Loading...
PZC Minutes 041679 (2)-q 40 i 7i W RECORD OF PROCEEDINGS MINUTES OF DESIGN REVIEW BOARD WORK SESSION APRIL 16, 1979 The work session was opened by, Vice -Chairman, Ken Richards, since Hugh Price, Chairman, was delayed. Present at the work session were Alice Knipe, Mike Blair, Ken Richards with John Wheeler arriving late. Also present was the Town Attorney, John Blish. Mike Blair suggested, on the Plan Map, that it would be appropriate and proper to have the Chairman of The Design Review Board sign The Master Plan Map and if the Town Council took official action, the Mayor should sign it also. It was agreed there would be no problem and could be done. Ken Richards stated that there were various letters sent out to developers, architects, or representatives of the owners of the various projects from the meeting of April 4, 1979 and suggested that the File No's of each case be put on the letters. Ken Richards reported that the Building Department is clamping down on contractors who started building before the Town Department became effective, about removing the debris around the working projects. The preliminary presentations for Wednesday's meeting were gone over with the first being, LaGarde'-Ecklund, Lots 46 and 47, Bleck 1, File No. 79-3-4 The letters or releases were received from all utility companies. The Des4.gn Review Board didn't see any problem with the project. Heymann, Elizabeth, Loc 51, Block 1, File No. 79-4-1 In this project there are 4 units, approximately 2,532 sq. ft. per unit. They are bringing landscaping plans, color renderings, etc.,at the meeting Wednesday. Plans don't show grading, lighting, utilities, screening for trash, sprinkler system, and is not detailed for siding. There is 80' feet of asphalt exposed. It was suggested that carports be closed in,at least one side. It was also suggested that they split into duplexes and make a walk around. After lengthly discussion it was agreed that the plans of Heymann's be modified. Buck Creek Condos, Lots 13, 14, 15, 16, Block 2, File No.79-3-11 It was stated the architiect will make the presentation for Toni Landauer. The review fees have not been paid as yet. There are four buildings (48 units). The grade entry was checked and is O.K. On Sheet 1, there will be 2 underground parking levels, on the first plan it showed 2 entries to the parking structure, but now shows just one entry. It was indicated they, may have to have a pedestrian walk -way entries put in for safety reasons. There was some discussions of snow removal, they will have to be more definite on these areas. They will present the color chips at this coming meeting. After lengthly discussion, John Blish suggested the Design Review Board give them approval subject to modification of standards. Present at the work session were Alice Knipe, Mike Blair, Ken Richards with John Wheeler arriving late. Also present was the Town Attorney, John Blish. Mike Blair suggested, on the Plan Map, that it would be appropriate and proper to have the Chairman of The Design Review Board sign The Master Plan Map and if the Town Council took official action, the Mayor should sign it also. It was agreed there would be no problem and could be done. Ken Richards stated that there were various letters sent out to developers, architects, or representatives of the owners of the various projects from the meeting of April 4, 1979 and suggested that the File No's of each case be put on the letters. Ken Richards reported that the Building Department is clamping down on contracto-s who started building before the Town Department became effective, about removing the debris around the working projects. The preliminary presentations for Wednesday's meeting were gone over with the first being, LaGarde'-Ecklund, Lots 46 and 47, Block 1, File No. 79-3-4 The letters or releases were received from all utility companies. The Design Review Board didn't see any problem with the project. Heymann, Elizabeth, Lot 51, Block 1, File No. 79-4-1 In this project there are 4 units, approximately 2,532 sq. ft. per unit. They are bringing landscaping plans, color renderings, etc.,at the meeting Wednesday. Plans don't show grading, lighting, utilities, screening for trash, sprinkler system, and is not detailed for siding. There is 80' feet of asphalt exposed. It was suggested that carports be closed in,at least one side. It was also suggested that they split into duplexes and make a walk around. After lengthly discussion it was agreed that the plans of Heymann's be modified. Buck Creek Condos, Lots 13, 14, 15, 16, Block 2, File No.79-3-11 It was stated the architect will make the presentation for Tom