PZC Packet 122193F
PLANNING AND ZONING COMMISSION STFFF REPORT'
DECEMBER 21, 1993
Tract G, Benchmark at Beaver Creek Subdivision
Aquatics/Recreation Center - Conceptual Design Review
Request for Conceptual Design Review for the proposed Town of Avon
Aquatics/Recreation Center
PROJECT TYPE: Recreation/Aquatics Facility
ZONING: GPEH, Government, Park and Employee Housingt
COMPLIES WITH ZONING? YES
The applicant has requested Conceptual Design Review to assist in the development of
Final Design Plans. The submittal is for a 43,000 sq ft recreation/aquatics center to be
located on Tract G. The P&Z reviewed the Conceptual Design on December 14th and
due to the length of the presentation and limited time, this item was continued to this
meeting in order to consolidate the issues and concerns of the Commission into a memo to
the Town Manager and Council.
STAFF COMMENTS:
At the December 14th meeting, P&Z reviewed the: schematic design for this project. A
summary of your initial comments are listed as:foilows:
• Building forms and flat roof plan add little visual interest;
• Extensive use of brick is not in keeping with area;
• Entryway/door way should be focal point, more interesting;
• Use of metal elements do not translate well in this mountain environment;
• Building needs to be more sensitive to surrounding architecture;
• Roof form over pool area could be broken up;
• Round roof form and snow shedding could be a problem;.
• Massing of building needs to be shown without second phase;
• Northeast corner of the building is first viewpoint for motorists, needs more
attention; and
• Building could be raised slightly for visibility over parking lot, if possible.
The main Conceptual Design issues appear to be massing, building materials, elevations,
and the entryway. The Town's Design Guidelines should suggest building forms, materials
and details.
As a continued Conceptual Review, the Staff has no formal recommendation;
Re"n---
spectfully Submitted,
Steve Amsbaugh
Director of Community Development
PLANNING AND ZONING COMMISSION STAFF REPORT
DECEMBER 21, 1993
Tract G, Benchmark at Beaver Creek Subdivision
Aquatics/Recreation Center - Concc Aual Design Review
Request for Conceptual Design Review for the proposed Town of Avon
Aquatics/Recreation Center
PLANNING AND ZONING ACTION:
Approved as submitted ( ) Approved with recommended conditions ( )
Approved with modified conditions ( ) Continued ( ) Denied ( )
Withdrawn ( ) Conceptual, No Action (✓�
Date oZ�/ Sue Railton, SecretaryiA /44�
As a conceptual review, no action was taken, however, the Commission did have
i a concession stand,tiltoF the
lap pool, they felt it should be larger, and the matter of there not being
a—
liability; the snow buildup on the barrel roofs, gabled roof were suggested;
the parking next to the library; the confusing approa_, to the building;
the use of brick on the building, stucco, stone and glass were suggested;
the use of the metal system being antiquated; the need for the building to
u, and --the need
for a second entrance. Also of concern was the matter of the drop off site
heing in tho Middle of the parking lot. gnmo rnminizeinn mpmherc 'till felt
that there was not enough parking and that there was a need for bicycle parking
also.
MEMORANDUM
TO: Planning and Zoning Commission Q ,
FROM: Steve Amsbaugh, Director of Community Development
DATE: December 16, 1993
RE: Comments on Aquatics Facility Schematic Design
Following the presentation by the architects on Tuesday, the Town staff met to discuss the
current schematic design and would like to provide you with our comments for your
consideration. We feel the following design issues should be addressed in your
recommendation to the Town Council.
A. Town of Avon Design Guidelines
The Town's Design Guidelines are specific as to the direction this building should be
taking. These key design elements were presented to the designers at an early Council
work session. In addition, the architects were given these Guidelines and we feel the
current Schematic Design does not presently address many of these Guidelines.
On page 6, the general architectural philosophy is reflected in the following statements:
The Town should continue to be perceived as a contemporary mountain town,
complementary to the natural landscape. From a distance, the Town should
appear as a cohesive unit comprised of simple building forms, subdued colors,
and predominantly pitched roof lines.
The Design philosophy for public and private improvements is int^nded to relate
to materials and colors of the Vail Valley.
On page 30, Architecture is addressed:
Basic principals of regional and contextual sensitivity are considered far more
important in their contribution to quality of design than stylistic
consistency ....... appropriate to its location in the mountains of Col gado.
All sides of buildings should receive equal architectural treatment
I
is
® Flat roofs are discouraged except for limited roof areas..... sloped roofs should
_ have overhangs. Valleys and complex roof forms are a potential source of ice
buildup and water damage, and should be used carefully and sparingly.
