Loading...
PZC Packet 072093PLANNING AND ZONING COMMISSION STAFF REPORT i July 20, 1993 Lot 28, Block 4, Wildridge Subdivision � McIntosh, Single Family Residence s /, Final Design Review, Condition Resubmittal On May 5 1992 Jim McIntosh received final design re yew approval for a single family home on Lot 28, Block 4, Wildridge Subdivision. The approved site plan included a berm screening the garage and driveway extension from the adjacent property. This berm encroached upon the adjacent lot and the P&Z approval was conditioned upon receiving written permission from the adjacent owner for the location of the berm. Mr. McIntosh has deleted the driveway extension on a revised site plan. The storage area to the back of the garage is now accessed via a 4" concrete sidewalk. This revision allows enough room to create a landscape buffer entirely upon Mr. McIntosh's property. Staff believes the intent of the original condition has been satisfied and recommends approval. Respectfully submitted, ,�lc 7(�� Rick Pylman PLANNING AND ZONING ACTION: Approved as submitted (✓S Approved with recommended conditions ( ) Approved with modified conditions ( ) Continued ( ) Denied ( ) Withdrawn ( ) Conceptual, No Action ( ) Date .� 3 Sue Railton, Secretary "-& �^--e a -- 1. 1.1 ` h% a+ 0 WrAInte r-Mountain ngineeringLtd. July 16, 1993 Mr. Norman Wood, P.E. Town of Avon P.O. Box 975 Avon, CO 81620 Re: Electric Meter Locations Lots 3 through 10, Eaglebend Filing No. 2 Dear Norman: In response to the Design Review Board and the homeowners who were present at the meeting request, we have reviewed the meter panels and propose to relocate them to the sides of the houses at the approximate• locations shown on the enclosed sketch. Because the homes are complete, they cannot all be located on the sides of the houses. It will be necessary for a few to face the street or entryways. I believe that this will be acceptable to everyone. JMS:jlc enclosure Sincerely, Je�fely M�Spanel, P.E. Vile resident Box No. 978 • Avon, Colorado 81620 • 949-5072 Denver 893-1531 1420 Vance Street • Lakewood, Colorado 80215 • Phone: 232-0158 ,,Prot ] .ac.....__ w M O ,vt'ror "�-- M ,q 0 � 0 J 3,)f1LPf N ,9r iZr n 0 � 0 Cl 9 � h h 1 3 W ,rrzn M ,,;scar s W M O a ,v'bfr M SALY.ar f / / h H 4N / e." - PLANNING AND ZONING COMMISSION STAFF REPORT July 20,199.-i Lot 21, Block 2, Benchmark at Beaver Creek Avon Commercial Building Final Design Review The Avon Commercial Building is applying for a minor amendment to the existing approved sign program for the building. The program recognizes new lease configurations and adjusts sign allowances accordingly. The amended program also includes a new Slifer Designs sign on the north end of the building, above and to the left of the Christy Sports sign. The sign would be 63 sq. P. in size, consisting of 24" pan channel letters with a hidden light source, mounted on a raceway in a manner similar to the Christy Sports sign. The existing blue canvas banners at the office area entry would have tenant names added as shown on the attached diagram. This amendment is appropriate to the existing program and building and the staff recommendation is for approval. Respectfully submitted, �?1C-2r-?YCU"4J Rick Pylman PLANNING AND ZONING ACTION! Approved as submitted (✓f Approved with recommended conditions ( ) Approved with modified conditions ( ) Continued ( ) Denied ( ) Withdrawn ( ) Conceptual, No Action ( ) Date 3 Sue Railton, Secretary/fig /—e�� The following conditions were added to the proposal: 1. Slifer Design's signs of a total can not exceed 70.5 quuare feet 2. Slifer Design must resubmit for the approval of the storage sheds in the back of their building. Lob 1191-. L 4 s �� i fi 4 - I 1 s �� 'IN Mr. Rick Pylman Town of Avon r Box 975 Avon, Colorado 81629 Dear Rick, SLIFER Designs RECF1v JUL , 19,9 TOWN OF AVON y 1, 1993 Slifer Designs would like to apply to the Town of Avon to install a