PZC Packet 010494PLANNING AND � 43NING COMMISSION STAFF RE,JRT
January 4, 1994
Lot 2, Nottingham Station Subdivision
Nottingham Station P.U.D.
Conceptual Design Review
PROJECT TYPE: Nottingham Station P.U.D.
ZONING: PUD COMPLIES WITH ZONING? Conceptual Review
INTRODUCTION:
Mr. Mark Donaldson, on behalf of SouthWest Partners, is requesting conceptual review of
P.U.D. zoning for Lot 3 of Nottingham Station Subdivision. The property is 13.9 acres in
size. The proposal consists of approximately 19,000 square feet of commercial, retail and
restaurant, in two buildings, and 196,500 residential sgiiare feet comprising 153 units,
which will be apartments, duplexes and townhomes.
The Nottingham Station property (consisting of Lots 1,2, and 3, Tracts A and B) was
annexed into the Town in December, 1981. At that time, Lot 3 received SPA zoning with
no detailed development assignments. The property changed from SPA to PUD in 1991.
Therefore, this lot has a PUD zoning designation but no development plan has been
approved for the property. This application consists of a request to approve a
development plan - thereby completing the PUD zoning designation for Lot 3.
The PUD zoning process requires a public hearing before the Planning and Zoning
Commission (a recommendation is forwarded to the Town Council), followed by a public
hearing by Town Council ibr final adoption.
Lot 3 is a relatively flat site with the exception of the bank along the Eagle River, which
has a steep pitch. The site has mature stands of cotton wood trees, aspens, some spruce
and willows. There are existing structures on the site.
STAFF COMMENTS:
The density being proposed is approximately 15 units per buildable acre. The applicant
has submitted a conceptual site development plan for your review.
Staff and the Town Engineer have reviewed the conceptual plan and have identified
various initial concerns that need to be addressed. These concerns are listed and briefly
discussed below.
TRAFFICICIRCULATI ON
• In the Transportation Master Plan, Hurd Lane is identified as connecting to
Stonebridge Drive. Hurd Lane, were it intersects Avon Road. is labeled as three lanes
(60' ROW), but as it heads east, is labeled as two lanes (50' ROW). Further, the 1988
Do
PLANNING AND NING COMMISSION STAFF RE�RT
W January 4, 1994
Lot 2, Nottingham Station Subdivision
Nottingham Station P.U.D.
Conceptual Design Review
Subdivision Improvements Agreement for Nottingham Station states that "The plan
will include the dedication of a right-of-way for Hurd Lane from the western boundary
of Lot 3 to the eastern boundary of Lot 3."
• The plan shows one bus stop in the development. The Transportation Master Plan
identifies this area as Phase II-Transit/Pedestrian System Improvements which states
"Town Route 2 is a new service along the proposed Hurd Lane. corridor. Connections
would be provided between US 6/West Beaver Creek Boulevard on the west and
Stonebridge Drive on the east. Specific routing of this service should conform to
future development patterns."
• This area also includes the proposed bike path shown which the applicants intends to
dedicate to the Town of Avon. The proposed bike path is it, keeping with the
Recreation Master Plan concerning trails.
• All Hurd Lane intersection locations within the development must meet Town
standards.
• The Town's maximum length for a cul du sac is 1000'. The proposed site plan shows a
cul du sac which exceeds this standard.
EASEMENTS
• Show all existing, recorded easements, which may not be reflected on the plat map,
and indicate proposed easements
• Permission must be obtained from the Denver 'Rio -Grande Railroad to utilize their
Right -of Way.
• Permission to relocate the Metcalf Ditch must be obtained from the Avon
Metropolitan District.
• Is the berm along the north portion of the property located in an easement?
FLOOD PLAIN/HYDROLOGY
• Provide a detailed definition and description of the 100 year flood plain.
• Provide a wetland delineation and report.
• Show species and location of all vegetation along the river and river bank.
UTILITIES
• Show and indicate how all utilities will be brought to ;he buildings.
PLANNING AND ,,ONING COMMISSION STAFF RE. ,SRT
January 4, 1994
Lot 2, Nottingham Station Subdivision
Nottingham Station P.U.D.
Conceptual Design Review
MISCELLANEOUS
• Show all existing structures on site. (There are three structures in this area that are
registered with the Colorado Histoiical Society.)
• Show species and location of all vegetation on the property.
• The Town will request an open space dedication along the Eagle River. Any
dedication should extend along the entire length of the south property line, north to
the 30' stream setback or the 100 year calculated flood plain, which ever is greater.
STAFF RECOMMENDATION
As a conceptual review, the Staff has no formal recommendation.
Respectfully Submitted
Mary Holden
Town Planner
PLANNING AND &,ONING COMMISSION STAFF REt oRT
January 4, 1994
Lot 2, Nottingham Station Subdivision
Nottingham Station P.U.D.
Conceptual Design Review
PLANNING AND ZONING ACTION:
Approved as submitted ( ) Approved with recommended conditions ( )
Approved with modi3ed conditions ( ) Continued ( ) Denied ( )
Withdrawn ( ) Conceptual, No Action ( )
Date p on, ec
�i7 Y �' ✓l5� Y1Vlo✓1
As a conceptual review, no formal action was taken reqardinq this PUD.
buildings; the linear look of the condominiums and the lack of interest;
Hurd 1.anp d the -ilation of traffie; the-drafina ,
a p'.ayground. Also discussed was how the project would be perceived
from I-70 , Highway 6 and Beaver Creek. Parking, site—lighting and
landscaping was also discussed.