Roof materials within the Town Core may be the following: unglazed concrete
tile, wood shingles, copper, standing seam metal, or terne-coated steel.
Exterior walls can be broken down in scale through the use of windows,
a► doorways, recesses and setbacks. They can be further articulated through the use
of different materials, patterns, ornament, texture and color. The following
materials are encouraged in the Town Core: Stucco and synthetic stucco, Stone,
Heavy Timber, and Concrete.
All projects in the Town Core should address the full range of guidelines found in the
adopted Design Guidelines. Town staff feels the current schematic design is not
consistent with many of these Guidelines.
B. Exterior Materials
The predominant use of brick as the exterior skin of the building may not be appropriate.
No other buildings in the area are brick and an isolated brick building could tend to clash
with the existing architecture of the area. There are several colors and textures of brick;
therefore, additional detail may show how the use of brick may blend with the area.
C. Entryway
The current building entry statement could be strengthened. Consideration should be
given to a more dramatic entryway which eliminates the flag and chimney stacks as the
focal point. Perhaps a stronger vertical element would better define the "town's center"
the architects spoke of. The proposed use of stone in this location should be encouraged.
D. Main Building Hallway
This element should contain a strong fee, ng of openness and light. As an example,
perhaps this area should become a tall hallway with clerestory natural lighting to give it an
open, sunlit feeling.
E. Roof Forms
There are no barrel roof forms in the "mountain" architecture vocabulary. Should the
architects take a look at a gable roof form which is more closely associated with the
Colorado mountains and the Design Guidelines?
PLANNING AND ZONING COMMISSION STAFF REPORT
December 21, 1993
Tract N, Wildridge Subdivision
�5 Public Works Facility
Conceptual Design Review
L:�]
4W:
PROJECT TYPE: Municipal Facility
ZONING: PUD, Open Space/Drainage/Access COMPLIES WITH
ZONING? YES
INTRODUCTION:
John Perkins, on behalf of the Town of Avon, has submitted revised plans for the Public
Works facility, which was approved at the June 15, 1993 Planning and Zoning
Commission meeting. This application is a conceptual due to the nature of changes.
SITE PLAN CHANGES:
The buildin;, artrance is oriented to the west, not the south;
The building has four elevations visible, whereas before only one elevation was
visible;
Driveway is aimed more toward the building with less of a turn;
There is less asphalt; and
There is one less retaining wall.
BUILDING CHANGES:
South:
Windows have been added and the garage doors removed;
Windows have the option of having fenestration or none;
Option of wood siding or stucco
A pedestrian door added; and
One retaining wall eliminated.
West:
Garage doors added; and
Wood siding with stucco.
East:
Stucco on concrete; and
Optional windows.
North:
Wood siding; and
Stucco over concrete.
PLANNING AND ZONING COMMISSION STAFF REPORT
December 21, 1993
Tract N, Wildridge Subdivision
• Public Works Facility
Conceptual Design Review
STAFF COMMENTS:
® The site plan does not show a 100 foot Colorado Ute easement, which cuts across this site
south of the building. The Final Design Review plans must reflect the easement.
The driveway and area in front of the building are showing gravel. This area needs to be
paved.
The plans are calling ovt two options for roofing and two options for finish material on the
south elevation. Following are the two options for the roof and finish material:
Roof:
1. Built up tar and gravel; or
2. Single ply ballasted roof on wood mono trusses at 24" o.c. at 18" in 12' pitch.
Finish Material for South Elevation:
1. Stucco on concrete block; or
2. Wood framing.
Two other options called out on the elevations are:
Window fenestration for the windows on the south elevation: and
Including windows on the east elevation.
Colors and landscaping have not been submitted.
STAFF RECOMMENDATION:
As a conceptual review, the Staff has no formal recommendation.
Respectfully Submitted
Mary Holden
Town Planner
PLANNING AND ZONING COMMISSION STAFF REPORT
,01 December 21, 1993
Tract N, Wildridge Subdivision
• Public Works Facility
Conceptual Design Review
C7
PLANNING AND ZONING ACTION:
Approved as submitted ( ) Approved with recommended conditions ( )
Approved with modified conditions ( ) Continued ( ) Denied ( )
Withdrawn ( ) Conceptual, No Action (Vill Q /fj�
Date / Sue Railton, Secretary /Xit2 4'A �
Ac: on.,.+ al review, no action was taken The Commission hart nn maior
concerns regarding this application and encouraged the applicant to proceed.
