PZC Packet 071988STAFF REPORT TO THE PLANNING AND ZONING COMMISSION
JULY 19, 1988
Lot 4, Block 1, Wildridge Subdivision
Ridgeline Condominium Project - 10 Units
Phoenix Discovery Group
Final Design Review
,ublic Hearing for the Approval of a
Fractionalized Project
INTRODUCTION
Phoenix Discovery Group is seeking final design approval for
the proposed 10 unit project on Lot 4, Block 1, Wildridge
Subdivision. The project conforms with the newly adopted
fractionalization ordinance, which limits density to 2-1/2
units per development right. Concurrent with this meeting
will be the "Public Hearing for Fractionalized Projects" for
this project as required by the Administrative Procedure for
Fractionalized Project of the Town of Avon Design Procedures
Rules and Regulations.
nn July 5, 1988, 'the Commission granted preliminary design
review approval.
A number of design issues have been addressed prior to this
request for final approval, and public hearing. Please refer-
to
eferto the letter, dated July 12, 1988, by Mark Donaldson in
regards to this project, included herein.
In addition to the Planning and Zoning Commission, Design
Review Procedures, Rules and Regulations, the following
criteria should also be taken into consideration when
reviewing this project for final approval.
II. Approval Criteria for Fractionalized Projects
A. The Planning and Zoning Commission shall consider
the following factors in addition to the Design
Review Guidelines listed in Section 6.00 of the
Design Procedures, Rules and Regulations for the
Planning and Zoning Commission of the Town of Avon,
When reviewing a project involving the
fractionalization of residential development rights:
1. The adequacy of access to the site with respect
to the width of the adjacent streets, their
grades, intersection safety, visibility and
entrance into the lot to be developed;
2. The need for, and availability of public or
private transportation to serve the proposed
Staff Report to the Planning and Zoning Commission
July 19, 1988
Lot 4, Block 1, Wildridge Subdivision
Ridgeline Condominium Project - 10 Units
Phoenix Discovery Group
Final Fedisgn Review
Public Hearing for Approval of a
Fractionalized Project
Page 2 of 4
development;
3. The impact of the proposed project upon public
and private services and facilities serving the
area;
4. The compatibility of the proposed unit sizes
and uni mix with existing and potential
development in the vicinity.
STAFF COMMENTS
SITE ACCESS - Staff has reviewed the site plan and
feel that existing roads and proposed drives will accomodate
the total potential vehicular traffic of the neighborhood.
PUBLIC TRANSPORTATION - At present: there is no
existing or proposed public transportation for Wildridge.
Easy access to public transportation would be a desirable
asset to this project, but the number of potential residents
for Wildridge does not easily justify the creation of a
public transport system. A van service at peak hours,
provided by the Homeowner's Association, would probably be
the mast effective means of addressing this concern.
AVAILABLE PUBLIC AND PRIVATE FACILITIES -- This
project is centrally located in Wildridge, and is within
walking distance of commercially zoned and designated park.
land. Similar projects exist on either side of this complex.
Fire protection has been discussed with the applicant and
conceptually agreed upon.
COMPATIBILITY - Building type and design generally
conforms with existing development and the Wildridge
Protective Covenants. The following differences are noted:
Existing units are larger;
Existing units have primarily on grade access.
Staff Report to the Planning and Zoning Commission
July 19, 1988
Lot 4, Block 1, Wildridge Subdivision
Ridgeline Condominium Project - 10 Units
Phoenix Discovery Group
Final Design Review
Public Hearing for the Approval of a
Fractionalized Project
Page 3 of 4
STAFF RECOMMENDATIONS
If the Commission finds that this application conforms with
Approval Criteria for Fractionalized Projects or can be
modified to be brought into conformance, Staff recommends
that Final Design Review approval be granted subject to:
1. Final design conform with Fire Department regulations for
emergency access, fire flows, etc.
