PZC Packet 030392STAFF REPORT TO THE PLANNING AND ZONING COMMISSION
March 3, 1992
Lot 1 and part of Lot 2, Nottingham Station Subdivisiion
Diamond Shamrock Cornerstore
Special Review Use
Oublic Hearing
INTRODUCTION
David Galloway, of Galloway, Romero and Associates, on behalf
of Diamond Shamrock, is requesting a Special Review Use
permit to allow for the construction of an automobile service
station on Lot 1 and part of Lot 2, Nottingham Station
Subdivision. Lot 1 is 0.62 of an acre (27,007 sq. ft.) in
size as currently platted, however, the applicants wish to
move the lot line between Lots 1 and 2 approximately 30' to
the east. If the proposed minor subdivision is approved by
the Town Council, the new lot size of Lot 1 will be 0.727 of
an acre (31,600 sq. ft.). Lots 1 and 2 are cureently zonwed
Neighborhood Commercial. The intention of the Neighborhood
Commercial District is to provide sites for commercial
facilities and services for the principle benefit of
residents of the community and also to highway -oriented
convenience commercial needs. The purpose of listing
automobile service station as a special review use in the NC
zone district is to allow the Planning Commission and Tov,n
Council to assess the need for imposing any additional
development or performance standards (i.e, not specifically
required by the zoning/building codes) reasonably determined
to be necessary to meet the special review use criteria
and/or mitigate against any adverse impacts to adjaacent
property and/or occupants.
The proposed development consists of a one story building
with a floor area of 1,563 sq. ft. and four petroleum
dispenser islands. The site also includes appurtenant
parking, driveway, landscaping and drainage facilities, as
well as a 49' x 103'8" canopy over the building and pump
islands. The canopy has a maximum height of 18'8" above
finished grade. A 12' x 20' handicap parki.g space has been
conveniently located on the south side of the building and
ramps have been placed at both entry doors for ease of
access. There are three 12,000 gallon and one 8, 000 gallon
underground petroleum storage tanks located at the eastern
side of the lot. The applicants propose to use a portion of
Lot 2 (25' x 40' area) for turning large trucks around on
those occasions when the site is to crowded to manouver.
This is preferable to backing out onto Hurd Lane. lhis same
area may also be used as a drive for future cross access
between Lots 1 and 2 in the future.
STAFF REPORT TO THE PLANNING AND ZONING COMMISSION
March 3, 1992
Page 2 of 5
Lot 1 and part of Lot 2, Nottingham Station Subdivision
Diamond Shamrock Cornerstore
Special Design 1teview
Public Hearing
STAFF COMMENTS
The following criteria as listed in Section 17.48.040 of the
Avon Zoning Code, should be considered by the Planning and
Zoning Commission and the Town Council when reviewing a
Special Review Use application.
A. Whether the proposed use otherwise complies with all
requirements imposed by the Zoning Code;
COMMENT: The proposed use appears to be in compliance
with all requirements imposed by the Avon Zoning Code.
8. Whether the proposed use is in conformance with the
town comprehensive plan;
COMMENT: It would appear that the proposed use is in
general conformance with the Avon Comprehensive Plan. The
Avon Comprehensive Plan's Urban Design Plan includes this
property in Subarea 4 "Town Gateway". It is critical that
properties within this Subarea are developed in a manner
which creates an attractive appearance. The following goals
and objectives exerpted from the Avon Comprehensive Plan also
seem applicable to this proposal:
- Enhance the Towr's role as a principal, year-round
residential and commercial center in the Vail Valley.
- Provide for increased opportunities for development of
service-oriented commercial and light industrial uses,
with proper controls to ensure compatibility.
- Ensure that a high quality visual image of the Town is
established through both public and private sector
activities.
- E,cure that the high quality, natural environment is
preserved and integrated into the developed areas of the
Town.