new sign on the North end of our building at 182 Avon Road. If approved, the new sign would be installed above and to the left of the existing Christy Sports sign (see elevation attached). Our sign would be the same style and approximate size as the Christy Sports sign, but would be red lettering instead of blue. Our one small red awning (which is located above the entry doors to our showroom) is no longer visible from Avon Road since the construction to have the street go under the railroad track. This has caused a significant reduction in the retail customer traffic coming into our store. Prior to Avon Road construction we would tell customers to "look for the 3 red awnings". Now, the only way new customers can find us is by us telling them to "look for the blue Christy Sports sign"! And, we rarely have walk in customers anymore - usually just people who see our ads and call. Additionally, some of the tenants occupying the office spaces would like to have their company names on the existing blue canvas strips at the North entrance to the building. There are three canvas strips - 2 are 1211ong x 1811, and 1 is 1511ong x 18". Please see attached drawings for proposed lettering. (Please note - some of the tenants do not want their names up and are not included.) Please let me know if you have any questions or require any additional information. The signage we want to install takes 3 months to make, so we are hoping for a quick response from the Town of Avon. Thank you and the board for your attention to this matter. Si cerely, Priscilla Salley -Walsh Building Manager Va"eaver Cree6 182 Avon Road P.O. Boz 5540 Avon, Colorado 81620 303.949.1621 Fax 303.949.1122 10 SLIFER Designs Mr. Rick Pylman Town of Avon Box 975 Avon, CO 81620 Dear Rick, July 1, 1993 As you know, the Adi Slifer Corporation purchased the building at 182 Avon Road, Avon, CO. in February 1992. Since that time there have been changes that you may not be aware of. These changes affect the Comprehensive Signage Program for this building, dated 2/1/90. Enclosed is a revised "Exhibit All, listing the current tenants of the building, the square footage occupied, and the sign allowance square footage calculation for each. Please Note: Slifer Designs will be moving into an additional 600 square feet as soon as the present tenant (Lorin Tarr) moves out. Tarr has been given notice and is expected to move in July. Therefore, this square footage will be included with Slifer Designs, in the revised "Exhibit All, as we are awaiting occupancy and have signed a lease for this space. Sincerely, �/�j Priscilla Salley -Walsh Adi Slifer Corporation Building Manager Vail/Beaver Creek 182 Avon Road P.O. Box 5540 Avon, Colorado 81620 303.949.1621 Fax 303.949.1122 SLIFER D e s i g n s July 1, 1993 REVISED 1°EXHIBIT All Building Signage Program for 182 Avon Road, Avor, Colorado r Total building frontage 174 linear feet Allowance per liniel foot 1 sq.ft. Total signage allowance 174 sq.ft. Rentable space per sq.ft. of signage 97.32 sq. ft. Tenant Square Ft. ---------------------------------------------------------------- Sign Allowance Christy Sports 7365 sq.ft. 75.68 sq.ft. Slifer Designs 6864 sq.ft. 70.53 sq.ft. Thul Electronics 820 sq.ft. 8.43 sq.ft. Summit Habitats 865 sq.ft. 8.89 sq.ft. Dean Johnson 144 sq.ft. 1.48 sq.ft. Charlie Lesne 144 sq.ft. 1.48 sq.ft._ Chris Boardman 228 sq.ft. 2.34 sq.ft. Hawkeye Services 1.15 sq.ft. 1.18 sq.ft. Steve Riden 389 sq.ft. --------------------------------------- 4.00 sq.ft. 16934 sq.ft.* 174.00 sq.ft. *increased due to interior remodeling Vaj/Beaver Crmk 182 Avon Road P.O. Box 5540 Avon, Colorado 81620 303.949.1621 Fax 303.949.1122 Au 1`Y 71 OL V 1.lzo -- F1 Au 1`Y (• MAI W, Al • ul 11 °"O fit_ i (• m [40 r..