PZC Packet 081684STAFF REPORT TO PLANNING & ZONING COMMISSIGN - 8/16/44 Lot 70, Block 2, Benchmark Subdivision Empire Savings - Design Review - Fence Per Carol Dahlinger's request, as of August 7, 1984, the fence design review will be dropped. Upon further study, the request may be revived at a later date. Respectfullyu mitte , Dan Fogland Building Administrator Planninn and Zoning Action: Approved as Submitted ( ) Continued ( ) Denied ( ) Dated: Avg 161 M4 - DF/mml 8/9/84 Approvsd with Modified Cond Withdrawn (X) Larry Kumpost, Secretary STAFF REPORT TO PLANNING AND ZONING COMMISSION - 8/16/84 Lot 67 & 68, Block 1, B.S. - Pizza Hut Building Design Review Phase I Conceptual Site Review Phase II Applicants Request: Phase I - Pizza Hut - Design Review Building and Site Phase II - Conceptual Site Review - Second Building The applicants are proposing to construct a Pizza Hut Restaurant on Lot 67 and a second phase commercial/residential building on Lot 68, with intentions of vacating the interior property line to form one lot. A portion of (Phase I) Pizza Hut building parking will be located on Lot 68, Block 1, Benchmark Sub- division. Phase I - Pizza Hut Building and. Site: Assuming the vacation of the interior property line between Lot 67 & 68, or a properly recorded agreement to protect Phase I as a site, it would appear Phase I meets the requirements of the Zoning Code, with the exceptions as noted in the staff considerations. The restaurant will seat 1^5, and building area is 4,584 S.F. In approving Phase I, the Commission may want to consider the following: 1. Landscaping plan needs to show type and size; 2. Design, size, location of retaining wall. Applicant has stated, the general conception is for concrete walls with a rock finish; 3. Trash bin needs to be enclosed; 4. Require one loading stall, should be according to type of delivery vehicle; 5. Suggest color coordination of roof ventilators, equipment, coolers, etc.; 6. Include lighting plan with landscape plan; 7. Guarantee of parking for Phase I if the property line is not vacated immediately; 8. Roof sign, as shown, is approximately 65 S.F. Maximum per code is 64 S.F. per lot, or 52 S.F. based on length of frontage of building. Respectfully Submitte Dan Fogland Building Administrator 0 yln. A Staff Report to Planning & Zoning Commission - 8/16/84 Lot 67 & 68, Block 1, B.S. - Pizza Hut Building Design Review Phase I Conceptual Site Review Phase II Page 2 of 3 Planning and Zoning Action: Approved as Submitted ( ) Continued ( ) Denied ( ) Dated: AV4 1 %' 19<14 '94i IM14Al2: 1. (Design Review Building and Site Phase I) Fuei,IrviiwAlLy AFPPOVAI, Approved with Modified Conditio s ()C Withdrawn ( ) Larry Kumpost, Secretary A((' SfttT 13CIAc QPsvLvEfl ANO AD14 iM►y q . ?�CA 4F lSNoo iY��1r21'cr�Pii.�� A6truZr,1A'fIVES To lie �xPLorG£o ?SY APpUGA�,Jj' A4o Co1-orc. t AATE2IAL 56Y`IPl S /ARE -r S3E ISI py io . Phase II - Conceptual Site Review - Second Building: The applicants request at this time is for a conceptual review for placement of a second building on this site. There is insufficient information to make a proper determination of all zoning requirements. However, given the degree of the request, the plan generally seems to comply with zoning requirements, with several exceptions: 1. There are no platted residential development rights for the property; 2. Without the property line being removed, the second phase building is too close to the property line. In approving any kind of a review of the second phase, the Commission may wish to be very specific in its approval, such as: 1. No approval is given for any specific use, or proposal including parking; 2. No approval is given for size, (height) other than the possibility of a second building; 3. No approval for residential units is being given. Respectfully Sub 'tted, 75/ Dan Fogla d Building Administrator Staff