STAFF REPORT TO THE PLANNING AND ZONING COMMISSION
March 3, 1992
Page 3 of 5
Lot 1 and part of Lot 2, Nottingham Station Subdivision
Diamond Shamrock Cornerstore
Special Review Use
Public Hearing
- Ensure that future development will minimize degradation
of the environment, particularly in sensitive natural
areas.
- Protect and enhance the water quality of the Eagle River
and Nottingham Lake.
C. Whether the proposed use is compatible with adjacent
uses. Such compatibility may be expressed in appearance,
architectural scale and features, site design, and the
control of any adverse impacts including noise, dust, odor,
lighting, traffic, safety, etc.
COMMENT: The applicant has made great strides in the
last few months to improve the compatibility of the proposal
with adjacent uses. Staff's biggest concerns with this
proposed were protection of the Eagle River and providing an
acceptable level of lighting as viewed from adjacent
properties.
The applicant has provided a lighting plan, as well as cut
sheets anu engineering specifications for lighting fixtures.
The foot candle footprint plan shows that minimal light
spills over the site boundries. The applicants have also
worked with Staff to reduce the impacts of seeing direct
light sources, as viewed from surrounding properties, by
providing recessed canopy lights and flat lens style site
lights. Staff is still concerned with the impacts of the
white pump spanners and internally lit white plexiglass faced
signs.
In order to reduce possible contamination to ground water
and/or the nearby Eagle River, the applicant is proposing
state-of-the-art secondary containment fuel product equipment
(dov'.ie wall tanks and piping system, vapor recovery, etc.).
This equipment provides maximum protection against
underground spills or leaks. The applicants drainage plan
provides a positive means of drainage collection and
treatment by:
1. Providing treatment of all runoff for oil/fuel
removal for even the slightest spill.
STAFF REPORT TO THE ANING AND ZONING COMMISSION
March 3, 1992
Page 4 of 5
Lot 1 and part of Lot 2, Nottingham Station Subdivision
Diamond Shamrock Cornerstore
Special Review Use
Public Hearing
2. Providing capture and treatement for the unexpected
large event (over 8,000 gallons of positive collection and
storage).
A more more detailed presentation of lighting and
environmental protection measures will be presented by the
applicant at the meeting.
STAFF RECOMMENDATION
Staff feels that an automobile service station is an
appropriate use for this site. The proximity of this site to
the Eagle River raises major environmental concerns, however,
the applicant has demonstrated that the proposed use can be
designed and controlled to mitigate the potential for
gasoline to contaminate the Eagle River in the event of a
minor or major spill incident.
Other concerns of the Staff in utilizing this site as a
gasoline service station may be addresse through the design
review process ( spanner and sign lighting).
RECOMMENDED ACTION
1. Introduce Application
2. Appleant Presentation
3. Open Public Hearing
4. Close Public Hearing
5. Commission Review
6. Commission Action
Reesspictfully submitted,
A " " "
Jim Curnutte
Planner
STAFF REPORT TO THE PLANNING AND ZONING COMMISSION
March 3, 1992
Page 5 of 5
Lot 1 and part of Lot 2, Nottingham Station Subdivision
Diamond Shamrock Cornerstore
Special Review Ues
Public Hearing
PLANNING AND ZONING ACTION
Approved as submitted ( ) Approved with recommended
conditions ( ) Approved with modified conditions ( )
Continued ( ) Denied (y— Withdrawn
Date _Patti Dixon, Secretary_
The Commission denied the request for the Special Review Use Permit for the
following reasons:
1. It does not ensure a high quality visual image of the Town.
2. It does not minimize degradation of the environment, particularly om
sensitive natural areas.
3. It does not protect and enhance the water quality of the Eagle River
and Nottinqham Lake.
