variance and then direct Staff to prepare a
resolution which would be brought back: to the next Planning
and Zoning meeting for action. He stated that the Staff had
received two letters regarding this variance, one from the
Otis Company, the owners of Lot 65, Block 2, requesting
denial of the variance, and one from P. H. Phillips and
Associates, as manager of the Benchmark Shopping Center,
representing Vail Avon Commercial Partners, stating that they
Planning and Zoning Meeting Minutes
February 2, 1988
Page 2 of 17
Avon Commercial Building, Lot 21 Block 2 Benchmark at
Beaver CreekParking Variance Request - Public Hearing
Continued
have no opposition to this request, provided that if in the
future they were to ask for a similar request, they would be
afforded the same consideration.
Brian Pesch, President, 182 Avon Corporation was present to
represent the Applicant. Mr. Pesch described some of the
improvements done since their purchase of the building and
stated that at this time they are in the process of further
renovating the building for the second time to accomodate
more office and some retail space with the expansion of
Christy Sports. Pesch showed, by a drawing, the changes they
wish to make. Christy Sports wishes to take on another 12
feet of space, primarily for their ski rental business. 182
Avon Corporation would like to use the remaining office space
as retail space also. This would require an additional 3
parking spaces. Pesch stated that they had figured they
would only need two spaces. The difference is in the way he
rounded off his figures and the way the code requires them to
be rounded off. The code requires figures be rounded up.
Pesch stated they have inquired about renting spaces from
Otis, which has been denied, and from the State of Colorado
which has not given a definitive answer yet. They are also
exploring some other possibilities, but have not made any
progress.
Cuny asked if the plan provided by Wood was the current plan.
Wood stated that it is the way the parking is at this time
and is fully maximized.
Cuny opened the public hearing.
Wood stated that the two letters were all the Staff had
received.
Cuny asked if anyone in the audience would like to be heard
in the public hearing.
Rick Cuny, Cuny-Jordan Partnership, which owns Buck Creek
Plaza, Lot 72, Block: 2, Benchmark at Beaver Creek, stated
that he was here to make a comment, not to say it should be
approved or denied, but to state that when he asked for a
variance for parking, he was told that there never has been a
variance for parking and there never will be. He stated that
he was told to seek; other means of solving the problem and he
is now paying $2100.00 per year rent to Christie Lodge, so he
can meet the requirements for his expansion. He stated that
about the only time that parking is used is during Christmas
week and his employees park there. Cuny stated that he was
in favor of business expansion in Avon one hundred percent,
but if the Town is going to give a variance to a business in
the same zone as he is in, then he would ask: the same
courtesy.
Chairwoman Cuny asked if there were others that would like to
be heard during the public hearing. There being none, Cuny
Planning and Zoning Meeting Minutes
February 2, 1988
Page 3 of 17
Avon Commercial Building, Lot 21 Block. 2, Benchmark at
Beaver Creek, Parking Variance Request - Public Hearing
Continued.
then closed the public hearing, and asked if the Commission
members had any questions for the Applicant.
Reynolds asked where the snow storage was on the lot.
Woods stated it was on railroad right-of-way, on State
right-of-way and on the lot next door. Discussion followed
on the requirement that businesses have snow storage on their
own property and the fact that this business does not have
said storage.
Reynolds stated he had strong feelings against the variance
because of the idea of the snow storage, because other people
are required to have it and because of the implications of
setting a precedence.
Blair suggested moving the trash receptacle to near the rear
door and putting a parking space there and adding two parking
spaces where the trash receptacle is. That adds three
parking spaces. What is not considered is the absence of a
truck loading space. This needs to be considered. Another
thing that could be considered is some of the spaces being
considered as smaller spaces for compact cars.
Wood stated that compact spaces are allowed in covered
parking spaces. Uncovered spaces are held at the minimum
because of the fact that this time of year the parking spaces
shrink tremendously.
Doll stated that he did not want to see the Commission get
into the business of granting variances for parking spaces.
It would set a precedence and would compound matters.
Donaldson asked the Applicant if the variance was not
attained would the space have to be left vacant?
The Applicant responded that he would have to use it as
office space, not retail. Christy Sports would not be
allowed to expand.
Cuny read the criteria on which a decision must be based, and
possible findings.