2. Criteria as determined by the Town Engineer.
RECOMMENDED ACTION
1. Introduce Project;
2. Presentation by Applicant;
3. Open Public Hearing;
4. Close Public Hearing;
5. Commission Review of Application;
6. Act on Application.
Respectfully submitted,
Lynn Fritz Ien J
Planner
Staff Report to the Planning and Zoning Commission
July 19, 1988
Lot 4, Block 1, Wildridge Subdivision
Ridgeline Condominium Project - 10 Units
Phoenix. Discovery Group
Final Design Review
Public Hearing for Approval of a
Fractionalized Project
Paqe It of 4
PLANNING AND ZONING ACTION
Approved as Submitted ( ) Approved with Recommended
Conditions t V> Approved with Modified Conditions ( )
Continued ( ) Denied ( ) WithdrawnL
Date[ b ��� 'Denise Hi11, SecretaryN1
The Commission granted approval to the Ridgeline Condpminnium Project with
the condition that the Staff Recommendations• 1 Final design conform with
Fire Department Regulations for emergenCy emergencyaccess3 fire flows etc. and
2. Criteria as determined by the Town Engineer be addressed.
STAFF REPORT TO THE PLANNING AND ZONING COMMISSION
JULY 19, 1988
Portion Lot 46/47, Block 1, Benchmark at Beaver Creek
Mountain Resort Condominium Residences
Phoenix Discovery Group
Final Design Review
Public Hearing for the Approval of a
Fractionalized Project
INTRODUCTION
Phoenix Discovery Group is seeking final design approval for
the proposed 10 unit project on a portion of Lot 46/47, Block
1, Benchmark at Beaver Cr-2ak. The project conforms with the
newly adopted fractionalization ordinance, which limits
density to 2-1/2 units per development right. Concurrent
with this meeting will be the "Public Hearing for
Fractionalized Projects" for this project as required by the
Administrative Procedure for Fractionalized Project of the
Town of Avon Design Procedures Rules and Regulations.
On July S, 1988, the Commission granted preliminary design
review approval for general building exterior design and site
improvement plan.
In addition to the Planning and Zoning Commission, Design
Review Procedures, Rules and Regulations, the following
criteria should also be taken into consideration when
reviewing this project for final approval.
1I. Approval Criteria for Fractionalized Projects
A. The Planning and Zoning Commission shall consider
the following factors in addition to the Design
Review Guidelines listed in Section 6.00 of the
Design Procedures, Rules and Regulations far the
Planning and Zoning Commission of the Town of Avon,
When reviewing a project involving the
fractionalization of residential development rights:
1. The adequacy of access to the site with respect
to the width of the adjacent struts, their
grades, intersection safety, visibility and
entrance into the lot to be developed;
2. The need for, and rvailability of public or
private transportation to serve the proposed
development;
3. The impact of cite proposed project upon public
and private services and facilities serving the
Staff Report to the Planning
July 19, 1992
Portion Lot 46/47, Block 1,
Mountain Resort Condominium
Phoenix Discovery Group
Final Design Review
and Zoning Commission
Benchmark at Beaver Creek
Residences
Public_ Hearing for the Approval of a
Fractionalized Project
Page 2 of 4
area;
4. The compatibility
and unit mix with
development in the
STAFF COMMENTS
of the proposed unit sizes
existing and potential
vicinity.
SITE ACCESS - Staff has revier!ed the site plan and
feel that existing roads and proposed drives will accomodate
the total potential vehicular traffic of the neighborhood.
PUBLIC TRANSPORTATION - At present there is no
existing or proposed public transportation for Nottingham
Road. This concern is somewhat offset by the project's
proximity to the Town Core.
AVAILABLE PUBLIC AND PRIVATE FACILITIES - Proximity
to the Town Core is a decided asset to this facility.
Although established park and commercial facilities are not
within walking distance they are within a few minutes drive
on level roads.
Proximity to Fire and Police protection will insure a quick
response time. Other fire protection requirements have been
discussed with the applicant and conceptually agreed upon.
