PZC Packet 031886STAFF REPORT TO PLANNING & ZONING COMMISSION - 3/18/86 Lot 38, Block 3, Wildridge Subdivision Ricks Duplex Final Design Review INTRODUCTION: At the March 4, 1986 meeting, Roy Ricks was given preliminary design review approval for a duplex residence to be located on Lot 38, Block 3, Wildridge. The proposed building is approximately 5,900 square feet. Building materials include R -wall exterior insulation system with a stucco -like finish proposed to be light sage in color. Roof material is sawn cedar shingles. With that preliminary approval, the applicant was directed to revise the site plan to show building ties and dimensions, add a culvert for drainage in the street right-of-way, and to dimension the parking and driveway areas. He was also directed to show the sizes and quantities of proposed plant materials, and make reference to an irrigation system on the landscaping plan. The revised plans that have been submitted address the Staff concerns and appear to be sufficient for final approval of this project. RECOMMENDED ACTIONS: 1. Introduce project; 2. Commission review of submitted materials; 3. Action on application. RespectffuNllyy Submitted, Enginee ing Technician Planning and Zoning Action: Approved as Submitted Approved with Recommended Conditions ( ) Approved with Modified Conditions ( ) Continued ( ) Denied ( ) Withdrawn Date Patricia Cuny, Secretary RW/mml 000'°4 STAFF REPORT TO PLANNING & ZONING COMMISSION - 3/18/86 Lots 26-28, Block 1, Benchmark at Beaver Creek Mountair Center - Warehouse/Wholesale Final Design Review INTRODUCTION: At the March 4, 1946 meeting, Michael Nowak of Nowak -Stevens Architects of Denver, representing the owner of Lots 26-28, Block 1, gave an in Formal presentation to the Commission outlining a proposal for a warehouse/wholesale project to be built on these lots. The project generally consists of a three story building, containing approximately 82,400 square feet. The first level, which is completely below grade, is proposed to house a mini -warehouse operation to be retained by the developer. The main level and the upper level will consist of warehouse space which is proposed to be condominiumized in order to sell the individual spaces to businesses. Allowable uses in the IC Zone District include warehouse, laboratories, electrical substation, light manufacturing plants, wholesale sales outlets, showrooms, industrial, construction, and wholesale offices. Some of the concerns expressed by the Commission at the previous meeting were: 1. That snow storage was inadequate; 2. Open space was below minimum requirements; 3. Parking was below minimum requirements; 4. Landscaping around the site was insufficient. the Commission generally felt that the building design was acceptable. The proposed materials include a comiination of smooth face and split face concrete block, to be a mauve color. A revised site plan has been submitted to address the Commission's concerrs. Some of the changes to the site plan include: 1. The layout of the parking area north of the building has been revised to increase open space and snow stc,;,age areas; 2. 104 parking spaces have been provided on-site; 3. Some landscape islands have been added within the parking areas; 4. Landscaping around the site has been increased. 10' Staff Report to Planning & Zoning Commission - 3/18/86 Lots 26-28, Block 1, Benchmark at Beaver Creek Mountain Center - Warehouse/Wholesale Final Design Review Page 2 of 4 STAFF COMMENTS: Review of the revised site plan has resulted in the following information: Impervious Surface Open Space Pavement Area Snow Storage Building height Proposed 75% of site 25% of site 45,560 sq. ft. 9,400 sq. ft. Approximately 36 feet Allowable 75% (maximum) 25% (minimum) N/A 9,110 sq. ft. req'd. 60 feet maximum Parking has been calculated on the basis of one space per 800 square feet for the entire floor area of the project. The open space is now at the minimum allowable in this zone district. Snow storage shown on the site plan is adequate for the amount of pavement area. Lot coverage by impervious surface is at the maximum allowable level. In reviewing this application, the Commission shall consider the following items: a. The suitability of the improvement, including materials of which it is constructed and the site upon which it is to be located; b. The nature of adjacent and neighboring improvements; c. The quality of the materials to be utilized in any proposed improvements; d. The visual appearance of any proposed improvement as viewed from any adjacent or neighboring property; e. The objective that no improvement will be so similar or dissimilar to others in the vicinity that values, monetary or aesthetic, will be impaired. STAFF RECOMMENDATIONS: The proposed design generally conforms with the requirements of the Zoning Code and Staff recommends that design approval be given for general building design and site layout for the project, subject to Commission concurrence with the above design review criteria and the recommendations below. Final approval should be subject to submission of additional plans and documents addressing the following items: Staff Report to Planning & Zoning Commission - 3/18/86 Lots 26-28, Block 1, Benchmark at Beaver Creek Mountain Center - Warehouse/Wholesale Final Design Review Page 3 of 4 STAFF RECOMMENDATIONS, CON'T.: 1. GENERAL a. Any approval will have to be contingent on the recording of a Subdivision Plat for Lots 26••28, Block 1, Benchmark at Beaver Creek, vacating the existing interior lot lines and easements; b. Approval is valid only for those uses which are specifically allowed in the IC Zone District. Any application for a Special Review Use in this project would be subject to available on-site parking. 