� PLANNING AND ZONING COMMISSION STAFF REPORT July 20, 1993 Lots 14/15, Block 1, Benchmark at Beaver Creek Commercial/Industrial Building Final Design Review At the Planning and zoning Commission meeting of July 6, 1993, the Commission deified final design review on a five to two vote for the proposed Commercial/Industrial building on lots 14/15, Block 1, Benchmark at Beaver Creek Subdivision. The issues concerning the Planning and zoning Commission were parkitig, gaides, size of building and landscaping design. T. J. Conners is returning with revisions to die building and site plan which include shortening the building length by 10 feet, thereby increasing landscape and snow storage areas; revising the grading plan to reduce the steepness of the parking areas, and adding substantial landscaping to the front of the parking area. snow storage areas now exceed 20% of the pavement area. these revisions appear to address all the concerns listed by the Planning and Zoning Commission. Please review the previous memo of July 6 for a detailed review of the building materials and colors. The Staff recommendation of the July 6 memorandum is still valid with the inclusion of condition 1. Respectfully submitted, Rick Pylman STAFF REPORT TO THE PLANNING AND ZONING C0r!_7SSION uP4.—� 1993 .',)(y (e 1a,c y a Lot 14/15, Block 1, Benchmark at Beaver Creek Commercial/Industrial Building Final Design Review INTRODUCTION T. J. Conners and Karl Bell, architect, are requesting final design review for a 57,600 square foot commercial/industrial building on Lots 14 & 15, Block 1, Benchmark at Beaver Creek. These lots are located on the west side of Metcalf Road, north of Avon Auto Bcdy and the recently approved Valley Wide Plumbing Building. They are approximately 2.79 acres in total area, the lots slopes to the east toward Metcalf Road. The zoning is IC-Industrial/Commercial. The proposed building is four stories high. The e.-terior finish is metal on the upper level, with a stucco product utilized on the lower level. Colors will be presented at the hearing. An elevator shaft on the front of the building breaks up that facade. The buildings utilized a metal mansard roof form, which has been increased to it's original size in response to comments at the last review. The too two floors of each building would contain self storage mini warehouse space, the bottom two level would contain spaces for service commercial offices/warehouses. Concurrently the applicant has requested a variance to excecd the maximum allowed height by a few feet and relief from the required parking for the self storag: units. This Commission has granted a similar parking variance in this area in the past, staff has not heard of any problems with the parking at the location of the previous variance. This project will also require the vacation of the lot line dividing lot 14 and 15. The applicant has redesign the parking and loading configuration to enable trucks to reach the loading docks without blocking Metcalf Road. Signage will, be presented at the hearing. Other than the height slightly exceeding the maximum and the required parking variance, the project appears to meet Town requirements. STAFF COMMENTS The Commission shall consider the following items in reviewing the design of the proposed project: 6.11 - The conformance with the Zoning Code and other applicable. rules and regulations of the Town of Avon. COMM: This applicant is concurrently requesting a variance for exceeding the maximum height allowed and for parking associated with the self storage units, and the property line between the lots wily. need to be vacated. Otherwise the project appears to be in conformance with the Zoning Code and all other town of Avon rules and regulations. STAFF RE?CRT TO THE PLANNING AND ZONING COM41SST_ON e�5 1°93 Lot 14/15, Block 1, Benchmark at Beaver Creek Commercial/Industrial Building Final Design Review 6.12 - The suitability of the improvement, including type and quality of materials of which it is to be constructed and the site upon whict it is to be located. C0t•4=21 : These improvements, as proposed, are not inapprcmriate to the neighborhood. 