COMPATIBILITY - Unit type and design is generally
compatible with existing neighborhood development. The
following differences are noted:
Existing development tends not to stack more than
two units above each other;
Existing units are larger;
Existing units do not cater to short term rental.
(There is a rental management office indicated on
the first level of the plans.)
Staff Report to the Planning and Zoning Commission
July 19, 1988
Portion Lot 46/47, Block 1, Benchmark at Beaver Creek
Mountain Resort Condominium Residences
Phoenix Discovery Group
Final Design Review
Public Hearing for the Approval of a
Fractionalized Project
Page 3 of 4
STAFF RECOMMENDATIONS
If the Commission finds that this application corforms with
Approval Criteria for Fractionalized Projects or can be
modified to be brought into conformance, Staff recommends
that Final Design Review approval be granted subject to:
1. Final design conform with Fire Department regulations for
emergency access, fire flows, etc.
2. Criteria as stated in the Engineering Report.
;. Use is restricted to the intention and uses of the
Residential Medium Density zone district which reads as
follows:
Intention - Areas primarily for long term
occupancy in attached or multi -unit family
dwellings on separate lots.
Allowed Uses - Duplex, multi -family dwellings,
townhouses, condominiums, aprartments, accessory
buildings.
RECOMMENDED ACTION
1. Introduce Project;
2. Presentation by Applicant;
3. open Public Hearing;
4. Close Public Hearing;
5. Commission _view of Application;
6. Act on Application.
7ect"$te
fyuJl bmd,
L nFri�tzlen
P1 nner
w;
4D
y
Staff Report to the Planning and Zoning Commission
July 19, 1988
Portion Lot 46/47, Block 1, Benchmark at Beaver Creek
Mountain Resort Condominium Residences
Phoenix Discovery Group
Final Design Review
Public Hearing for Approval of a
Fractionalized Project
Page 4 of 4
PLANNING AND ZONING ACTION
Approved as Submitted ( ) Approved with Recommended
Conditions ( ) Approved with Modified Conditions ( )
Continued ( > Denied G,A) Withdrawnt )
Date 14,JtA a D(�
enise Hi 1i, Secretary YJDnvAD
The Commission moved to deny the application as submitted, citing the
incompatibility of the number and size of the units of this project with
the other units in the neighborhood. --
40
STAFF REPORT TO THE 'LANNING AND ZONING COMMISSION
JULY 19, 1988
Lot 3, Block 5, Wildridge Subdivision
Otterman and Associates
ZO Unit Condominium Project
Final Design Review
Public Hearing for the Approval of a
Fractionalized Project
INTRODUCTION
Otterman and Associates is seeking final approval for the
proposed 20 unit project on Lot 3, Block. 5, Wildridge
Subdivision. Preliminary design approval was granted on May
17, 1988. Final design approval is being requested at this
time. Concurrent with this meeting will be the "Public
Hearing for Fractionalized Projects" for this project as
required by the Administrative Procedure for Fractionalized
Project of the Town of Avon Design Procedures Rules and
Regulations, February 1987.
A number of design issues have been addressed prior to this
request for final approval and public hearing.
Roof lines were changed from the original
submission to create more visual interest.
Engineered site plans were submitted which
more fully address grading and drainage.
Parking lot lighting has been indicated.
Landscaping and retaining walls were
redesigned to lessen site impact and
improve appearance.
Density was approved.
In addition to the Planning and Zoning Commission, Design
Review Procedures, Rules and Regulations, the following
criteria should also be taken into consideration when
reviewing this project for final approval.
II. Approval Criteria for Fractionalized Projects
A. The Planning and Zoning Commission shall consider
the following factor=_ in addition to the Design
Review Guidelines listed in Section 6.00 of the
Design Procedures, Rules and Regulations for the
Planning and Zoning Commission of the Town of Avon,
When reviewing a p.-oject involving the
Staff Report to the Planning and Zoning Commission
July 19, 1988
Lot 3, Block S, Wiidridu a Subdivision
Otterman and Associates
20 Unit Condominium Project
Final D&sign Review
Public Hearing for the Approval of a
Fractionalized Project
Page 2 of b
fractionalization of residential development-'ghts:
1. The adequacy of access to the site with respect
to the width of the adjacent streets, their
grades, intersection safety, visibility and
entrance into the lot to be developed;
2. The need for, and availability of public or
private transportation to serve the proposed
development;
3. The impact of the proposed project upon public
and private services and facilities serving the
area;
4. The compatibility of the proposed unit sizes
and unit mix with existing and potential
development in the vicinity.
