On May 5 1992 Jim McIntosh received final design re yew approval for a single family
home on Lot 28, Block 4, Wildridge Subdivision. The approved site plan included a berm
screening the garage and driveway extension from the adjacent property. This berm
encroached upon the adjacent lot and the P&Z approval was conditioned upon receiving
written permission from the adjacent owner for the location of the berm.
Mr. McIntosh has deleted the driveway extension on a revised site plan. The storage area
to the back of the garage is now accessed via a 4" concrete sidewalk. This revision allows
enough room to create a landscape buffer entirely upon Mr. McIntosh's property.
Staff believes the intent of the original condition has been satisfied and recommends
approval.
Respectfully submitted,
,�lc 7(��
Rick Pylman
PLANNING AND ZONING ACTION:
Approved as submitted (✓S Approved with recommended conditions ( )
Approved with modified conditions ( ) Continued ( ) Denied ( )
Withdrawn ( ) Conceptual, No Action ( )
Date .� 3 Sue Railton, Secretary "-& �^--e a --
1. 1.1 ` h% a+
0
WrAInte
r-Mountain
ngineeringLtd.
July 16, 1993
Mr. Norman Wood, P.E.
Town of Avon
P.O. Box 975
Avon, CO 81620
Re: Electric Meter Locations
Lots 3 through 10, Eaglebend Filing No. 2
Dear Norman:
In response to the Design Review Board and the homeowners who
were present at the meeting request, we have reviewed the meter
panels and propose to relocate them to the sides of the houses at
the approximate• locations shown on the enclosed sketch.
Because the homes are complete, they cannot all be located on
the sides of the houses. It will be necessary for a few to face
the street or entryways.
I believe that this will be acceptable to everyone.
JMS:jlc
enclosure
Sincerely,
Je�fely M�Spanel, P.E.
Vile resident
Box No. 978 • Avon, Colorado 81620 • 949-5072 Denver 893-1531
1420 Vance Street • Lakewood, Colorado 80215 • Phone: 232-0158
,,Prot ] .ac.....__
w
M
O
,vt'ror "�--
M ,q
0 �
0
J
3,)f1LPf N
,9r iZr
n 0 �
0
Cl
9 � h
h 1 3 W
,rrzn M ,,;scar s W
M
O a
,v'bfr M SALY.ar f
/
/
h
H
4N
/
e." -
PLANNING AND ZONING COMMISSION STAFF REPORT
July 20,199.-i
Lot 21, Block 2, Benchmark at Beaver Creek
Avon Commercial Building
Final Design Review
The Avon Commercial Building is applying for a minor amendment to the existing
approved sign program for the building.
The program recognizes new lease configurations and adjusts sign allowances accordingly.
The amended program also includes a new Slifer Designs sign on the north end of the
building, above and to the left of the Christy Sports sign. The sign would be 63 sq. P. in
size, consisting of 24" pan channel letters with a hidden light source, mounted on a
raceway in a manner similar to the Christy Sports sign.
The existing blue canvas banners at the office area entry would have tenant names added
as shown on the attached diagram.
This amendment is appropriate to the existing program and building and the staff
recommendation is for approval.
Respectfully submitted,
�?1C-2r-?YCU"4J
Rick Pylman
PLANNING AND ZONING ACTION!
Approved as submitted (✓f Approved with recommended conditions ( )
Approved with modified conditions ( ) Continued ( ) Denied ( )
Withdrawn ( ) Conceptual, No Action ( )
Date 3 Sue Railton, Secretary/fig /—e��
The following conditions were added to the proposal:
1. Slifer Design's signs of a total can not exceed 70.5 quuare feet
2. Slifer Design must resubmit for the approval of the storage sheds in the
back of their building.
Lob
1191-.
L 4
s ��
i
fi
4
- I
1
s ��
'IN
Mr. Rick Pylman
Town of Avon
r Box 975
Avon, Colorado 81629
Dear Rick,
SLIFER
Designs
RECF1v
JUL , 19,9
TOWN OF AVON
y 1, 1993
Slifer Designs would like to apply to the Town of Avon to install
a new sign on the North end of our building at 182 Avon Road.