4. It does cause considerable traffic problems.
STAFF REPORT TO THE PLANNING AND ZONING COMMISSION
March 3, 1992
Lot 1, and part of Lot 2, Nottingham Station Subdivision
Diamond Shamrock Cornerstore
Final Design Review
INTRODUCTION
David Galloway, of Galloway, Romero and Associates, on behalt
of Diamond Shamrock, Inc., has requested final design review
of a proposed convenience store and motor fuel sales facility
on Lot 1, and part of Lot 2, Nottingham Station Subdivision.
Lots 1 and 2 of the Nottingham Station Subdivision are owned
by Nottingham Investment Co. and are zoneo Neighborhood
Commercial (NC). Lot 1 is 0.62 of an acre (27,007 sq. -rt.)
in size as currently platted, however, the applicants wish to
move the lot line between Lots 1 and 2 approximately 30' to
the east. If the proposed minor subdivision is approved by
the Town Council, the new lot size of Lot 1 will be 0.727 of
an acre (31,600 sq. ft.).
Since an automobile service station is not listed
specificall,, as an allowed use in the Neighborhood Commercial
zone district, the applicants have submitted a Special Review
Use application in conjunction with this design review
application. In addition, a minor subdivision has been
requested for the purpose of adjusting the lot line between
Lots 1 and 2.
The proposed development consists of a one story building
with a floor area of 1,563 square feet and four petroleum
dispenser islands. The site also includes appurtenant
parking, driveway, landscaping and drainage facilities, as
well as a 49' x 103'6" canopy over the building and pump
islands. The canopy has a maximum height of 18'8" above
finished grade. A 12' x 20' handicap parking space nas been
conveniently located on the south side of the building and
ramps have been placed at both entry doors for ease of
access. The parking requirement of 7 spaces is being met on
site There are three 12,000 gallon and one 8,000 gallon
underground petroleum storage tanks located at the eastern
Gide of the lot. Proposed building and site materials are as
follows:
BUILDING: The majority of the building will be finished
with stucco (light grey color). the top 3' of
the building is proposed to be 1" x 4'
horizontal T & G cedar siding, stained light
grey and red. The building's windows and
doors are black anodized aluminum.
•
a
a
STAFF REPORT TO THE PLANNING AND ZONING COMMISSION
March 3, 1992
Page 2 of 8
Lot 1 and part of Lot 2, Nottingham Station Subdivision
Diamond Shamrock Cornerstore
Final Design Review
CANOPY: The top 3' of the canopy will be finished with
red metal fascia panels. Below that is an 9"
dark grey metal reveal. The canopy columns
and column supports on top of the building
are steel and painted dark grey. The canopy
will include eighteen 400 watt super metal
halide recessed light fixtures with prismatic
glass lenses. Drainage of the canopy is
handled by concealed downspouts within the
canopy ciltimns. The canopy roofing and
structu ul elements on top of the roof will
be painted white.
PUMP ISLANDS: The pump islands include red, white, black and
grey petroleum dispensers under 2'6" x 14'
plastic white illuminated spanners. The white
spanners have a red accent stripe. The total
wattage at each spanner is approximately
1,080 watts.
SIGNS: There are two Diamond Shamrock signs on the
canopy. These signs are located on the north
and south fascia and are interior -lit white
plastic channel letter signs. The canopy
signs are 18" x 21' or 31.5 square feet
each. Another sign "Corner Store" is proposed
on the south side of the convenience store.
This sign consists of interior -lit green
plastic channel letters. The corner store
sign is 18" x 14' or 21 square feet in size.
A freestanding monument sign identifying the
business and gas prices is located near the
west property line. This sign will be an
interior -lit, plastic faced, box sign. The
sign face will be red, white and green with a
dark grey metal border. rhe sign will be
supported by two 8" x 8' timber posts stained
grey to match the building fascia. This sign
is 5'10" x 8'3-3/4" or 48.5 square feet and
will have a maximum height of 12'4" above
finished grade.
TRASH ENCL: A 12' X 9' X 6' high trash enclosure is pro-
posed in the northeast corner of the site.
