PZC Packet 071994PLANNING A.,D ZONING COMMISSION STAFF _.:PORT
July 19, 1994
Lot 1, Eaglewood Subdivision
96 Unit Complex -- Brookside
Final Design Review
PROJECT TYPE: 96 Units
ZONING: RIIDC COMPLIES WITH ZONING? Yes
INTRODUCTION:
Riverview Park Asso., has submitted an application for Final Design Review of 96 units
on Lot 1 of the Eaglewood Subdivision The applicant is proposing 4 buildings standing
approximately 60' hi. -h. The lot is 4.709 acres in size and is bounded by the Eagle River
on the north and Hwy. 6/24 on the south.
Following is a list of building materials and colors for the four proposed buildings:
Roof
Siding
Other
Fascia
Soffits
Window
Window Trim
Door
Door Trim
Hand/ Deck Rail
Flues/Flashings
Chimney
Trash Enclosure
Materials Co' -off
standing seam metal forest green
stucco bull/darker value buff
cedar metals/trim opaque cedar
metal cedar .1
metal
aluminum
N/A
aluminum
N/A
brown
forest green frame
Brest green frame
aluminum buff
metal forest g.een
stucco chimney/cedar trim/metal cap
stucco bufF
The plant list for the Brookside landscape plan has been attached to this report. The
developer is proposing thirteen, 12' high lights for the parking area throughout the site.
REVIEW HISTORY
The Commission reviewed this application as a Conceptual at the May 17, 1994 and
informally at the June 7, 1994 meeting and made the following comments:
• Impacts to the site as townhome project,
• Setbacks,
• Covered parking,
• Height, and
• Taller, denser buildings to preserve site features.
PLANNING n.41) ZONING COMMISSION STAFF .:SPORT
July 19, 1994
Lot 1, F,agle.vood Subdivision
9F Unit Complex -- Brookside
Final Design Review
STAFF COMMENTS:
Site Plan ('omments;
_Water Line Extension: Water service is not currently available at this site. The developer
must provide evidence that potable water will be provided to the site PRIOR to the
application of a building permit.
Drainage Ra?ort: The applicant has provided Staff with the drainage plans, however, no
report has been submitted. A drainage report, coinciding with the plans, must be provided
to the Town for approval PRIOR to the application of a building permit.
Irrigation Easement: The developer is proposing to pipe a portion of the irrigation ditch
on the site. Permission must be provided to the Town of Avon from the respective agency
for the piping PRIOR to the application of a building permit.
Colorado Division of Iran.sportation: The developer must provide to the Town of Avon,
PRIOR to the application of a building permit, permission from CDOT for HWY 6/24
access.
Hike Path: The developer is proposinh a 10' wide paved bike path along the south portion
of the river. The Recreation Master Plan recommends a 3-6' soft surface path Staff is
still discussing the path and will have a determination on the type of path at the meeting
Interna/ Circulation. The applicant has met with the Fire Department and discussed
concerns for emergency vehicle access. The applicant has agreed to reduce the size of the
circular island at the entry way and straighten out areas in the site
The backout space of 24' is also the internal drive for the site
1-risnng 1ree_s The developer is proposing to remove 7 Spruce trees that stand 25'+ high
and 10-15 cottonwood tree 40'* high. Is the proposed landscape plan adequate to
mitigate the cutting of the trees' The developer will be saving a large portion of the
existing trees on site
Eagle Rive: Corridor Comments:
30' Stream hefhack The site plan vaguely reflects the 30' setback from the mean annual
high w4ter mark. Staff would like to applicant to be aware that no site disturbance is
allowed in the .30' setback Further, Eaglewood Subdivision plat note q 3 states
"Drainage, public pedestrian, park land and open space easement shall be for use of the
general public which use shall not be limited or interfered wuh by declarant or its assigns.
Perman;,;u structures, other than bike paths, will not be allowed with the 30' stream
PLANNING n.iD ZONING COMMISSION STAFI .tEPORT
July 19, 1994
Lot 1, Eaglewood Subdivision
96 Unit Complex -- Brookside
Final Design Review
setback on the south side of the Eagle River, including the 30' strearn setback area on both
Lot 2 and Tract W." The site plan does not indicate any ,.ublic access.
Tract W: The property line for Tract W disappears in the western portion of the site. The
on site plan needs to reflect the property line for Tract W, which must be dedicated to the
Town of Avon. by April 1, 1997.
Miscellaneous Comments
A construction/erosion control fence will he required to be placed at the 30' stream
setback line PRIOR to ANY site disturbance.
r
The proposed signs are not approved since no detail has been provided. They must
receive approval at a separate meeting.
Building lighting has not b --en indicated, which is important due to the size of the
buildings. Building lighting must be brought back for approval at a later meeting.
DESIGN REVIEW CONSIDERATIONS:
The Commission shall consider the following items in reviewing the design of this project
Conformance with the Zoning Code and other applicable regulations of the Town.
Comment: This proposal is in conformance with Town codes and guidelines
The suitability of the improvement, including type and quality of materials of which
it is to be constructed and the site upon which it is to be located.
Comment: The type and quality of proposed building and landscape materials are
consistent wtth Town guidelines.
The compatibility of the design to minimize site impacts to adjacent properties.
Comment: All impacts will be contained on site.
The compatibility of the proposed improvements with site topography.
Comment: The design minimizes impacts to the site.
The visual appearance of any proposed improvement as viewed from adjacent and
neighboring properties and public ways.
r.
PLANNING A.D ZONING COMMISSION STAF1 APORT
Judy 19, 1994
Lot 1, Eaglewood Subdivision
96 Unit Complex -- Brookside
Final Design Review
Comment: The visual appearance of the proposed improvements are not out of context
with surrounding properties or public ways.
The objective that no improvement be so similar or dissimilar to others in the
vicinity that values, monetary or aesthetic will be impaired.
Comment: The proposal meets the objective of this guideline.
The general conformance of the proposed improvements with the adopted Goals,
Policies and Programs for the Town of Avon.
Comment: The proposal is in conformance with the goals, policies and programs for the
Town of Avon.
STAFF RECOMMENDATION:
Staff recommends approval of this final design review with the following conditions:
I. No site disturbance or grading may take place on the 30' stream setback, except for
the construction of the bike path.
2. Prior to any site disturbance, a construction/erosion control fence be placed at the 30'
stream setback.
3. Plans for the water line extension be approved by the Town of Avon and tho Avon
Metropolitan District PRIOR to the application for a building permit.
4. A drainage report be submitted to the Town of Avon and approved by the Town
Engineer PRIOR to the application of a building permit.
5. The developer provide to the Town of Avon permission from the respective agency
for the piping of the irrigation ditch PRIOR to the application of a building permit.
6. The developer provide to the Town of Avon, Colorado Division of Transportation
permission for the access onto HWY. 6/24 PRIOR to the application of a building
permit.
7. The developer will install the bike path prior to the issuance of a Temporary
Certificate of Occupancy of the first constructed building.