If approved, the new sign would be installed above and to the left
of the existing Christy Sports sign (see elevation attached). Our
sign would be the same style and approximate size as the Christy
Sports sign, but would be red lettering instead of blue.
Our one small red awning (which is located above the entry doors to
our showroom) is no longer visible from Avon Road since the
construction to have the street go under the railroad track.
This has caused a significant reduction in the retail customer
traffic coming into our store. Prior to Avon Road construction we
would tell customers to "look for the 3 red awnings". Now, the
only way new customers can find us is by us telling them to "look
for the blue Christy Sports sign"! And, we rarely have walk in
customers anymore - usually just people who see our ads and call.
Additionally, some of the tenants occupying the office spaces would
like to have their company names on the existing blue canvas strips
at the North entrance to the building. There are three canvas
strips - 2 are 1211ong x 1811, and 1 is 1511ong x 18". Please see
attached drawings for proposed lettering. (Please note - some of
the tenants do not want their names up and are not included.)
Please let me know if you have any questions or require any
additional information. The signage we want to install takes 3
months to make, so we are hoping for a quick response from the Town
of Avon. Thank you and the board for your attention to this matter.
Si cerely,
Priscilla Salley -Walsh
Building Manager
Va"eaver Cree6
182 Avon Road
P.O. Boz 5540
Avon, Colorado 81620
303.949.1621 Fax 303.949.1122
10
SLIFER
Designs
Mr. Rick Pylman
Town of Avon
Box 975
Avon, CO 81620
Dear Rick,
July 1, 1993
As you know, the Adi Slifer Corporation purchased the building at
182 Avon Road, Avon, CO. in February 1992.
Since that time there have been changes that you may not be aware
of. These changes affect the Comprehensive Signage Program for
this building, dated 2/1/90.
Enclosed is a revised "Exhibit All, listing the current tenants of
the building, the square footage occupied, and the sign allowance
square footage calculation for each.
Please Note: Slifer Designs will be moving into an additional 600
square feet as soon as the present tenant (Lorin Tarr) moves out.
Tarr has been given notice and is expected to move in July.
Therefore, this square footage will be included with Slifer
Designs, in the revised "Exhibit All, as we are awaiting occupancy
and have signed a lease for this space.
Sincerely,
�/�j
Priscilla Salley -Walsh
Adi Slifer Corporation
Building Manager
Vail/Beaver Creek
182 Avon Road
P.O. Box 5540
Avon, Colorado 81620
303.949.1621 Fax 303.949.1122
SLIFER
D e s i g n s
July
1, 1993
REVISED 1°EXHIBIT All
Building Signage Program for 182 Avon Road,
Avor, Colorado
r
Total building frontage 174 linear feet
Allowance per liniel foot 1 sq.ft.
Total signage allowance 174 sq.ft.
Rentable space per sq.ft. of signage 97.32
sq. ft.
Tenant Square Ft.
----------------------------------------------------------------
Sign
Allowance
Christy Sports 7365 sq.ft.
75.68
sq.ft.
Slifer Designs 6864 sq.ft.
70.53
sq.ft.
Thul Electronics 820 sq.ft.
8.43
sq.ft.
Summit Habitats 865 sq.ft.
8.89
sq.ft.
Dean Johnson 144 sq.ft.
1.48
sq.ft.
Charlie Lesne 144 sq.ft.
1.48
sq.ft._
Chris Boardman 228 sq.ft.
2.34
sq.ft.
Hawkeye Services 1.15 sq.ft.
1.18
sq.ft.
Steve Riden 389 sq.ft.
---------------------------------------
4.00
sq.ft.
16934 sq.ft.*
174.00
sq.ft.
*increased due to interior remodeling
Vaj/Beaver Crmk
182 Avon Road
P.O. Box 5540
Avon, Colorado 81620
303.949.1621 Fax 303.949.1122
Au
1`Y
71
OL
V
1.lzo
--
F1
Au
1`Y
(•
MAI
W, Al
• ul
11
°"O
fit_
i
(•
m
[40
r..�
PLANNING AND ZONING COMMISSION STAFF REPORT
July 20, 1993
Lots 14/15, Block 1, Benchmark at Beaver Creek
Commercial/Industrial Building
Final Design Review
At the Planning and zoning Commission meeting of July 6, 1993, the Commission deified
final design review on a five to two vote for the proposed Commercial/Industrial building
on lots 14/15, Block 1, Benchmark at Beaver Creek Subdivision.