STAFF COMMENTS
SITE ACCESS - Staff has reviewed the site plan and
feel that existing roads and proposers drives will accomodate
the total potential vehicular traffic of the neighborhood.
PUBLIC TRHN_SPORTATION - At present there is no
existing or proposed public transportation for Wildridge.
Easy access to public transportation would be a desirable
asset to this project, but the number of potential residents
for Wildridge does not easily justify the creation of a
public transport system. A van service at pe�lk hours,
provided by the Homeowner's Association, would probably be
the most effective means of addressing this concern.
AVAILABLE PUBLIC AND PRIVATE FACI_LITIFS - The
number of existing residential units in Wildridge is 53. The
number of units proposed for Lot 3 and Lot b will almost
double the number of existing units in Wildridge. This will
have a significant effect on the presently nominal
availability of public and private facilities in the area,
i.e. parks, passive and active recreational areas,
neighboorhood commercial facilities, and fire protection.
Staff Report to the Planning and Zoning Commission
,July 19, 1988
Lot 3, Block 5, Wildridge Subdivision
Otterman and Associates
20 Unit Condominium Project
Final Design Review
Public Hearing for the Approval of a
Fractionalized Project
Page 3 of 6
This impact is further compounded by three additional
factors:
A) The project's lack of any on site amenity or usable open
space suitable for active or passive recreation.
B) The remote location from central Wildridge will continue
to isolate the project from future neighborhood
facilities in that the probable development of such would
be on the opposite side at Metcalf Road.
C) The project's lack of accomodation far on site
management.
FIRE PROTECTION - Fire protection is also
inadequate and the need for an additional hydrant as well as
standpipes within the stairwells of the structure and an
offsite truck turnaround has been discussed with the
applicant.
DRAINAGE AND EROSION_ - These are addressed in the
engineering report prepared by Nc;rm Wood, which is included
herein.
COMPATIBILITY - Block 5, Wildridge Subdivision has
one developed lot within it to date. That development is
"Gosshawk" condominiums, a ten unit townhouse complex on Lot
10.
Block 5, is a relatively isolated cul de sac of lots zoned
for multi -unit residential complexes. Total build out far
Block 5 is 90 units, taking into account fractionalization
and the development of this project.
The concurrent construction of projects on Lot 3 and Lot 6
will constitute half of the total unit build out of Block 5,
therefore, these projects will dominate the character of the
immediate neighborhood.
This project varies from, existing residential development jr.
Wildridge in the following ways - Existing Development:
a. Units are larger;
Staff Report to the Planning and Zoning Commission
July 19, 1988
Lot 3, Block 5, Wildridge Subdivision
Otterman and Associates
20 Unit Condominium Project
Final Design Review
Public Hearing for the Approval of a
Fractionalized Project
Page 4 of 6
b. Incorporates enclosed parking as required
by the Wildridge Covenants
C. Has primarily on grade entry access
d. Has less monolithic building proportions
e. Incorporates private lawns or yards.
ENGINEERING REPORT
Drainage Report - Lot 3 Block 5, Wildridge
1. Erosion protection must be provided at
inlet and outlet to Filter Pit
2. Depth of Filter Pit is not indicated. Volume
cannot be calculated.
3. If 2' deep, holding capacity for 10 year
runoff would be approximately 1.0 minute.
This does not seem adequate for a reasonable
level of treatment.
Recommendation
Approval subject to submission of acceptable
drainage plan prior to issuance of Building
Permits.
CONCLUSION
This project, as proposed would offer a desirable housing
type for employees in the Avon/Beaver Creek area.