8. The flues, Flashings and vents be painted to match the color scheme of the building.
9. The building lighting be approved by Planning and Zoning Commission.
10. Revegetation include native bushes.
11. Meters be placed on the building.
RECOMMENDED ACTION:
1. Introduce Application
r,
PLANNING A,iD ZONING COMMISSION STAFI,-.EPORT
July 19, 1994
Lot 1, Eaglewood Subdivision
96 Unit Complex -- Brookside
Final Design Review
2. Applicant Presentation
3. Commission Review
4. Commission Action
Respectfully Submitted
C� 4-t
Mary Holde
Town Planner
PLANNING AND ZONING ACTION:
Approved as submitted ( ) Approved with recommended conditions ( )
Approved with modified conditions ( -1 Continued ( ) Denied ( )
Withdrawn ( ) Conceptual, No Action ( )
Date __Z -s 2, / lq_Sue Railton, Secretary
PLANNING AND ..ONING COMMISSION STAFF RE. JRT
July 19, 1994
Lot 3, Block 5, Wildridge Subdivision
Big Sky Townhomes
Condition of Approval
PROJECT TYPE: 5 Units
ZONING: PUD, Five Units COMPLIES WITH ZONING? YES
INTRODUCTION:
Big Sky Townhomes were approved on March 15, 1994 with conditions. The conditions
being addressed by this submittal are:
1. Revised site plan;
2. A roofing material sample; and
3. A revised landscaping plan.
They are changing the elevations slightly by supporting the decks with posts instead of
braces.
STAFF COMMENTS:
The changes proposed meet the Town of Avon Codes and Guidelines.
STAFF RECOMMENDATION:
Staff recommends approval of the proposed changes with the following condition:
1. Grading be revised to maintain existing drainage pattern along Wildwood Road.
RECOMMENDED ACTION:
1. Introduce Application
2. Applicant Presentation
3. Commission Review
4. Commission Action
Respectfully Submitted
Mary Holden
Town Planner
PLANNING ANA, LONING COMMISSION STAFF Ru: OR.T
July 19, 1994
Lot 3, Block 5, Wildridge Subdivision
Big Sky Townhomes
Condition of Approval
will PLANNING AND ZONING ACTION:
Approved as submitted ( ) Approved with recommended conditions (v'�
Approved with modified conditions ( ) Continued ( ) Denied ( )
Withdrawn ( ) Conceptual, No Action ( )
Date / / Sue Railton, Secretary
�xkEi�exu4asiz ' �d
The Commission approved the modifications as submitted.
/1 /' a •�?. �'_ _'I_/ - - i/\ / •�-/
_\ I
/ 1 /
/
In
IKI✓1it 151)
11
r l I / /• 1 ;'r 1 / / l
zjo
cr
�`A
\a
I
I 11 I I m 2.e 1 1 11 111 11 1 1 I 1 1 \ I \ Va �(\
I�10rp \ I 111 1• �7' _ �_ _ i \
'mss
I
I I I I 1 I 1 1 1 111 1 � I � I•. 1 � � \�1 ..�;:�.:. � ..: / % \\ /
i
Ini
1111 , \ \.., �I`, ' I I :I 1 1
IJ i
14-2t
1 I I I, 1 I II 1 M sC
c`: I' I I I , I I �H1 ��' `I o � ISI I T � � /�4 •\ .�
N
\
U 1 o�Ynil' I
II
.t
rr)
I
i
9I III 1 I
I
I I 1
1' 1
W
//11®/
1 It
I
n /
,
1I
I
1�
v
)o
1:
^u
t°
�o
limim
I
ii
i
v
4
I
�n
Q
e'1
i;
PLANNING ANL ZONING COMMISSION STAFF Ri-.,ORT
July 19, 1994
Lot 2, Foxx 4 Subdivision (Lot 2, Block 5, Wildridge)
Spiegel/Tracey Duplex
Variance - Side Yard Setback
PROJECT TYPE: Duplex
ZONING: PUD -- Duplex COMPLIES WITH ZONING? No, Requires a
Variance to Side Yard Setback Requirements
This is a Public Hearing for a variance to the front and side yard setback an Lot 2,
Foxx 4 Subdivision.
INTRODUCTION:
Chris Spiegel is requesting a variance to both 10' side yard setbacks for the allowance of a
4.5' encroachement in the north side yard and a .3' encroachment into the south side yard.
The request, based on the application for a variance, is due to improper pin placement by
surveyors and continuing construction of the residence based on the placement of the pins.
STAFF COMMENTS:
Before acting on a variance application, the Commission shall consider the following
factors with respect to the requested variance:
Section 17.36.40, Approval Criteria'
A. The relationship of the requested variance to existing and potential uses and
structures in the vicinity.
Comment: The requested variance is in keeping with the surrounding uses and structures
in the area.
B. The degree to which relief from the strict or literal interpretation and
enforcement of a specified regulation is necessary to achieve compatibly and
uniformity of treatment among sites in the vicinity.
Comment. The degree of' relief being sought is minimal. Encroachments are 4.5' and 3'
and already exists.
C. The effect of the requested variance on light and air, distribution of population,
transportation and traffic facilities, public facilities and utilities, and public safety.
Comment,. The effect of the request will have no negative impacts on light, air,
population, transportation, traffic facilities, public facilities, utilities or public safety.
D. Such other factors and criteria as the Commission deems applicable to the
requested variance.
W
PLANNING ANVEONING COMMISSION STAFF R ORT
July 19, 1994
Lot 2, Foxx 4 Subdivision (Lot 2, Block 5, Wildridge)
Spiegel/Tracey Duplex
Variance - Side Yard Setback
Comment Staff has not identified anv other factors for the Commission to consider.
FINDINGS REQUIRED:
The Planning and Zoning Commission shall make the following findings before granting a
variance:
A. That the granting of the variance wi!I not constitute a grant of special privilege
inconsistent with the limitations on other propertirc -^ 'he vicinay.
B. That the granting of the variance wii' not be detrimental to 'he public health,
safety, or welfare, or materially injurious to puoperties or improvements in the
vicinity.
C. That the variance is warranted for one or more of the following reasons:
i. The strict or literal interpretation and enforcement of the regulation would
result in practical difficulty or unnecessary physical hardship inconsistent with the
objectives of this title;
ii. There are exceptional or extraordinary circumstances or conditions applicable to
the site of the variance that do not apply generally to other properties in the
vicinity;
iii. The strict or lit: ral interpretation and enforcement of the specified regulation
would deprive the applicant of privileges enjoyed by the owners of other properties
in the vicinity.
STAFF RECOMMENDATION:
Staff recommendation is for approval of Resolution No. 94-13 , A Resolution .Approving
a Variance f om the Side Yard Setback Requirements, as Stipulated in Title 17 of the
Avon municipal Code for Lot 2, Foxx 4 Subdivision, Town of' Avon, Eagle County,
Colorado. If following the public hearing, the Commission does not concur with the
findings, Resolution 94-13 should be amendee .ccordingly prior to adoption.