The issues concerning the Planning and zoning Commission were parkitig, gaides, size of
building and landscaping design.
T. J. Conners is returning with revisions to die building and site plan which include
shortening the building length by 10 feet, thereby increasing landscape and snow storage
areas; revising the grading plan to reduce the steepness of the parking areas, and adding
substantial landscaping to the front of the parking area. snow storage areas now exceed
20% of the pavement area. these revisions appear to address all the concerns listed by the
Planning and Zoning Commission.
Please review the previous memo of July 6 for a detailed review of the building materials
and colors.
The Staff recommendation of the July 6 memorandum is still valid with the inclusion of
condition 1.
Respectfully submitted,
Rick Pylman
STAFF REPORT TO THE PLANNING AND ZONING C0r!_7SSION
uP4.—� 1993
.',)(y (e 1a,c y a
Lot 14/15, Block 1, Benchmark at Beaver Creek
Commercial/Industrial Building
Final Design Review
INTRODUCTION
T. J. Conners and Karl Bell, architect, are requesting final design
review for a 57,600 square foot commercial/industrial building on
Lots 14 & 15, Block 1, Benchmark at Beaver Creek.
These lots are located on the west side of Metcalf Road, north of
Avon Auto Bcdy and the recently approved Valley Wide Plumbing
Building. They are approximately 2.79 acres in total area, the lots
slopes to the east toward Metcalf Road. The zoning is
IC-Industrial/Commercial.
The proposed building is four stories high. The e.-terior finish is
metal on the upper level, with a stucco product utilized on the lower
level. Colors will be presented at the hearing. An elevator shaft
on the front of the building breaks up that facade. The buildings
utilized a metal mansard roof form, which has been increased to it's
original size in response to comments at the last review. The too
two floors of each building would contain self storage mini warehouse
space, the bottom two level would contain spaces for service
commercial offices/warehouses.
Concurrently the applicant has requested a variance to excecd the
maximum allowed height by a few feet and relief from the required
parking for the self storag: units. This Commission has granted a
similar parking variance in this area in the past, staff has not
heard of any problems with the parking at the location of the
previous variance. This project will also require the vacation of
the lot line dividing lot 14 and 15.
The applicant has redesign the parking and loading configuration to
enable trucks to reach the loading docks without blocking Metcalf
Road. Signage will, be presented at the hearing.
Other than the height slightly exceeding the maximum and the required
parking variance, the project appears to meet Town requirements.
STAFF COMMENTS
The Commission shall consider the following items in reviewing the
design of the proposed project:
6.11 - The conformance with the Zoning Code and other
applicable. rules and regulations of the Town of Avon.
COMM: This applicant is concurrently requesting a
variance for exceeding the maximum height allowed and for parking
associated with the self storage units, and the property line between
the lots wily. need to be vacated. Otherwise the project appears to
be in conformance with the Zoning Code and all other town of Avon
rules and regulations.
STAFF RE?CRT TO THE PLANNING AND ZONING COM41SST_ON
e�5 1°93
Lot 14/15, Block 1, Benchmark at Beaver Creek
Commercial/Industrial Building
Final Design Review
6.12 - The suitability of the improvement, including type and
quality of materials of which it is to be constructed and the site
upon whict it is to be located.
C0t•4=21 : These improvements, as proposed, are not
inapprcmriate to the neighborhood.
6.13 - The compatibility of the design to minimize site
impacts to adjacent properties.
COMMENT: The project appears to have no adverse site impacts
on adjacent properties and retains the access necessary to adjacent
lots.
6.14 - The compatibility of the proposed improvement with
site topography.
COh2= . Considering that this is a steep site, the project
is relatively compatible with the site topography.
6.15 - The visual appearance of any proposed improvements as
viewed from adjacent and neighboring properties and public ways.
