PZC Packet 090793e, " , PLANNING AND ZONING COMMISSION STAFF REPORT September 7,. 1993 Lot 8, Block 4, Wildridge Subdivision Simon Residence Final Design Review PROJECT TYPE: Single Family Residence ZONING: PUD, COMPLIES WITH ZONING? YES INTRODUCTION: The applicant appeared before the Commission on August 4, 1993 to present the Conceptual Design for a single-family residence on Lot 8, Block 4, Wildridge Subdivision. The following suggestions were made: 1. The driveway grade needs to be reviewed, with attention to the grade as it meets the street. 2. The siding and stucco differentiation between those materials needs to be clearly indicated. 3. The street front elevation needs to be colored and submitted at Final. 4. All of the retaining wall finishes need to be detailed and delineated clearly; what are the wall materials; how does the wall relate to the building 5. Provide color and material samples at Final. 6. Provide more detail on the elevations and floor plans. The applicant has addressed these suggestions and is now requesting Final Design Review of his residence. SITE PLAN: The property is 1.39 acres in size and slopes uphill from the street at an average grade of 33%. The property fronts on Wildridge Road. The existing site is generally covered with sage brush and native grasses. Lot coverage is proposed to be 12.2%. The driveway and parking areas will be paved with asphalt. Off-street parking is adequate. Snow storage areas are shown at the top of the driveway. A sitelgrading plan and a landscape planting plan and schedule have been provided for the Commission's review. The grading plan has been reviewed by the Town Engineer and his comments are found below. The driveway grade is shown at 4% as it approaches the street. In order to construct a driveway and parking area as proposed, a retaining wall is required along the length of the drive on the street side which will have a maximum height r PLANNING AND ZONING COW IISSION STAFF REPORT September 7, 1993 Lot 8, Block 4 Wildridge Subdivision Simon Residence Final Design Review of approximately 10 feet near the northwest property line. This retaining wall and the wall to the east of the house are proposed to be poured concrete with a stone aggregate finish. A portion of the retaining wall on the northwest encroaches into the 7.5 foot easement set aside for utilities and drainage. The retaining walls proposed at the rear of the house and adjacent to the garage are proposed to be poured concrete with a 1 x 8 lap and gap rough sawn cedar finish to match the residence. The landscape plan shows a reasonable variety of adequately sized trees and shrubs. All disturbed areas will be reseeded with a native grass and flower mix. Drip irrigation is proposed for tree and plant beds. BUILDING: The proposed single-family residence will have 3,260 sq. ft. of habitable living space. The maximum height of the structure will be 34 feet. The building utilizes a hip roof form with a 6/12 pitch. Roof material will be 230# asphaltic dimensional in gray. The exterior of the building will include a 1 x 8 lap and gap cedar rough sawn siding in brown (Woodsman, Celery Seed) for the ground floor surfaces and a stucco finish in Navajo white on the second floor wall surfaces. Facias will be 1 x 12 spruce in brown (Woodsman, Rustic Brown) and the soffits will be plywood in rustic brown. Window trim, door trim and hand and deck rails will be Woodsman Rustic Brown in color. Window casings and doors will be painter Woodsman Celery Seed. Chimneys will be surfaced in stucco with the flues and flashing painted Rustic Brown. Exterior deck posts will be wrapped in 1 x 8 cedar and stained to match siding. h PLANNING AND ZONING COMMISSION STAFF REPORT September 7, 1993 Lot 8, Block 4 Wildridge Subdivision Simon Residence Final Design Review STAFF COMMENTS OR CONCERNS: The Commission shall consider the following items in reviewit , the design of this project: Conformance with the Zoning Code and other applicable regulations of the Town. Comment: This proposal is in conformance with Town codes, except for the retaining wall located within the easement on the northwest. The suitability of the improvement, including type and quality of materials of which it is to be constructed and the site upon which it is to be located. Comment: The type and quality of proposed building materials and landscape materials is consistent