They did feel that some window fenestration was needed and that the tarmac
Should be paved at some point. Also, they felt that the exterior lighting
was important.
U
PLANNING AND ZONING COMMISSION STAFF REPvRT
December 21, 1993
Lot 82, Block 1, Wildridge Subdivision
McComic Four-plex
Conceptual Design Review
PROJECT TYPE: McComic Four-plex
ZONING: PUD, Four Units COMPLIES WITH ZONING? YES
INTRODUCTION:
Mr. Barry McComic has submitted conceptual plans for a four-plex on Lot 82, Block 1
(1.26 acres), with three levels and approximately 32' in height. The site slopes from east
to west at approximately 33 %, with the building located on the east portion of the site.
The four-plex will consist of the following materials:
Roof cedar shake
Siding 1 x 8 channel rustic cedar
Other
stucco
Fascia
rough cedar
Soffits
1/4 fir plywood
Window/Trim
wood
Door/Trim
wood
Hand/ Deck Rail
steel pipe
Flues/Flashings
galvanized metal
Chimney
stucco
Garage Door
not given
natural in color
semi -transparent stain
(Olympic 911)
warm gray
Olympic 911
Olympic 911
Benjamin Moor 697
Benjamin Moor 697
Benjamin Moor 699
Benjamin Moor 1552
warm gray
Benjamin Moor 1552
The landscape plan being proposed includes the following material:
5
Spruce
9
Aspen
4
Sandberry
4
Mountain Spirea
10
Potentilla
6
Sagebrush
STAFF COMMENTS:
2 at 10' high, 2 at 8' high and 1 at S' high
1 1/2" caliper
5 gallon
5 gallon
2 gallon
5 gallon
The Town Engineer has reviewed the plans and has the following concerns:
1. The driveway entrance must meet Town of Avon standards;
2. The Final Design review topography for the entire lot must be done by a
Registered Engineer or Surveyor;
t•
Is
[w
.c
PLANNING AND ZONING COMMISSION STAFF REPORT
December 21, 1993
Lot 82, Block 1, `JVildridge Subdivision
McComic Four- plex
Conceptual Design Review
3. Guest parking needs to be taken into consideration;
4. The boulder retaining wall is in the easement; and
5. Indicate how utilities will be brought into the units.
This site contains a 50' wide utility and access easement that lays along the north boundary
of the lot. The access into the four-plex can cross over this easement. Further, all
easements and setbacks need to be shown.
The building elevations show snow shedding in front of the garage doors and entryways.
Building details (overall massing, continous roof plane, trim details) should be further
detailed on Final Design submittal.
Most of the landscape material meets the minimum Town of Avon standards. However
the aspen need to be a minimum of 2" caliper, and the potentillas need to be a minimum of
5 gallons. Further, an irrigation system is not indicated.
STAFF RECOMMENDATION:
As a conceptual review, the Staff has no formal recommendation.
Respectfully Submitted
Mary Holden
Town Planner
QL'5o CJ, ..
PLANNING AND ZONING COMMISSION STAFF REPORT
•) December 21, 1993
I ! Lot 82, Block 1, Wildridge Subdivision
McComic Four-phx
Conceptual Design Review
PLANNING AND ZONING ACTION:
'® Approved as submitted ( ) Approved with recommended conditions
Approved with modified conditions ( ) Continued ( ) Denied ( )
Withdrawn ( ) Conceptual, No Action (✓f
Date AG 2� qfa Sue Railton, Secretary 4'ee' 4"--
A, a conceptual review, no formal action was taken at this time. The Commission
had no major concerns regarding this application and encouraged the applicant
to proceed. It was suggested that the applicant work with breaking up some of
e ver4ticalify—a-fiTthe massing, either with a material change or landscaping.
PLANNING AND ZONING COMMISSION STAFF REPORT
December 21, 1993
Lot 74, Block 1, Wildridge Subdivision
McComic Duplex
Conceptual Design Review
PROJECT TYPE: McComic Duplex
ZONING: PUD, Duplex COMPLIES WITH ZONING? YES
INTRODUCTION:
Mr. Barry McComic has submitted conceptual plans for a duplex with a detached garage.
The duplex is located on the middle portion of the .53 acre lot with the detached garage
situated on the southeastern area of the lot. The site slopes from southeast to northwest
at approximately 21 %.