COM=LS: The proposed improvements appear to be visually
compatible with the neighborhood.
6.16 - The objective that no improvement be so similar or
dissimilar to others the vicinity that values, monetary or
aesthetic will be im*- !.
COMMENTS: Staff sees no conflict with this criteria.
6.17 - The general conformance of the proposed improvements
with the adopted Goals, Policies and Programs of the Town of Avon.
COM =S: This proposal is in general conformance with the
adopted goals, policies and programs of the Town of Avon.
STAFF REPORT TO THE PLANNING AND ZONING CONMSSION
July 6, 1993
Lot 14/15, Block 1, Benchmark at Beaver Creek
Commercial/Industrial Building
Final Design Review
STAFF RECOM)vIENDATION:
Approval subject to the following conditions:
1. Subject to submission and approval of grading and drainage plan prior to application
for building permit. Revise grading to confine grading operation within property lines and
drainage easements, eliminate grading in street, provide appropriate erosion control in
drainage swales and provide for detention and treatment of parking lot drainage in
accordance with Town of Avon regulations.
2. Floor plans must match site plan dimensions.
3. Address grades at ramps and parking lot to fire department satisfaction.
4. address snow storage requirements.
5. Address architectural treatment of retaining walls.
It is the opinion of the Staff that although there are many positive attributes to this project,
and there is an identified community need, the request for two variances, the grading
problems, the steepness of the parking and ramp areas and the sheer quantity of retaining
wall indicates that too much building is being forced onto this site.
Lot 14/15, Block 1, Benchmark at Bearer Creek
Commercial/Industrial Building
Final Design Review
PLANNING AND ZONING ACTION:
Approved as submitted (4 Approved with recommended conditions ( )
•
Approved with modified conditions ( ) Continued ( ) Denied ( )
Withdraw�n(� �) Conceptual, No Action ( ) /j
Date 7/:�V/ _Sue Railton, SecretaryZLcQi
The following condition applies: Subject to submission and approval of qrading
and drainage plan prior to ann lca.tion for buildinT permit. Revised grading to
confine grading operation 16.6in Droperty lines and drainane easements, eliminate
-{rad-iny rn-sta eet, provide approm iate•-erosion-control in d>Maar-smles and
nrovide for detention and treatment of narkinq lot drainage in accordance with
Town of Avnn regulations
R]
^ ^
PLANNING AND ZONING COMMISSION STAFF REPORT
July 20, 1993
Lot 45, Block 3, Wildi dge Subdivision
� Vedder Residence, Materials Change and Condition Ratification
Final Design Review
• Brian Vedder received a final design review approval for a residence on Lot 45, Block 3,
Wildridge Subdivision on July 21, 1992. That approval included a condition requiring Mr.
Vedder to return to the Commission once a railing material had been selected, for review
and approval of the railing material.
Mr. Vedder has selected a railing material which is described in detail on the attached
documentation.
Mr. Vedder is also requesting a materials change from wood shake to a Tamko Heritage
Premium Shadowline composite shingle.
As a material change staff has no formal recommendation.
Respectfully submitted,
�Icr_ -�(u
Rick Pylman
PLANNING AND ZONING ACTION:
Approved as submitted (✓/) Approved with recommended conditions ( )
Approved with modified conditions ( ) Continued ( ) Denied ( )
Withdrawn ( ) Conceptual, No Action ( )
Date 204J Sue Railton, SecretaryLt;
Brian Hendrik Vedder, A.I.A. Architect/Developer
P. O. Box 5501 Vail, CO 61658 (303) 949-0509
Date: July 6, 1993
Town of Avon
Design Review Committee
IN RE: 4747 Wildridge Road (Lot 45, Block 3)
In accordance with the committee's request of last summer,
would like to submit the finalized handrail design; and in
response to the powerfully motivating issues: of budget,
value, and durability I must submit for a change in roofing
materials.