Discussion followed on the criteria.
Blair asked if the Applicant would consider a modification of
the parking design or consider requesting a variance on
parking space sizes to conform. Discussion followed on the
sizes of parking spaces.
Wood stated that the parking spaces have been stretched to
just get what now exists.
The Applicant stated that they had worked with Staff a great
deal prior to this application on several different
alternatives, none of which met with Staff approval at the
time. He stated he would take another look at the problem
with the Staff.
Donaldson asked if the Applicant would rather be done with
this Commission and go to the Council with an appeal or
rather continue to work something out at this level?
Planning and Zoning Meeting Minutes
February 2, 1988
Page 4 of 17
Avon Commmercial Building, Lot 212 Block 2 Benchmark at
Beaver Creek Parking variance Request - Public Hearing
Continued.
Applicant stated that the pending leases depended on the
outcome of the variance and they wished to meet the Town's
and property owners considerations.
Reynolds asked if the Applicant had considered a garage?
Applicant responded that it would be too expensive as they
would be adding renovation costs and decreasing leasable
areas for income.
Blair moved that, in the interest of bothe the Town and the
various neighboring properties, and of the Applicant and
increased business, that this item be tabled until the next
regular meeting to give the Applicant the opportunity to
consider a modification of design of the existing parking
lot, including covering some of the parking spaces, and
considering a variance to change some of the sizes of the
parking spaces.
Donaldson seconded.
Motion passed unanimously.
Lot 19 Eaglebend Filing 1 Variance Reguest to _Allow
Carports in 20 Foot Building Setback - Public Hearing
Cuny -tated that this is also a public hearing.
Wood stated the John and Suzanne Railton, owners of Lot 19,
Eaglebend Filing 1, have requested a variance to allow
construction of two carports in the 20 foot setback. At the
time that Eaglebend was going through the annexation, zoning
and subdivision process with the Town, the property was given
a 20 foot setback. A single family residence exists on the
;ot and the Applicant is requesting the variance for the
setback, for the parking structure in order to provide parking
for the existing residence and also for the anticipated
second half of the duplex. Site plans and building
elevations have been submitted for your consideration.
Wood stated that the Commission must consider the criteria
and findings and direct the Staff of the action they wish
included in the resolution to be presented at the next
regular meeting. Wood provided site plans for the Commission
to review.
Applicant, John Railton was present to answer any questions
from the Commission. Railton stated that when the residence
was built it was part of the County. He reviewed the plans
with the Commission members. He stated that the land itself,
with the grade and the setback requirements, is a hardship.
He also stated that the Stonebridge Development had paved car
parking right up to the property line. Discussion followed
on the fact that he now parks in the setback and is
requesting permission to cover and eventually pave the area.
Cuny asked if Staff had received any letter or phone calls
Planning and Zoning Meeting Minutes
February 2, 1968
Page 5 of 17
Lot 19 Eaglebend Filing 1 Variance Request to Allow
Carports in 20 Foot Building Setback - Public Hearing -
Continued.
regarding this matter?
Wood stated that none had been received.
Cuny opened the public hearing, and asked if there was anyone
in the audience who would like to be heard.
Chris Ekrem stated that she owns Lot 15 in Eaglebend and is
Railton's neighbor to the east about three lots and is
familiar with what he plans to do and feels that it would be
an asset to the neighborhood.
Cuny asked for any other comments. There being none, Cuny
then closed the public hearing.
Blair asked if this plan would be an impediment to traffic
visibility?
Wood stated that there was none in this particular area, but
he suggested that if the Commission was considering approving
the variance, that it be conditioned to the extent that the
design be such that the ones using the structure aren't
backing out into the street, but are required to back out on
the site and pull out into the street.
Blair asked if it would create a problem with street
maintenance?
Wood stated that snow would probably be pushed right up to
it, but would probably not cause a problem. Discussion
followed regarding utilities and it was concluded that there
would not be a problem. Discussion followed on the proposed
wall.
Reynolds asked about snow storage.
Railton stated that he felt that this situation would be
improved because the amount of snow would be reduced by the
roof area.
Cuny read the criteria on which the granting or denial of the
variance must be based. Discussion followed on the criteria
and findings.
