Loading...
PZC Packet 121384F" �. STAFF REPORT TO PLANNING & ZONING COMMISSION - 12/13/84 r Cunningham Subdivision A P,eplat of Tracts Q & P„ Block 2, Benchmark at Beaver Creek _ Continued from 11/29/84 Regular Meeting Information Staff has continued to work with the applicant and we feel a mutually acceptable solution to the problems addressed at the Planning and Zoning Commission meeting of November 29, 1984 has been found. The current submittal includes a slight modification to the proposed dividing lot line, a 50 foot wide access easement across Lot 1 and an access easement across the southerly tip of Lot 2. These access easements provide the potential for future development of a street across from Benchmark Road or at the current location of the entrance to Lot 21. This represents all options for street locations, in this area, as explored to date in the development of the Town's Master Plan. The revised site plan indicates that 122 parking spaces and two 12' x 35' loading spaces can be provided for the existing Benchmark Shopping Center by piping Metcalf Ditch through the existing open flow, ponding area. An analysis of existing building uses indicates requirements for 114 parking spaces and two 12' x 35' loading spaces. The revised site plan indicates the existing building area ratio is approximately 18% of the total Lot 1 area and the open space area ratio is approximately 30% of the total Lot 1 larea. (.nmma nt e. The revised resubdivision and site plan indicate the following: 1. Parking and loading space requirements for the existing Benchmark Shopping Center can be met on Lot 1; 2. The existing development complies with building area ratio and open space requirements; 3. The proposed easements would allow for development of a future street at either of the two locations presently under consideration during development of the Town's Master Plan; 4. Access to both existing and future parking areas would be improved from current conditions. Staff Report to Planning & Zoning Commission - 12/13/84 Cunningham Subdivision A Replat of Tracts 0 & R, Block 2, Benchmark at Beaver Creek Continued from 11/29/84 Regular Fleeting Page 2 of 2 Recommendations Staff recommends the followino Planning and Zoning Commission action with regard to this matter: Motion recommending to the Town Council that Cunningham Subdivision, A Resub- division of Tract 0 and R, Block 2, Benchmark at Beaver Creek, Town of Avon be approved subject to: 1. The plat being revised to conform with the site plan as submitted; 2. A satisfactory Subdivision Agreement containing provisions for development of the revised parking and loading spaces on Lot 1 prior to development of Lot 2 and provisions for the possible future acquisition of the access easements, by the Town of Avon, for a public street right-of-way; 3. Detailed Site Layout, Grading, Drainage and Landscape Plans for the site modifications to Lot 1 be submitted to the Planning and Zoning Commission for review and approval prior to approval of Final Plat; 4. Plans for reconstruction of Metcalf Ditch be submitted to Avon Metro District for approval prior to approval of Final Plat. ' Respectfully Su itte541 No m Mood Director of Public ldorks Planninq and Zoning Action: Approved as Submitted ( ) Approved as per Staff Recoimnen a ions (v ) Approved with Modified Conditions ( ) Continued ( ) e ed thdrawn ( ) Date Vee. l'� _ Larry Kumpost, Secretary NW/mml STAFF REPORT Te PLANNING & ZONING COMMISSION - 12/13/84 Tract 0, Block 2, Benchmark at Beaver Creek Special Review Use - Benchmark Shopping Center Large Lot Parking Reduction Continued from 11/29/84 Regular Fleeting Applicants are requesting approval of a reduction in required parking in accordance with Section 17.24.020, for large parking lots. Section 17.24.020-88 of the Avon Municipal Code, Reduction in Parking Requirements for Larger Parking Lots states: Parking requirements may be reduced based on the total size of a parking area based on the following chart if approved by the Planning and Zoning Commission as a Special Review Use: 10TAL REnUIPED Up to 50 spaces 50 to 100 spaces 100 to 250 spaces 250 and ever MAXIMUM REDUCTIONS No reduction 5% 10% 15% Reduction in parking spaces for large lots shall