Please take note of the following:
A> The south -facing sundeck handrail detail has been
finalized, and consists of an aluminum framework in satin -
finish bronze -anodized color, with clear tempered glass
panels inserted. The west unit will receive three panels
approximately 26" high by 76" long. The east unit will
receive two panels approximately 26" high by 90" long. The
building already contains such a large amount of south -
facing glass that these handrails will constitute less than
5% additional glass coverage, and much of that passes in
front of other window -wall panels. In addition, the
handrail glass is clear, whereas the window -walls contain
high-tech energy -conservation coatings which exhibit a
noticeable degree of reflectivity.
B> It has been decided to omit wood -shake roofing
shingles, and instead substitute Tamko Heritage Premium
Shadowline composition shingles. The color selected is
Birchwood, to harmonize with the rest of the color scheme,
but which differs slightly from my neighbor Mr. Buzz
Reynolds' color. This product is the exact same product and
has the same genarel appearance as on Mr. Reynolds home.
The logic behind this decision is inescapable, that of the
Tamko product carrying a 40 year guarantee, whereas wood
shakes cost nearly double, carry no guarantee whatsoever,
and have a life expectancy of only about ten years
considering the severity of the Wildridge microclimate.
I hope these issues and explanations will meet with the
committee's approval.
7
kou for ou kin sid ation,
Br' Vedder
Brian Hendrik Vedder_, A.
P. O. Box 5501 Vail,
Date: July 6, 1993
Town of Avon
Design Review Committee
IN RE: 4747 Wildridge Road
.A. Architect/Developer
CO 81658 (303) 949-0509
(Lot 45, Block 3)
In accordance with the committee's request of last summer,
would like to submit the finalized handrail design; and in
response to the powerfully motivating issues of budget,
value, and durability I must submit for a change in roofing
materials.
Please take note of the following:
A> The south -facing sundeck handrail detail has been
finalized, and consists of an aluminum framework in satin -
finish bronze -anodized color, with clear tempered glass
panels inserted. The west unit will receive three panels
approximately 26" high by 76" long. The east unit will
receive two panels approximately 26" high by 90" long. The
building already contains such a large amount of south -
facing glass that these handrails will constitute less than
5% additional glass coverage, and much of that passes in
front of other window -wall panels. In addition, the
handrail glass is clear, whereas the window -walls contain
high-tech energy -conservation coatings which exhibit a
noticeable degree of reflectivity.
B> It has been decided to omit wood -shake roofing
shingles, and instead substitute Tamko Heritage Premium
Shadowline composition shingles. The color selected is
Birchwood, to harmonize with the rest of the color scheme,
but which differs slightly from my neighbor Mr. Buzz
Reynolds' color. This product is the exact same product and
has the same genarel appearance as on Mr. Reynolds home.
The logic behind this decision is inescapable, that of the
Tamko product carrying a 40 year guarantee, whereas wood
shakes cost nearly double, carry no guarantee whatsoever,
and have a life expectancy of only about ten years
considering the severity of the Wildridge microclimate.
I hope these issues and explanations will meet with the
committee's approval.
trian youforon,
an edder
r'1
PLANNING AND ZONING COMMISSION STAFF REPORT
July 20. 1993
Lot 6, Block 5, Wildridge Subdivision
Barrows Sixplex
Final Design Review
PROJECT TYPE: Final Design Review
ZONING: PUD 6 unit COMPLIES WITH ZONING? YES
STfE PLAN:
Average slope of lot.
Max. slope of driveway.
Lot coverage.
Driveway is paved.
Parking provided is adequate.
Snow storage is adequate.
Grading plan is adequate.
Landscape plan is adequate.
Plant sizes meet criteria.
Meters are on building.
Meets setback requirements.
30% Lot Size 1.62 acres
10%
5%
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Other site plan issues Boulder retaining walls.
BUILDING:
Habitable Space. 400 sq. ft. per unit plus 400 sq. ft. garage per unit
Maximum Height. 28 Ft.