1. Introduce Application
2. Applicant Presentation
RECOMMENDED ACTION:
PLANNING ANL ZONING COMMISSION STAFF Rt.. ORT
July 19, 1994
Lot 2, Foxx 4 Subdivision (Lot 2, Block 5, Wildridge)
SpiegeVfracey Duplex
Variance - Side Yard Setback
3. Open Public Hearing
4. Close Public Hearing
5. Commission Review
6. Commission Action
Respectfully submitted,
--" � a'Lr
Mary Holden
Town Planner
PLANNING AND ZONING ACTION:
Approved as submitted Approved with recommended conditions ( )
Approved with modified conditions ( ) Continued ( ) Denied ( )
Withdrawn ( ) Conceptual, No Action ( )
Dc?e / �` — Sue Railton, Secretary
Please see attached sheet for conditions.
,'N
Lot 2, Foxx 4 Subdivision Conditions
July 19, 1994 P&Z Meeting
Page 1 of 1
The Commission approved Planning and Zoning Commission Resolution 94-13, A
Resolution Approving a Variance From The Side Yard Setback Requiremants as
Stipulated in Title 17 Of The Avon Municipal Code, citing the following
findings.
A. That the granting of the variance will not constitute a grant of special
privilege inconsistent with the limitations on other properties in the
vincity.
B. That the granting of the variance will not be detrimentalto the public
health, safety, or welfare, or materially injurious to properties or
improvements in the vicinty.
C. That the variance is warranted for one or more of the following reasons:
1. The strict or literal interpretation and enforcement of the regulation
would result in practical difficluty or unnecessary physical hard-
ship inconsistent with the objectives of this title.
2. There are exceptional or extraordinary circumstances or conditions
applicable to the site of the variance that do not apply generally
to other properties in the same district.
3.Bg,g
A4ochmwnA-
Bowl
0
l5
A
ON
TOWN OF AVON
PLANNING AND ZONING COMMISSION
RESOLUTION NO. 94 - 13
SERIES OF 1994
A RESOLUTION APPROVING A VARIANCE FROM THE
SIDE YARD SETBACK REQUIREMENTS AS
STIPULATED IN TITLE 17 OF THE AVON MUNICIPAL CODE,
FOR LOT 2, FOXX 4 SUBDIVISION,
TOWN OF AVON, EAGLE COUNTY, COLORADO
WHEREAS, Chris Spiegel and Greg Tracey, owners of Lot 2 , Foxx 4
Subdivision have applied for a setback variance from the "Side Yard Building Setback"
requirements as stipulated in Title 17, of the Avon Municipal Code, and
WHEREAS, a public hearing has been held by the Planning and Zoning Commission of
the Town of Avon, pursuant to notices required by law, at which time the applicant and the
public were given an opportunity to express their opinions and present certain information and
reports regarding the proposed Side Yard Building Seiback Variance application
and has considered:
1. The relationship of the requested variance to other existing or potential uses and
structures in the vicinity,
2. The degree to which relief from the strict or literal interpretation and enforcement's of
a specified regulation is necessary to achieve compatibility an;! uniformity of treatment
among sites in the vicinity, or to attain the objectives of this title without grant of special
privilege,
3. The effect of the requested variance on light and air, distribution of population,
transporration and traffic facilities, public facilities and utilities, and public safety;
4 Such other factors and criteria as the Commission deems applicable to the proposed
11.uIw,4 rvV. 94- iJ
SERIES OF 1994
A RESOLUTION APPROVING A VARIANCE FROM THE
SIDE YARD SETBACK REQUIREMENTS AS
STIPULATED IN TITLE 17 OF THE AVON MUNICIPAL CODE,
FOR LOT 2, FOXX 4 SUBDIVISION,
TOWN OF AVON, EAGLE COUNTY, COLORADO
WHEREAS, Chris Spiegel and Greg Tracey, owners of Lot 2 , Foxx 4
Subdivision have applied for a setback variance from the "Side Yard Building Setback"
requirements as stipulated in Title 17, of the Avon Municipal Code, and
WHEREAS, a public hearing has been held by the Planning and Zoning Commission of
the Town of Avon, pursuant to notices required by law, at which time the applicant and the
public were given an opportunity to express their opinions and present certain information and
reports regarding the proposed Side Yard Building Setback Variance application
and has considered:
1. The relationship of the requested variance to other existing or potential uses and
structures in the vicinity,
2. The degree to which relief from the strict or literal interpretation and enforcement's of
a specified regulation is necessary to achieve compatibility and uniformity of treatment
among sites in the vicinity, or to attain the objectives of this title without grant of special
privilege,
3. The effect of the requested variance on light and air, distribution of population,
transportation and traffic facilities, public facilities and utilities, and public safety,
4. Such other factors and criteria as the Commission deems applicable to the proposed
variance.
WHEREAS, the Planning andT_on:ng Commission finds:
A. That the granting of the variance will not constitute a grant of special privilege inconsistent
with the limitations on other properties in the vicinity.
B. That the granting of the variance will not be detrimental to the public health, safety, or
welfare, or materially injurious to properties or improvements in the vicinity.
C. That tf a variance is warranted for one or more of the following reasons:
I. The strict or literal interpretation and enforcement of the regulation would result in
practical difficulty or unnecessary physical hardship inconsistent with the objectives of this
title.
2. There are exceptional or extraordinary circumstances or conditions applicable to the site
of the variance that do not apply generally to other properties in the same zone.
3. The strict or literal interpretation and enforcement of the specified regulation would
deprive the applicant of privileges enjoyed by the owners of other properties in the same
district.
NOW, THEREFORE, BE IT RESOLVED, that the Planning and Zoning Commission of
the Town of Avon, Colorado, hereby approves the 4.5' setback variance from the north "Side
Yard Building Setback" and .3' setback variance from the south "Side Yard Building Setback"
requirement of Title 17 of the Avon Municipal Code for Lot 2, Foxx 4
Subdivision, Town of Avon, Eagle County Colorado as further shown on Attachment A.
ADOPTED THIS DAY OF
Secretary
..,
welfare, or materially injurious to properties or improvements in the vicinity.
C. That the variance is warranted for one or more of the following reasons:
1. The strict or literal interpretation and enforcement of the regulation would result in
practical difficulty or unnecessary physical hardship inconsistent with the objectives of this
title.
2. There are exceptional or extraordinary circumstances or conditions applicable to the site
of the variance that do not apply generally to other properties in the same zone.
3. The strict or literal interpretation and enforcement of the specified regulation would
deprive the applicant of privileges enjoyed by the owners of other properties in the same
district.
NOW, THEREFORE, BE IT RESOLVED, that the Planning and Zoning Commission of
the Town of Avon, Colorado, hereby approves the 4.5' setback variance from the north "Side
Yard Building Setback" and .3' setback variance from the south "Side Yard Building Setback"
requirement of Title 17 of the Avon Municipal Code for Lot 2, Foxx 4
Subdivision, Town of Avon, Eagle County Colorado as further shown on Attachment A.