The neighborhood has the potential to become an affordable
medium density residential district surrounded by ample open
space and interesting views. The remote location of Block 5
from Wildridge will isolate it from the lower density
projects on the west side of Metcalf road which is a positive
planning aspect.
As presently platted, Block 5 does not include any designated
park: land or lots zoned for commercial use, therefore, it is
Staff Report to the Planning and Zoning Commission
July 19, 1988
Lot 3, Block 5, Wildridge Subdivision
Otterman and Associates
20 Unit Condominium Project
Final Design Review
Public_ Hearing for the Approval of a
Fractionalized Project
Page 5 of 6
important that all developments in Block 5 be relatively
self-sufficient in nature and adequately address the remote
location.
It is also noted that the site, due to its topography, does
not easily accomodate the density proposed and that a highly
engineered solution is necessary.
STAFF RECOMMENDATIONS
If the Commission finds that this application conforms with
Approval Criteria for Fractionalized Projects or can be
modified to be brought into conformance, Staff recommend-,
that Final Design Review approval be granted subject to:
1. Final design conform with Fire Department regulations for
emergency access, fire flows, etc.
2 --iteria as stated in the Engineering Report.
1. Incorporation of on site, clearly usable open =_pace, with
less than a 5% grade, for indoor or outdoor passive and/or
active recreation, other than the parking lot, that is not
less than 5% of the habitable area of the structure and
easily accessible to all inhabitants.
Staff recognizes that the incorporation of additional open
Space will require additional grading, possibly more
retainage or a built deck, but feel=_ that the advantages
outweigh the additional site impact.
4. Incorporation of covered parking equal to 50% of the
roqui.red parking.
5. Designation of at least one on site manager's unit
between the two projects on Lot 3 and Lot 6 that would be
platted as limited common area on the condominium map.
6. The construction of an offsite turnaround as previously
discussed with the staff.
LL
4M
V-A , w
Staff Report to Planning and Zoning Commission
July 19, 1988
Lot 3, Block 5, Wildridge Subdivision
Otterman and Associates
20 Unit Condominium Project
Final Design Review
Public Hearing for Approval of a
Fractionalized Project
Page 6 of 6
RECOMMENDED ACTION
1. Introduce Project;
2. Presentation by Applicant;
3. Open Public Hearing;
4. Close Public Hearing;
5. Commission Review of Application;
6. Act on Application.
Respectfully submi ad,
� Lynn Fritzlerf
Planner
PLANNING AND ZONING ACTION
Approved as Submitted ( ) Approved with Recommended
Conditions t > Approved with Modified Conditions ( >
Continuedt >GG Denied (L/) Withdrawn
Date 14,198 D Denise Hill, Secretary 's LCt4� KX
The Commission moved to deny this project on the basis that the proposed
unit sizes and unit mix are not compatible with the existing and potential
development in the vicinity. Furthermore, this project does not minimize
site impacts to adjacent properties or the visual appearance as viewed
from adjacent or neighboring properties and public ways as stated in the
Design Guidelines Sections 6.13 and 6.15. Additionally, the proposed
improvements are not compatible with the site topography as required in
ml
1
STAFF REPORT TO THE PLANNING AND ZONING COMMISSION
JULY 19, 1988
Lot 6, Block 5, Wildridge Subdivision
Otterman and Associates
24 Unit Condominium Project
Final Design Review
Public Hearing for the Approval of a
Fractionalized Project
INTRODUCTION
Otterman and Associates is seeking final approval for the
proposed 24 unit project on Lot S, Block 5, Wildridge
Subdivision. Preliminary design app -oval was granted on May
17, 1988. Final design approval is being requested at this
time. Concurrent with this meeting will be the "Public
Hearing for Fractionalized Projects" for this project as
required by the Administrative Procedure for Fractionalized
Project of the Town of Avon Design Procedures Rules and
Regulations, February 1987.
A number of design issues have been addressed prior to this
regi.test for final approval and public hearing.