Roof Form. Gable
MATERIAL
COLOR
Roofing
Asphalt
Reddish Brown
Walls, Dominant
Stucco
Buckskin
Walls, Other
Bolly Band -Brick
Dark Red
Fascia
2x 10
White
Soffits
Plywood
White
Windows/Trim
Ix4 with detail
White
Doors/Trim
I x4
White
Other Building Issues:
Trash enclosure to be stucco in Buckskin color.
e%
PLANNING AND ZONING COMMISSION STAFF REPORT
NO July 20, 1993
Lot 6, Block Wildridge Subdivision
® Barrows Sixplex
Final Design Review
w
STAFF COMMENTS OR CONCERNS:
Need to review specific roof material and color
STAFF RECOMMENDATION:
Approval
RECOMMENDED ACTION:
I. Introduce Application
2. Applicant Presentation
3. Commission Review
4. Commission Action
Respectfully submitted,
ubI
Rick Pylman
''1
PLANNING AND ZONING CONMISSION STAFF REPORT
m4a July 20, 1993
Lot 6, Block Wildridge Subdivision
0 Barrows Sixplex
Final Design Review
PLANNING AND ZONING ACTION:
Approved as submitted (✓f Approved with recommended conditions ( )
Approved with modified conditions ( ) Continued ( ) Denied ( )
Withdrawn ( ) Conceptual, No Action ( )
Date XJ 3 Sue Railton, Secretary�� .
PLANNING AND ZONING COMMISSION STAFF REPORT
July 20. 1993
•
Lot 28, Block 1, Wildridge Subdivision
John Orcutt, Duplex
Is Final Design Review
•I PROJECT TYPE: Final Design Review
ZONING* PUD, Duplex COMPLIES WITH ZONING? YES
SITE PLAN:
Average slope of lot.
Max. slope of driveway.
Lot coverage.
Driveway is paved.
Parking provided is adequate.
Snow storage is adequate.
Grading plan is adequate.
Landscape plan is adequate.
Plant sizes meet criteria.
Meters are on building.
Meets setback requirements.
Other site plan issues
BUILDING:
Habitable Space,
Maximum Height.
Roof Form.
Roofing
Walls, Dominant
Walls, Other
Fascia
Soffits
Windows/Trim
Doors/Trim
Other Building Issues:
5%
Flat
13%
Asphalt
Yes
Yes
Yes
Yes
Yes, as corrected
Yes
Yes
3000 sq. ft. total
25 Ft.
Gable
MATERIAL
COLOR
Asphalt/Shingle
Brown Colors to be
Cedar 8" lap
Brown presented at
Stucco
meeting
PLANNING AND ZONING COMMISSION STAFF REPORT
am July 20, 1993
Lot 28, Block 1 Wildridge Subdivision
�
John Orcutt, Duplex
Final Design Review
STAFF COMMENTS OR CONCERNS:
1. Material samples, colors and fascia, trim details to be presented at meeting.
STAFF RECOMMENDATION:
Approval
RECOMMENDED ACTION:
1. Introduce Application
2. Applicant Presentation
3. Commission Review
4. Commission Action
Respectfully submitted,
��?U4-j
Rick Pylman
PLANNING AND ZONING COMMISSION STAFF REPORT
July 20, 1993
Lot 28, Block 1 Wildridge Subdivision
John Orcutt, Duplex
we Final Design Review
PLANNING AND ZONING ACTION:
Approved as submitted ( ) Approved with recommended conditions (✓S
Approved with modified conditions ( ) Continued ( ) Denied ( )
Withdrawn ( ) Conceptual, No Action ( )
Date ^ 3 Sue Railton, Secretary
Conditions are as follows: Landscaping plan be submitted to the Planning and
Zoning Commission; and that two windows be added to the garage that are the
same configuration and size as the windows in the bedroom. .
PLANNING AND ZONING COMMISSION STA,7F REPORT
July 20. 1993
Lot 33, Block 1, Wildridge Subdivision
I Jein/Sherwood, Single Family Residence
Final Design Review
PROJECT TYPE: Final Design Review
ZONING: PUD, Duplex COMPLIES WITH ZONING? YES
SITE PLAN:
Average slope of lot. 20%
Max. slope of driveway. 6%
Lot coverage. 10%
Driveway is paved.
Yes
Parking provided is adequate.
Yes
Snow storage is adequate.
Yes
Grading plan is adequate.
Yes
Landscape plan is adequate.
Yes
Plant sizes meet criteria.
Yes
Meters are on building.