Doll moved to direct the Staff to prepare a variance
resolution stating that the variance is to be granted for all
the reasons listed in Sections 17.36.050-A, B, and C - 1
through 3 and further that the applicant be prepared to come
before this Commission for design review of the proposed
structure and to demonstrate to the Commission that the
effect of the requested variance will not be detrimental to
the transportation, traffic facility and public facilities in
the area.
Landauer seconded.
The motion passed unanimously.
Blair asked when the approval would be effective?
Wood stated actual approval would be when the resolution is
adopted in two weeks.
Planning and Zoning Meeting Minutes
February 2, 1988
Page 6 0+ 17
Lots 3/75 Block 2, Benchmark at Beaver Creek, Community
Shopping Center - Retail Shops Sign Program, Design Review
Cuny stated that even though she is a tenant in the same
shopping center, she did not feel that she had a conflict
with their sign program, there+ore she would not step down
unless the other Commission members felt she should. There
were no comments from the other Commission members.
Wood stated that at the May 5, 1987 meeting the Planning and
Zoning Commission approved a sign program for the Community
Shopping Center. the project is nearing completion and the
owner, Palmer Development, has submitted a written sign
program for the retail portion of the project. The written
program basically conforms with what was previously approved,
but provides more detail. One area of difference exists
though. The previously approved program provided for a
maximum sign area of 30 square feet per business. The
written program does riot provide for that particular
limitation. Staff recommendation, if the Commission concurs
with the sign program as presented, is that the condition
that the program be amended to reflect the maxir+,ct, sign area
for each individual business not to exceed 30 square feet.
Wood provided information on what was previously approved.
No representative was present to discuss the sign program
with the Commission.
The Commission members wondered why the 30 square foot
maximum was left out. Wood stated that possibly it was Just
an oversight.
Blair moved that the Community Shopping Center Retail Shops
Sign Program be approved as recommended by the Staff, with
the limitation of 30 square feet maximum sign area for each
individual business being included.
Reynolds seconded.
Motion passed unanimously.
Lot 46/47 Block 1 Benchmark at Beaver Creek Chambertin
Foundation Development Sign Design Review.
Mark Donaldson stepped down as a Commission member due to a
conflict of interest.
Wood stated that the Phoenix. Discovery Group has applied for
Design Review of a Development Sign they propose to place on
the existing foundation at the east end of the Chambertin
Townhouse project which is located on Lots 46/47, Block 1,
Benchmark at Beaver Creek on the north side of the
Interstate. The sign code does allow for development signs
provided that: only one sign per parcel, lot or group of
contiguous lots under one ownership, not to exceed 16 square
feet of display area and eight feet in height: signs must be
removed within thirty days of land sale or upon issuance of a
certificate of occupancy: and in no case to be retained for
more than two years, unless an extension is granted by the
Planning and Zoning Meeting Minutes
February 2, 1988
Page 7 of 17
Lot 46/47 Block 1 Benchmark at Beaver Creek Chambertin
Foundation Development Sion Design Review - Continued.
planning and zoning commission.
Wood stated that the proposed sign appears to conform with
these requirements and in the application the owner has
indicated a willingness to accept the condition for some
cleanup of that sight and the staff recommends that this be a
condition of the sign approval and also to install an
adequate guard rail or fence to isolate the foundation for
safety reasons.
Mark Donaldson, representating the Applicant, stated that
some of the debris removal and installation of the guard rail
can be done soon, however some of the debris removal will
have to be done after the snow is gone.
Discussion followed on the type of sign to be installed.
Reynolds moved to approve the development sign on Lot 46/47,
Block 1, Benchmark at Beaver Creek as submitted, with the
addition of the Staff recommendation.
Gersbach seconded.
The motion pas: -ed unanimously.
Rub 's/Deluca's Restaurant Avon Center at Beaver Creep
Design Review.
Marti: Donaldson and Charlie Gersbach stepped down as Planning
and Zoning Commission members due to conflicts of interest.
Wood stated that Ruby's/DeLuca's Restaurants have requested
preliminary design review for modifications to the
southeasterly quadrant of the Avon Center. This is the space
formerly occupied by Shogun. He stated that this is a 6217
square foot area and includes a 832 square foot addition into
the mall area and includes new entrances, highlighted by
fabric canopies and the addition of a beer garden in the mall
area. The addition is flat roofed with a cloth faced barrel
vault skylight and log faced with operable wood windows. The
fabric canopies cover existing walkways and include backlit
signs at canopy ends and building entrances. The information
provided did not include =olor or size information at this
time. The outdoor beer 4arden includes extensive landscaping
and would include brick pavers with decorative wood retaining
walls.