Report to Planning & Zoning Commission - 8/16/84 Lot 67 & 68, Block 1, B.S. - Pizza Hut Building Design Review Phase I Conceptual Site Review Phase II Page 3 of 3 Planning and Zoning Action: 2. (Conceptual Site Review Phase II) NDNE. SPI;C4ftC. CO"Cef`TUAL APPAAAL Approved as Submitted ( ) Approved with Modified ConditiAs)(> Continued ( ) Denied Dated: AV6 16,1151 'Jithdrawn ( ) Larry Kumpost, Secretary Afpl;oVAL WO MOT t3A500 014�Ifi G ASPeCTSy OF 'ILS 1d4 V-1 foot EA 4wi A AL CQWCZn ONLY 1 , fPPw<ANT W II C. 46CO "R7Aox—e%,!5 15n4 Tig crAff gggp'ortr ITEMS Lie/ EO A5 y4r-Lu AS 4CAC AL _Ga+Mf” 5 6UM -M)c - Df/mml 8/13/84 STAFF REPORT TO PLANNING & ZONING COMMISSION - 8/16/84 Lots 54 & 55, Block 2, Benchmark Subdivision Avon Center Landscape Plan & Business Sign Continued from 6/28/84 Regular Meeting Applicants Request: 1. Avon Center - approval of landscape plan; 2. Avon Center - approval of business sign. 1. Planning Commission requested on June 28, 1984 that the design of the landscaping be resubmitted showing walkway along Beaver Creek Boulevard, revised planting locations, show landscaping for the entire area affected. 2. Planning Commission requested on June 28, 1984 that the design of the sign be revised and resubmitted based on several comments: "Too large of structure, perhaps structure could be worked into the earth berm, should be mare of a design that relates to local streets and not a hig!�way sign". The landscaping plan has been resubmitted showing a walkway along Beaver Creek Boulevard, parking lot and landscaping have been extended east to the edge of the property. The proposed landscaping plan shows only two types of plantings. The sign has also been relocated towards the northeast corner, and has been reduced in length from 44' to 36' with the fin type ends dropped to a height of approximately 40". The height of the sign appears to be between 9' to 10' with earth berms at the ends to reduce the height to approximately 7' to 8'. The Commission may want to consider the following in reviewing these plans for approval: 1. Lights used match those in the area of the Town Mall; 2. The 2 large trees not be placed in the northeast corner (to avoid traffic visibility restrictions); 3. Landscaping - (sod?) be carried out to the bottom of the roadway ditch, Planning and Zoning Rules and Regulations, Section 5.21; 4. Review - current development sign on lot west of Avon Center. Respectfully Submitted Dan Fogland Building Administrator Staff Report to Planning & Zoning Commission - 8/16/84 Lots 54 & 55, Block 2, Benchmark Subdivision Avon Center Landscape Plan & Business Sign Continued from 6/28/84 Regular Meeting Page 2 of 2 Planning and Zoning Action: 1. (Approval of Landscape Plan) Approved as Submitted ( ) Continued ( ) Denied ( ) Dated: Ax Approved with Modified Conditi Withdrawn ( ) j Larry Kumpost, Secretary �' 1. � � di.• ► ' a 1i• � � d Planning and Zoning Action: 2. (Approval of Business Sign) Approved as Submitted ( ) Continued ( ) Denied ( Dated: !, Approved with Modified Condi Withdrawn ( ) 1 Larry Kumpost, Secretary 5( STAFF REPORT TO PLANNING AND ZONING COMMISSION - 8/16/84 Lots 29 & 30, Block 2, Benchmark Subdivision Conceptual Review - First Bank of Avon The applicant has submitted a letter requesting a continuance on their conceptual review for First Bank of Avon. As per Mr. Terry Halverson's request of August 16, 1984, please continue to the next regular meeting of August 30, 1984. Respectfully Submit d, L L,Ma aret . Lach Recording Secretary Planning and Zoning Action: Approved as Submitted ( ) Approved with Modified Conditi Continued (K Denied ( ) Withdrawn ( ) Dated: u4 1� 1 j� .Larry Kumpost, Secretary COW?IW Vf� VAj(L SULu_ TIME _ Nf.LEsAAa _ _ 1h1f1daMaTt00 SurAAie4;T Tc'-__ iZ£V16Nn) _ ►f _'i4dre W MA I" Ce MOWNS . /mml 9E�q tEv,) ) AICD rokrt'w of jcF Js AFeLiLA4T _t7dEs No -r $v1&,1%ijT_ _