STAFF REPORT TO THE PLANNING AND ZONING COMMISSION
March 3, 1992
Paye 3 of 8
Lot 1 and part of Lot 2, Nottingham Station Subdivision
Diamond Shamrock Cornerstore
Final Design Review
The enclosure will be constructed of concrete
blocks and finished with a light grey stucco,
with a 6" wide red band at the top. The
enclosure doors will be made of 1" x 6" dog
eared cedar pickets. The enclosure doors will
be stained light grey to match the building.
OTHER SITE
CONDITIONS: All parking and driveway areas will be topped
with 5" of reinforced concrete (8" slab over
underground storage tanksj. A 6' concrete
curb surrounds the paved areas. A concrete
retaining wall with fluted face pattern will
be placed along much of the north property
line. Thi;; wall will range in height from
0' to 7' high, and will match the color scheme
and patterns of the existing railroad under-
pass retaining walls on Avon Rd.
A 4' high black vinyl covered chain link fence
will be placed on top of the retaining wall to
match the one on the railroad underpass
retaining walls. The retaining wall and fence
will run approximately 185' along the
center portion of the north property line.
There are five 16' high area floodlights on
the property. These lights incorporate a 400
watt super metal halide lamp in a medium
sized one piece aluminum housing with a flat
lens. The housing and pole will be painted
dark grey.
A free air station and two public telephones
are lo.:ated along the eastern property line.
Polaroid photographs have been provided of
these facilities.
A 25' x 40' area on Lot 2 is labled "drive for
future access". The applicants propose to
surround this area with a 4' high black vinyl
covered chain link fence and a 2' high
earthen berm. The area will be used to turn
large trucks around when necessary. Written
authorization from the owner of Lot 2
STAFF REPORT TO THE PLANNING AND ZONING COMMISSION
March 3, 1992
Page 4 of 8
Lot 1 and part of Lot 2, Nottingham Station Subdividiosn
Diamond Shamrock Cornerstore
Final Design Review
concerning the improvements on, and the use of
the property will be provided by the applicant
prior to submittal of a building permit
aoplication. This area will be paved with 5"
oP reinforced concrete.
The site grading and drainage plans show that the site has
been graded towards two inlet points where the water is piped
to a 750 gallon mud and grease trap and a 10,000 gallon
oil/water separator capable of treating the effluent to 15
PPM oil to water. From the tank, the storm water/run-off is
piped to the existing storm water manhole at the corner of
Hurd Lane and Avon Road. Parking/driveway areas have a
maximum grade of 6% near the entrance, however, most of the
site averages 2% to 3%.
A landscape plan has been provided for the Commission's
review. The plan shows a mixture of sod, shrub areas and
evergreen and deciduous trees. A separately zoned automatic
irrigation system will be provided to all shrub beds and lawn
areas. fhe shrubs within the shrub bed areas will be
surrounded with cobble rock, and a steel edger. The
landscape plan includes a good mixture of plant species and
sizes.
The applicants have agreed to construct a 6' wide concrete
sidewalk along Hurd Lane to their east property line. The
sidewalk will conform with Town standards and is necessary
for efficient and safe pedestrian access to and from the
property.
STAFF COMMENTS
The Commission shall consider the following items in
reviewing the design of a proposed project:
6.11 - The conformance with the Zoning Code and other
applicable rules and regulations of the Town of Avon.
COMMENT: As mentioned previously, an automobile service
station is not a "use by right" in the NC zone district, but
is listed as a special review use. This proposal will be in
STAFF REPORT TO THE PLANNING AND ZONING COMMISSION
March 3, 1992
Page 5 of 8
Lot 1 and part of Lot 2, Nottingham Station Subdivision
Diamond Shamrock Cornerstore
Final Design Review
conformance with the Zoning Code if the accompanying special
review use application is approved by the Planning and Zoning
Commission and Town Council.