The duplex will consist of the following materials:
Roof cedar shake
Siding 1 x 8 channel rustic cedar
Other
Fascia
Soffits
Window Trim
Doon'Trim
Hand/ Deck Rail
Flues/Flashings
Chimney
Garage Door
stucco
rough cedar
1/4 fir plywood
wood
wood
steel pipe
galvanized metal
stucco
not given
natural in color
semi -transparent stain
(Olympic 908)
red sandstone
Olympic 908
Olympic 908
Benjamin Moor 697
Benjamin Moor 697
Benjamin Moor 697
no color indicated
red sandstone
Benjamin Moor 967
The landscape plan consists of 12 aspen at 1 1/2" caliper, 6 sagebr;ish. 4 sandcherry and 3
spirea all at 5 gallons each. Sod is not in shown and revegitation is proposed with
mountain grasses. An irrigation system has not been indicated.
STAFF COMMENTS:
The Town Engineer has reviewed the plans and has the following concerns:
• A certified topography of the entire lot will be required for final design submittal;
• Detail on the garage has not been provided and will need to be submitted;
• Parking requirements must be satisfied, at 2 spaces per unit; and
• Garage does not meet the minimum 10' sideyard setback requirement.
PLANNING AND ZONING COMMISSION STAFF REPORT
December 21, 1993
Lot 74, Block 1, Wildridge Subdivision
McComic Duple:
Conceptual Design Review
A detached garage is allowed as long as it meets the definition of an accessory structure,
which is not habitable (has no kitchen or bath facilities and is incidental to the primary
use).
For submittal of final design plans, the elevations must be complete and sh-)w all windows,
and call out materials.
Total area of site disturbance should be indicated on the revised site plan.
The landscape material does not meet the mi: imum Town of Avon standards. Aspens
need to be a minimum of 2" caliper.
STAFF RECOMMENDATION:
As a conceptual review, the Staff has no formal recommendation.
Respectfully Submitted
-y410_j U)kc j/ ``
Mary Holden
Town Planner
PLANNING AND ZONING COMMISSION STAFF REPORT
December 21, 1993
Lot 74, Block 1, Wildridge Subdivision
McComic Duplex
Conceptual Design Review
PLANNING AND ZONING ACTION:
Approved as submitted ( ) Approved with recommended conditions ( )
Approved with modified conditions ( ) Continued ( ) Denied ( )
Withdrawn ( ) Conceptual, No Action (v)"
Date_ /.?,V—Sue Railton, Secretary �--
Since this was a conceptual review, no action was taken. The Commission had
no pro ems with e detached garage. The Commission felt that the
applicant should work on a better connection for the duplex than the one
tile 111ir 1 U F
image and others did not.
50
PLANNING AND ZONING COMMISSION STAFF REPORT
December 21, 1993
Lot 44, Block 4, Wildridge Subdivision
Baca Single Family
Conceptual Design Review
PROJECT TYPE: Single Family Residence
ZONING: PUD Duplex COMPLIES WITH ZONING? YES
INTRODUCTION:
Mr. Bruce Baca has submitted plans for a single family residence of two and a half stories
and approximately 36 feet in height. The residence will be situated on northeast portion of
the site, which slopes from northeast to the southwest at approximately 25%.
The residence will consist of the following materials:
Roof asphalt shingles
Siding log
Other synthetic stucco
Window/Door Trim wood
Hand Rail 2" x 2" wood picket
No colors have been specified.
The landscape plan consists of 23 aspen at 1 1/2" caliper, 3 spruce, one being 4' in height
and the other two being 6' in height, and 7 potentillas at 1 gallon each. Sod and native
grasses are proposed. An irrigation system has not been indicated.
STAFF COMMENTS:
The Town Engineer has reviewed the plans and has the following concerns:
The Final Design plans should be shown on a certified topography of the entire lot;
The indicated grades do not match the building elevations; and
Additional fill or retainage may be required along the back of the building.
The site plan shows the drive location, but paving is not indicated. Driveways must be
paved.
The applicant may wish to consider a stepped foundation system which follows the slope
of the lot to reduce site disturbance.
Areas of true site disturbance need to be indicated on the revised site/landscape plan.
PLANNING AND ZONING COMMISSION STAFF REPORT
December 21, 1993
Lot 44, Block 4, Wildridge Subdivision
Baca Single Family
Conceptual Design Review
The landscape materials do not meet the minimum Town of Avon standards. The aspen
need to be a minimum of 2" caliper, the spruce need to be 6' minimum height and the
potentillas need to be a minimum of 5 gallons. Further, an irrigation system is not
indicated.
Building height shall not exceed 35 feet.
Applicant should be aware that one one residential structure ( single-family or duplex) will
be allowed on Lot 44.