6.13 - The compatibility of the design to minimize site impacts to adjacent properties. COMMENT: The project appears to have no adverse site impacts on adjacent properties and retains the access necessary to adjacent lots. 6.14 - The compatibility of the proposed improvement with site topography. COh2= . Considering that this is a steep site, the project is relatively compatible with the site topography. 6.15 - The visual appearance of any proposed improvements as viewed from adjacent and neighboring properties and public ways. COM=LS: The proposed improvements appear to be visually compatible with the neighborhood. 6.16 - The objective that no improvement be so similar or dissimilar to others the vicinity that values, monetary or aesthetic will be im*- !. COMMENTS: Staff sees no conflict with this criteria. 6.17 - The general conformance of the proposed improvements with the adopted Goals, Policies and Programs of the Town of Avon. COM =S: This proposal is in general conformance with the adopted goals, policies and programs of the Town of Avon. STAFF REPORT TO THE PLANNING AND ZONING CONMSSION July 6, 1993 Lot 14/15, Block 1, Benchmark at Beaver Creek Commercial/Industrial Building Final Design Review STAFF RECOM)vIENDATION: Approval subject to the following conditions: 1. Subject to submission and approval of grading and drainage plan prior to application for building permit. Revise grading to confine grading operation within property lines and drainage easements, eliminate grading in street, provide appropriate erosion control in drainage swales and provide for detention and treatment of parking lot drainage in accordance with Town of Avon regulations. 2. Floor plans must match site plan dimensions. 3. Address grades at ramps and parking lot to fire department satisfaction. 4. address snow storage requirements. 5. Address architectural treatment of retaining walls. It is the opinion of the Staff that although there are many positive attributes to this project, and there is an identified community need, the request for two variances, the grading problems, the steepness of the parking and ramp areas and the sheer quantity of retaining wall indicates that too much building is being forced onto this site. Lot 14/15, Block 1, Benchmark at Bearer Creek Commercial/Industrial Building Final Design Review PLANNING AND ZONING ACTION: Approved as submitted (4 Approved with recommended conditions ( ) • Approved with modified conditions ( ) Continued ( ) Denied ( ) Withdraw�n(� �) Conceptual, No Action ( ) /j Date 7/:�V/ _Sue Railton, SecretaryZLcQi The following condition applies: Subject to submission and approval of qrading and drainage plan prior to ann lca.tion for buildinT permit. Revised grading to confine grading operation 16.6in Droperty lines and drainane easements, eliminate -{rad-iny rn-sta eet, provide approm iate•-erosion-control in d>Maar-smles and nrovide for detention and treatment of narkinq lot drainage in accordance with Town of Avnn regulations R] ^ ^ PLANNING AND ZONING COMMISSION STAFF REPORT July 20, 1993 Lot 45, Block 3, Wildi dge Subdivision � Vedder Residence, Materials Change and Condition Ratification Final Design Review • Brian Vedder received a final design review approval for a residence on Lot 45, Block 3, Wildridge Subdivision on July 21, 1992. That approval included a condition requiring Mr. Vedder to return to the Commission once a railing material had been selected, for review and approval of the railing material. Mr. Vedder has selected a railing material which is described in detail on the attached documentation. Mr. Vedder is also requesting a materials change from wood shake to a Tamko Heritage Premium Shadowline composite shingle. As a material change staff has no formal recommendation. Respectfully submitted, �Icr_ -�(u Rick Pylman PLANNING AND ZONING ACTION: Approved as submitted (✓/) Approved