ADOPTED THIS /—DAY OF
Secretary
1994
PLANNING AN►, ZONING COMMISSION STAFH R. , ORT
July 19, 1994
Lot 56, Block 2, Benchmark at Beaver Cre^k
Vail Bank Center
Final Design Review
PROJECT TYPE: Bank and Offices
ZONING: TC—Town Center COMPLIES WITH ZONING? YES
INTRODUCTION:
Dean Koll, on behalf of Vail Bank Center, has submitted an application for final design
review of 18,031 gross square feet of bank and office space. The building will contain
four levels, one being a basement, and stand approximately 43' high and the tower will be
56'. The building will contain the following materials:
Roof
Other
Fascia
Soffits
Window
Window Trim
Door
Door Trim
Flues/Flashings
Trash Enclosure
Materials
Color
metal
copper
stucco
cream
metal/wood
not indicated
stucco
clad/aluminum
bronze
metal
wood11
n
not indicated
A plant list for the Vail Bank landscape plan is attached to this report.
Three wall wash up -lights are proposed on the east side of the building, four tree up -lights
are proposed on the west side of the building and four parking lot lights are proposed for
the northwest parking area.
Mechanical equipment will be placed on the roof, however, a roof pit has been provided
so the equipment will not be visible.
REVIEW HISTORY
The Commission reviewed this application at the May 17, 1994 meeting and commented
on the following:
• metal roof,
• being all stucco;
• combination of colors to break up stucco,
• color of roof being copper;
• Metcalf ditch and sewer line relocation,
PLANNING AN ii, LONING COMMISSION STAFF RL: ORT
July 19, 1994
Lot 56, Block 2, Benchmark at Beaver Creek
Vail Bank Center
Final Design Review
• question short term parking;
• snow shedding on east elevation,
• trash enclosure location,
• snow storage; and
• setbacks.
STAFF COMMENTS:
Lot i6, Block 2 is located in
1. Town Center Zone District;
2. Comprehensive Plan Subarea 14, which designates this lot as having primary
Streetscape development and public pedestrian space, and
3. Specifically addressed in the section on Urban Design, B band Uses -General, in
the Design Guidelines.
• This lot contains the Nletcalf Ditch and a sewer line. The applicant is working with the
respective agencies on relocating both Permission from the agencies will be needed
on the location of the lines prior to the application of a building permit
♦ The site plan has a note stating " All site improvements outside property line to be
supplied and installed by the Town of Avon " On the site plan, two Streetscape
improvement street lights are shown as provided by the Town and a note indicates the
sidewalk as the Town of Avon's Staff would like to make the applicant aware of' their
responsibility to supply and install these improvements, as is the case with other
developments in the Town.
• Forty-one (41) parking spaces are provided based on 13,049 square feet of gross
leaseable floor area The 13, 049 square feet does not include the 893 square feet of
lobby area in the basement Staff is including the basement area in the parking
requirements due to the use it will receive in the future phase 2 and the potential for
storage use in phase I Including the basement area, 42 spaces are required by the
Code, which the applicant is lacking one space.
• The Fire Department has specified that stand pipes will be needed if the building is not
sprinkled. Further, the alarm system must be addressable, which means there is a
master LED read out at the main panel that indicates the location of the fire in the
building
• The applicant must address any issues or concerns the To%: i Engineer identifies
regarding drainage, grading and access.
[�w
PLANNING AND aONING COMMISSION STAFF RE. ORT
July 19, 1994
Lot 56, Block 2, Benchmark at Beaver Creek
Vail Bank Center
Final Design Review
Mr. Jerry B. Landeck on behalf of Shapiro Development, wrote a letter stating they have
no objections to phase 1 of the Vail Bank Center, however, he suggested the Town
require the Vail Bank to dedicate the 10' wide pedestrian strip through the property.
o DESIGN REVIEW CONSIDERATIONS:
The Commission shall consider the following items in reviewing the design of this project.
Conformance with the Zoning Code and other applicable regulations of the Town.
Comment: This proposal is in conformance with Town codes, Design Guidelines and the
Comprehensive Plan with the condition that one additional parking space '-e provided.
The suitability of the improvement, including type and quality of materials of which
it is to be constructed and the site upon which it is to be located.
Comment: The type and quality of proposed building and landscape materials are
consistent with all Town guidelines.
The compatibility of the design to minimize site impacts to adjacent properties.
Comment: Al: impacts will be contained on site. The design of the project coordinates
with the project to the north.
The compatibility of the proposed improvements with site topography.
Comment: The project is compatible with the site.
The visual appearance of any proposed improvement as viewed trom adjacent and
neighboring properties and public ways.
Comment The visual appearance of the proposed improvements will not negatively
impact neighboring properties or public ways.
The objective that no improvement be so similar or dissimilar to others in the
vicinity that values, monetary or aesthetic will be impaired.
Comment: The proposal meets the objective of this guideline.
The general conformance of the proposed improvements with the adopted Goals,
Policies and Programs for the Town of Avon.
PLANNING AND a ONING COMMISSION STAFF RE. JRT
July 19, 1994
Lot 56, Block 2, Benchmark at Beaver Creek
Vail Bank Center
Final Design Review
Comment, The proposal is in conformance with the goals, policies and programs for the
Town of Avon.
STAFF RECOMMENDATION:
Staff recommends the Commission approve this application with ,ne foilowing conditions:
1. The developer address and receive approval concerning issues identified by the Town
Engineer regarding drainage, grading, and access PRIOR to the ; pplication of a
building permit.
2. Approval of technical corrections identified by Staff.
3. The flues, flashings, vents and roof top mechanical equipment have a finished surface
to match the color scheme of the building.
4. The meters be placed on the building.
5. The streetscape improvements, including curb, gutter, sidewalk, walkway/street lights,
as required to complete connection with Avon Road and Avon Town Center Mail
facilities, be supplied and install by the developer at no cost to the Town of Avon be
supplied and installed by the developer.
6. One additional parking space be added, for a total of 42 parking spaces. Should there
be substantial changes to the site plan due to the addition of one parking space, the
applicant will need Planning and Zoning Commission approval.
7. The developer provide to the Town of Avon permission for the respective agencies for
the relocation of Metcalf Ditch and the sewer lines PRIOR to the application of a
building permit.
RECOMMENDED ACTION:
1. Introduce .Application
2. Applicant Presentation
3. Commission Review
4. Commission Action
Respectfully Submitted
Mary Holden
Town Planner
PLANNING AND � ONING COMMISSION STAFF RnRT
July 19, 1994
Lot 56, Block 2, Benchmark at Beaver Creek
Vail Bank Center
Final Design Review
PLANNING AND ZONING ACTION:
Approved as submitted ( ) Approved with recommended conditions ( )
Approved with modified conditions (—'� Continued ( ) Denied { )
Withdrawn ( ) Conceptual, No Action r
Date / / Sue Railton, Secretaryvd riz� A
The Commission granted final design approval with the following conditions:
1. The developer address and receive approval concerning issues identified
by the Town Engineer regarding drainage, grading, and acess prior to the
cation of a building permit.
