Loading...
PZC Minutes 082985>AIMN RECORD OF PROCEEDINGS MINUTES OF PLANNING AND ZONING COMMISSION MEETING AUGUST 29, 1985 The regular meeting of the Avon Planning and Zoning Commission was held on August 29, 1985 at 6:40 PM in the Town Council Chambers of the Town of Avon Municipal Complex, 400 Benchmark Road, Avon, Color -ado. The meeting was called to order- by Chairman Mike Blair Members Present: Pat Cuny, Mile Blair-, Jeff Maddox, Mark Donaldson, Charlie Gersbach, Cheryl Dingwell, Tont Landauer Members Absent: None Staff Present: Norm Wood, Director of Engineering and Community Development - Ray Wright, Engineering Technician Jim Williams, Building Administrator - Jim Lamont, Planning Consultant - Maggie Lach, Recording Secretary Work Session Wood r.2viewed agenda items with Commission. Lamont then reviewed and explained Master Plan map to Commission. Commission discussed meeting times for review of the Master Plan. Blair suggested that the regular meetings of September 12 and 17 begin at 6:00 PM. Regular.Agenda - 7:45 PM Lots 29 & 32, Blk. 2, BM @_BC (Lot 1,Prgposed W infield Subdivision) Wynfield Inn - Conceptual Review Wood stated that Staff had met with applicant about 2 weeks previous to this maeting and they requested a presentation to the Planning and Zoning Commission showing revisions to previous plans which were not favorably received. Applicant has requested specific direction from the Commission on this conceptual review. Hary Champlin, Vice President of Development for Wynfield Inns stated that he had presented a letter which introduced their purpose. He stated that Wynfield was tinder a time constraint to complete construction 'chis year, huwever it is possible to accelerate scheuule for grading and foundation permits for this year. Feedback from previous meetings have been incorporated into a new plan. Champlin stated there are certain things they canno': do on this project which would be cost prohibitive, such as underground parking, and as a result, there is still a large surface area of surface parking for 160 cars. The landscaping has been enhanced, and the ptlysical appear -ante of the building has changed. Champlin presented renderings of old design and new design and explained those to Commission. He explained from the drawitgs that the roof line has been altered,and public building is completely different, using hip and mine shaft roof line. �^'� i'*�N Planning & Zoning rleeting Minutes August 29, 1985 Page 2 of b Lots 29 & 32, Hlk. 2,_8M @ 8C (Lot_ I oposed Wynfield Subdivision) WynField Inn - Conceptual Reviews Con"t_ Donaldson felt that architect had done a tremendous job c,f redesigning the exterior of building. Champlin further explained that Wynfield Place had been cleaned up and turn out for buse= had been relocated. The footprint of the building is exactly the same, as is the public building. TI ie shape of the swimming pool has been changed and there is enhanced landscaping str'N between sidewalk and pool. Landscape and building materials were discussed. Champlin stated that building would be stuccu. Dean Kerkiing spoke from the audience and stated that landscaping is narrow around boundary of project and there is a lack of landscaping around most of the sides of the building and he felt that when the prosect would be viewed from a distance, it would look like a concrete boy, in thy: middle of an asphalt field. Gersbach stated that he felt thas was riot a resort Hotel and had no relation to a ski area. Dingwell disagreed and felt this type of hotel was needed, but felt there could be more landscaping. Champlin stated that this was all of the space that they had to wort, with. Donaldson suggested that pockets of space might be Sound to add landscaping, especially around building. Lanrt Aller stated Ise liked the redesign of Lite building, but felt building could be raised one level to accommodate underground parking. Champlin stated it was not economically feasible to build a five story building. Maddox stated that design is superior to that previously presented; it is a more contemporary design and fits in better with the existing buildings. Commission l..embers agreed with Maddox. Donaldson stated that south facing areas loot: good., the materials and massing, but felt that back of building was lost because of parking lot and amount of asphalt. Discussion followed on landscaping around batt: of building. Wood suggested that the I--70 right-of-way might be used for more landscaping, but would need to find out if that is allowable or not. Dingwell motioned conceptual approval for project with reyard to building design, which is headed in the right direction, and the site plan and landscaping plan needs to be considered as far as landscaping around building and the amount of concrete aid Iandscapirig together. Do-ialdson seconded. Landauer opposed. Motie,: carried. i0"') Planning & Zoning Meeting Minutes August 29, 1985 Page 3 of 6 Lgts 29& Blk. 2,_FM @ P^_ (Lot 1. Proposed Wynfield Subdivision) Wynfield Inrr - Conceptual Review, Cont. Champlin was concerned that he was riot given enough specific direction to respond to. If he carne back with specific revisions, would the Commission be able to grant final approval at the September 12 meeting. Dingwell stated that the Commission is not landscape designer or - architect. Discussion followed between applicant and Commission on landscape design and site ,.lan. Wood stated that review could easily go to final approval. Grading and drainage, along with site plan has riot changed and is in place. Gersbach clarified that applicant is in position where he cannot accommodate the landscaping or the parking. He felt decision would entail negotiation and compromise with regard to Master P1 an. Lengthy discussion followed regarding suggestions for landscaping. Blair then thanked applicant for presentation. Lodge -at Avon -Subdivision (Former iy.