Wood stated that for Staff comments they have outlined the
design criteria listed in the Planning and Zoning Commission
Rules and Regulations and the Staff comments follow that.
Wood proceeded to read these items.
Staff recommendation is that the Commission direct the
Applicant to obtain approval of the Mall Advisory Committee
and the Twon Council for building the extension into the Mall
area and for development in the Mall area., prior to applying
for final design review.
Mark Donaldson stated that he was representing the
Planning and Zoning Meeting Minutes
February 2, 1988
Page 8 of 17
application on behalf of Jim Lindsay, Avon Center and on
behalf of Steve and Ellie Jelacic, owners of Ruby's and
DeLuca"s. Donaldson stated that he would introduce some of
the concepts and then later get into more detail about the
design. He stated that they have deleted the logs and have a
different approach on the exterior trim. He stated that the
Applicant wished to have the grand opening on June 8th, the
anniversary of the Ruby's fire. Donaldson stated that what
is proposed will help Avon Center and the Town. He stated
that the Jelacics had done extensive research across the
country regarding restaurant and bar images. Donaldson
provide pictures of other types of restaurants and bars they
had considered. He then introduced Steve Jelacic who
provided a history of Ruby's and their goals of serving the
public.
Cuny asked if the Applicant had gone before the Mall Advisory
Committee?
Jelacic stated that this would take a ten day notice and Jim
Lindsay had been notified verbally and will be sending out a
letter. Further discussion followed on the concepts of
Ruby's and Deluca's.
Donaldson then provided some pictures of the area of Avon
Center and the Mall area where the project will be. He
stated that they felt that the canopies would be the vehicle
for attraction to the project. They feel that this project
is a test case for the Mall, since no one has peviously built
on the Mall.
Discussion followed on the canopies.
Cuny asked if the canopy covered just the existing sidewalk?
Donaldson described where the canopies would be by using the
plans and pictures provided.
Discussion followed on the addition of the 832 feet.
Cuny asked if the beer garden would be beyond that?
Donaldson stated that it would be.
The barrel vault skylight was discussed.
The proximity of the Brass Parrot was discussed briefly.
Cuny asked how far the addition went and it was shown the
Brass Parrot goes beyond the addition.
Donaldson asked if there were any questions on the addition
or the canopies?
Cuny asked what color the canopies would be?
Donaldson stated that they would probably use the salmon and
ruby colors that are used on the business cards. The
background has not been decided. They don't want to get
outrageous, but want to use something to set it off from the
stucco color of the building.
Doll asked about the log siding.
Donaldson stated that after discussions with the Staff about
the log siding not being to their advantage, they have
proposed a brick treatment to tie into some interior brick
and bring it out to the beer garden and use it to some degree
Planning and Zoning Meeting Minutes
February 2, 1988
Page 9 of 17
in the decoration of the beer garden.
Donaldson explained some of the elements to be used. The
ultimate goal is to provide a view from any table in the
restaurant.
Discussion followed on the height of the addition. Donaldson
stated that the addition was the same height of the first
floor. The concern was that it might interfere with the
views of other tenants. Donaldson stated that no other views
would be interferred with and showed on the plans that this
would be so.
Reynolds asked about the view from the Brass Parrot?
Donaldson stated that they have no windows that would be
blocked. He stated that one of the Issues that they have
encountered is not only the Brass Parrot's windows but their
views of their outdoor patio. Access to the Brass Parrot
patio was also discussed.Donaldson stated that this was an
issue. They want to reroute the access by being prepared to
introduce a second pathway off the Brass Parrot deck directly
to the Mall. In order to obtain a liquor license, they have
to have physical control of the area they are going to serve
in.
Donaldson stated that they are miring up materials because
they want to do something fresh and be different. They have
included the brick veneer with painted wood windows, probably
the Ruby's type colors. The brick work will be interupted
with continuous soldier course along the top of the windows
and doorhead, and above that they are using transom windows,
and then going back to the Avon Center materials by picking
Lip the metal roof facade. The same concept will be used in
the beer garden.
