PZC Packet 050686STAFF REPORT TO PLANNING & ZONING COMMISSION - 5/6/86
Eaglebend Sketch Plan
East of Nottingham Station and North of Eagle River
Eaglebend Subdivision and Zoning
INTRODUCTION:
A petition for annexation of the Eaglebend Subdivision has been filed with, and
accepted by the Avon Town Council. The annexation ordinance has been approved
on first reading and is scheduled for public hearing and second reading on
May 27, 1986. The Eaglebend Subdivision was previously approved by Eagle County
and is located between the Eagle River and the Denver Rio Grande and Western
Railway railroad tracks east of Nottingham Station Addition. The annexation
also includes the Frank Doll property and residence. The annexation petition
included an annexation agreement which stipulates that zoning is to be assigned
concurrently with final annexation action. The applicant is requesting SPA
zoning for the proposed annexation.
The requested action at this meeting is for an informal (conceptual) review of
the proposed subdivision and zoning. This report will be broken down into each
of these categories to hopefully simplify and clarify the process.
SUBDIVISION:
The subdivision process establishes the boundaries between the vas•ious types of
development within the proposed SPA zone district.
The proposed subdivision has a total area of 33.6 acres which would be divided
into six distinct areas. Streets and utilities are generally in place as a
result of the previously approved Eagle County subdivision. Some minor
modifications to the utility systems will be required to conform with the proposed
subdivision. These will require review and approval of the various utility
companies and districts. Access to the site and streets within the site will
be addressed in a detailed subdivision agreement as a part of final plat approval.
ZONING:
The zoning process for the requested SPA zone district establishes the development
rights and allowed uses within the district as well as other zoning regulations
such as building height, building setbacks, building area ratios and parking.
This project has been broken into six distinct areas with varying regulations
per each.
Area I is located immediately west of the entrance from Highway 6 and has a
total area of 2.9 acres. The proposed uses in this area include residential,
commercial and community recreational facilities for the residents and guests
of the subdivision. The applicant has requested 67 residential development
rights, or 23.1 per acre for this area. The proposed uses and density for this
area is generally consistent with those allowed in the RHDC zone districts.
Staff Report to Planning & Zoning Commission - 5/6/86
Eaglebend Sketch Plan
East of Nottingham Station and North of Eagle River
Eaglebend Subdivision and Zoning
Page 2 of 6
Area II is located between Area I and the Frank Doll property and residence.
Area II consists of 7.6 acres and the applicant has requested 83 residential
development rights, or 10.9 per acre for this area. The proposed uses and
density for this area are similar to those allowed in the RMD zone districts.
Area III is located immediately east of the entrance from Highway 6 and consists
of 6.5 acres. This area has twelve existing residential units which were built
as a part of the Stonebridge project as approved by Eagle County. The applicant
is requesting the assignment of development rights to allow the construction of
six additional residential units similar to the existing units plus a separate
unit for an on-site manager. This would be a total of 19 residential development
rights, or 2.9 per acre. The proposed density and use is generally consistent
with that allowed in the RMD zone districts.
Area IV is located at the easterly end of the subdivision between the existing
street and the railroad tracks. Area IV consists of 3.2 acres and 32
residential development rights, or 10 per acre are requested for l.nis area for
the development of townhomes. This use and density is similar to those allowed
in the RMD zone districts.
Area V is located at the easterly end of the subdivision between the existing
street and the Eagle River. Area V consists of 19 lots totalling 11.9 acres.
The applicant is requesting that each of these lots be assigned two residential
development rights which would be consistent with previous Eagle County approvals.
There is an existing single family residence on Lot 19. The remainder of Area V
is undeveloped, although a number of lots were sold by the original developer.
Area VI is the Frank Doll property located at the westerly end of the proposed
annexation and consists of 1.5 acres. This area has an existing single family
residence. The assignment of two residential development rights to allow the
possible future development of a second unit on the site has been requested.
STAFF COMMENTS:
This is an informal (conceptual) review and should be used to provide guidance to
the applicant regarding the requested zoning and proposed uses. The requested
SPA zone district also requires the approval of the site plan which establishes
allowable densities, uses, parking requirements and other zoning matters such as
setbacks, building heights, building area ratios and open space requirements.
The following is the recommended format for each of the areas:
-1
r
Staff Report to Planning & Zoning Commission - 5/6/86
Eaglebend Sketch Plan
East of Nottingham Station and North of Eagle River
Eaglebend Subdivision and Zoning
Page 3 of 6
AREA I:
Density: 67 residential development rights. (Note: 56 required per conceptual plan).