with Town guidelines. The landscape treatment along the streetside retaining wall should be addressed by the Commission. The compatibility of the design to minimize site impacts to adjacent properties. Comment: All proposed site disturbance and grading will be contained within lot lines. The use of retaining walls to achieve grade changes reduces the amount of site disturbance. The compatibility of the proposed improvements with site topography. Comment: The proposed building and driveway have been designed to cause minimum impact upon the topography. Again, the use of retaining walls reduces the overall impact on topography. The visual appearance of any proposed improvement as viewed from adjacent and neighboring properties and public ways. Comment: The applicant has attempted to blend the building and wall surfaces into the natural site by the use of earth tones and landscaping. The retaining wall along the face of the driveway wiil have an aggregate finish broken up by a row of 14 aspen trees. 00 ^ PLANNING AND ZONING COMMISSION STAFF REPORT September 7, 1993 Lot 8, Block 4 Wildridge Subdivision Simon Residence Final Design Review The objective that no improvement be so similar or dissimilar to others in the vicinity that values, monetary or aesthetic will be impaired. Comment: The proposal meets the objective of this guideline. The general conformance of the proposed improvements with the adopted Goals, Policies and Programs for the Town of Avon. Comment: The proposal is in conformance with the goals, policies and programs for the Town of Avon. STAFF RECOMMENDATION: Staff recommends approval of this final design review with the following conditions 1. That the northwest retaining wall not extend into the 7.5 foot utility easement. 2. Any structural retaining wall must be engineered by applicant and approved by the Town Engineer prior to issuance of a building permit. 3. Final site drainage, driveway design and culverts must be approved by the Town Engineer prior to issuance of a building permit. RECOMMENDED ACTION: 1. Introduce Application 2. Applicant Presentation 3. Commission Review 4. Commission Action Respectfully submitted, Steve Amsbaugh to PLANNING AND ZONING COMAIIISSION STAFF REPORT 10 September 7, 1993 No Lot 8, Block 4 Wildridge Subdivision Simon Residence Final Design Review Mb PLANNING AND ZON2NG ACTION: Approved as submitted ( ) Approved with recommended conditions ( ) Approved with modified conditions ( ) Continued ( ) Denied ( ) Withdrawn ( ) Conceptual, No Action () Date Sue Railton, Secre The Commission granted final desi n aDD oval conditions: 1. That the northwest retaining w`ai-r not extend into the 7.5 foot utility easement 2. Any structural retaining wall must be engineered by applicant and approved hi the Town Engineer prior to issuance of a hui.ldi ng Rermi-Y. 3. Final site drainage, driveway design and culverts must be approved by the Tewn Engineer prier to the issuanee of a building pen, 4. The asphalt roofing material be a minimum of 300#. 5. The final design and material selection of the retaining walls be brought back to the Commission for approval. 6. The meters be located on the house and screened from view, 7. The location of the address be indicated when they brong backe the retaining walls for approval. 3. The schedule of the landscape materials be revised as discussed, Oft ^ PLANNING AND ZONING CONMUSSION STAFF REPORT September 7,. 1993 Lot 60, Block 4, Wildridge Subdivision Hale Duplex Final Design Review PROJECT TYPE: Duplex ZONING: PUD, Duplex COMPLIES WITH ZONING? YES INTRODUCTION: The applicants, Brian and Diana Hale, are requesting Final Design Approval for a residential duplex on Lot 60, Block 4, Wildridge Subdivision. SITE PLAN: The property is 0.955 acres (41,605 sq. ft.) in size and slopes uphill from the street at an average grade of approximately 201/o. The property fronts on Longsun Lane. The existing site is generally covered with sage brush and native grasses. Lot/building coverage is proposed to be 10%. The driveway and parking areas will be paved with asphalt. Off-street parking is adequate. Snow storage areas are shown on the west and northwest of the driveway. A site/grading plan and a landscape planting plan and schedule have been provided for the Commission's review. The grading plan has been reviewed by the Town Engineer and is acceptable as presented. Engineering comments