with recommended conditions ( ) Approved with modified conditions ( ) Continued ( ) Denied ( ) Withdrawn ( ) Conceptual, No Action ( ) Date 204J Sue Railton, SecretaryLt; Brian Hendrik Vedder, A.I.A. Architect/Developer P. O. Box 5501 Vail, CO 61658 (303) 949-0509 Date: July 6, 1993 Town of Avon Design Review Committee IN RE: 4747 Wildridge Road (Lot 45, Block 3) In accordance with the committee's request of last summer, would like to submit the finalized handrail design; and in response to the powerfully motivating issues: of budget, value, and durability I must submit for a change in roofing materials. Please take note of the following: A> The south -facing sundeck handrail detail has been finalized, and consists of an aluminum framework in satin - finish bronze -anodized color, with clear tempered glass panels inserted. The west unit will receive three panels approximately 26" high by 76" long. The east unit will receive two panels approximately 26" high by 90" long. The building already contains such a large amount of south - facing glass that these handrails will constitute less than 5% additional glass coverage, and much of that passes in front of other window -wall panels. In addition, the handrail glass is clear, whereas the window -walls contain high-tech energy -conservation coatings which exhibit a noticeable degree of reflectivity. B> It has been decided to omit wood -shake roofing shingles, and instead substitute Tamko Heritage Premium Shadowline composition shingles. The color selected is Birchwood, to harmonize with the rest of the color scheme, but which differs slightly from my neighbor Mr. Buzz Reynolds' color. This product is the exact same product and has the same genarel appearance as on Mr. Reynolds home. The logic behind this decision is inescapable, that of the Tamko product carrying a 40 year guarantee, whereas wood shakes cost nearly double, carry no guarantee whatsoever, and have a life expectancy of only about ten years considering the severity of the Wildridge microclimate. I hope these issues and explanations will meet with the committee's approval. 7 kou for ou kin sid ation, Br' Vedder Brian Hendrik Vedder_, A. P. O. Box 5501 Vail, Date: July 6, 1993 Town of Avon Design Review Committee IN RE: 4747 Wildridge Road .A. Architect/Developer CO 81658 (303) 949-0509 (Lot 45, Block 3) In accordance with the committee's request of last summer, would like to submit the finalized handrail design; and in response to the powerfully motivating issues of budget, value, and durability I must submit for a change in roofing materials. Please take note of the following: A> The south -facing sundeck handrail detail has been finalized, and consists of an aluminum framework in satin - finish bronze -anodized color, with clear tempered glass panels inserted. The west unit will receive three panels approximately 26" high by 76" long. The east unit will receive two panels approximately 26" high by 90" long. The building already contains such a large amount of south - facing glass that these handrails will constitute less than 5% additional glass coverage, and much of that passes in front of other window -wall panels. In addition, the handrail glass is clear, whereas the window -walls contain high-tech energy -conservation coatings which exhibit a noticeable degree of reflectivity. B> It has been decided to omit wood -shake roofing shingles, and instead substitute Tamko Heritage Premium Shadowline composition shingles. The color selected is Birchwood, to harmonize with the rest of the color scheme, but which differs slightly from my neighbor Mr. Buzz Reynolds' color. This product is the exact same product and has the same genarel appearance as on Mr. Reynolds home. The logic behind this decision is inescapable, that of the Tamko product carrying a 40 year guarantee, whereas wood shakes cost nearly double, carry no guarantee whatsoever, and have a life expectancy of only about ten years considering the severity of the Wildridge microclimate. I hope these issues and explanations will meet with the committee's approval. trian youforon, an edder r'1 PLANNING AND ZONING COMMISSION STAFF REPORT July 20. 