2. SITE PLAN a. The 12:1 slope on the north side of the property be retained with jute -mesh, or equivalent, and at least temporary irrigation be provided in this area to assure revegetation effort; b. Additional screening be provided along Nottingham Road by the use of Evergreen trees in conjunction with proposed Decidious trees; c. Specify type of irrigation system to be used in various landscaped areas; d. A complete grading and drainage plan be submitted detailing facilities for the treatment of parking lot runoff, as well as an engineered design for the existing drainage swale on the west end of the project to provide for protection from runoff and debris flows; e. Consideration should be given to alternate locations for roof drain discharge. 3. BUILDING a. Building materials and colors be more specifically described on the plans; b. Lighting details including fixture types, pole heights, etc., be submitted and approved; c. A Comprehensive Sign Program be submitted specifying the maximum sign size for each business, the materials and colors for signs, the number and sizes of any project entry signs and directories; d. Details for the trash enclosures be submitted. Staff Report to Planning & Zoning Commission - 3/18/86 Lots 26-28, Block 1, Benchmark at Beaver Creek Mountain Center - Warehouse/Wholesale Final Design Review Page 4 of 4 RECOMMENDED ACTIONS: 1. Introduce project; 2. Presentation by applicant; 3. Commission review of submitted materials; 4. Act on application. Respectfully Submitted, (� fight ngineering Technician Planning and Zoning Action: Approved as Submitted ( ) Approved with Recommended Conditions (1--), Approved with Modified Conditions ( ) Continued ( ) Denied ( ) Withdrawn ( ) Date " _ Patricia Cuny, Secretary % �i i--__��_/ / iii. i., ., _ii►�-.t._i✓ aAz��� ) a � . — - RW/mm, M 40 s STAFF REPORT TO PLANNING & ZONING COMMISSION - 3/18/86 Tract P, Block 2, Benchmark at Beaver Creek Upper Eagle Valley Regional Water Authority Water Treatment Plant - Design Review INTRODUCTION: The Planning and Zoning Commission approved a design for a Water Treatment Plant on Tract P, Block 2, Benchmark at Beaver Creek at the August 15, 1985 meeting. After receiving bids for construction, it became necessary to reduce costs to match available funds. A portion of the cost reduction was achieved by eliminating construction of the administrative area. The elimination of the administrative area results in a design change to building footprint and the north, south and west elevations. Consequently, a new design review approval is required. It is anticipated that this will become a phased project with the administrative area being added with a second phase. At that time the construction would conform with the original design approved. STAFF COMMENTS: All materials and colors will be as per the original approval. The administrative area consisted of approximately 2,900 square feet on the westerly end of the Water Treatment Plant. The remaining building area is approximately 13,350 square feet. Considering the overall size of the building, the deletion of the administrative area is a relatively minor reduction. The major change in appearance is the west elevation which becomes much less ornate than the previously approved design. This may be partially offset by the fact that the front of the building will be set back approximately 50 feet further from the street. This would leave room for the required parking spaces without the previously approved front lot setback variance. STAFF RECOMMENDATIONS: This is not a regular agenda item and therefore final action is not recommended. In order to allow proceeding with construction, the following actions are recommended: 1. Preliminary approval of revised building design subject to the submission of a revised site plan including: a. Revised parking layout which does not encroach into front lot setback; b. Landscape plan conforming to revised site plan; Final design approval be withheld until scheduled as a regular agenda item. �^'k Staff Report to Planning & Zoning Commission - 3/18/86 Tract P, Block 2, Benchmark at Beaver Creek Upper Eagle Valley Regional Water Authority Water Treatment Plant - Design Review Page 2 of 2 RECOMMENDED ACTION: 1. Introduce project; 2. Applicant presentation; 3. Commission review and action. Respectfully Submitted, Norm Wood Director of Engineering and Community Development Planning and Zoning Action: Approved as Submitted ( ) Approved with Recommended Conditions (XS Approved with Modified Conditions ( ) Continued ( ) Denied ( ) Withdrawn ( ) Date ,3 Patricia Cuny, Secretary % ��n����� C �2r �n !�d. / If - I I _w NW/mml