Landauer. The review fees have not been paid as yet. There are four buildings (48 units). The grade entry was checked and is O.K. On Sheet 1, there will be 2 underground parking levels, on the first plan it showed 2 entries to the parking structure, but now shows just one entry. It was indicated they, may have to have a pedestrian walk -way entries put in for safety reasons. There was some discussions of snow removal, they will have to be more definite on these areas. They will present the color chips at this coming meeting. After lengthly discussion, John Blish suggested the Desian Review Board give them approval subject to modification of standards. -2 - Alice Knipe stated there might be a problem for the fire trucks getting to all of the buildings, being that the park is in front of the buildings. It was agreed that Jay Hosburgh will be confronted with this subject. It was agreed that John Blish, Town Attorney, suggest to the Town Council that the Procedures, Rules and Regulations be modified to include a sentence that,"Phase projects will be subjected to updated regulations and codes." John Blish, Town Attorney, wanted to bring up a matter concerning the Master Plan, page 2, second paragraph, since no one from the Design Review Board was present at the Town Council Meeting of the 10th. Discussion was made on whether an industrial or commercial classification was a correct zoning for the area of the Wildwood access road. Council agreed that the zoning was consistent, however, the Town Attorney suggested the Council advir;e the Design Review Board, of the future high traffic projection along this road in considerlYiT Design approval. John Blish stated that `he Council was saying two things, 1) Be aware of the projected future high traffic area, and 2) Be aware of likely change of use. The Town Attorney stated also the first step has been taken by the Town in attempting to secure an access up Buck Creek, there is no idea how long that will take or whether we will be successful. A letter was sent to James Johnson asking him the status of that bill. With all of these matters taken care of the Design Review Board proceeded with the zoning code, with these additions and corrections. Section 2.5 Land Under Water After the word "density" delete, "or required open space." Section 2.7 Authority to require economic studies This paragraph and title was changed to read, Authority to require additional studies "Whenever the Design Review Board shall have review of a development proposal by means of the provisions of this zoning code, it shall be neccessary, to adequately apprise itself of the consequence of the development, including all applicable items listed under section 1.2. The Applicant at his cost shall furnish information and data which is needed for his project. All required statements or analysis shall be executed by professionals or other persons qualified to provide the requestle6 reports. If the Board shall refuse to accept said persons as qualified which refusals shall not be arbi,.rary, the applicant shall present alternate qualified persons to the satisfaction of the Board. The format of the proposed study shall be acceptable to the Town and be compatible with any existence studies previously prepared for the Town area.. The results of any study or analysis shall not dictate either approval or disapproval of the proposed project." It Was agreed that Jonn Bllsn' 'Town L-1LLorncy, 5u99(2sL w Lii .own Council that the Procedures, Rules and Regulations be modified to include a sentence that,"Phase projects will be subjected to updated regulations and codes." John Blish, Town Attorney, wanted to bring up a matter concerning the Master Plan, page 2, second paragraph, since no one from the Design Review Board was present at the Town Council Meeting of the 10th. Discussion was made on whether an industrial or commercial classification was a correct zoning for the area of the Wildwood access road. Council agreed that the zoning was consistent, however, the Town Attorney suggested the Council advise the Design Review Board, of the future high traffic projection along this road in consideriyiq Design approval. John Blish stated that the Council was saying two things, 1) Be aware of the projected future high traffic area, and 2) Be aware of likely change of use. The Town Attorney stated also the first step has been taken by the Town in attempting to secure an access up Buck Creek, there is no idea how long that will take or whether we will be successful. A letter was sent to James Johnson asking him the status of that bill. With all of these matters taken care of the Design Review Board proceeded with