Roof lines were changed from tithe original
submission to create more visual interest.
Engineered site plans were submitted which
more fully address grading and drainage.
Parking lot lighting has been indicated.
Landscaping and retaining walls were
redesigned to lessen site impact and
improve appearance.
Density was approved.
In addition to the Planning and Zoning Commission, Design
Review Proced'.ires, Rules and Regulations, the following
criteria should also be taken into consideration when
reviewing this project for final approval.
II. Approval Criteria for Fractionalized Projects
A. The Planning and Zoning Commission shall consider
the following factors in addition to the Design
Review Guidelines listed in Section 6.00 of the
Design Procedures, Rules and Regulations for the
Planning and Zoning Commission of the Town of Avon,
When reviewing a project involving the
Staff Report to the Planning and Zoning Commission
July 19, 1988
Lot 6, Block 5, Wildridge Subdivision
Otterman and Associates
24 Unit Condominium Project
Final Design Review
Public Hearing for the Approval of a
Fractionalized Project
Page 2 of 6
fractionalization of residential development rights:
1. The adequacy of access to the site with respect
to the width of the adjacent streets, their
grades, intersection safety, visibility and
entrance into the lot to be developed;
2. The need for, and availability of public or
private transportation to serve the proposed
development;
The impact of the proposed project upon public
and private services and facilities serving the
area;
4. The compatibility of the proposed unit sizes
and unit mix with existing and potentia]
development in the vicinity.
STAFF COMMENTS
SITE ACCESS - Staff has reviewed the site plan and
feel that existing roads and proposed drives will accomodate
the total potential vehicular traffic of the ieighborhood.
PUBLIC TRANSPORTATION - At present there is no
existing or proposed public transportation for Wildridge.
Easy access to public transportation would be a desirable
asset to this project, but the number of potential residents
for Wildridge does not easily justify the creation of a
public transport system. A van service at peak hours,
provided by the Homeowner's Association, would probably be
the most effective means of addressing this concern.
AVAILABLE PUBLIC AND PRIVATE FACILITIES - The
number of existing residential units in Wildridge is 53. The
number of units proposed for Lot 3 and Lot 6 will almost
double the number of existing units in Wildridge. This will
have a significant effect on the presently nominal
availability of public and private facilities in the area,
i.e. parks, passive and active recreational areas,
neighboorhood commercial facilities, and fire protection.
Staff Report to the Planning and Zoning Commission
July 19, 1988
Lot 6, Block 5, Wildridge Subdivision
Otterman and Associates
24 Unit Condominium Project
Final Design Review
Public Hearing for the Approval of a
Fractionalized Project
Page 3 of 6
This impact is further compounded by three additional
factors:
A) The project's lack of any on site amenity or usable open
space suitable for active or passive recreation.
B) The remote location from central Wildridge will continue
to isolate the project from future neighborhood
facilities in that the prohable development of such would
be on the opposite side at Metcalf Road.
C) The project's lack of accomodation for on site
management.
FIRE PROTECTION - Fire protection is also
inadequate and the need for an additional hydrant as well as
standpipes within the stairwells of the structure and an
offsite truck turnaround has been discussed with the
applicant.
DRAINAGE AND EROSION - These are addressed in the
engineering report prepared by Norm Wood, which is included
herein.
COMPATIBILITY - Block 5, Wildridge Subdivision has
one developed lot within it to date. That development is
"Gosshawk" condominiums, a ten unit townhouse complex on Lot
10.
Block 5, is a relatively isolated cul de sac of lots zoned
for multi -unit residential complexes. Total build out for
Block 5 is 90 units, taking into account fractionalization
and the development of this project.
The concurrent construction of projects on Lot 3 and Lot 6
will constitute half of the total unit build out of Block 59
therefore, these projects will dominate the character of the
immediate neighborhood.