are included in the Staffs Recommended Action. The driveway grade is shown at 4% as it approaches the street. A retaining wall is proposed to the rear of the house. This retaining wall will be constructed of native rock and will have a maximum height of 6 feet. The landscape program shows a reasonable variety of adequately sized trees and shrubs. Trees have been grouped for maximum effect. A lawn area is shown at both ends of the duplex. The lawn areas extend up to the drip line of the elevated decks. Lawns will be sod. The landscape treatment below the decks will consist of concrete patio surfaces and crushed rock. All disturbed areas, other than the lawn, will be reseeded with a native grass and flower mix. Drip irrigation is proposed for tree and plant beds. Lawn areas will be irrigated. PLANNING AND ZONING COMMISSION STAFF REPORT September 7, 1993 Lot 60, Block 4 Wildridge Subdivision Hale Duplex Final Design Review BUILDING: Each proposed duplex unit will have 2,900 sq. ft. of habitable living space. This building will not exceed the maximum building height of 35 feet. Roof material will be Heritage II, Fiberglass/Asphalt Shingles in Rustic Slate. The exterior of the building will consist of 8" x 12" Lodgepole Pine Logs finished in a natural spruce stain. A native river rock veneer is proposed for the lower level. Facias will be I x 8 cedar in a natural spruce stain and the soffits will be 2 x 6 T&G White Pine, also in natural spruce stain. All window trim and casings, doors and trim, and hand and deck rails will be natural spruce stain. Chimneys will be surfaced in native river rock with the flues and flashing painted Charcoal Gray. Exterior decking will be 2" x 6" redwood and stained to match the siding STAFF COMMENTS OR CONCERNS: The Commission shall consider the following items in reviewing the design of this project: Conformance with the Zoning Code and other applicable regulations of the Town. Comment This proposal is in conformance with Town codes. The suitability of the improvement, including type and quality of materials of which it is to be constructed and the site upon which it is to be located. Comment: The type and quality of proposed building materials and landscape materials is consistent with Town guidelines. The compatibility of the design to minimize site impacts to adjacent properties. Comment: All proposed site disturbance and grading will be contained within lot lines. The use of retaining walls to achieve grade changes reduces the amount of site disturbance. PLANNING AND ZONING CONMSSION STAFF REPORT September 7, 1993 Lot 60, Block 4 Wildridge Subdivision Hale Duplex Final Design Review The compatibility of the proposed improvements with site topography. Comment: The proposed building and driveway have been designed to cause minimum impact upon the topography. Again, the use of retaining walls reduces the overall impact on topography. The visual appearance of any proposed improvement as viewed from adjacent and neighboring properties and public ways. Comment: The applicant has attempted to blend the building and wall surfaces into the natural site by the use of earth tones, natural rock wall surfaces and native landscaping. The objective that no improvement be so similar or dissimilar to others in the vicinity that values, monetary or aesthetic will be impaired. Comment: The proposal meets the objective of this guideline. In addition, the applicant has stepped the northwest unit back from the southeast unit by two feet and elevated the same unit by two feet in order to reduce the mirror image possibility. The general conformance of the proposed improvements with the adopted Goals, Policies and Programs for the Town of Avon. Comment: The proposal is in conformance with the goals, policies and programs for the Town of Avon. STAFF RECOMMENDATION: Staff recommends approval of this final design review with the following conditions: 1. Any structural retaining wall must be engineered by applicant and approved by the Town Engineer prior to issuance of a Building Permit, 2. Final drainage, driveway design and culverts must be approved by the Town Engineer prior to issuance of a Building Permit. to 40,* " X] PLANNING AND ZONING COMMISSION STAFF REPORT M September 7, 1993 Lot 60, Block 4 Wildridge Subdivision Hale Duplex Final Design Review _)_ RECOMMENDED ACTION: 1. Introduce Application 2. Applicant Presentation 3. Commission Review 4. Commission Action Respectfully submitted, VY. Steve Amsb ugh fl• n PLANNING AND ZONING CONMSSION STAFF REPORT M September 7, 1993 Lot 60, Block 4 Wildridge Subdivision Hale Duplex Final Design Review !J- PLANNING AND ;CONING ACTION: Approved as submitted ( ) Approved with recommended conditions ( ) Approved with modified conditions ( ) Continued ( ) Denied ( ) Withdrawn ( ) Conceptual, No Action ( ) Date_oq Sue Railton, Secret solution regarding the mirror image of the duplex. •• c• PLANNING AND ZONING COMMISSION STAFF REPORT W September 7,. 