Doll asked about the color of brick to be used.
Donaldson stated they were more interested in the style than
the color, but probably a used brick will be used, with a
textured pattern.
Cuny asked if they wouldn't want to match the brick that is
already being used on the building?
Donaldson stated that they are trying to be different and
they would not use the same brick. He stated that they did
not want to change the character of the neighborhood or be
offensive to the building or any neighbors, but they do want
to be different.
Reynolds asked if they would be serving in the beer garden
and if so, is there any type of retaining wall to keep the
guests in.
Donaldson replied yes, that the beer garden is a very
interesting design.
Blair commented that he asked himself how this project could
be compatible and feels that the design is exciting and adds
some real excitement to the Mall and is not overdone. He
feels that the project interfaces the building with the Mall
itself which is one of the goals of the Mall. He feels that
Planning and Zoning Meeting Minutes
February 2, 1988
Page 10 of 17
Rub 's/DeLuca's Restaurant Avon Center at Seaver Creek
Design Review - Continued
the concept is interesting and exciting to the Town,
disregarding some of the details that have to be worked out
and he hopes it will not be another drab store front. Blair
stated that he was willing to encourage this concept as long
as it doesn't interfere with other peoples access, not only
on the ground, but for view and light and air, etc.
Discussion followed on the use of mixed materials and
comparison with other malls.
Donaldson showed the shape of the beer garden. He stated
that entrance to the beer garden would be only through
Ruby's_ Fie then introduced Glenn Ellison, Ellison
Landscaping, who will be doing the landscaping of the beer
garden.
Mr. Ellison stated that he was approaching this project with
the concept that the eating experience is one of
entertainment. the eating spaces will be broken up by
terracing with retaining walls and berming with heavy plant
massing. The materials have not been decided yet since this
is a conceptual plan at this point. A basketball court has
been included for entertainment. With the correct use of
plant material, the basketball ring and enjoyment of eating
experience can be achieved. Ellison stated that they were
looking at phasing the project.
Donaldson state that in terms of the phasing, what they want
to accomplish in the first season would be the installation
of the retaining walls, all the land forms and some of the
major plant material and sodding the land area and slowly
comming back and cutting away the sodding and putting more
plants.
Reynolds asked how long a phase period they were talking
about.
Donaldson stated that at this time they were not sure, but
would come back with a more definite time period. It all
depends on other costs.
Donaldson stated that they have worked very carefully with
the existing grades and will illustrate to the Staff and
Board more details.
Cuny stated that this is an exciting concept7 but asked if
they had given any thought about the condos above and
Peregrine regarding the entertainment, night lighting, noise
level, etc.
Donaldson stated that the mall agreement very clearly spells
out the uses of the mall as being bars and restaurants.
Donaldson stated that the concept met the regoirements of the
mall agreement. He stated that there are no large dining
areas. It is very segregated.
Jelacic stated that they were looking at it from the
standpoint of apree ski or special events etc.
Doll asked how they could use it year round? Use would be
Planning and Zoning Meeting Minutes
February 2, 1488
Page 11 of 17
Rub 'slDeLuca's Restaurant Avon Center at Beaver Creek
Design Review - Continued.
only on days and times that were nice enough in the winter.
Blair stated that the mall was designed to be the active area
for the west side of the town. There will have to be some
kind of noise control standards established.
Discussion followed on the access to the beer garden and the
fact that this would be an isolated green area. It was felt
that this would not be a mall area, but a private situation
and the mall would be barricaded off.
Cuny stated that it is a shame that they are using all of the
landscaped area since the workers or residents will not be
able to use this area.
Landauer stated that he felt the Mall Committee should loot:
at who is to keep this area up since the mall area is a
community project.
Donaldson stated that the tenant is required to pay for all
improvements and also required to maintain them. He stated
that he felt that they could incorporate some pedestrian
stops and seating and bicycle racks and get the feeling of a
mall back into the plan.
Jim Parks, manager of Avon Center, asked who owns the ground
referred to as the mall and how far out into the area will
the beer garden occur?
Cuny stated, in answer to the second question, that it would
go all the way out to the existing asphalt path.
