PZC Packet 121493!"'1 PLANNING AND z-ONING COMMISSION STAFF REPO.. December 14, 1993 Tract G, Benchmark at Beaver Creek a Aquatics Center PROJECT TYPE: Recreation/Aquatics Center ZONING: GPEH, Government, Park and Employee Housingt l COMPLIES WITH ZONING? YES INTRODUCTION: The design team has requested Conceptual Design Review to assist in the completion of schematic design for the proposed Aquatics Center. The Conceptual Design Revie-.N will consist of a review of the proposed site plan, schematic floor plan and athematic building elevations. SITE PLAN: The site, Tract G, slopes from north to south at approximately 3% and is currently developed as a portion of the Nottingham Park complex. The site plan shows access via Benchmark Road on the south and West Beaver Creek Road on the north. The north/south section of Benchmark Road which runs through the site will be relocated to the east property boundary. The site pian shows the aquatics/recreation building in a location generally where the tennis courts are currently located. One hundred ninety (190) parking spaces are proposed with an additional 48 spaces available for overflow in front of the municipal building. BUILDING: The proposed building footprint is approximately 43,000 square feet. Phase one will consist of the aquatics areas, an aerobic and weight center, day care facilities and mist. support functions. The applicant will provide details at the meeting related to proposed building materials, finishes and colors. ®PLANNING AND ;LNING COMMISSION STAFF REPOi,. • December 14, 1993 Tract G, Benchmark at Beaver Creek 40 Aquatics Center STAFF RECOMMENDATION: As a Conceptual Design Review, staff has no recommendation. Respectfully Submitted, 'A l Steve Amsbaugh eos PLANNING AND /�vNING COMMISSION STAFF REPO., Me December 14, 1993 Tract G, Benchmark at Beaver Creek • Aquatics Center • PLANNING AND ZONING ACTION: Approved as submitted ( ) Approved with recommended conditions (f?T • Approved with modified conditions ( ) Continued ( ) Denied ( ) Withdrawn ( ) Conceptual, No Action ( ✓f Date /1 / Sue Railton, Secretary As a conceptual design review, no formal action was taken at this time. The Commission did have several concerns regarding this proposaland since time was limited, the applicant agreed to come back at the December 21st meeting for further discussion PLANNING AND BONING COMMISSION STAFF REt JRT December 14, 1993 Lot 63, Block 2, Benchmark at Beaver Creek Subdivision Seasons at Avon Final Design Review - Modifications PROJECT TYPE: Mixed Use Residential/Retail/Office ZONING: 'Town Center COMPLIES WITH ZONING? Yes INTRODUCTION: Avon Partners Limited Liability Company, the applicant has submitted an application for modifications to their previous Final Design Review approvals (1984-1990). The Seasons at Avon, formerly known as the Peregrine and the Grand at Avon, is being completed as a mixed use commercial project with 103 residential condominium units, 60,000 sq ft of office space and 10,000 sq ft of retail. Three hundred fifty six (3 56) parking spaces are provided for the project ( including 292 in the garage, 33 on-site surface and 31 off-site on Tract G). Total current parking requirements are listed as follows: 103 Condominium Units 188 spaces Residential Guest Parking 10 spaces 60,000 sq ft of Office Use 180 spaces 10,000 sq ft of Retail Use 40 spaces 418 spaces 15% Mixed Use Reduction 63 spaces Total Parking Required 355 spaces Summary of the Design Modifications: The applicants are currently proceeding with completion of the originally approved project; however they have expressed the desire to upgrade the exterior of the building and are requesting several modifications, including: 1. New color scheme for the exterior of the building. 2. Modified architectural treatment on the central towers and the commercial area roof on the north elevation 3. Revised Porte Cochere on the south entrance 4. New enclosure for the 'football' area between the main building and the south commercial area. 5. New chimney caps for the roof -top chimney clusters 6. Revised balcony rail details for the residential units. 7. New garage doors for the two garage entrances. 8. Revised Master Sign Program. 9. Other miscellaneous stairs, windows and doorways. PLANNING AND � ONING COMMISSION STAFF RE, JRT December 14, 1993 Lot 63, Block 2, Benchmark at Beaver Creek Subdivision Seasons at Avon Final Design Review - Modifications Of the modifications listed above, the applicants are requesting Final Design Review and approval at this time for the central tower modifications, the new exterior color scheme, the enclosure for the 'football' area, the revised porte cochere and the chimney caps. The remaining items will be addressed in an upcoming meeting. SITE PLAN MODIFICATIONS: None are proposed with this application. Revised streetscape improvements on the south side of the building, along Benchmark Road, will be addressed at a future meeting. Any modifications to the mall side of the project will also be reviewed at a future meeting, if required. BUILDING MODIFICATIONS: Tower Modifications: The four towers on the north side of the building will be detailed to exemplify the new name "The Seasons". Each tower will have a rounded arch (stucco) installed at the top to soften their presence and a subdued color statement which ties into the color of the building and the season it depicts. This theme was developed to display