6.12 - The suitability of the improvement, including
type and quality of materials of which it is to be
constructed and the site upon which it is to oe located.
COMMENT: The building architecture and material
selection is somewhat consistant with the Avon design
guidelines. As originally submitted, the building walls were
entirely stucco, with a 3' metal fascia at the top. Staff
suggested that the applicant consider incorporating wood and
stone into the building design. The applicants responded to
Staff's suggestion by substituting the metal fascia with the
1' x 4" horizontal T & G cedar siding at the building, and
trash enclosure. The site itself appears to be very conducive
to the development of the Neighborhood Commercial type uses
for which it is zoned.
6.13 - The compatibility of the design to minimize site
impacts to adjacent properties.
COMMENT: This property is bordered on the north by the
100' wide Denver and Rio Grande Western Railroad right-of-way
and on the south by Hurd Lane and the open space zoned Tracts
A & B of the Nottingham Station Subdivision. Immediately to
the west of this property is the 100' wide Avon Road
right-of-way and to the east is Lot 2, Nottingham Station;
which is zoned Neighborhood Commercial. The entrance to this
property has been located as far to the east as possible in
order to reduce driveway grades and increase the distance
from the Hurd Lane/Avon Road intersection (approximately
160'). Staff has determined that the recent improvements to
Avon Road and Hurd Lane are adequate to handle the
anticipated traffic movements associated with this proposed
business. The applicants have provided a lighting plan for
tho Commission's review, as well as cut sheets and
engineering specifications for lighting fixtures. The foot
candle footprint plan shows that minimal light spills over
the site boundaries, and the average foot candle amount at
the property boundaries is 1 foot candle (fr), which is
apparently the recommended minimal level for parking lots.
The applicants have also worked with Staff to reduce the
STAFF REPORT
March 3, 1992
Page 6 of 8
10 THE PLANNING AND ZONING COMMISSION
Lot 1 and part of Lot 2, Nottingham Station Subdivision
Diamond Shamrock Cornerstore
Final Deeign Review
impacts of seeing direct light source, as viewed from
surrounding propert-.es,
by providing recessed canopy lights
and flat lens style site
lights.
Staff is still somewhat
concerned with the aesthetics of
the white plexiglass faced
pump spanners and monument sign.
A summary of proposed
exterior lighting fixture
wattages
is as follows:
Canopy Lights
400
watts each (18 total)
Site Lights
400
watts each (5 total)
Security Light
175
watts (1 total)
Pump Spanners
1080
watts each (4 total)
Monument Sign
648
watts (1 total)
Canopy Sign
920
watts each (2 total)
Cornerstore Sign
890
Watts (1 total)
The applicant feels that their lighting compares very
favorably to other similar facilities in the area. They have
stated that the Conoco at Edwards has 1 canopy light per 140
sq. ft. of area, the "C" Mart has 1 canopy light per 106 sq.
ft. of area, and the Diamond Shamrock proposal is 1 light per
292 sq. ft. of canopy area. Diamond Shamrock believes that
their lighting plan creates a sensitive new standard in Avon
for site lighting on areas which require good lighti,ig to
perform their intended function safely.
6.14 - The compatibility of proposed improvement with
site topography.
COMMENT: The proposed improvements appear to work well
with site topcgraphy. The site has been designed to direct
drainage flows in two directions, however, all surface
run-off will ultimately pass through the 750 gallon mud and
grease trap and the 10,000 gallon treatment device.
6.15 - The visual appearance of any proposed
improvement as viewed from adjacent and neighbor-.og
properties and public ways.