Allowed Uses: Condominium, apartment, lodge, hotel, recreational and community
facilities and limited commercial uses consisting of restaurant,
retail shops and office. Commercial space limited to 15% of
building area.
Maximum Building Height 90 Feet (staff recommendation
80 feet)
Maximum Building Area Ratio 50 Percent
Minimum Useable Open Space 25 Percent
Minimum Building Setback Front 25 Feet
Side 7.5 Feet
Rear 10 Feet
Off Street Parking and Loading Per Chapter 17.24 of AMC
AREA II:
Density: 83 residential development rights. (Note: 77 required per conceptual plan).
Allowed Uses: Multi -family dwellings, condominiums, townhouses, apartments,
accessory buildings and uses.
Maximum Building Height 45 Feet
Maximum Building Area Ratio 50 Percent
Minimum Useable Open Space 25 Percent
Minimum Building Setback Front 25 Feet
Side 50 Feet (west line)
7.5 Feet (east line)
Rear 10 Feet
Off Street Parking and Loading Per Chapter 17.24 of AMC
Staff Report to Planning & Zoning Commission - 5/6/86
Eaglebend Sketch Plan
East of Nottingham Station and North of Eagle River
Eaglebend Subdivision and Zoning
Page 4 of 6
AREA III:
Density:
19 residential development
rights.
AREA V:
Allowed
Uses: Duplex, multi -family
dwellings,
condominiums, townhouses,
Uses: One and two family dwellings,
apartments, accessory
buildings
and uses.
Maximum
Building Height
Maximum
35 Feet
Maximum
Building Area Ratio
Minimum
50 Percent
Minimum
Useable Open Space
Minimum
25 Percent
Minimum
Building Setback
Front
Side
25 Feet
100 Feet (east line)
Side
Rear
10 Feet or 30 feet from mean annual
Rear
10 Feet
P kin and Loading
high water line of Eagle,River -
Per Chapter 17.24 of AMC
Off Street ar g
Note: Existing garages, parking and driveway areas do not conform with Standard
Setbacks.
AREA IV:
Density: 32 residential development rights.
Allowed Uses: Duplex, multi -family dwellings, condominiums, townhouses,
apartments, accessory buildings and uses.
Maximum Building Height 35 Feet
Maximum Building Area Ratio 50 Percent
Minimum Useable Open Space 25 Percent
Minimum Building Setback Front 25 Feet
Si;ie 7.5 Feet
Re,r 10 Feet
t 17 24 of AMC
Off Street Parking and Loading
Per Chap er
AREA V:
2 residential development
rights per lot (38 residential development rights).
Density:
Allowed
Uses: One and two family dwellings,
accessory buildings and uses.
Maximum
Building Height
35 Feet
Maximum
Building Area Ratio
50 Percent
Minimum
Useable Open Space
25 Percent
Minimum
Building Setback
Front
25 Feet
7.5 Feet
Side
Rear
10 Feet or 30 feet from mean annual
high water line of Eagle,River -
whichever is greater
Off Street Parking and Loading
Per Chapter 17.24 of AMC
Note: Some
lots may require special
setback
provisions to maintain building envelope.
4W1
'7
4Wj
Staff Report to Planning & Zoning commission - 5/6/86
Eaglebend Sketch Plan
East of Nottingham Station and North of Eagle River
Eaglebend Subdivision and Zoning
Page 5 of 6
AREA VI:
Density: 2 residential development rights.
Allowed Uses: One and two family dwellings, accessory buildings and uses.
Maximum Building Height 35 Feet
Maximum Building Area Ratio 50 Percent
Minimum Useable Open Space 25 Percent
Minimum Building Setback Front 25 Feet
Side 7.5 Feet
Rear 30 Feet from mean annual high water
line (Eagle River)
Off Street Parking and Loading Per Chapter 17.24 of AMC
REVIEW CRITERIA:
The following criteria is suggested for review of the proposed zoning and uses as
outlined above:
a. Compatibility with surrounding area;
b. Harmony with character of neighborhood;
c. Need for proposed development;
d. Effect of proposed development on immediate area;
e. Effect of proposed SPA (Specially Planned Area) upon future development
of area;
f. Whether exceptions from the zoning ordinance requirements and limitations
is warranted by virtue of the design and amenities incorporated in the site
plan;
g. Land surrounding the proposed SPA can be planned in -coordination with the
proposed SPA;
h. The proposed SPA is in conformance with the general intent of the Master
Plan and general zoning ordinance;
i. The existing and proposed streets are suitable and adequate to carry
anticipated traffic within the area and in the vicin'ty of the area;
j. Existing and proposed utility services are adequate for the proposed
development;
k. The SPA creates a desireable and stable environment;
1. The S?A makes it possible for the creation of a creative innovation and
efficient use of the property.