1993 Lot 6, Block 5, Wildridge Subdivision Barrows Sixplex Final Design Review PROJECT TYPE: Final Design Review ZONING: PUD 6 unit COMPLIES WITH ZONING? YES STfE PLAN: Average slope of lot. Max. slope of driveway. Lot coverage. Driveway is paved. Parking provided is adequate. Snow storage is adequate. Grading plan is adequate. Landscape plan is adequate. Plant sizes meet criteria. Meters are on building. Meets setback requirements. 30% Lot Size 1.62 acres 10% 5% Yes Yes Yes Yes Yes Yes Yes Yes Other site plan issues Boulder retaining walls. BUILDING: Habitable Space. 400 sq. ft. per unit plus 400 sq. ft. garage per unit Maximum Height. 28 Ft. Roof Form. Gable MATERIAL COLOR Roofing Asphalt Reddish Brown Walls, Dominant Stucco Buckskin Walls, Other Bolly Band -Brick Dark Red Fascia 2x 10 White Soffits Plywood White Windows/Trim Ix4 with detail White Doors/Trim I x4 White Other Building Issues: Trash enclosure to be stucco in Buckskin color. e% PLANNING AND ZONING COMMISSION STAFF REPORT NO July 20, 1993 Lot 6, Block Wildridge Subdivision ® Barrows Sixplex Final Design Review w STAFF COMMENTS OR CONCERNS: Need to review specific roof material and color STAFF RECOMMENDATION: Approval RECOMMENDED ACTION: I. Introduce Application 2. Applicant Presentation 3. Commission Review 4. Commission Action Respectfully submitted, ubI Rick Pylman ''1 PLANNING AND ZONING CONMISSION STAFF REPORT m4a July 20, 1993 Lot 6, Block Wildridge Subdivision 0 Barrows Sixplex Final Design Review PLANNING AND ZONING ACTION: Approved as submitted (✓f Approved with recommended conditions ( ) Approved with modified conditions ( ) Continued ( ) Denied ( ) Withdrawn ( ) Conceptual, No Action ( ) Date XJ 3 Sue Railton, Secretary�� . PLANNING AND ZONING COMMISSION STAFF REPORT July 20. 1993 • Lot 28, Block 1, Wildridge Subdivision John Orcutt, Duplex Is Final Design Review •I PROJECT TYPE: Final Design Review ZONING* PUD, Duplex COMPLIES WITH ZONING? YES SITE PLAN: Average slope of lot. Max. slope of driveway. Lot coverage. Driveway is paved. Parking provided is adequate. Snow storage is adequate. Grading plan is adequate. Landscape plan is adequate. Plant sizes meet criteria. Meters are on building. Meets setback requirements. Other site plan issues BUILDING: Habitable Space, Maximum Height. Roof Form. Roofing Walls, Dominant Walls, Other Fascia Soffits Windows/Trim Doors/Trim Other Building Issues: 5% Flat 13% Asphalt Yes Yes Yes Yes Yes, as corrected Yes Yes 3000 sq. ft. total 25 Ft. Gable MATERIAL COLOR Asphalt/Shingle Brown Colors to be Cedar 8" lap Brown presented at Stucco meeting PLANNING AND ZONING COMMISSION STAFF REPORT am July 20, 1993 Lot 28, Block 1 Wildridge Subdivision � John Orcutt, Duplex Final Design Review STAFF COMMENTS OR CONCERNS: 1. Material samples, colors and fascia, trim details to be presented at meeting. STAFF RECOMMENDATION: Approval RECOMMENDED ACTION: 1. Introduce Application 2. Applicant Presentation 3. Commission Review 4. Commission Action Respectfully submitted, ��?U4-j Rick Pylman PLANNING AND ZONING COMMISSION STAFF REPORT July 20, 1993 Lot 28, Block 1 Wildridge Subdivision John Orcutt, Duplex we Final Design Review PLANNING AND ZONING ACTION: Approved as submitted ( ) Approved with recommended conditions (✓S Approved with modified conditions ( ) Continued ( ) Denied ( ) Withdrawn ( ) Conceptual, No Action ( ) Date ^ 3 Sue Railton, Secretary Conditions are as follows: Landscaping plan be submitted to the Planning and Zoning Commission; and that two windows be added to the garage that are the same configuration and size as the windows in the bedroom. . PLANNING AND ZONING COMMISSION STA,7F REPORT July 20. 