1993 Lot 33, Block 1, Wildridge Subdivision IN Klein/Sherwood Residence Condition Submittal, Final Design Review PROJECT TYPE: Single Family Residence ZONING: PUD, Duplex COMPLIES WITH ZONING? YES INTRODUCTION: At the July 20, 1993 meeting, the Commission approved the Final Design for the Klein/Sherwood single-family residence with the condition that the applicant return with a landscape plan. SITE: The average slope of the. lot is approximately 20%, falling away from the street. The driveway grades have been re -worked to improve the transition between the street and driveway, resulting in a 41/6 slope for the first 20 feet. The existing plant materials on the site are sage and native grasses. Because of the slope of the site, a step foundation is being used. LANDSCAPE PLAN: The submitted landscape plan provides for four clusters of plant materials and the re - vegetation of all disturbed areas with a native grass mix. In addition, snow storage areas have been designated and a 3 foot rock retaining wall is proposed along the inside curve of the driveway. The landscape plan shows a reasonable variety of adequate sized trees and shrubs. Irrigation is proposed to be by hand. STAFF COMMENTS: Staff feels that the proposed plant materials meet the minimum size criteria. Species are acceptable and their location in clusters provides maximum effect. The re -vegetation area shown on the landscape plan must cover the total area of disturbance. The landscape plan shows a 3 foot high rock wall. t• PLANNING AND ZONING COMMISSION STAFF REPORT s September 7, 1993 Lot 33, Klein/Sherwood 1, Resider a Subdivision Klein/Sherwood Residence Condition Submittal, Final Design Review During a site inspection, staff noted some vegetation and soil disturbance on an adjacent lot caused by foundation excavation on this property. STAFF RECOMMENDATION: As a submittal of previously requested information, staff has no recommendation. However, approval of the landscape plan should be conditioned to include: 1. All site damage to the adjacent Lot 50 will be raked to original site grade and re - vegetated. 2. Re vegetation should occur on all areas of disturbance on this property. 3. Any rock or retaining wall details should be approved by staff. RECOMMENDED ACTION: 1. Introduce Application 2. Applicant Presentation 3. Commission Review 4. Commission Action Respectfully submitted, )ed Steve Amsbaugh w LU to PLANNING AND ZONING COMMISSION STAFF REPORT September 7, 1993 Lot 33, Block 1, Wildridge Subdivision Klein/Sherwood Residence Condition Submittal, Final Design Review PLANNING AND ZONING ACTION: Approved as submitted ( ) Approved with recommended conditions ( ) Approved with modified conditions ( ) Continued ( ) Denied ( ) Withdrawn ( ) Conceptual, No Action ( ) Date T�7Sue Railton, Sec7for11nLalapproval The Commi sion tabled this reques of the landscape plan recommending that the applicant rein for further review with additional plant materials and elevation drawings of the retaining wall, and also plans for revegetation and for restoration of the adjacent lot. PLANNING AND ZONING COMMISSION STAFF REPORT September 7,. 1993 Lot 45, Block 1, Benchmark at Beaver Creek Anointed Christian Fellowship Church and Parsonage Condition Submittal, Final Design Review PROJECT TYPE: Church and Parsonage ZONING: RLD, Residential Low Density COMPLIES WITH ZONING? YES INTRODUCTION: The applicant received Final Design Review approval for the church and parsonage on May 4, 1993 with the condition that they return to the Commission with the proposed building colors. SITE: The lot is one-half acre in size and is zoned Residential Low Density. It is located on the north side of Nottingham Road. The lot is bordered by Town of Avon owned open space tracts on the north and east, and by the A -Y Townhomes on the west