2. Approval of technical corrections identified by Staff.
3. The flues, flashings and vents and roof top mechanical equipment have
a finished surface to match the color scheme of the building.
4. The meters be placed in the building.
5. The streetscape improvements, including curb and gutter, sidewalks,
walkway/streetlights, as required to complete connection with Avon Road
and Avon Town Center Mall facilities be supplied and installed by the
developer.
6. The developer provide to the Town permission for the respective agencies
for the relocation of Metcalf Ditch and the sewer lines prior to the
application of a building permit.
7. Sign program be brought back at a later date for review by this commission.
8. The trash dumpster have some sort of cover, to be approved by Staff.
V, scape Material
Vail enk
Abbrev Botanical Name/ Quantity Size Remarks
Common Name
Deciduous Trees
FP61 Prastnus Pennsyivanica 'Marshall" 19 3" cal. Matching, R&B
_ Gregn Ash __
PA Populus angustValia 13 ---_-- 2 1/2" cal. --Matching, B&B
Norrowleof Cottonwood
DeciduousrnarMental TrePS
MPS Malus 'Radusnt" 2 3"cal Matching, B&
Radiant Crab
Evergreen Trees
ACO Abies ooncolor
6 6' Hgt.
B&B
White Fir
PP Picea pungens
7 6H9t—`—
8&Fi ------
Colorado Spruce
Deciduous Shrubs
cc Caryopleris 2 clandonensis
64 5 gal.
3' ox
_ Blue Mist Solreo
CL Cotoneaster acutifolia
13 --_--5 gal —._—_
4'
Peking Coloneaster
o.c
Evergreen Grourldc vers
JHP ✓untper horizontalis 30 5 gel 4' o.c.
Prince of !tholes"
Prince of Whales Juniper
JBU Juniper sabina 'Buffalo' 20 5 -
Buffalo Juniper
Perennial Groundcovers
CT CerasHum torn naosum
Snow -In -Summer 2850 2 1/4" pot 10' ox,
Grosses
BG Kentucky Blue Grass 3250 s.f. Sod
Sod
NS NativeGrass
c..w 2880 s.f. Seed
Annuals
PPE Pelargonturn peltatum 'Sybil Nolmea 333 4' pot 1!,' a.-
SPii Holmes Ivy Geranium
MVE
I
O
O
S
PLANNING AND�ONING COMMISSION STAFF RART
July 19, 1994
Lot 7, Blo-,k 5, Wildridge Subdivision
10 Units
Final Design Review
PROJECT TYPE: I O Units
ZONING: PUD, 10 Unit COMPLIES WITH ZONING? Units Proposed --
Yes
I TRODUCTION:
ACL Limited Liability has submitted an application for Final Design Review of 2 triplexes
and I fourplex on Lot 7, Block 5, Wildridge. The lot, 2.52 acres in size, slopes down to
the west at + 34%. The buildings will contain three levels and stand 32' high.
The duplexes will consist of the following materials:
Roof
Siding
Other
Fascia
Soffits
Window
Window Trim
Door
Door Trim
Hand/Deck Rails
Flues/Flashings
Chimnev
Materials
Colors
celotex presidential
weathered wood
masonite I x 12 lap
Not Indicated
Stucco
"
2x10 rE
"
masonite
bronze aluminum
Ix4 r. s. cedar
steel six panel
I x4 r s. cedar
redwood
galvanized, painted
"
stucco
"
Following is the plant list proposed for the landscape plan.
Aspens 33 1 1/2" caliper
Blue Spruce 30 C high
Cottonwood 3 2" caliper
Serviceberry 65 1 gallon
Pyracandta 35 1 gallon
A drip irrigation system is proposed Various fescues are proposed along with
revegetation
REVIEW HISTORY
The Commission reviewed this application at the June 7, 1994 meeting and commented on
the following.
try
PLANNING AND BONING COMMISSION STAFF R.L. JRT
July 19, 1994
Lot 7, Block 5, Wildridge Subdivision
10 Units
Final Design Review
• Handling of trash;
• Full circle drive being for the Fire Department;
• Colors;
• Height of boulders wall being 4';
• Type of fireplaces,
• Width of driveway; and
• Problem with width in winter.
STAFF COMMENTS:
♦ The boulder walls shown on the site plan do not coincide with the sections provided.
Staff has concerns that since the plans do not coincide, the boulder walls will not work
on site with the proposed project. Further, the site still has slopes in excess of 2 1,
(slopes are at I :1) which at the conceptual review was pointed out as not being
allowed.
• At the Conceptual Review, it was stated by the applicant that the boulder retaining
walls would not exceed 4', the Final Design Review site plan shows boulder walls 16'
high.
• The sections do not correspond with site plan. The site plan shows much taller walls
and steeper slopes, with some in excess of 1 1 in the Roadway Slope Maintenance
Easement.
♦ In the Conceptual Review Staff report, it was represented that the slope of the
driveway could not exceed 10%, which is not correct for this project. For residential
projects of three or more units, the slope of the driveway may not exceed S%.
♦ There is no indication of how revegetation will occur. As a condition of approval,
native bushes be used to revegetate all disturbance, in addition to native grasses. This
is due to the steep nature of the site and the extensive disturbance that will occur on
the site
♦ The applicant will be required to place a construction and erosion control fence on the
site prior to any site disturbance
• The applicant has not given a perspective of the site, has not indicated colors of the
materials, and has not provided a material sample board
♦ The Design Review Considerat on.s have not been included because of inordinate
discrepancies in the submitted material,
PLANNING AND BONING COMMISSION STAFF RE. JRT
July 19, 1994
Lot 7, Block 5, Wildridge Subdivision
10 Units
Final Design Review
• The landscape material does not comply with the Town of Avon minimum standards,
which include a minimum 2" caliper for deciduous trees and 5 gallons for shrubs.
STAFF RECOMMENDATION:
Due to the nature of the site, the potential impacts of the ;project on the site, and adjacent
roadway, substantial discrepancies between sections and site plan, and the outstanding
items, Staff recommends the Commission table this application until consistent information
has been provided and the grading plan has been revised to eliminate slopes steeper than 2
horizontal to 1 vertical in Roadway Slope maintenance Easement..