Yes, with enclosure
Meets setback requirements.
Yes
Other site plan issues
BUILDING:
Habitable Space.
Maximum Height.
Roof Form.
Roofing
Walls, Dominant
Walls, Other
Fascia
Soffits
Windows/Trim
Door&7rim
Other Building Issues:
Shared driveway issues have been resolved satisfactorily.
2000 sq. ft. total
31 Ft.
Gable
MATERIAL
COLOR
Asphalt (presidential ser.)
Dark Brown
Redwood 8" lap siding
Seagull Gray
Stucco
Off White
2x 12/1x6
Blue Heron
Brick Mold
Blue Heron
Brick Mold
Blue Heron
N/A
PLANNING AND ZONING COMMISSION STAFF REPORT
July 20, 1993
Lot 33, Block 1 Wildridge Subdivision
Klein/Sherwood, Single Family Residence
Final Design Review
STAFF COMMENTS OR CONCERNS:
Issues at conceptual review were driveway grading. Stucco band location on
north elevation and utility trench location. These issues have all been addressed
satisfactorily.
STAFF RECOMMENDATION:
Approval
ACTION:
1. Introduce Application
2. Applicant Presentation
3. Commission Review
4. Commission Action
Respectfully submitted,
Rick Pylman
[•
AM
Aft
C:1
,o--,. - -,\,
PLANNING AND ZONING COMMISSION STAFF REPORT
July 20, 1993
Lot 33, Block 1 Wildridge Subdivision
Klein/Sherwood, Single Family Residence
Final Design Review
PLANNING AND ZONING ACTION:
Approved as submitted (✓) Approved with recommended conditions ( )
Approved with modified conditions ( ) Continued ( ) Denied ( )
Withdrawn (/--3` Conceptual, No Action ( )
Date_,00/ 9_Sue Railton, Secretary '64e 4 G /j/
The following condition exists: A landscapi
Committee once the plan is worked up.
lan needs to be submitted to the
••
•
"� �e)
10�,
PLANNING AND ZONING COMMISSION STAFF REPORT
July 20. 1993
Lot 104, Block 1, Wildridge Subdivision
� Peel/Pressley, Duplex
Final Design Review
PROJECT TYPE: Final Design Review
ZONING: PUD, Duplex COMPLIES WITH ZONING? YES
SITE PLAN:
Average slope of lot.
Max. slope of driveway.
Lot coverage.
Driveway is paved.
Parking provided is adequate.
Snow storage is adequate.
Grading plan is adequate.
Landscape plan is adequate.
Plant sizes meet criteria.
Meters are on building.
Meets setback requirements.
22% Lot size 18.295 sq. ft. (42 acre)
10%
15%
Yes
Yes
Yes
Yes
Yes
Yes, some smaller, some larger
Ves, with enclosure
Yes
Other site plan issues Utility lines that extend to rear of lot will be planned in
easements.
BUILDING:
Habitable Space.
Maximum Height.
Roof Form.
Roofing
Walls, Dominant
Walls, Other
Fascia
Soffits
Windows/Trim
Doors/Trim
Other Building Issues:
4450 sq. ft. total
29 Ft.
Gable, 6/12 pitch
MATERIAL
COLOR
Timberline Ultra
Shadow Gray
Cedar Channel Lap
Delta Fog
Stucco
Oatmeal
2x8 cedar
Forest Green
Plywood
Delta Fog
Metal Clad
White
Metal
White
Garage Doors
Delta Fog
A"1 1101�. - .
PLANNING AND ZONING COMMISSION STAFF REPORT
July 20, 1993
Lot 104, Block I Wildridge Subdivision
Peel/Pressley, Duplex
Final Design Review
STAFF COMMENTS OR CONCERNS:
STAFF RECOMMENDATION:
Approval
RECOMMENDED ACTION:
1. Introduce Application
2. Applicant Presentation
3. Commission Review
4. Commission Action
Respectfully submitted,
I',- etcx
Rick Pylman
•
J
004, 0041
I --
PLANNING
PLANNING AND ZONING COMMISSION STAFF REPORT
July 20, 1993
Lot 104, Block 1 Wildridge Subdivision
Peel/Pressley, Duplex
Final Design Review
PLANNING AND ZONING ACTION:
Approved as submitted ( ) Approved with recommended conditions (✓S
Approved with modified conditions ( ) Continued ( ) Denied ( )
Withdrawn ( ) Conceptual, No Action ( )
Date PO 3 _Sue Railton, Secretaryit'ai '
The following conditions apply: Resubmit a grading plan once complete, and
install a drip irrigation system for the trees.