COMMENT: The visual appearance of the building seems to
have been improved with the addition of wood siding in place
of the 3' metal Fascia. The metal canopy fascia panels are
materials which may be permitted only with the specific
approval of the Commission. The guidelines also e•courage
the use of natural or earth tones as the dominant crj)or with
-i -
STAFF REPORT TO THE PLANNING AND ZONING COMMISSION
March 3, 1992
Page 7 of 8
Lot 1 and part of Lot 2, Nottingham Station Subdivision
Diamond Shamrock Cornerstore
Final Design Review
trighter colors used for accent. The area of the red canopy
exceeds the total area of the buildings stucco and wood
siding. Staff recommends further discussi,)n of the possible
visual impacts associated with the white pump spanners, and
all proposed signing.
6.16 - The objective that no improvement be so similar
or dissimilar to others in the vicinity that values, monetary
or aesthetic will be impaired.
COMMENT: This project is similar to other commercial
buildings in the vicinity, specifically the retail buildings
in the Shopping Center Zone District. Sign and pump spanner
lighting are Staff's chief concerns relating to this
criteria.
6.17 - The general conformance of the proposed
improvements with the adopted Goals, Policies and Programs of
the Town of Avon.
COMMENT: The intention of the Neighborhood Commercial
District is to provide sites for commercial facilities and
services for the principle benefit of residents of the
community and also to highway -oriented convenience commercial
needs. Staff feels that the Diamond Shamrock proposal fits
in nicely with the intent of the NC zone District.
The Avon Comprehensive Plan's Urban Design Plan includes this
property in Subarea 4 "Town Gateway". It is critical that
properties within this Subarea are developed in a manner
which crea+es an attractive appearance.
STAFF RECOMMENDATION
Staff recommends approval of this final design review
application with the following conditions:
1). Written authorization be must provided from the owner
of Lot 2, regarding the intended improvements and use of said
Lot.
2). Staff concerns with the proposed sign and spanner
lighting be discussed and resolved prior to approval.
to
a
ft
STAFF REPORT TO THE PLANNING AND ZONING COMMISSION
March 3, 1992
Page 8 of 8
Lot 1 and part of Lot 2, Nottingham Station Subdivision
Diamond Shamrock Cornerstore
Final Design Review
3). Final Staff review and approval of grading and drainage
plan prior to issuance of building permit.
RECOMMENDED ACTION
1. Introduce Application
2. Applicant Presentation
3. Commission Review
4. Commission Action
Respectfully submitted,
Jim Curnutte
Town Planner
PLANNING AND ZONING ACTION
Approved as submitted ( ) Approved with Recommended
Conditions ( ) Approved with Modified Conditions ( )
Continued ( ) Denied ( ) Withdrawn ( T
DatePatti Dixon, Secretary
The Commission did not consider the final design review for this project
since the Special Review Use Permit associated with this Project was
denied.
STAFF REPORT TO THE PLANNING AND ZONING COMMISSION
M MARCH 3, 1992
modLot 44, Block 3, Wildridge Subdivision
Reynolds Residence
Material Change Request
Design Review
INTRODUCTION
Buz and Monica Reynolds received final design approval on
February 4, 1992, for a single family home on Lot 44, Block
3, Wildridge. The approved materials were tongue and groove
cedar siding (stained with a natural color weather seal),
cedar trim and fascia (stained cedar tan) and stucco (polar
white). A #2 medium cedar shake was -pproved for the roof.
The applicants are now proposing a change trom the cedar
shake shingle to an asphalt shingle. They are proposing the
Timberline Ultra in a charcoal blend color. This product has
a weight of 420 lbs per square and a 40 year warranty. A
sample of the proposed material will be presented at the
meeting.
STAFF COMMENTS
At the October 1, 1991 Planning and Zoning Commission meeting
the Commission adopted a new policy regarding acceptable
roofing products in the Wildridge Subdivision. Specifically,
the Ccmmission determined that asphalt shingles will be
considered an acceptable roofing material in the Wildridge
Subdivision depending on their compatibility with the
particular building(s) upon which they are proposed to be
installed. The Commission decided that requests for the use
of asphalt shingles on a buiiding would be reviewed for
compliance with the following minimum stanJards:
1. Weight - 300 lbs per square (minimum).
2. Texture - Appropriate relief and shadow effect.
3. Color - Darker earthtone c-icrs with
appropriate color variation and pattern.