In response to the first question, Wood stated that according
to the mall agreement, once the project was built, the area
between the building and what was originally laid out as the
mall, which was basically a 50 foot wide strip through that
area between Avon Center and Peregrine, all that area between
the building and that strip was to be dedicated to the Town a
a part of the mall. On the plat for Avon Center, when the
building was completed and they did the condiminium plat,
they designated what was an outlot, which followed the wall
of the building around and formed a three cornered piece,
that was to be dedicated to the To -An. There was another area
inside -there, a trianglar piece reserved for this type of
operation or for outdoor activities. The general intent of
the mall agreement was that this all become part of the mall
and the mall agreement specified that it was the intent to
promote these types of activities in the mall area.
Cuny asked for clarification on the triangular piece.
Discussion followed with Wood showing on the plan for Avon
Center- and the mall the part that although it is known as
part of the mall it, in actually, is part of Tract G.
Cuny asked Donaldson how far his plan went into Tract G.
Donaldson stated that the whole beer garden was in this area.
Further discussion on the exact area for the beer garden
followed.
Cuny asked, if the mall area was dedicated to the Town, does
Planning and Zoning Meeting Minutes
February 2, 1988
Page 12 of 17
Avon Center have the right to let a public entity go on it?
Wood responded that through the mall agreement there are
conditions where they can expand into those areas with the
consent or approval of the Mall Advisory Committee and the
Town Council. It specifically addresses the areas, i.e. near
Avon Center, as Avon Center being able to lease to
restaurants, bars etc., for outdoor activities with the
approval of the Town Council and Mall Advisory Committee.
Landauer asked if it said anything about building out into
the mall area?
Wood stated that it refers to outdoor activities only.
Cuny asked if the Commission needed some legal advice as to
whether they can give approval for something into the mall
area?
Wood stated that the Staff recommendation requires that
approval by the Mall Advisory Committee and the Town Council
must be received before final design review can be
accomplished. He feels that it is probably not appropriate
for the Planning and Zoning Commission to make the decision
of allowing building into the area. That is up to the Mall
Advisory Committee and the Town Council.
Mr. J. J. Carey, representing the State Federal Savings and
Loan Association, who owns and operates 8 of the 52 units of
Avon Center, and also is authorized to speak for Dr. Paul,
another owner, stated he had a number of questions. He asked
about the total square footage and the anticipated seating
capacity.
Donaldson stated the square footage was approximately 6200
square feet and the estimated seating was between 185 and 200
seats. The beer garden would be about another 30 seats.
Carey stated that he had a problem with that estimate, as
most restaurants that size will seat approximately 800
people. He stated that State Federal was just made aware
that this project was being considered and they want to be
made aware of what is going on. He was concerned that the
Avon Center was described as a hotel. He stated that there
are a number of people living there as permanent residents
and he doesn't think, it is proper to consider the building as
a hotel. He feels the project would be very well done on a
free standing piece of property down the road and would be a
beneficial facility for the Town of Avon. He stated that he
was almost certain the Homeowners Association, when they are
made aware of what is being contemplated, will have comments
to make about this project. Their next board meeting is the
18th of February and they request that no positive action be
taken on this until the Homeowners Association can be advised
of this project. He stated that the homeowners were not
aware of the kind of activities that are now being planned.
He stated that another concern was the parking. He feels
that there will be a tremendous parking problem with that
many people expected. Another concern is delivery access.
Planning and Zoning Meeting Minutes
February 2, 1988
Page 13 of 17
Rub 's/DeLuca's Restaurant Avon Center at Heaver Creek
Design Review - continued.
There is not a good access for the existing restaurant.
The homeowners will also be concerned with the character of
the neighborhood that is being impacted. The change in the
public area of the mall to private use is another concern.
Cuny asked if the Homeowners Association would have the power
to disapprove a business going into the building or would
they have the power to recommend?
Carey stated that the Homewoners Association has what ever
powers they have and he thinks that the owners of the first
two floors will find a great deal of descension if they try
to put in a facility of this type. He stated that Dr. Paul
has assured him that he intends to sue to see that it doesn't
happen. State Federal will probably do the same. He was
aked if, when he purchased in the building, wasn't the space
a restaurant, Shogun? Carey stated it was and if a
restaurant was put in that space of that nature, there would
be no quarrel, but when you talk about a beer garden and
facilities for a lot more than 180 people, then you have
problems.