"1 �0) I -
PLANNING AND ZONING COMMISSION STAFF REPORT
July 20, 1993
Lot 27/28, Block 1, Benchmark at Beaver Creek
Mountain Center, Phase II
Final Design Review
In March of 1986, the Avon Planning and zoning Commission granted final design review
approval to the Mountain Center, a 82,400 square foot, 3 story, warehouse and
commercial building. Phase I, consisting of approximately 34,333 square feet was
constructed shortly after the approval was granted.
Vail Building Arts, the building owner, now wishes to complete Phase II of the project.
The original design review approval expired in 1988, therefore, a new design review
approval is required.
Minor site plan changes have been made to the 1986 approval, resulting in slightly more
parking. A vehicle ramp to serve the existing auto body shop has also been added to the
proposal since 1986.
The building design and sign program are proposed to remain as originally designed and
will match the existing building. Colors will also match the existing building.
The lower level of the building is proposed as mini storage and a parking variance,
exempting the mini storage area from parking requirements, was granted in 1986. A total
of 115 parking spaces are proposed, with the variance in place and including the increased
parking demand of the uses in the existing phase I, the total parking demand is 104
parking spaces.
In 1987, Jerry Verke was granted a Special Review Use to operate a auto repair shop in
the building. A condition of approval was a review of that permit upon initiation of Phase
H. A complete review of the parking demands of the Phase I tenants, including Jerry's
Automotive, reveals a demand of 64 parking spaces and an availability of 56. This
situation is corrected with the addition of Phase II and calculated as warehouse use only,
there will be parking available in excess of Town requirements.
The Staff recommends approval of the final design for the Mountain Center, Phase II, with
the following conditions:
1. Vail Building Arts will be removing approximately 15 - 20,000 cubic yards of
fill from the site. this truck traffic will adversely impact Nottingham Road.
Vail Building Arts shall, prior to building permit issuance, overlay Nottingham
Road from Kamen Supply to the intersection with Metcalf Road, with 2"
STAFF REPORT TO THE PLANNING AND ZONING COMMISSICN
. July 20, 1993
Page 2
meLot 27/28, Block 1, Benchmark at Beaver Creek Subdivision
Mountain Center Phase II
Final Design Review
of asphalt, or deposit with the Town funds sufficient to complete the overlay.
2. Mini storage and parking shall constitute the only allowed uses for the lowest
level of Phase II.
3. Construction staging must occur entirely on Lots 26/27/28 and must maintain
the integrity of the drainage swale.
4. The remaining property line defining the original Lots 26/27/28 must be
vacated prior to building permits.
Respectfully submitted,
07-52
Rick Pylman "d ge
PLANNING AND ZONING ACTION:
Approved as submitted ( ) Approved with recommended conditions (V�
Approved with modified conditions ( ) Continued ( ) Denied ( )
Withdrawn ( ) Conceptual, No Action ( )
Date ,2p 3 Sue Railton, Secretary
Conditions for S ecial Review Use: 1. Parkin for �
lot will be limite to 10 spaces. Z. After 1 year c
view needs to take place of the Special Review Use.
1. Staff ecommendations !, 2, and app'y Wnirn—WrE
road from the cald-a-sack to Medcalf Rd. b. The mini
remain fnr aithar ctnraga nr parking nnly C Tha a
through the Lot Line Vacation process prior to buildi
come back to the board with color scheme. 3. The ap
with—F new sign program, considering the options give
erry's Automotive on the outside
f occupation inlhase II, a re -
Conditions for Final Design:
y on the
storage in the basement should
tiditinnal Int ling he vacated
ng permit. 2. The applicant
plicant come back to the board