Loading...
PZC Packet 090391STAFF REPORT TO THE PLANNING AND ZONING COMMISSION September 3, 1991 Lot 7, Block 2, Bencgmark at Beaver Creek Subdivision Jack Hunn for Beaver Bench Condo Association Proposed Building Color Change Design Review INTRODUCTION Jack Hunn, on behalf of the Beaver Bench Condominium Association, has requested design review of a proposed building color change for the two twenty two unit buildings located on Lot 7, Block 2, Benchmark at Beaver Creek Subdivision. One of the buildings is currently painted a redwood color, while the other is tan with brown trim. The Honeowners Association wishes to repaint both of the buildings with a similar color. The proposed paint color along with sample chips will be provided at the Planning and Zoning Commission meeting. STAFF RECOMMENDATION Review and approval of proposed building color change. RECOMMENDED ACTION 1. Presentation of Application 2. Applicant's Presentation 5. Commission Review 6. Commission Action Respectfully submitted, J4�� l Jim Curnutte Planner STAFF REPORT TO THE PLANNING AND ZONING COMMISSION September 3, 1991 Page 2 of 2 Lot 7, Block 2, Benchmark at Beaver Creek Subdivision Jack Hunn for Beaver Bench Condo Association Proposed Building Color Chang Design Review PLANNING AND ZONING ACTION Approved as submitted ( ) Approved with Recom-nended Conditions (�� Approved with Modified Conditions Continued ( ) Denied ( ) Withdrawn ( ) Date Q - 3 Cil Patti Dixon, Secretary 4 rhp Commirgion granted approval for the color change ac cphmitted t17 the condition that the painting be completed by the end of September. a a a STAFF RLPORT TO THE PLANNING AND ZONING COMMISSION September 3, 1991 Lot 45, Block 4, Wildridge Subdivision Sam Ecker Single Family Residence Conceptual Design Review INTRODUCTION Sam Ecker is proposing to construct a single family residence on Lot 45, Biock 4, Wildridge Subdivision. Lot 45 is 0.94 of an acre (40,946 sq. ft.) and has frontage on both Wildridge Road East and Longsun Lane. The applicant is proposing to access the property fron Longsun Lane. The buildable portion of the property slopes Loward the southwest at approximately 24%. The proposed building is a two story stick built home with gable roofs and a two car garage. Proposed building materials include 6" masonite lap siding, woodruf shingles and triple pane aluminum windows, flagstone walkway and an asphalt driveway. Samples of proposed building colors and siding treatment are provided. A site grading and landscape plan has been provided for the Commission's review. The landscape scheme includes a proposed level lawn area in the back of the house which utilizes a railroad tie retaining wall. STAFF COMMENTS As a conceptual review, no formal Staff recommendation has been made. However, Staff will point our that driveway grade appears to be excessive (16 to 18%) and a boulder retaining wall is currently shown within the 10' road ma-ntenance easement. STAFF REPORT TO THE PLANNING AND ZONING COMMISSION September 3, 1991 Page 2 of 2 Lot 45, Block 4, Wildridge Subdivision Sam Ecker Single Family Residence Conceptual Design Review RECOMMENDED ACTION Introduce Application 2. Applicant Presentation 3. Commission Review/Discussion Respectfully submitted, AVCurnutte Planner STAFF REPORT TO THE PLANNING AND ZZONING COMMISSION September 3, 1991 Lot 18, Block 1, Wildridge Subdivision Wildflower Condominiums William Hein Associates Building Revisions Conceptual Design Review INTRODUCTION William Hein is requesting conceptual design review of proposed design changes to the previously approved building design on Lot 18, Block 1, Wildridge (Wildflower Condominiums). Specifically, the applicant wishes to propose the following changes: - Removal of one of the five one -car garages. This change would reduce the building's mass somewhat. - Change the roof form to better deal with snow shedding and improve the look of the building. - Eliminate the interior space previously proposed to be used for storage/meeting/mechanical areas. This space would be incorporated into the habitable area of the units. - Redesign the interior floor plans of the units to better utilize the building's habitable space. These changes will be accompanied by the necessary fenestration changes. The applicant has indicated that he has no intention of changing the exterior building materials (1" x 6" cedar siding and cedar shingles) or landscape plan at this time. STAFF COMMENTS As a conceptual review, no formal Staff recommendation has been made. RECOMMENDED ACTION 1. Introduce Application 2. Applicant Presentaticn 3. Commission Review/Discussion Re pectfully submitted, iyLc�. CEJ Jim Curnutte Planner W STAFF REPORT TO THE PANNING AND ZONING COMMISSION September 3, 1991 Lot 43, Block 2, Mark Harrisun for Proposed Building Design Review INTRODUCTION Wildridge Subdivision Sandstone Development Design and Roof Material Changes Mark Harrison, on behalf of Sandstone Development Corp., has requested design review of proposed building design and roof material changes for the development located on Lot 43, Block 2, Wildridge Subdivision. Specifically, the applicant would like to change the design of building #2 by enclosing the area currently shown as a deck on the west side of the residence. This area is approximately 7' x 7' (49 sq. rt.). A new deck anu railing will be added along the entire front elevation of the house. Also the appl cant would like to add a door (including steps and railing) to the east side of the building. The second item proposed for revision involves a change of roofing materials from cedar shakes to woodruf on all four of the homes on Lot 43. STAFF RECOMMENDATION Review and discussion of proposed building design and roof material changes. RECOMMENDED ACTION 1. Presentation of Application 2. Applicant's Presentation 5. Commission Review 6. Commission Action R(en�spectfr/ully submitted, Jim Curnutte Planner STAFF REPORT TO THE PLANNING AND ZONING COMMISSION September 3, 1991 Page 2 of 2 Y3 u-)'4-0 Lot 60, Block 2, Be ichmark a4 Apa,,Q j;rz a Subdivision Mark Harrison for Sandstone Development Proposed Building Design and Roof Material Changes Design Review PLANNING AND ZONING ACTION Approved as submitted ( ) Approved with Recommended i Conditions (✓) Approved with Modified Conditions Continued ( )q Denied ( ) Withdrawn ( ) Date � — 3— `l Patti Dixon, Secretary_ T Flil of the door on Unit #2, but denied the requested change of roofing material from cedar shakes to woodruf shingles.