Cuny thanked Mr. Carey for his input.
Donaldson asked to reply to Mr. Carey's comments_ He stated
that the size of the restaurant as far as the number of
seats, the table layout has been very carefully layed out and
800 seats will not happen. the reference to Avon Center
being a hotel comes from the fact that the company is
operating the building as a hotel.
Jim Parks stated that it was being run as a condominium
hotel.'
Donaldson stated that the zone district that Avon Center is
in is the Town Center zone district and the uses in that zone
district are very clear, drinking establishments,
restaurants/bars and on and on. This was the district the
Avon Center set aside for all the activity of this nature.
Donaldson stated he did not feel that parking was an issue.
The service to the restaurant will be handled through the
interior mall. Trucks would be in the west parking lot.
The character of the neighborhood is really Jim Lindsay's
problems, as it relates to the owners above. The condo
declarations, which were in existance when the homeowners
bought the condos tell them what the uses are.
Cuny stated she would like to hear from Jim Lamont, the Town
Planner.
Lamont statsd that he just had a couple questions. The one
question that he can't tell from the plan is how does the
entry way work? Snow drop from above is the concern.
Donaldson stated that they would provide a solid framed roof
in that area.
Lamont stated that he felt there were ways to mitigate some
of the problems of the use. He would like to see them not
do
•
-
Planning d Zuni:g Meeting Minutes
February 1988
Page 14 L 17
Rub 's/DeLuca's Restaurant Avon Center at Beaver Creek
Design Review - Continued -
block the public Off with the screening, but letting the
public see and participate. He thinks that the basketball
court is an exciting idea, but he shares the concerns with
the residents in the building. If you have those kinds of
uses and the neighboorhood complains, the law will go against
you. If noise problems are created you will lose. He
suggested maybe using white noise sources, i.e. fountains,
waterfalls, which sort of mask the sound out. White noise
would be a welcome asset in a primarily dining area.
He stated that some of the progress tht has been made in the
last week on the exterior architecture speaks to some of the
philosophy that the owner was trying to impart that he now is
not a temporary use in a strip center, he wants to become
part of a permanent dowtown area. He needs to rec„gnize that
there are some privileges and responsibilities that go with
relocating in a downtown area. One of the things he wants to
caution about is to be sure that the Applicant understands
the internal ventilation system. Noise can be carried via
this system. Lamont also suggested color tile rather than
used 'brick. Another suggestion was to not turn their back on
the internal mall. Lamont also urqed them to look at the
canopies as a more permanent material and better in._rgrated
with the structural aspect of the building. Wear and decay
factors were the major concern with the canopies.
Donaldson commented that as far as blocking off the public as
well as the solar, they can probably thin out some Of the
areas. He also stated that there were no common ducts with
the residents so the noise shouldn't be any problem. He also
stated that they were retaining the entry from the interior
mall. Donaldson responded that they were taking a look at
the canopies material_
Lamont stated that they should upgrade the exhaust system.
Donaldson responded U nt where the kitchen is located they
will not have to dump the exterior exhaust out on the beer
garden, they will be able to go up to the second floor in
areas that do not have windows.
Lamont stated that one other item which might be valuable is
night lighti.%g and discussion fullewed on this matter.
Cuny asked for reaction and comments from the Commission
members.
Balir stated that because of all the que=,tions and comments,
he wonders if the Commission is ready to take any action. He
stated that there should be a way that the people should be
able to interact with the activities of the building. The
Town zoning, the mall design and t -e building desi n were
designed so there would be commercial activities 0%1 the lower
floors and residential on upper floors. There are mired uses
and hopefully they can be compatible. Blair stated that the
Applicant should consider and respond to all the questions
i•
C
O
40
Planning and Zoning Meeting Minutes
February 2, 1988
Page 15 of 17
Rub 's/DeLura's Restaurant Avon Center at Beaver Creek
Desiqn Review - Continued.
and comments that were made at this meE-ting and that they go
to the mall committee to determine what perameters they have
to operate in the mall.
Landauer stated that he agreed with Blair. There were too
many questions not answered at this time.
Donaldson asked what quest:.ons?
Landauer stated parking wan one. How will it be policed,
etc.?