Staff Report to Planning & Zoning Commission - 5/6/86
Eaglebend Sketch Plan
East of Nottingham Station and North of Eagle River
Eaglebend Subdivision and Zoning
Page 6 of 6
RECOMMENDED PROCEDURE:
1. Introduce project and requested action;
2. Presentation by applicant;
3. Commission review and comment:
Subdivision
Zoning Area I
Zoning Area II
Zoning Area III
Zoning Area IV
Zoning Area V
Zoning Area VI
(Provide specific comments and direction to applicant).
Respectfully Submitted,
Norm Wood
Director of Engineering and
Community Development
NW/mml
STAFF REPORT TO PLANNING & ZONING COMMISSION - 5/6/86
Eaglebend - Area II and Area III
Design Review - Conceptual
INTRODUCTION:
A conceptual design review for the proposed development of Area II and Area III
has been requested. The conceptual review of these two areas should be separated
in order to clarify any direction to applicant.
AREA II:
The proposed development on Area II consists of eleven identical buildings with
ten condominium units and ten covered parking spaces in each. The units would
vary in size from 725 square foot, one bedroom units to 1,450 square foot,
three bedroom units. Each building would be three stories plus a loft for the
third level units. Building materials indicated are redwood or cedar siding
with standing seam metal roof.
Based upon available information, each building would require seven residential
development rights and 19 parking spaces for a total of 77 residential development
rights and 21.9 parking spaces which includes 10 guest spaces as required. The
sketch plan indicates 237 parking spaces will be available for this area.
Eighty-three residential development rights have been requested for this area.
AREA III:
Proposed development of Area III consists of six residential units similar to the
existing units, two garages similar to existing garages and an additional building
which would contain a residential unit for an on-site manager and spa facilities
for residents and guests. A cluster of four residential units would be located
at the westerly end of the area and a cluster of two residential units would be
located at the easterly end of the area. The on-site managers unit and spa would
be located near the northwesterly corner of Area III. The proposed garages would
be located along the northerly boundary of the area.
Drawings have not been provided for the residential units or the garages. The
managers unit and spa is a two story building with wood siding and cedar shake
shingle roof. The drawings also indicate that some stone will be used on the
building.
STAFF COMMENTS:
AREA II:
The following comments are offered in response to a cursory Staff review of the
conceptual site development plans for area II:
The parking and driveway areas do not meet 10 feet front yard setback
requirement;
Staff Report to Planning & Zoning Commission - 5/6/86
Eaglebend - Area II and Area III
Design Review - Conceptual
Page 2 of 3
STAFF COMMENTS, CONT.:
AREA II, CONT.:
2. It may be desireable to have common access easement or agreement between
Area I and Area II to provide for possibility of separate development
of the two areas;
3. The landscaping within the street right-of-way may not be prac!:ical due
to width and grades involved;
4. The landscape plan appears to utilize a large number of pinyon pines,
which seem to have only limited success in this area;
5. Pedestrian walkways are not shown on the site plan. This would seem to
indicate that all access to the units will be through the garages;
6. Parking area lighting is not indicated.
AREA III:
Six of the proposed additional units are to be similar to the existing units on
this site. Consequently, Staff recommends the Commission concentrate on the
proposed design of the on-site managers unit, SPA and the site development plan.
Some of the issues are:
1. Are the proposed building locations appropriate?
2. Can the additional parking and garages be appropriately located to conform
with the 10 foot front yard setback?
The above comments are based upon the limited information available. It is
presumed that detailed drawings providing the additional information specified
in the Planning and Zoning Commission Procedures, Rules and Regulations will be
provided prior to request for final design review approval.
RECOMMENDED ACTION:
1. Introduce Area II design;
2. Applicant presentation;
Commission review and comment;
4 introduce Area III design;
5. Applicant presentation;
6. Commission review and comment.
Staff Report to Planning & Zoning Commission - 5/6/86
Eaglebend - Area II and Area III
Design Review - Conceptual
Page 3 of 3
Respectfully Submitted,
Norm Wood
Director of Engineering
and Community Development
NW/mml
STAFF REPORT TO PLANNING & ZONING COMMISSION - 5/6/86
Lot 72, Block 2,
Buck Creek Plaza
Design Review
INTRODUCTION:
Benchmark at Beaver Creek
- Unit 6 - Greenhouse Addition
Pat and Rick Cuny, owners of Unit 6, Buck Creek Plaza, have applied for design
review of a proposed greenhouse addition to their property. The proposed
greenhouse addition would enclose the balcony area directly in front of Unit 6.