side. BUILDING: The church building would utilize a combination of stucco and vertical T&G cedar siding. Fascia's will be 2 x 12 cedar; soffits will be wafer board. The roof form is an offset gable with a central dormer. The proposed roof material will be medium density cedar shakes. The parsonage uses the same exterior finishes as the church. It also has a gable roof form and has two dormers on the street side. STAFF COMMENTS: The applicant has submitted the following building colors for your approval: Stucco Surfaces: Cedar Siding: Trim: STAFF RECOMMENDATION: As a submittal of previously requested information, staff has no recommendation. CC rA n' to PLANNING AND ZONING COMMISSION STAFF REPORT M September 7, 1993 Lot 45, Block 1 Benchmark at Beaver Creek Subdivision Anointed Christian Fellowship Churcn Condition Submittal, Final Design Review RECOMMENDED ACTION: I. Introduce Application 2. Applicant Presentation 3. Commission Review 4. Commission Action Respectfully submitted, lid. 4--, Steve Amsbaugh P 0WA PLANNING AND ZONING COMMISSION STAFF REPORT o September 7, 1993 Lot 45, Block 1 Benchmark at Beaver Creek Al Anointed Christian Fellowship Church Condition Submittal, Final Design Review PLANNING AND ZONING ACTION: Approved as submitted ( ) Approved with recommended conditions ( ) Approved with modified conditions ( ) Continued ( ) Denied ( ) Withdrawn ( ) Conceptual, No Action ( ) Railton, The Commiksionlgranted final design(approal for the following colors: The stucco will be a Thorowal S-322 - a cream color The cedar siding will be a Devoe Candy Sweet The Trim will be a 9evoe SC -14, a light navy blue a004 0� e- s L) PLANNING AND ZONING COMMISSION STAFF REPORT September 7, 1993 Lot 21, Block 2, Benchmark at Beaver Creek Slifer Designs, Final Design Review Request for Approval of Storage Shed and Storage/Loading Area Fencing PROJECT TYPE: Storage Shed and Storage Area Fencing ZONING: TC, Town Center COMPLIES WITH ZONING? YES, NON- CONFORMING USE The Commission reviewed a new sign for Slifer Designs on July 20, 1993, and approved the sign with the condition that the applicant return with a request for approval of the storage shed located at the rear of the building. The applicant, Slifer Designs, has submitted a request to utilize a "Tuff' Shed" on their property to store material (previously stored along the south wall, which gave an untidy appearance to this area of the building). In addition, they would like to construct a six foot wood fence along the east and south property line to prevent trespassing in this area. The proposed fence does not completely enclose the property, rather is intended to deter people from cutting through this area. The fence would also screen their loadingistorage area from surrounding properties. SITE PLAN: An overall site plan has been submitted by the applicant (see enclosed) which shows the location of the existing building, the required overall parking spaces, the existing dumpster and the storage shed. A detailed site plan has also been submitted showing the proposed location of the fence. The loading/storage area is located on the south side of the Slifer Designs building. The site is currently used for truck parking and loading. This area also has four designated parking spaces and a dumpster enclosure. The area is flat and pa•,ed. Adjacent land uses include WalMart to the east and the railroad right-of-way to the south. DISCUSSION: Building: The applicant is requesting an accessory building to be used for storage. The shed is approximately 8'X 10' and is 8'-8" at its maximum height Accessory buildings are allowed in this zoning district. However, the location, materials and color of the storage shed must be approved by the Commission. r% 00� --, PLANNING AND ZONING COMMISSION STAFF REPORT September 7, 1993 Lot 21, Block 2, Benchmark at Beaver Creek Slifer Designs, Final Design Review Request for Approval of Storage Shed and Storage/Loading Area Fencing The proposed location would be adjacent to the dumpster enclosure. The exterior is T1- 11 rough -sawn siding with similar trim. The color is light brown. Roof material is asphalt shingle in dark gray. Fencing: The applicant proposes a six foot high closed vertical -slat wood fence along the south and east limit of the paved loading/storage area. The fence would be visible from the WalMart west parking lot and from the railroad right-of-way to the