With thes.a minimum standards in place the Commission went on
to consider three requests for changes trom previously
approved roofing materials to asphalt shingles. The
Timberline Ultra shingle on Jan Livergood's stick built home
and the 300 lb per square (minimum) Tamko .hingle on a
manufactured unit fourplex being built by P chard Wahl and
Tad Degen. The Commission denied Bruce Kelly's request to
change from wood shakes to a 300 lb per square (minimum)
STAFF REPORT TO THE PLANNING AND ZONING COMMISSION
March 3, 1992
Page 2 of 3
Lot 44, Block 3, Wildridge Subdivision
Reynolds Residence
Material Change Request
Design Review
asphalt shingle on a log home. This denial was later
overturned on appeal to the Avon Town Cuuncil.
On November 26, 1991, the Avon Town Council approved
Resolution 91-31, which established a moratorium on design
review considerations of asphalt shingles in the Wildridge
Subdivision. The purpose of the resolution was to allow the
Wildridge Citizens to work with the other residents and
property owners of Wildridge to examine and refine the
Covenants and Design Guidelines for Wildridge. the
moratorium became effective for any design review application
submitted after Ncvember 1, 1991 and continued until March I,
1992. Since the effective date of the moratorium has
expired, the Reynolds are now able to ask the Planning and
Zoning Commission to consider their roof material change
request.
STAFF RECOMMENDATION
Review and discussion of proposed roof material change.
RECOMMENDED ACTION
1. Presentation of Application
2. Applicant's Presentation
3. Commission Review
4. Commission Action
Respectfully submitted,
Jim Curnutte
Planner
STAFF REPORT TO THE PLANNING AND ZONING COMMISSION
March 3, 1992
Page 3 of 3
Lot 44, Block 3, Wildridge Subdivision
Reynolds Residence
Material Change Request
Design Review
PLANNING AND ZONING ACTION
Approved as submitted Approved with Recommended
Conditions ( ) Approved with Modified Conditions ( )
Continued ( ) Denied ( ) Withdrawn ( `)
Date 21L Patti Dixon, Secretary-4Y;a—
The Commission granted approval to the request to change from cedar
shake shingles to a Timberline Ultra, 420 lb per square asphalt shingle
in the weatherwood color.
RESOLUTION NO. 91-31
SERIES OF 1991
A RESOLUTION ESTABLISHING A MORATORIUM ON ASPHALT SHINGLES
IN WILDRIDGE SUBDIVISION
WHEREAS, Wildridge Specially Planned Area was heretofore
approved by Ordinance; and
WHEREAS, the Town of Avon Design Procedures, Rules and
Regulations do not address specific roof materials; and
WHEREAS, the Wildridge Architectural and Design Guidelines do
not allow asphalt shingles; and
WHEREAS, the Wildridge Citizens have expressed a desire to
work with the other residents and property owners of Wildridge to
examine and refine the Covenants and Design Guidelines for
Wildridge.
NOW, THEREFORE, BE IT RESOLVED BY THE TOWN COUNCIL OF THE TOWN
OF AVON, COLORADO:
1. No applications for design review approval that include
asphalt roof shingles shall be considered by the Council
and the Planning and Zoning Commission.
2. Such moratorium shall become effective for any design
review application submitted after November 1, 1991, and
shall continue in effect until March 1, 1992.
PASSED AND ADOPTED at a regular meeting of the Town Council on
this 26th day of November, 1991.