-Lots 57_60. Blk. 2. BM @ BC)_ Design Review - Con't._from 8/15/65 Reg Meeting Wright stated Commission gave preliminary approval at last meeting with conditions to first phase. The approved project consists of 62, 1 bedroom units totalling 34,966 SF of residential floor area, and 12,931 SF of commercial space. The project, as proposed, requires 23 1/6 Residential Development Rights. The property currently has 70 Residential Development Rights. Total parking required for project is 113 spaces. The applicant was directed to divide the commercial space into areas of less than 25% of the total commercial area in order to qualify for a parking reduction as a mired -use project.. Applicant was directed to provide updated drainage information fur Staff review and to comply with the newly adopted procedures for Fractiunalized projects. Bill Pierce, representative of Lodge at Avon Associates staterd that landscaping had been modified to show reseeding the west: end of the project. Wood believed all comments had been addressed except the 6' nigh barrier fence along the south property line. Pierce staa.ed that they were not in favor of putting up tyre fence. He stater' fence was not high anough to screen the train. It is in an area that has a sewer line that is built outside the estabiished easement and developer would have to tear the fence down when another phase is started. Wood explained that town plans to e::tend stockade fence up to this project. It would provide screening and more finished project. Commission ...embers agreed that a fence requires maintenance and that Town should take responsibility of extendirng fence. Pierce reviewed submitted plans with Commission. Wood stated that commercial area meets qualificatiuns and would qualify pruiect Our mi::ed-use reduction it-, parking. '10,*N fOPOWN Planning & Zoning Meeting Minutes August 29, 1985 Page 4 of 6 Lodge__at Avon_ Subdivision_ (Formerly Lots.. 57=60,B1k,_2,_BM @_ BC) Design Review._ Cont. from 8/15/85Regula,r Meeting. Con't._ '_andauer motioned fur final design review approval fur Ledge at Avon with conditions 2 and 3 of Staff recommendations. Dingwell seconded. Passed unanimously. Avon Trader Inc._ - A._portion of the NW 1/4 SE 1/41_ Section 12, T5S.R82.W_of_ 6th P.M.Eagle County,_ Colorado___Formerly_ known as the White Proi.erty-_SPA Develurnent_Plpn_ __Public Hearing Wood stated that applicant had submitted conceptual plan for development of a portion of the White/Eagle River Townhouse Association Ltd. annexation. The proposed area is located on the Grace White portion of the property. 'tie proposed area of development is on the easterly side of the White property. The proposed development consists of 1,840 SF convenience store and 2,159 SF automobile service station with car wash, and appruximately 3,500 SF for future development as office space. The White annexation was zoned SPA, although nu plan of development establishing allowable densities, uses, arid required parking and other zoning matters has been approved. There are two issues invulved with this. The plan establishes the zoning regulations for the proposed area of development arid alsu the design review of �.he project. Gary Tricarico of Avon Trader inc. stated that they are suggesting a service center which includes a convenience store, self--serve/full service fuel island, as well as full ser vice repair station, along with considered e::pansiun for commercial office space. TrlCarirJ presented site plan and cUlur- r-e11deriny fur UUmmi!s61iJn review. Triraricu stated that they would like preliminary approval on this pruiect regarding design issues. He stated that the Highway permit had been issued and are ready to proceed with highway access. Blair opened the public hearing. Dean leerkliny, representative of Vail AssociaLea, Beaver Creek Metropolitan District, and Upper Eagle Regional Water AuthuriLy stated that use of proper -Ly as full service gas station and it's location in relation to the enLrance of Beaver Creel. is an appropriate use to the site. The issue to be strongly considered is that of drainage from the site as it inrpacLE- water quality: snow plow areas as shown on plans are to the west of the property, and in reality, the snow plowing around the gas service islands will be off Lhe bank on the ba(kside of the pruperty. The oil arid gas spills will be plowed over Lhat back bank and unless there is specific direct address to the issue of trapping and removing of those petroleum products from the waters, they will be getting .into the river during Lite snow melt arid have a potential of being picked up in the water intakes for Bi_aver Creel: clrrrenlly, arid f� f� Planning & Zoning Meeting Minutes August 29, 1985 Page 5 of b Avon Trader Inc_- A portion of the MW 1/4_ SE 1/?,Section _ 12, T5S, R82W of 6th P.M.. Eaul a Count ys Col orado - For mer ly_ known as the White Property - SPA Development Plan -_Public Hearing, Con't_._ ultimately for Upper Eagle Regional Water Authority. He asked that Commission consider these comments. Wood stated that he did meet with Kerkling and Dean K:oll of Zehren and Associates, who represented the Fulson property and were satisfied with proposed use and general appearance of building. Terrill Knight spoke From audience and expressed an interest in reviewing the site plan. Blair closed the public hearing. Plans were reviewed by Commission regarding drive and parking. Wood stated that it is recommended that current zoning regulations be used to determine parking requirements. Lengthy discussion and review of plans was made betwe—i Commission a:id applicant regarding parking, screening, and access. Blair stated that in review of site plan, it considers only that particular use and it does not regard future uses for the rest of the property, access, or interaction in any way. He felt it was not good because this development may preclude any kind of safe access to other uses on the property. The plan should show how it could interrelate to the rest of the property. He felt access was i•convenient and could cause problems with traffic flow. He stated the general use for the site seemed to be acceptable. Discussion continued between Commission and applicant. Blair summarized details discussed by Commission: 1) traffic f UnCtion, access, parking and flow on and to site, and other- parts of the property; 2) drainage off the site near- river; 3) landscaping; 4) concept of building; and 5) proposed use. Donaldson stated that detail he would look for at next meeting would be regrading along zopo lines and felt use needed more study with regard to site circulation. Wood stated that Staff had not made a detailed review or made a detailed list of what needs to be addressed. From Staff standpoint, we are looking at general direction to applicant regarding proposed uses for SPA zone district, design of building, zoning issues regarding setbacks, building heights, and area definiti_m. There are a lot of issues to be resolved that have not been covered. Discussion followed between Cummission, Staff and applicant. Donaldson motioned to grant conceptual approval for the use of the property and the general design style of the building and limiting it to triose ideas based upun the numerous comments from the Commission, Applicant is to return with complete design drawings addressing all problems expressed during review and submittals are to be made in the proper time frame. Cuny seconded. Passed unanimously. Planning & Zoning Meeting Minutes August 29, 1985 Page 6 of 6 Reading_ and- _Aoproval__of _P & Z Minutes_ of 8/15/85 Regular Meeting Landauer motioned to approve the minutes of August 15, 1985 as submitted. Donaldson seconded. Passed unanimously. Other Business Blair reminded Commission t(;at the meeting of September 12, 1985 would comaie;:ce at 6:00 PM regarding the Master Plan. Blair asked Commission why last 2 items Look such a lengthy time to discuss. Donaldson felt that last applicant had a tremendous amount of information submitted on the Tuesday before the meeting which limited Staff review. Discussion followed between Commission and Staff. Wood felt that with redraft of Commission rules and regulations, and new forms for submittals, that this would riot occur at future meetings. There being no further business; to discuss, Maddox: motioned to adjourn the meeting. Dingwell seconded. Passed unanimously. Meeting adjourned at 11:30 P11. Respectfully Submitted, _ � ( Mar' a M. Lach Reco ng Secretary Commission Appruval_____ M. Blair �y__ P. Cully l'. Landaue J. Maddo>: C. Gersbacl Date ' It Donaldson l7/J Staff Report to Planning & Zoning Commission - 8/29/85 Avon Trader, Inc. Amoco Service Center Portion of NW 4 SE '„ Section 12, T5S, R82W (Formerly known as the White Property) SPA Precise Plan & Design Review Page 3 of 4 3. Evidence that sewer service is available to the project from appropriate sewer district; 4. Drainage report pre-•ared by registered engineer showing mean annual high water line and proj=cted 100 year flood level for Eagle River across project site. This information should be provided prior to final design approval. RECOMMENDED PROCEDURE: 1. Introduce project; 2. Presentation by applicant; 3. Public Hearing; 4. Planning and Zoning Commission review and comment; a. Zoning issues (SPA Plan); b. Design Review; 5. Continue review for submittal of complete and detailed Precise Plan and related documentation. Respectfully Submitted, -Norm Wood Director of Engineering and Community Development Staff Report to Planning & Zoning Commission - 8/29/85 Avon Trader, Inc. Amoco Service Center Portion of NW '.;, SE G, Section 12, T5S, R82W (Formerly known as the White Property) SPA Precise Plan & Design Review Page 4 of 4 Planning and Zoning Action: Approved as Submitted ( ) Approved with Recommended Conditions ( ) Appro.,ed with Modified Conditions ( ) Conti;iued (x) Denied ( ) Withdrawn i Date S Patricia Cuny, Secretary _ RECOMMENDED ACTION: NW/mml