not be taken in combination with a reduction allowed for mixed use parking requirements. Revised plans show approximately 123 parking spaces, provided after the proposed Subdivision occurs. In accordance with Section 17.24.020-8, a reduction of 10% or 12.5 spaces could be approved. All of the concerns addressed by Staff have been dealt with in the revised Plan: 1. New exit and entrance northwest corner; 2. Two loading stalls have been added; 3. An easement has been provided for a possible road if ever needed on the south part of Tract Q. Parking spaces of 123 have been shown. Required parking is currently 114. f. reduction in the parking would allow for future expansion possibilities such as enclosing the balcony areas, partial additions, etc. Large lot reduction is a Special Review Use, according to Sectinn 17.24.020-8. Staff Report to Planning & Zoning Commission - 12/13/84 Tract Q, Block 2, Benchmark at Beaver Creek Large Lot Parking Reduction Continued from 11/29/84 Regular Meeting Page 2 of 3 The Special Review Use Process: 1. Proper notices have been posted and mailed; 2. Fees have been paid; 3. Public hearing is required; 4. Final approval by Town Council is required. Section 17.20.020-B of the Avon Municipal Code States: In consideriig the suitability of the Special Review Use, the Commission shall determine: 1. Whether the proposed use otherwise complies with all requirements imposed by the zoning code; 2. Whether the proposed use is consistent with the objectives and purposes of this zoning code and the applicable zoning district; and 3. Whether the proposed use is designed to be compatible with surrounding land uses and uses in the area. Section 17.20.030 of the Avon Municipal Code states: 4. The Planning and Zoning Commission, in approving a Special Review Use, may prescribe appropriate conditions and safeguards in conformity with the zoning laws of the Town, violation of which shall be deemed a violation of this section. With the revisions incorporated into these plans, I feel that the improvements will benefit the project and the Town, and 1 recommend approval. Respectful Subm' ed, Dan Fogl d Building and Zoning Administrator -IN Staff Report to Planning & Zoning Commission - 12/13/84 Tract Q, Block 2, Benchmark at Beaver Creek Large Lot Parking Reduction o Continued from 11/29/84 Regular Meeting Page 3 of 3 Planning and Zoning Action: Approved as Submitted (%/) Approved with Modified Condit Continued ( ) Denied ( ) Withdrawn ( ) Date: dvE,L, 11 a L"¢ Larry Kumpost, Secretary kc6omol"Aorc. wrrw SS riaJ I1 -M - oZo-S. JA' zxj 4. 4A6Cu t.ATWa.15 vSED ro L RjewG riasi Aitf� OA'S'-D ofA DF/mml STAFF REPORT TO PLANNING u ZONING COPMIISSION - 12/13/84 The Lodoe at Avon Subdivision Phase Iy- Design Review (Formerly Lots 57-60, Block 2, Benchmark at Beaver Creek) Continued from 11/29/84 Regular Meeting Applicants, represented by Bill Pierce, would like to have the Planning and Zoning Commission review the minor revisions discussed at the previous Planning and Zoning Commission meeting: 1. Parking is closer to building; 2. Relocated trash enclosure, loading stall and entrance; 3. Partial color elevat'on will be submitted. Plans were reviewed with Norm Wood. Respectfully bmi t�itl, Dan Foglan Buildina and Zoning Administrator Planning and Zoning Actio Approved as Submitted ( Approved with Modified Conc Continued ( ) Denied ( ) Withdrawn ( ) Date; 'DfG Larry Kumpost, Secretary DF/mml STAFF REPORT TO PLANNING & ZONING COMMISSION - 12/13/84 Tract H, Block 3, Benchmark at Beaver Creek Upper Eagle Valley Sanitation Treatment Plant Addition to Existing Building - Design Review Upper Eagle Valley has submitted plans for construction of a 50' x 35' addition to the existing treatment plant building. The addition is for a covered truck area for sludge handling. The proposed addition is of the same materials and colors as the existing building. Due to the use of like materials, etc., and the relative obscurity of this addition, I recommend approval. RqFogla Su ; D Building and Zoning Administrator Planning and Zoning Action: Approved as Submitted ( ) Continued ( ) Denied ( ) Date: 10SC. , l3 #11140 4 DF/mml Approved with Modified Conditi Withdrawn ( ) , Larry Kumpost, Secretary