RECOMMENDED ACTION:
1 . Introduce Application
2 Applicant Presentation
3. Commission Review
4 Commission Action
Respectfully Submitted
ak,'-r
Mary Holden
Town Planner
Ao
PLANNING ANL ZONING COMMISSION STAFF RL_ ORT
July 19, 1994
Lot 7, Block 5, Wildridge Subdivision
10 Units
Final Design Review
PLANNING A ND ZONING ACTION:
Approved as submitted ( ) Approved with recommended conditions ( )
Approved with modified conditions ( ) Continued ( ) Denied ( )
Withdrawn (✓S Conceptual, No Action ( )
Date < <494 Sue Railton, Secretary 4L
This Item was withdrawn from the agenda at this time,
,I
G
i
.
r,
P
I,
cr"
y
r ii •'
�.
o
T
i
r t �
r
i
M
J
[c•
I�
1_
t
0 0
o
, -----�- ,-----�
-
.7
py I LR Fl r p
FF p� F
r �
PLANNING AND zONING COMMISSION STAFF RE, JRT
July 19, 1994
Lot 1, Eaglewood Subdivision
96 Unit Complex -- Brookside
Final Design Review
PROJECT TYPE: 96 Units
ZONING: RHDC COMPLIES WITH ZONING? Yes
INTRODUCTION:
Riverview Park Asso., has submitted an application for Final Design Review of 96 units
on Lot I of the Eaglewood Subdivision. The applicant is proposing 4 buildings standing
approximately 50' high. The lot is 4.709 acres in size and is bounc.'ud by the Eagle River
on the north and Hwy. 6/24 on the south.
Following is a list of building materials and colors for the four proposed buildings:
Roof
Siding
Other
Fascia
Soffits
Window
Window Trim
Door
Door Trim
Hand/ Deck Rail
Flues/Flashings
Chimney
Trash Enclosure
Materials
Color
standing seam metal
forest green
stucco
buff/darker value buff
cedar metals/trim
opaque cedar
metal/cedar
"
metal
brown
aluminum
forest green frame
N/A
aluminum
forest green frame
N/A
aluminum
buff
metal
forest green
stucco chimney/cedar trim/metal cap
stucco buff
The plant list for the Brookside landscape plan has been attached to this report. The
developer is proposing thirteen, 12' high lights for the parking area throughout the site.
REVIEW HISTORY
The Commission reviewed this application as a Conceptual at the May 17, 1994 and
informally at the June 7, 1994 meeting and made the following comments:
• Impacts to the site as tow Thome project,
• Setbacks,
• Covered parking,
• Height, and
• Taller, denser buildings to preserve site features
PLANNING AND &,ONING COMMISSION STAFF RE► JRT
July 19, 1994
Lot 1, Eaglewood Subdivision
96 Unit Complex -- Brookside
Final Design Review
STAFF COMMENTS:
Site Plan Comments:
Waver Line Exten iron: Water service is not currently available at this site. The developer
must provide evidence that potable water wili be provided to the site PRIOR to tht
application of a building permit.
Drainage Report: The applicant has provided Staff with the drainage plans, however, no
report has been submitted. A. drainage report, coinciding with the plans. . ae provided
to the Town for approval PRIOR to the application of a building permit.
Irrigation Easement: The developer is proposing to pipe a portion of the irrigation ditch
on the site. Permission must be provided to the To -.:,,n of Avon from the respective agency
for the piping PRIOR to the application of a building permit.
Colorado Division of 7 v Ovation: The developer must provide to the Town of Avon,
PRIOR to the application of a building permit, permission from CDOT for HWY. 6/24
access.
Bike Path: The developer is proposing a 10' wide paved bike path along the south portion
of the river. The Recreation Master Plan recommends a 3-6' soft surface path Staff is
still discussing the path and will have a determination on the type of path at the meeting.
Interna! Circulation: The applicant has met with the Fire Department and discussed
concerns for emergency vehicle access The applicant has agreed to reduce the size of the
circular island at the entry way and straighten out areas in the site
The backout space of 24' is also .he internal drive for the site.
I:xicntrr Tree, + The developer is proposing to removt: 7 Spruce trees that stand 25'+ high
and 10-15 cottonwood tree 40'+ high Is the proposed landscape plan adequate to
mitigate the cutting of the trees° The developer will be saving a large porti-)n of the
existing gees on site
Emile River Corridor Comments:
30' Stream .Setback: The site plan vaguely reflects the 30' setback from the mean annual
high water mark Staff would like to applicant to be aware that no site disturbance is
allowed in the 30' setback Further, . iglewood Subdivision plat note 0 3 states
"Drainage, public pedestrian, park land and open space easement shall be for use of the
general public which use shall not be limited or interfered with by declarant or its assigns
Permanent structures, other than bike paths, will not be allowed with the 30' stream
PLANNING AND �OMNG COMMISSION STAFF RE. JR7'
July 19, 1994
Lot 1, Eaglewood Subdivision
96 Unit Complex -- Brookside
Final Design Review
setback on the south side of the Eagle River, ir.:luding the 30' stream setback area on both
Lot 2 and Tract W." The site plan doers not indicate any public access.
Traci W: The property line for Tract W disappears in the western portion of the site. The
s site plan needs to reflect the property line for Tract W, which must be dedicated to the
Town of Avon by April 1, 1997.
Miscellaneous Comments
A construction/erosion control fence will be required to be placed at the 30' stream
setback line PRIOR to ANY site dist,rbance.
The proposed signs are not approved since no detail has been p ovided. They must
receive approval at a separate meeting.
Building lighting has not been indicated, which is import?at due to the size of the
buildings. Building lighting must be brought back for approval at a later meeting.
DESIGN REVIEW CONSIDERATIONS:
The Commission shall consider the following items in revie ving the design of this project.
Conformance with the Zoning Code and other applicable regulations of the Town.
Comment: This proposal is in conformance with Town codes and guidelines
The suitability of the improvement, including type and quality of materials of which
it is to be constructed and the site upon which it is to be located.
Comment: The type and quality of proposed building and landscape materials are
consistent with Town guidelines.
The compatibil;ty of the des:en to minimize site impacts to adjacent properties.
Comment: All impacts will be contained on site.
The compatibility of the proposed improvements with site topography.
Comment. The design minimizes impacts to the site.
The visual appearance of any proposed improvement as viewed from adjacent and
neighboring pr,perties and public ways.
dS
• 1,
PLANNING AND zONING COMMISSION STAFF RE, -jRT
July 19, 1994
Lot 1, Eaglewood Subdivision
96 Unit Complex — Brookside
Final Design Review
Comment: The visual appearance of the proposed improvements are not out of context
with surrounding properties or public ways.
The objective that no improvement be so similar or dissimilar to others iu the
vicinity that values, monetary or aesthetic will be impaired.
Comment: The proposal meets the objective of this guideline.
The general conformance of the proposed improvements with the adopted Goals,
Policies and Programs for the Town of Avon.
Comment: The proposal is in conformance with the goals, policies and programs for the
Town of Avon.
STAFF RECOMMENDATION:
Staff recommends approval of this final desig, ieview with the following conditions:
I. No site disturbance or grading may take place on the 30' stream setba:k, except for
the construction of tie bike path.
2. Prior to any site disturbance, a construction/erosion control fence be piaced at the 30'
stream setback.
3. Plans for thL water line extension be approved by the Town of Avon and the Avon
Metropolitan District PRIOR to the application for a building permit.
4. A drainage report be submitted to the Town of Avon and approved by the Town
Engineer PRIOR to the application of a building permit.