1993 Lot 33, Block 1, Wildridge Subdivision I Jein/Sherwood, Single Family Residence Final Design Review PROJECT TYPE: Final Design Review ZONING: PUD, Duplex COMPLIES WITH ZONING? YES SITE PLAN: Average slope of lot. 20% Max. slope of driveway. 6% Lot coverage. 10% Driveway is paved. Yes Parking provided is adequate. Yes Snow storage is adequate. Yes Grading plan is adequate. Yes Landscape plan is adequate. Yes Plant sizes meet criteria. Yes Meters are on building. Yes, with enclosure Meets setback requirements. Yes Other site plan issues BUILDING: Habitable Space. Maximum Height. Roof Form. Roofing Walls, Dominant Walls, Other Fascia Soffits Windows/Trim Door&7rim Other Building Issues: Shared driveway issues have been resolved satisfactorily. 2000 sq. ft. total 31 Ft. Gable MATERIAL COLOR Asphalt (presidential ser.) Dark Brown Redwood 8" lap siding Seagull Gray Stucco Off White 2x 12/1x6 Blue Heron Brick Mold Blue Heron Brick Mold Blue Heron N/A PLANNING AND ZONING COMMISSION STAFF REPORT July 20, 1993 Lot 33, Block 1 Wildridge Subdivision Klein/Sherwood, Single Family Residence Final Design Review STAFF COMMENTS OR CONCERNS: Issues at conceptual review were driveway grading. Stucco band location on north elevation and utility trench location. These issues have all been addressed satisfactorily. STAFF RECOMMENDATION: Approval ACTION: 1. Introduce Application 2. Applicant Presentation 3. Commission Review 4. Commission Action Respectfully submitted, Rick Pylman [• AM Aft C:1 ,o--,. - -,\, PLANNING AND ZONING COMMISSION STAFF REPORT July 20, 1993 Lot 33, Block 1 Wildridge Subdivision Klein/Sherwood, Single Family Residence Final Design Review PLANNING AND ZONING ACTION: Approved as submitted (✓) Approved with recommended conditions ( ) Approved with modified conditions ( ) Continued ( ) Denied ( ) Withdrawn (/--3` Conceptual, No Action ( ) Date_,00/ 9_Sue Railton, Secretary '64e 4 G /j/ The following condition exists: A landscapi Committee once the plan is worked up. lan needs to be submitted to the •• • "� �e) 10�, PLANNING AND ZONING COMMISSION STAFF REPORT July 20. 1993 Lot 104, Block 1, Wildridge Subdivision � Peel/Pressley, Duplex Final Design Review PROJECT TYPE: Final Design Review ZONING: PUD, Duplex COMPLIES WITH ZONING? YES SITE PLAN: Average slope of lot. Max. slope of driveway. Lot coverage. Driveway is paved. Parking provided is adequate. Snow storage is adequate. Grading plan is adequate. Landscape plan is adequate. Plant sizes meet criteria. Meters are on building. Meets setback requirements. 22% Lot size 18.295 sq. ft. (42 acre) 10% 15% Yes Yes Yes Yes Yes Yes, some smaller, some larger Ves, with enclosure Yes Other site plan issues Utility lines that extend to rear of lot will be planned in easements. BUILDING: Habitable Space. Maximum Height. Roof Form. Roofing Walls, Dominant Walls, Other Fascia Soffits Windows/Trim Doors/Trim Other Building Issues: 4450 sq. ft. total 29 Ft. Gable, 6/12 pitch MATERIAL COLOR Timberline Ultra Shadow Gray Cedar Channel Lap Delta Fog Stucco Oatmeal 2x8 cedar Forest Green Plywood Delta Fog Metal Clad White Metal White Garage Doors Delta Fog A"1 1101�. - . PLANNING AND ZONING COMMISSION STAFF REPORT July 20, 1993 Lot 104, Block I Wildridge Subdivision Peel/Pressley, Duplex Final Design Review STAFF COMMENTS OR CONCERNS: STAFF RECOMMENDATION: Approval RECOMMENDED ACTION: 1. Introduce Application 2. Applicant Presentation 3. Commission Review 4. Commission Action Respectfully submitted, I',- etcx Rick Pylman • J 004, 0041 I -- PLANNING PLANNING AND ZONING COMMISSION STAFF REPORT July 20, 1993 Lot 104, Block 1 Wildridge Subdivision Peel/Pressley, Duplex Final Design Review PLANNING AND ZONING ACTION: Approved as submitted ( ) Approved with recommended conditions (✓S Approved with modified conditions ( ) Continued ( ) Denied ( ) Withdrawn ( ) Conceptual, No Action ( ) Date PO 3 _Sue Railton, Secretaryit'ai ' The following conditions apply: Resubmit