STAFF RECOMMENDATION:
As a conceptual review, the Staff has no formal recommendation.
Respectfully Submitted
-Y11 4jb'4'k'1'—
Mary Holden
Town Planner
PLANNING AND ZONING COMMISSION STAFF REPORT
December 21, 1993
Lot 44, Block 4, Wildridge Subdivision
Baca Single Family
Conceptual Design Review
PLANNING AND ZONING ACTION:
Approved as submitted ( ) Approved with recommended conditions ( )
Approved with modified conditions ( ) Continued ( ) Denied ( )
Withdrawn ( ) Conceptual, No Action (✓�
Dat e-y_�� /Sue Railton, Secretary
The general consensus was that this was a very nice lo!3 home. Some of the
concerns were i tis house wou fit on t is particu ar twit ou a lot
of site disturbance; and the visibility of the underside of the deck.
I
..
PLANNING AND ZONING COMMISSION STAFF REPORT
• December 21, 1993
Lot 3, Block 5, Wildridge Subdivision
Valley View Townhomes
Conceptual Design Review
a
� .a
PROJECT TYPE: Five Plex
ZONING: PUD, Five Units COMPLIES WITH ZONING? YES
INTRODUCTION:
Sally Brainerd, on behalf of the applicants, has submitted plans for a five plex on this .93
acre parcel. Thi; lot slopes east to west at approximately 27%. The five plex is proposed
to be three stories and approximately 40 feet in height on the west elevation.
Following are the proposed materials, (colors have not been indicated):
Root'.
asphalt shingles;
Siding:
painted wood or vinyl siding;
Fascia:
painted wood;
Soffits:
painted wood;
Windows:
vinyl clad
Window Tdm:
painted wood;
Doors and Door Trim:
wood;
Hand/Deck Rails:
painted wood;
Flues/Flashings:
painted metal;
Chimne) s:
match walls
Trash Enclosure:
match walls
The landscape plan calls for six Spruce at 5-7 feet in height, 20 Aspen, with no caliper
indicated and 10 Service berry and Potentilla shrubs, with no sizes indicated. Irrigation
has not been indicated.
STAFF COMMENTS:
This lot contains a drainage and access/maintenance easement, covering the entire front
portion of the lot where it meets Wildwood Road. The southeast corner of the building
encroaches into this easement.
The proposed grading plan shows a slope at the northeast corner of the building will not
meet Town of Avon standards and therefore needs a retaining wall.
The elevations and floor plans submitted do not coincide with the site plan or the grades
shown. The elevations need to be dimensioned
A driveway culvert is being required at the driveway entrance due to this area being a
main drainage way.
ki
N' N
PLANNING AND ZONING COMMISSION STAFF REVOR I
December 21, 1993
Lot 3, Block 5, Wildridge Subdivision
Valley View Townhomes
Conceptual Design Review
The elevations indicate two choices for siding, wood or vinyl. In the Planning and Zoning
Commission Procedures, Rules and Regulations, Section 6.25 state, "The following
materials and wall finishes will not ordinarily be permitted on the exterior of any structure:
asphalt siding, imitation brick, asbestos cement shingles or siding, imitation stone,
imitation log siding or plastic... "
The building, un the west elevation, stands approximately 40 feet in height. Buildings may
not exceed 35 feet or three stories, which ever is greater.
Guest parking, snow storage and the total area of site disturbance need to be shown cn the
Final Site Plan.
The Final Landscape Plan mus show plant materials which meet the minimum size
standards, type and area of revegetation and an irrigation system for plant island: and lawn
areas.
STAFF RECOMMENDATION:
As a cunt eptual review, the Staff has no formal recommendation.
Respectfully Submitted
Mary Holden
Town Planner
U
PLANNING AND ZONING COMMISSION STAFF REPORT
December 21, 1993
Lot 3, Block 5, Wildridge Subdivision
Valley View Townhomes
Conceptual Design Review
PLANNING AND ZONING ACTION:
Approved as submitted ( ) Approved with recommended conditions ( )
Approved with modified conditions ( ) Continued ( ) Denied ( )
Withdrawn ( ) Conceptual, No Action (✓j
Date Zle& Sue Railton, Secretary—e/—w-�
Basically, the Commission felt that this was an appropriate proposal
or 1s o e but the hefight
problem (the proposal is five feet over the allowed height) and to work on
windevo terms a r*s. it c inneeted that the ane 1iUat
possibly use a second material to try to break up some of the massing and
add more interest As a conceptual review, no action was taken at this time.