south. No specifications have been provided. STAFF COMMENTS OR CONCERNS: Overall Parking: This property was granted a parking variance by the Town Council in 1991. The variance allows for 45 parking spaces, with two being compact spaces. The attached site plan shows 45 parking spaces on the property. The variance approvdl showed 4 spaces in the loading area; however, the applicant states that only two spaces are now needed in the loading area to meet their site parking requirements because of pavement improvements along the west property line. Storage Shed: The proposed location of the shed will retain two parking spaces in the loading dock area (see above). The shed will also clean up the area by allowing enclosed storage of materials presently being stored along the back of the building. Fencing: Under Miscellaneous Provisions in the Zoning Code, commercial service yards shall be fenced or screened so as not to be visible from the street, and such screening shall be a maximum six feet high. PLANNING AND ZONING COMMISSION STAFF REPORT September 7, 1993 Lot 21, Block 2, Benchmark at Beaver Creek Slifer Designs, Final Design Review Request for approval of Storage Shed and Storage/Loading Area Fencing The Design Guidelines for the Town Core also require all service areas, loading and unloading docks to be screened from public view. The Guidelines recommend the use of 4' or 6' fences and/or heavily massed plant materials. The Guidelines also require all fences to be constructed of wood. STAFF RECOMMENDATION: Approval of the storage shed and the six foot fence on the east and south property lines with the following conditions: 1. That the shed be painted/stained a color compatible with the building and the dumpster enclosure. 2. That all on-site parking areas be re -striped to show the parking plan submitted (showing the 45 spaces). 3. That the fence be constructed consistent with the Design Guidelines and other Town Codes. Fence should be cedar or redwood with stain compatible with building and dumpster enclosure. Dimensions should be submitted to staff for approval. RECOMMENDED ACTION: 1. Introduce Application 2. Applicant Presentation 3. Commission Review 4. Commission Action Respectfully submitted, Q Steve Amsbaugh iM to 04 to PLANNING AND ZONING COMMISSION STAFF REPORT September 7, 1993 Lot 21, Block 2, Benchmark at Beaver Creek Slifer Designs, Final Design Review ! Request for approval of Storage Shed and Storage/Loading Area Fencing PLANNING AND ZONING ACTION: Approved as submitted ( ) Approved with recommended conditions ( ) Approved with modified conditions ( ) Continued ( ) Denied ( ) Withdrawn ( ) Conceptual, No Action ( ) Date The Commifsion Railton, nted final design(approial for the fence and with the following conditions: 1. The color of the fence closely match the building. e shed e. ine exposed sheetmetal on the side of the building be painted to match the building. 3. The shed be painted/stained a color compatible with the building and the dumpster enelesure. Ian submitted (showing 45 spaces). 5. That the fence be constructed consistent with the Design ,uidelines and other Town Codes. Fence should be cedar or redwood with stain compatible with building and dumpster enclosure. Dimensions should be submitted to Staff for approval. _SLIFER Designs August 4, 1993 Town of Avon Planning and Zoning Commission Avon, CO 81620 To the Board: Slifer Designs would like your permission to have a "Tuff Shed" on our property to use as storage. In the past we have stacked material outside our building along the south wall, which does not look very tidy - the "Tuff Shed" eliminates the mess. Additionally, we would like permission to install cyclone fencing (see drawing) to prevent trespassing through our property. Presently people walk from the trailer park through our property to Walmart. They have the opportunity to observe our operation up close. We feel this activity contributed to Slifer Designs delivery trucks being robbed last week. While the fence will not enclose our property, it will at least require people to walk around our loading area, rather then through the middle of it. Thank you additional 949-1621. so much for considering our requests. If there is any information I can provide for you, please contact me at Vail/Bcawr L7r,%- r 182 Avoo R,mtl P.O. Hoz 5540 Avon, Colorado 816?o .11;"ln Ic`I Sincerely, Priscilla S. Walsh