This project varies from existing residential development in
Wildridge in the following ways: - Existing Development:
a. Units are larger;
Staff Report to `.he Planning and Zoning Commission
July 19, 1988
Lot 6, Block 5, Wildridge Subdivision
Otterman and Associates
24 Unit Condominium Project
Final Design Review
Public Hearing for the Approval of a
Fractionalized Project
Page 4 of 6
b. Incorporates enclosed parking as required
by the Wildridge Covenants
C. Has primarily on grade entry access
d. Has less monolithic building proportions
e. Incorporates private lawns or yards.
ENGINEERING REPORT
Drainage Report - Lot b Block 5 Wildridge
1. Does not appear that positive treatment
of parking lot runoff will be achieved
by filter curtain on a 10% grade.
2. Volume to be treated would be reduced
substantially if offsite were separated from
parking lot drainage.
3. Limits of filter curtain are not shown.
Recommendation
Approval subject to submission of acceptable
drainage plan prior to issuance of Building
Permit.
CONCLUSION
This project, as proposed would offer a desirable housing
type for employees in the Avon/Beaver Creek area.
The neighborhood has the potential to become an affordable
medium density residential district surrounded by ample open
space and interesting views. The remote location of Block 5
from Wildridge will isolate it from the lower density
projects on the west side of Metcalf road which is a positive
planning aspect.
As presently platted, Block 5 does not include any designated
park land or lots zoned for commercial use, therefore, it is
40
40;
Staff Report to the Planning and Zoning Commission
July 19, 1988
Lot 6, Block 5, Wildridge Subdivision
Otterman and Associates
24 Unit Condominium Project
Final Design Review
Public Hearing for the Approval of a
Fractionalized Project
Page '� of 6
important that all developments in Block 5 be relatively
self-sufficient in nature and adequately address the remote
location.
It is also noted that the site, due to its topography, does
not easily accomodate the density proposed and that a highly
engineered solution is necessary.
STAFF RECOMMENDATIONS
If the Commission finds that this application conforms Witt)
Approval Criteria for Fractionalized Projects or can be
modified to be brought into conformance, Staff recommend!:
that Final Design Review approval be granted subject to:
1. Final design conform with Fire Department regulations for
emergency access, fire flows, etc.
2. Criteria as stated in the Engineering Report.
3. Incorporation of on site, clearly usable open space, with
less than a 5% grade, for indoor or outdoor passive and/or
active recreation, other than the parking lot, that is not
less than 5% of the habitable area of the structure and
easily accessible to all inhabitants.
Staff recognizes that the incorporation of additional open
space will require additional grading, possibly more
retainage or a built deck, but feels that the advantages
outweigh the additional site impact.
4. Incorporation of covered parking equal to 50% of the
required parking.
5. Designation of at least one on site manager's unit
between the two projects on Lot 3 and Lot 6 that would be
platted as limited common area on the condominium map.
6. The construction of an offsite turnaround as previously
discussed with the staff.
i I
40l
!0
Staff Report to Planning and Zoning Commission
July 19, 1988
Lot 6, Block 5, Wildridge Subdivision
Otterman and Associates
24 Unit Condominium Project
Final Design Review
Public Hearing for Approval of a
Fractionalized Project
Page 6 of 6
RECOMMENDED ACTION
1. Introduce Project;
2. Presentation by Applicant;
3. Open Public Hearing;
4. Close Public Hearing;
5. Commission Review of Application;
6. Act on Application.
Respectfully submitted,
Lynn Fritzlen
Planner
PLANNING AND ZONING ACTION
Approved as Submitted ( ) Approved with Recommended
Conditions ( > Approved with Modified Conditions ( )
Continuedp( ) Denied (l/ Withdrawn ( )
Date �i ��7 I L Denise Hi11, Secretary�GLC�C
The Commission moved to deny this project on the basis that the proposed
unit sizes and unit mix are not compatible with the existing and potential
development in the vicinity. Furthermore this project does not minimize
site impacts to adjacent properties or the visual appearance as viewed _
from adjacent or neighboring properties and public ways as stated in_the
Design Guidelines Sections 6.13 and 6.15. Additionally, the proposed
improvements are not compatible with the site topography as required in