5. The developer provide to the Town of Avon permission from the respective agency
forthe piping of the irrigation ditch PRIOR to the application of a building permit.
6 The developer provide to the Trwn of Avon, Colorado Division of Transportation
permission for the access onto hWY. 6/24 PRIOR to the application of a building
permit
7 The developer will install the bike path prior to the issuance of a Temporary
Certificate of Occupancy of the first constructed building
8 The flues, flashings and vents be painted to match the color ^cheme of the building.
9 The building lighting be approved by Planning and Zoning Commission.
10 Revegetation include native bushes.
I I Meters be placed on the building.
RECOMMENDED ACTION:
I. Introduce Application
PLANNING AND zONING COMMISSION STAFF RE: JRT
July 19, 1994
Lot 1, Englewood Subdivision
96 Unit Complex -- Brookside
Final Design Review
2. Applicant Presentation
3. Commission Review
4. Commission Action
Respectfully Submitted
Mary Holden
Town Planner
PLANNING AND ZONING ACTION:
Approved as submitted ( ) Approved with recommended conditions ( )
Approved with modified conditions ( ) Continued ( } Denied ( )
Withdrawn ( ) Conceptual, No Action ( )
Date Sue Railton, Secretary ,,L X
mma towAym) X*XD(l(t`Altw)6 Xt6XoXxxxl(X
The Commission tabled this item at this time due to concerns about where
the buildings would be located on the site and how many trees would be lost.
The Commission asked the applicant to pin the corners of the buildings so the
Commission could see where they would be.
a
7r
�
- -
_---��_a,QwY•Ra�t-F-moi.-1�N1^�'
\
I
.10
1
go
°\,
10
010
`
°o
61 \
\
v
° �1
•Oe
9
8
e
R t 1•,\
t
i
C
J
O
r
d" ls
STANDNG SLAM HE7AL
1 ROOF 10 MATGM 15ULD04GS
WOOD FASCIA TO MATGM
TTP. DIAANGS
WOOD 5DNG OVER 2,4
FRAMED WALLS
5'-ONx10'-O'V WOOD
PAR OF GATES W/
DIAGONAL BRACING AND
HEAVY DM HARDWARE.
DUMPSTEP ENCLOSURE ELEVATION
SCALE - 1/4'.1'-O'
1L4•
41 L TWO C2> STEEL PIPE STOPS.
7'-0' HIGH x 4' WOOD STUD WALL
W/ WOOD SIDING AND PAINT,
COLOR TO MATCH BUILDNG.
CONCRETE SLAB. SLOPE SLAB.
G DIA. x 4,5' M. 57EEL PIPE BOLLARD
FILLED W/ GONG. (FAINTED)
GATE5 TO BE HELD OPEN
AND C1-05ED W'/ A 5PRPJG
LOADED PIN.
Z
d
�,
z
0
vp
a
DESCRIPTION OF PRO�— es entia c i— ami y
The following information is required r r submittal by the apolicant to the Design Review
Board before a final approval can be fiven:
A. BUILDING MATERIALS: TYPE OF MATERIAL COLOR
Roof Standing !eam metal root- Forest Green
Fie u
Siding Stucco Base [rim: darker value buff
Other Wall Materials Cedar metals/trim Opaque cedar
Fascia
Metal/Cedar
Opaque
cedar
Soffits
Metal
Brown
Windows
Aluminum
Forest
Green frame
Window Trim
N/A
Doors
Aluminum
Forest
Green Frame
Door Trim
N/A
Hand or Deck Rails
Aluminum
Buff
Flues
N/A
Flashings
Metal
Forest
Green
Chimneys
Stucco chimney/cedar trim/metal
cap
Trash Enclosures
Stucco
Buff
Greenhouses
N/A
Other
N/A
3. LANOSCAPIAG: Aame
of Designer:
Dennis Anderson
phone:
303 926-2433
PLANT MATERIALS: Botanical lame
Common `lame
Ouanity Size*
PROPOSED TREES
Picea Purgeus
Blue Spruce
63
6'-12'
Populus
Tremboloides
Quaking Aspen
52
2"
Populus
Augustifocia
Cottonwood
22
2"
Prunus Virgini.ana Shubert Canada
Red Cherry
3
2"
EXISTING TREES TO _
BE RE"OVE7
Spruce 7 25'+
Cottonwood 10-15 40'+
-Indicate caliper for ae6diclous Crus. ie,inc •nr -on �9
�r.eri
PLANT MATERIALS: Botanical 'lame Common ':ame in i ty Size
(con't)
SHRUBS Amelanchier Alnifolia Serviceberry _ 20 5 Gallon
Cornus Stolonifera Red Twig Dogwood 20
Potents a ru>_ticosa
Jackimanni Potentilla 20
Ribbed Alpinum Alpine.Current 10
Rosa _Woods Woods Rose 10
Dwarf
EXISTING SHRUBS Salix Purpurea RI,+P Willow In
TO BE REMOVED Spirea Nipponica Snow Mound Spirea 10
Type
GROUND COVERS Perrenials/Wildflower;
SOD Bluegrass
SEED
TYPE OF Automatic Spray — sod/perrenials/shrubs
IRRIGATION
Automatic Drip — all trees
TYPE OR METHOD OF
EROSION CONTROL
Square =ootaae
gcnn
bullu
C. OTHER LANDSCAPE r i�iTURES (retaining ,galls, fences, swimming pools, etc.) Please spec;-,.
\
�
❑ // 000 /�1 \�
■
k E
• !`E$:»
� fk� \
2%
�.�)22n\ �-
- - 7 - - - - - - - - - - - - - - - - - - - -
It
�r
R
3
Ei
Eq
R
w
M
ig
Z
94
14
IL
Limit building heights to three stories, and require developments to
demonstrate preservation of views to the Town Center through the
strategic placement of open space or the further limitation of
building heights.
Encourage new development and redevelopment of existing
buildings to be in conformance with the overall design theme
established for the Town.
Require a minimum 15' landscape buffer between the interstate right-
of-way and parking areas, and 40' landscaped setback from the I-70
right-of-way for all residential structures.
Subarea 7: Much of the River Residential District has been developed, but
River Residential future residential development that will occur along the river
District beyond the boundaries shown on the Urban Design Plan should be
developed in accordance with the recommendations for this subarea. The
major design influences are U.S. 624, the riparian environment along the
Eagle River, and public access to the river. The character of the river and
its associated natural habitat should be preserved by sensitive site
planning, architectural detailing, and appropriate setbacks, color, and
scale of structures.
Recommendations:
Develop Beaver Creek Boulevard and any other future major access
roads, as defined on Figure 5-1, to residential development as
secondary streetscapes.
Develop the intersection of U.S. 624 and West Beaver Creek
Boulevard as a secondary intersection.
Within building setback areas adjacent to the Eagle River, provide a
public access easement for public enjoyment of the river and
construction of a public recreational trail. Require a minimum 30'
building setback from the Eagle River.
iA 5.17
Require development to provide reasonable public access through
their property to the river, and provide public parking and signage at
strategically located trailheads.