The applicant has submitted photographs showing the exterior of this area of the
building as it exists, along with a product brochure identifying the style of
structure proposed for the addition. There is also a letter from three of the
officers of the Buck Creek Condominium Association granting the applicant
permission to construct the addition.
STAFF COMMENTS:
The Commission has granted approval for this type of addition in the past. The
previous submittals for greenhouse additions included floor plans and elevations
showing the relationship of the proposed addition to the existing improvements,
along with details for the connection of the addition to the existing building.
The photos and brochure submitted with this application do not provide this
level of detail. This information would be helpful in this case as the addition
may possibly result in the snow from the roof in this area being shed onto the
driveway to the project.
The Commission should decide whether or not to accept this application as
submitted, or request additional information from the applicant.
STAFF RECOMMENDATIONS:
If design review approval is granted on this application, Staff would suggest
that the following conditions be made a part of such approval:
1. That a letter be submitted that would indicate approval of the Condominium
Association rather than approval of the officers.
RECOMMENDED ACTIONS:
1. Introduce project;
2. Presentation by applicant;
3. Commission review of submitted materials;
4. Act on application in accordance with attached design review guidelines.
Staff Report to Planning & Zoning Commission - 5/6/86
Lot 72, Block 2, Benchmark at Beaver Creek
Buck Creek Plaza - Unit 6 - Greenhouse Addition
Design Review
Page 2 of 2
Respectfully Submitted,
igh
ng nee ring Technician
Planning and Zoning Action:
Approved as Submitted ( ) Approved with Recommended
Approved with Modified Conditions ( I Continue ( )
Date
5.6.6GO , sec4ary
1. G .
Rbl!mnil
itions (�
ix) Withdrawn
r7
•
1_ON
STAFF REPORT TO PLANNING & ZONING COMMISSION - 5/6/86
Lot 7, Block 1, Wildridge Subdivision •
Suncrest Townhomes, Phase II
Irrigation System
•
INTRODUCTION:
At the meeting of April 15, 1986, the Cc-,ission concurred with Staff that the I approved plans for this project included the installation of an automatic
irrigation system for the landscaping. Since that meeting, Staff has received
a letter from the developer, a copy of which is attached to this report, stating
the reasons that the developer feels an automatic irrigation system is not
necessary. Staff would like the Commission to review the information on this
particular project and reaffirm their decision of April 15, 1986, if the
Commission feels that it is appropriate.
STAFF COMMENTS:
When the developer approached the Town for a Temporary Certificate of Occupancy
on this project, the Town attached conditions to the Temporary Certificate of
Occupancy, which are attached to this report, and demanded that an Irrevocable
Letter of Credit be opened that world cover the cost of those items not completed
at the time of the issuance of the Temporary Certificate of Occupancy. The
amounts in the letter of credit were tied to specific contracts that were
submitted by contractors, and accepteJ by the developer, for the completion of
the landscaping, driveway grading and paving, trash enclosure and entry lighting
for the project. In the bid for the landscaping, the developer accepted a bid
of $4,118.50 from Eagle Valley Landscaping and Nursery, which includes $1,600.00
for one automatic irrigation system 4 zone, installed. A copy of this bid is
attached to this report.
Staff feels that the notes on the approved plans, and the acceptance of the bid
for the landscaping by the developer, indicates the intention to install that
system and Staff would recommend that the Commission direct the developer to
comply with the approved plans.
RECOMMENDED ACTIONS:
Introduce project;
2. Presentation by applicant;
3. Commission review of submitted material;
4. Act on application.
Respectfully SuAe
bmitt d,
aW ghtg' eerinician
Staff Report to Planning & Zoning Commission - 5/6/86
Lot 7, Block 1, Wildridge Subdivision
Suncrest ?ownhomes, Phase II
Irrigation System
Page 2 of 2
Planning and Zoning Action:
Approved as Submitted K) Approved with Recommended Conditions ( )
Approved with Modified Conditions ( ) Continued ( ) Denied ( ) Withdrawn ( )
Date >����� Patricia Cuny, Secretary �u�'
RW/mml