a grading plan once complete, and install a drip irrigation system for the trees. "1 �0) I - PLANNING AND ZONING COMMISSION STAFF REPORT July 20, 1993 Lot 27/28, Block 1, Benchmark at Beaver Creek Mountain Center, Phase II Final Design Review In March of 1986, the Avon Planning and zoning Commission granted final design review approval to the Mountain Center, a 82,400 square foot, 3 story, warehouse and commercial building. Phase I, consisting of approximately 34,333 square feet was constructed shortly after the approval was granted. Vail Building Arts, the building owner, now wishes to complete Phase II of the project. The original design review approval expired in 1988, therefore, a new design review approval is required. Minor site plan changes have been made to the 1986 approval, resulting in slightly more parking. A vehicle ramp to serve the existing auto body shop has also been added to the proposal since 1986. The building design and sign program are proposed to remain as originally designed and will match the existing building. Colors will also match the existing building. The lower level of the building is proposed as mini storage and a parking variance, exempting the mini storage area from parking requirements, was granted in 1986. A total of 115 parking spaces are proposed, with the variance in place and including the increased parking demand of the uses in the existing phase I, the total parking demand is 104 parking spaces. In 1987, Jerry Verke was granted a Special Review Use to operate a auto repair shop in the building. A condition of approval was a review of that permit upon initiation of Phase H. A complete review of the parking demands of the Phase I tenants, including Jerry's Automotive, reveals a demand of 64 parking spaces and an availability of 56. This situation is corrected with the addition of Phase II and calculated as warehouse use only, there will be parking available in excess of Town requirements. The Staff recommends approval of the final design for the Mountain Center, Phase II, with the following conditions: 1. Vail Building Arts will be removing approximately 15 - 20,000 cubic yards of fill from the site. this truck traffic will adversely impact Nottingham Road. Vail Building Arts shall, prior to building permit issuance, overlay Nottingham Road from Kamen Supply to the intersection with Metcalf Road, with 2" STAFF REPORT TO THE PLANNING AND ZONING COMMISSICN . July 20, 1993 Page 2 meLot 27/28, Block 1, Benchmark at Beaver Creek Subdivision Mountain Center Phase II Final Design Review of asphalt, or deposit with the Town funds sufficient to complete the overlay. 2. Mini storage and parking shall constitute the only allowed uses for the lowest level of Phase II. 3. Construction staging must occur entirely on Lots 26/27/28 and must maintain the integrity of the drainage swale. 4. The remaining property line defining the original Lots 26/27/28 must be vacated prior to building permits. Respectfully submitted, 07-52 Rick Pylman "d ge PLANNING AND ZONING ACTION: Approved as submitted ( ) Approved with recommended conditions (V� Approved with modified conditions ( ) Continued ( ) Denied ( ) Withdrawn ( ) Conceptual, No Action ( ) Date ,2p 3 Sue Railton, Secretary Conditions for S ecial Review Use: 1. Parkin for � lot will be limite to 10 spaces. Z. After 1 year c view needs to take place of the Special Review Use. 1. Staff ecommendations !, 2, and app'y Wnirn—WrE road from the cald-a-sack to Medcalf Rd. b. The mini remain fnr aithar ctnraga nr parking nnly C Tha a through the Lot Line Vacation process prior to buildi come back to the board with color scheme. 3. The ap with—F new sign program, considering the options give erry's Automotive on the outside f occupation inlhase II, a re - Conditions for Final Design: y on the storage in the basement should tiditinnal Int ling he vacated ng permit. 2. The applicant plicant come back to the board