TOWN OF AVON, COLORADO
I , �
Je I
ry Da iii` Mayor '
ATTEST:
Patty Neyhart, Town Clerk
STAFF REPORT 10 THE PLANNING AND ZONING COMMISSION
March 3, 1992
Lot 25, Block 2, Benchmark at Beaver Creek Subdivision
John Perkins for Christie Lodge
Proposed Building Modifications
Conceptual Design Review
INTRODUCTION
John Perkins, on behalf of the Christie Lodge, is requesting
conceptual review of several proposed exterior building
modifications at the Christie Lodge, Lot 25, Block 2,
Benchmark at Beaver Creek Subdivision. The proposed
modifications are as follows:
1. All existing timber (8x8) retain -,ng walls are
to be replaced with poured in place concrete wails. A form
liner system similar to the one used on the railroad bridge
(cracked fin) is being considered. Color will be a concrete
gray or gray similar to the railroad bridge.
2. The porte'cochere entries at both east and west
sides of the main lobby will be reconfigured to read as a
"squared off" form as opposed to the triangular existing
forms. Vertical support will be a battered stone wall
standard. Stone veneer to be angular field stone, drystacked
in a rainbow mix over reinforced concrete structural walls.
3. The buildings main entry way will be redesigned
introducing curved forms above and below the existing
concrete spandrel. The spandrel will be penetrated with a
back lighted canvas awning (in a matching curvalinear form).
Awning will cantilever over two painted steel posts to
terminate at the curb line (to be revised with the street
improvement program). Awning may carry some project signage.
The newly formed entry will be backdropped with a stone
veneered curtain wall matching the form and surface of the
stone work on the porte'cocheres. Existing landscaping will
be relocated in front of the stone curtain wall.
4. Residing of the entire prole -.t with a 29 gage
steel siding project manufactured by "Alsic= Inc.", color to
be mist grey. All appurtenant trim pieces and flashings to
match.
5. All pitched 3 -tab asphalt roots will be
replaced with "AEP -SPAN" 24 gage steel roofing in felt green
color or approved equal.
6. Aluminium store front walls (405 linear feet)
"OWN
STAFF REPORT TO THE PLANNING AND ZONING COMMISSION
March 3, 1992
Pa Page 2 of 2
4W4Lot 25, Block 2, Benchmark at Beaver Creek Subdivision
John Perkins for Christie Lodge
Proposed Building Modifications
Conceptual Design Review
to be replaced with one of the Following systems:
a.
Stone
veneer
with glazing and stucco above.
b.
Stucco
below
and above glazing.
C.
Steel
siding
below and above glazing.
More details will follow after value engineering.
7. Commercial canopy columns will be wrapped in
fiberglass cr,amn surrounds and painted.
A phasing plan, beginning this spring, will be discussed at
the meeting.
STAFF COMMENTS
As this is a conceptual review, no formal staff
recommendation will be presented at this time, however,,
Staff would point out that the proposed entry awning will
require an approved setback variance.
RECOMMENDED ACTION
1. Introduce Application
2. Applicant Presentation
3. Commission Review/Discussion
Respectfully submitted,
Jim Curnutte
Planner
M
•
06
STAFF REPORT TO THE PLANNING AND ZONING COMMISSION
March 3, 1992
Page 2 of 2
Lot 25, Block 2, Benchmark at Beaver Creek Subdivision
John Perkins for Christie Lodge
Proposed Building Modifications
Conceptual Design Review
to be replaced with one of the following systems:
a. Stone veneer with glazing and stucco above.
b. Stucco below and above glazing.
C. Steel siding below and above glazing.
More details will follow after value engineering.
7. Commercial canopy columns will be wrapped in
fiberglass column, surrounds and painted.
A phasing plan, beginning this spring, will b- discussed at
the meeting
STAFF COMMENTS
As this is a conceptual review, no formal statt
recommendation will be presented at this time, however,,
Staff would point out that the proposed entry awning will
require an approved setback variance.
RECOMMENDED ACTION
1. Introduce Application
2. Applicant Presentation
3. Commission Review/Discussion
Respectfully submitted,
Jim Curnutte
Planner