Reynolds stated he thought that Mr. Carey's points were well
taken. The beer garden might be a concern of the neighbors.
Donaldson stated that this is not an issue of this board.
Reynolds stated that he wanted to be sure that the
neighboring people are not dissatisfied.
Doll steed that he was concerned with the problems of the
deliveries and how the trash was to be handled. He does not
think that the use of the interior mall is a good idea. He
stated that he felt there was a problem the way it sticks out
into the mall also. He wants to hear more about what the
Mall Advisory Committee has to say about that. He wants tc
hear more about what has been done about the homeowners
concerns and more about the logistics of the parking.
Cuny stated that she lilted the canopies, but thinks it shjuld
be i.ore permanent and the thing on top is not necessary.
Tale it off and leave the canopies. Another o+` her co:icerns
was that the parking is on one side of the building and the
entrance on another. Deliveries are another concern. Even
now the area at the Post office is very con.iested with
trucks. This problem must be addressed. The noise factor is
a problem. Would like to see a curfew so it would be
compatible with residential area. Cuny feels that Tract G
was meant to be open space. She feels this is a private
enterprise and very difficult for people to en3oy the
landscaped area. Wants to see what the Mall Advisory
Committee has to say about the encroachment. She would also
like to hear from the homeowners.
Ellie Jelacic stated that a lot of marketing research had
been done before making any commitments. They want to make
Avon Center a better place.
Donaldson stated that they will continue to work with the
Staff and work with the Mall Advisory Committee and try to
address all the concerns brought up this evening. They would
appreciate if the Commission would consider conceptual
approval with any number of conditions so they would have
some direction. He also state'-; that the top of the canopy
could be changed and when asked about the sign on the eighth
floor level he stated that they would ask for that sign in
addition to the canopies.
Blair moved to grant conceptual approval, which does not
guarantee or assure preiiminary or final approval, based on
Planning and Zoning Meeting Minutes
February 2, 1988
Page 16 of 17
Rub 's/DeLuca's Restaurant Avon Center at Beaver Creek,
Design Review - Continued.
what hsa been seen this evening, but to give direction to
proceed, based on the discussions of this evening.
Conditions would include response from the Homeowners
Association, response form the Mall Advisory Committee and
response to the comments and questions that were given at
this meeting by the audience and by the Staff and Commission
members.
Doll seconded.
The motion passed with Doll, Blair and Reynolds voting aye
and Landauer voting nay.
Carey asked to be notified when this matter comes up again.
He was informed that it would be posted the Friday before the
meeting at the Avon Post Office, and the next meeting is the
16th of February.
Reading and Approval of P & Z Minutes of January 19, 1988
Regular Meeting.
Doll moved that the minutes of the January 19, 1988 Planning
and Zoning Regular Meeting be approved as submitted.
Land&-aer seconded.
The motion passed unanimously.
Other Business.
It was decided that the Commission members should study the
Sign Code Revisions further and discuss them at the next
regular meeting.
Cuny stated that she :+as disappointed that the Staff report
for Ruby's/DeLuca's Restaurant had questions rather than
comments for the Commission to go by and asked Staff the
reason for this approach. Wood in turn asked Donaldson to
address this matter. Donaldson stated that they had made the
application and in turn had received a goodly amount of
comments, which were not exciting to their team. They had a
meeting with the Staff and addressed a lot of the issues and
got some of them out of the way. It was the feeling of the
administration that the Staff report should be cut down to
the questioning of those criteria to be 'eft to the
discretion of the Planning and Zoning Commission.
Cuny stated that they have never had a project come with so
few comment=_ from the Staff.
Donaldson stated she should talk to Bill James.
Wood advised the Commission members of a semi-kar on land use
planning t3 be held in Silverthorne on February 11th for
Planning and Zoning members.
Planning and Zoni.ig Meeting Minutes
February 2, 1988
Page 17 of 17
Doll moved to adjourn.
Reynolds seconded.
The motion passed unanimously and the meeting was adjourned
at 11:30 PM.
Re
s
p
ectfully
submitted,
Charlette Pascuzzi
Recording Secretary
Commission approvaly Date / `e llc---44�' / �;96
M. Blair
P. Cuny _
T. Landat
M. Donalt
U. Gersb
A. Reyno.
F. Doll