PLANNING AND BONING COMMISSION STAFF REt ORT
January 4, 1994
Lot 25, Block 2, Benchmark at Beaver Creek Subdivision
Final Design Review - Christie Lodge Satellite Dish Placement
PROJECT TYPE: Mixed Use
ZONING: Town Center
COMPLIES WITH ZONING? YES
INTRODUCTION:
The Christie Lodge Homeowners Association is requesting approval to place one 3'
diameter, satellite dish on top of the east porte cochere roof. The dish will stand
approximately 3-4' in height. Approval was granted on November 16, 1993 to place a 6'
diameter dish on the north side of the property, facing the highway, which will not be
utilized.
STAFF COMMENTS
The Design Review Procedures, Rules and Regulations, Section 6.24, (C).
Communications R Satellite Dish Antennas sets out guidelines to be followed for the
placement of satellite dishes, which are as follows:
1. All antennas shall be located so as to be screened from view from any public
right-of-way or neighboring property. Screening may be accomplished by, or
through the use of landscaping materials, fencing, existing structures, subgrade
placements or other means that both screen the antennas and appear natural to the
site:
2. All wiring and cable related to antennas installation shall be installed
underground or be incorporated entirely within the structure:
3. The use of mesh antennas is encouraged, and
4. Color selection for dish antennae should be made with respect to the
characteristics of the site or structure. Unpainted surfaces and dish antenna with
reflective surfaces shall not be allowed. No advertising, logos or identification
shall be allowed on any dish antenna.
STAFF RECOMMENDATION:
Staff recommends the Planning and Zoning Commission approve this application with the
following condition:
I. The satellite dish be screened from view of the public rights-of-way (using materials
and colors found on the existing building).
00%
PLANNING AND BONING COMMISSION STAFF REi jRT
January 4, 1994
Lot 25, Block 2, Benchmark at Beaver Creek Subdivision
Final Design Review - Christie Lodge Satellite Dish Placement
RECOMMENDED ACTION:
1. Introduce Application
2. Applicant Presentation
3. Commission Review
4. Commission Action
Respectfully Submitted,
Mary Ho den
Town Planner
PLANNING AND .ENING COMMISSION STAFF RE► .SRT
January 4, 1994
Lot 25, Block 2, Benchmark at Beaver Creek Subdivision
Final Design Review - Christie Lodge Satellite Dish Placement
PLANNING AND ZONING ACTION
Approved as submitted ( ) Approved with recommended conditions ( )
Approved with modified conditions ( ) Continued ( ) Denied ( )
Withdrawn ( ) Conceptual, No Action
The Commission approved the norn l re lncatinn fn r the satellite
dish with the recommendation that the dish be painted to match the
building if at all possible.
PLANNING AND BONING COMMISSION STAFF REt.JRT
January 4, 1994
Lot 42, Block 2, Wildridge Subdivision
Euba.nks/Hubers Duplex
Conceptual Design Review
PROJECT TYPE: Duplex
ZONING: PUD, Two Units COMPLIES WITH ZONING? YES
INTRODUCTION:
An application for conceptual review of a duplex has been submitted. The duplex will be
located on the north portion of the 1.5 acre lot, which slopes from north to south at
approximately 41%. The duplex stands approximately 44 feet in height on the rear
elevation.
The duplex will consist of the following materials:
Roof asphalt shingles
Siding stucco with rock
Other sidine
No landscaping or exact building colors have been submitted for review.
STAFF COMMENTS:
Staff has reviewed the proposal with the Town Engineer and following are the concerns
we have identified:
• The building exceeds the allowed building height;
• The building is located in the front yard setback, which needs to be removed from
the setback or apply for a variance;
• Grading is not shown and needs to be submitted;
• Retaining walls are not shown and need to be shown and detailed;
• The floor elevations do not match the grades shown;
• The north side of the site, in front of the building, will require fill and this needs to
be reflected on the grading plan;
• A foundation plan and sections need to be submitted,
• The level of site disturbance needs to be shown on the site plan;
• Driveway access for the west unit is not shown and should be;
• Driveways for both units must have turn around capabilities, since backing out
onto Wildridge Road is not allowed.
• There are four fireplaces being shown with no indication of the type of fireplace,
and
• The total length of the building is 120 feet (could be broken at the common wall
and half the duplex shifted to provide variation in massing and overall site impact).
rwk,
PLANNING AND BONING COMMISSION STAFF REt.1RT
January 4, 1994
Lot 42, Block 2, Wildridge Subdivision
Eubanks/Hubers Duplex
Conceptual Design Review
STAFF RECOMMENDATION:
As a conceptual review, the Staff has no formal recommendation.
Respectfully Submitted
Mary Holden
Town Planner
PLANNING AND ZONING ACTION:
Approved as submitted ( ) Approved with recommended conditions ( )
Approved with modified conditions ( ) Continued ( ) Denied ( )
Withdrawn ( ) Conceptual, No Action ( )
.. All
/ CAIM
Since ther was no representative for the applicant present, the Commission
ta61e tis anp kation to t e next regular meeting.