the zoning code, with these additions and corrections. Section 2.5 Land Under Water After the word "density" delete, "or required open space." Section 2.7 Authority to require economic studies This paragraph and title was changed to read, Authority to require additional studies "Whenever the Design Review Board shall have review of a development proposal by means of the provisions of this zoning code, it shall be neccessary, to adequately apprise itself of the consequence of the development, including all applicable items listed under section 1.2. The Applicant at his cost shall furnish information and data which is needed for his project. All required statements or analysis shall be executed by professionals or other persons qualified to provide the requestad reports. If the Board shall refuse to accept said persons as qualified which refusals shall not be arbitrary, the applicant shall present alternate qualified persons to the satisfaction of the Board. The format of the proposed study shall be acceptable to the Town and be compatible with any existence studies previously prepared for the Town area.. The results of any study or analysis shall not dictate either approval or disapproval of the proposed project." Section 3.1 r%, -3- Definitions After 11 (c) add 11(d) which shall read, "If a question arises as to what line shall be the front, rear, or side lot line, the Design Review Board shall make the neccessary determination." (y) Accessory Building or Use. Was agreed definition Balcony. to rewrite. An additional was added, "That portion of a structure which extends: outward from the main building with a floor and a railing with or without a ceiling and over 4' feet above this existing ground level, which is essentially open." (eee) Will be rewritten. (fff) Will be rewritten. Section 3.2 Allowed and Special Review Uses Change "therefore" to "therefor" Section 3.3 Grant of Special Review Use 1st paragraph, 1st sentence, change "shall" to "May". b(3) Change "if"to "Whether" Section 3.4 Rules of Procedure for Special Review Approval (a) Change to read, "The approval of the majority of the full authorized membership." b(l) It was agreed when the Design Review Board holds a public hearing on requests for a Special Review Use, that the number of days would be equal (15 days) for all,prior to the hearing date. This paragraph shall be rewritten by John Blish. b(2) Omit, "advertising and" b(2) Add sentence to read, "The applicant shall also pay the actual costs of providing the notification referred to in Sub(1) above. b(5) Was rewritten to read, "if a special review uses approval as outlined, the Town Council shall be notified in writing by Recording Secretary of the Design Review Board and the Approval shall rest with the Town Council. (y) Accessory Building or Use. Was agreed definition Balcony. to rewrite. An additional was added, "That portion of a structure which extends:: outward from the main building with a floor and a railing with or without a ceiling and over 4' feet above this existing ground level, which is essentially open." (eee) Will be rewritten. (fff) Will be rewritten. Section 3.2 Allowed and Special Review Uses Change "therefore" to "therefor" Section 3.3 Grant of Special Review Use 1st paragraph, 1st sentence, change "shall" to "May". b(3) Change "if"to "Whether" Section 3.4 Rules of Procedure for Special Review Approval (a) Change to read, "The approval of the majority of the full authorized membership." b(1) It was agreed when the Design Review Board holds a public hearing on requests for a Special Review Use, that the number of days would be equal (15 days) for all,prior to the hearing date. This paragraph shall be rewritten by John Blish. b(2) Omit, "advertising and" b(2) Add sentence to read, "The applicant shall also pay the actual costs of providing the notification referred to in Sub(1) above. b(5) Was rewritten to read, "if a special review uses approval as outlined, the Town Council shall be notified in writing by Recording Secretary of the Design Review Board and the Approval shall rest with the Town Council. ND Section 3., Special Review Criteria Change "inspector" to "Official", and change where ever shown in the zoning code. (e) After "considering", add "Including, but not limited to obstruction of view, noise, lighting, appearance," (f) Delete. it was noted that the Definiticns will be numbered instead of lettered. It was agreed to continue the reading of the zoning code with corrections and additions after the business of the regular meeting on Wednesday April 13, 1979. The work session adjourned at 11:20 P.M. Approved: Respectfully Submitted, Patricia J. Doyle