the beauty of the area during all seasons of the year. Each tower will be capped with a rolled standing rib metal roof element in steel grey. North Elevation Roof Fascia Modifications: The north elevation commercial level roof fascia is currently a flat plane, extending the full length of the building. Rounded arch awnings are proposed along the fascia to break up the flat roof form in this location. The awnings will be steel grey rolled metal, approximately 5 feet in depth. Enclosure of'football' area: The existing open terrace area (concrete deck) between the two existing buildings (North Building Residential Towers and the South One Story Building) is proposed to be enclosed for additional commercial/office uses. There will be entry vestibules at the East and West ends of this newly enclosed area which will be constructed of matching storefront glazing systems. The new enclosing roof structure will be structural steel framing. PLANNING AND BONING COMMISSION STAFF RE, JRT December 14, 1993 Lot 63, Block 2, Benchmark at Beaver Creek Subdivision Seasons at Avon Final Design Review - Modifications The North parapet wall of the existing South Building is to be removed to allow the new football area roof system to drain and flow with the existing South Building roof system. This will allow for a uniform appearance of the new and existing roof surfaces when viewed from above. All roofing membranes will be the single ply (black) to match the balance of the reroofing. A series of skylights and roof monitors are being proposed on the new football area roof to provide natural lighting into the interior corridor and office spaces. Skylight details will be provided are a future meeting. Chimney Caps: It is anticipated that the existing chimney projections will be covered with a rounded arch made from metal and painted steel grey, complimenting the other proposed round forms being introduced into the building. The existing chimney boxes will be painted brick red. Porte Cochere: A new porte Cochere has been designed that ties to the scale of the first floor and coordinates with the overall softening of the building and ties into the "arching" details. The steel posts support a steel grey round ("rolled") metal roof. Project identifying signage will occur here and will be formally submitted with the complete sigage package at a later date. The existing concrete support columns along the street front will be finished in stucco in a base building color. A metal guardrail is proposed along the top of the retaining wall. Railing color will be steel grey. Exterior Color• A 'cool' color palette has been selected for the residential floors on the south side of the building, while a "warm" color palette has been proposed for the north side. A horizontal gradation in colors is proposed, by floor. A distinct complimentary color is suggested to delineate the commercial portion from the residential. A detailed presentation of the color theme, color renderings and samples will be provided at the meeting. STAFF COMMENTS: PLANNING AND ONING COMMISSION STAFF RE, JRT December 14, 1993 Lot 63, Block 2, Benchmark at Beaver Creek Subdivision Seasons at Avon Final Design Review - Modifications The proposed modifications to the Seasons at Avon building provide an overall attempt to "soften" the large architectural elements of the building. STAFF RECOMMENDATION: Staff recommends approval of the requested modifications to the Final Design approval, subject to the following conditions: 1. That the streetscape along Benchmark Road and the landscape improvements to the north side of the building be incorporated into a revised site improvement plan. 2. The west building elevation be revised to soften the current large blank stucco appearance. 3. All surface on-site parking be identified on a revised site improvement plan. All surface parking shall be striped to clearly delineate the amount and location of surface parking. RECOMMENDED ACTION: 1. Introduce Application 2. Applicant Presentation 3. Commission Review 4. Commission Action Respectfully submitted, Steve Amsbau hl g Director of Community Development PLANNING AND . ONING COMMISSION STAFF RE. JRT December 14, 1993 Lot 63, Block Z, Benchmark at Beaver Creek Subdivision Seasons at Avon Final Design Review - Modifications PLANNING AND ZONING ACTION: Approved as submitted ( ) Approved with recommended conditions (V Approved with modified conditions ( ) Continued ( ) Denied ( ) Withdrawn ( ) Conceptual, No Action ( ) Date Sue Railton, Secretary_ A, a_ -t_ -- ' The Commission approved the following modifications wits three conditions: 1. New color scheme for the exterior of the building. ercial area roof on the north elevation. 3_ Revised Parte rnrhpra nn the cnuth entranra 4. New enclosure for the "football" area between the main building and the south commercial area. 5. New chimney cans for the roof op chimney clusters. 6. Revised balcony rail details for the residential units. The three conditions were: 1. That the streetscape along Benchmark Road and the landscape improvements along the north side of the building be incorporated into a revised site improvement plan. 2. The west building elevation be revised to soften the current large blank stucco appearance. 3. All surface on-site narking be identified on a revised site improvement plan. All surface parking shall be striped to clearly delineate the amount and location of surface parking.