• Buildings should be oriented to capitalize upon the Eagle River as an
amenity. Parking areas, trash dumpsters, and other uses which could
potentially disrupt the quality of the r'ver environment should be
located and designed to have the least impact on the river corridor.
Set buildings back from the river to preserve its natural character.
• Limit building height to three to four stories. The intent is to
establish a scale of development that is subordinate to the Town
Center and compatible with the river environment. Buildings should
be designed to step down in height as they near the river 2nd in
response to the natural topography.
• Require new development and reds relopment of existing buildings
to be in conformance with the overall design theme established for i
the Town.
• Where possible, buildings and parking areas should be located to E
preserve and promote the health of existing quality trees.
• Plant trees to screen existing large residential buildings along E
U.S. 6/24.
• Provide berms and landscaping between residences and U.S. 6/24. t
Subarea 8: Nottingham Park is bordered to the west, north, and northeast F
Nottingham Park by existing high quality residential development. The structures F
Residential are a visual asset to the Town. Missing, however, are provisions
District for pedestrians and bicyclists along West Beaver Creek Boulevard and F
adequate screening of parking areas. Landscaping around the perimeter t
of the buildings could be enhanced.
F
f
5.18
t
PLANNING ANb'LONING COMMISSION STAFF RL TORT
July 19, 1994
Lot 1, Block 2, Wildridge Subdivision
Four Plex
Final Design Review
PROJECT TYPE: Four Plex
ZONING: PUD, Four Unit COMPLIES WITH ZONING? YES
INTRODUCTION:
Laddie Clark has submitted an application for final design review of a four plex on Lot 1,
Block 2, which is 1.39 acres in size and slopes to the south at 16-34%. The four pley will
contain three levels and stand approximately 32' high.
The four plex will consist of the following materials:
The landscape plant list will consist of 12 Pinion pine at 4-6' high, 8 R;,cky Mnt. Juniper at
4-6' high, Potentilla and sod. An automatic drip irrigation system is proposed to all trees.
Revegetation will occur with native grasses and shrubs.
REVIEW HISTORY
The Commission reviewed this as a conceptual at the June 7, 1994 meeting and
commented on the following:
• Connecting device and any heated space,
• Solid wall and a full roof connection;
• Railing on the lower balcony going down steps,
• No windows on the east and west elevations;
• Mirror image and not enough change in elevations to offset mirror image; and
• Amount of wall mass on north elevation connection.
Materials _
Color
Roof
asphalt
colonial slate
Siding
r.s. cedar
brown/natural
Other
stucco
buff/natural
Fascia
rs cedar
brown
Soffits
rs cedar faced plywood
buff
Window
casements and fixed
Window Trim
alum clad
brown
Door
steel
Door Trim
Hand/ Deck Rail
rs cedar/cedar
natural
Flues
pre -fab metal
Flashings
metal -painted
buff
Chimney
stucco
buff
The landscape plant list will consist of 12 Pinion pine at 4-6' high, 8 R;,cky Mnt. Juniper at
4-6' high, Potentilla and sod. An automatic drip irrigation system is proposed to all trees.
Revegetation will occur with native grasses and shrubs.
REVIEW HISTORY
The Commission reviewed this as a conceptual at the June 7, 1994 meeting and
commented on the following:
• Connecting device and any heated space,
• Solid wall and a full roof connection;
• Railing on the lower balcony going down steps,
• No windows on the east and west elevations;
• Mirror image and not enough change in elevations to offset mirror image; and
• Amount of wall mass on north elevation connection.
PLANNING AND "ZONING COMMISSION STAFF RLL -ORT
July 19, 1994
Lot 1, Block 2, Wildridge Subdivision
Four Plex
Final Design Review
STAFF COMMENTS:
• The site plan refects grading in the 10' Slope Maintenance, Snow Storage and Utility
easement, which could jeopardize the integrity of Old Trail Road. Further, this area,
among other areas on the site, is indicating slopes in excess of 2:1, which is the limit
for slopes. The applicant must address all concerns of the Town Engineer, which may
include no grading in the easement.
• The landscape plan must include plant material that meets the minimum size standards
that include a 6' minimum height for coniferous trees.
DESIGN REVIEW CONSIDERATIONS:
The Commission shall consider the following items in reviewing the design of this project:
Conformance with the Zoning Code and other applicable regulations of the Town.
Comment: This proposal is in conformance with Town codes.
7 he suitability of the improvement, including type and quality of materials of which
it is to be constructed and the site upon which it is to be located.
Comment: The type and quality of proposed building and landscape materials are
consistent with Town guidelines.
The compatibility of the design to minimize site impacts to adjacent properties.
Comment. All impacts will be contained on site.
The compatibility of the proposed improvements with site topography.
Comment The design minimizes the impacts to the site..
The visual appearance of any proposed improvement as viewed from adjacent and
neighboring properties and public ways.
Comment The visual appearance of the proposed improvements will not negatively
impact neighboring properties or public ways.
The objective that no improvement be so similar or dissimilar to others in the
vicinity that values, monetary or aesthetic will be impaired.
I"
PLANNING AN k, ZONING COMMISSION STAFF R...'ORT
July 19, 1994
Lot 1, Block 2, Wildridge Subdivision
Four Plex
Final Design Review
Comment: The proposal meets the objective of this guideline.
The general conformance of the proposed improvements with the adopted Goals,
Policies and Programs for the Town of Avon.
Comment: The proposal is in conformance with the goals, policies and programs for the
Town of Avon.
STAFF RECOMMENDATION:
Staff recommends approval of this final design review with the following conditions:
1. The applicant address all Engineering concerns prior to the application of a building
permit.
2. The flues, flashings and vents be painted to match the color scheme of the building.
3. The building lighting be approved by staff prior to issuance of a building permit.
4. Meters be placed on the building.
5. Prior to any site disturbance, a construction/erosion control fence be placed on site.
RECOMMENDED ACTION:
1. Introduce Application
2. Applicant Presentation
3. Commission Review
4. Commission Action
Respectfully Submitted
Mary Holden
Town Planner
PLANNING ANL. ZONING COMMISSION STAFF R. OORT
July 19, 1994
Lot 1, Block 2, Wildridge Subdivision
Four Plex
Final Design Review
PLANNING AND ZONING ACTION:
A, -;,proved as submitted ( ) Approved with recommended conditions ( )
Approved with modified conditions (4 Continued ( ) Denied ( )
Withdrawn ( ) Conceptual, No Action ( )
Date / / Sue Railton, Secretary
The Commission granted final design approval with the following conditions:
1. The applicant bring back color renderings showing the color differences.
2. The applicant bring back a revised landscape plan.
3. The applicant address all Engineering concerns prior to the application
Tor a ouiiaing permit.
4. The flues, flashinqs ani vents be painted to match the color scheme of
the building.
5. The building lic
building permit.
6.. Meters be placed on the building.
7. Prior to any site disturbance, a construction/erosion fence be placed on
the site.