PZC Minutes 070579RECORD OF PROCEEDINGS
MINUTES OF DESIGN REVIEW BOARD
MEETING OF JULY 5, 1979
The regular meeting of the Design Review Board for the Town of Avon was
held on July 5, 1979 at 7:45 P.M. in the Town Council Chambers of the Town
of Avon in the Benchmark Shopping Center, Avon, Colorado. The meeting
was called to order by Chairman, Hugh Price.
Board Members Present were: Cynthia Jordan, Alice Knipe, Hugh Price,
Mike Blair, Ken Richards, John Wheeler. Tom Landauer was absent.
First item was a motion to approve the June 20, 1979 minutes. It was
noted there was an error, that "ariel" should be "aerial". A motion by
Alice Knipe was made to approve the June 20th minutes as amended, seconded
by Ken Richards and approved unanimously.
It was carried that the Town Council has not approved the recommendation
on the Building Code Amendment, that wording and referrals to certain
articles in the Code Sections may not be proper. The first reading will be
next Tuesday, July 10 at ttie Council Meeting.
Item #1, A -Y Townhouses, Lot 44, Block 1, File No. 79-5-4.
John Wheeler stepped down from the Board to represent this project. A -Y
Townhouses had been presented before. Mr. Wheeler was hers '-o present the
answers and agreements to meet the requirements that they failed to have
at the last meeting. The drainage, countours and retaining wall.
The drainage and contours are indicated by existing dotted contours, the
new contours are shown on the plans as the solid lines, all the drainage
comes around the driveway, down the edge of the sodded area and down into
the ditch. The retaining wall worked out to be 4' high of the initial lower
wall, an 8' flat shelf and then a 1 to 2' slope up across the property line
and about 8 to 10' into the common green belt area. It is now a 4' 6x6
spruce cribbing retaining wall. The driveway slope is 102; from the road-
way all the way up to a. point, then flattens out to a 6Y; slope. Final
approval was granteil subject to soil test, building permit.
Item #2, P.P.L., Inc., Lot 22, Block 1, File No. 79-3-17
Represented by John Wheeler. The roof material on the warehouse of
P.P.L. is asphalt shingles. It was noted that a slope roof should be
shake shingles. The slope of this roof is a 8-12 pitch.
They have completed the roof with asphalt shingles and was not built
according to the presentation to the Design Review Board. After lengthly
discussion the Chairman noted there were two issues, 1) being whether
the material is acceptable and 2) whether people can just go ahead and change
something and them being aware that it shouldn't be changed. This roof was
presented to the Design Review Board as a standing rib -metal roof.
of Avon in the Benchmark Shopping Center, Avon, Colorado. The meetinc
was called to order by Chairman, Hugh Price.
Board Members Present were: Cynthia Jordan, Alice Knipe, Hugh Price,
Mike Blair, Ken Richards, John Wheeler. Tom Landauer was absent.
•
First item was a motion to approve the June 20, 1979 minutes. It was
noted there was an error, that "ariel" should be "aerial". A motion by
Alice Knipe was made to approve the June 20th minutes as amended, seconded
by Ken Richards and approved unanimously.
It was carried that the Town Council has not approved the recommendation
e on the Building Code Amendment, that wording and referrals to certain
articles in the Code Sections may not be proper. The first reading will be
next Tuesday, July 10 at the Council Meeting.
Item #l. A -Y
John wheeler stepped down from the Board to represent this project. A -Y
Townhouses had been presented before. Mr. Wheeler was here to present the
answers and agreements to meet the requirements that they failed to have
at the last meeting. The drainage, countours and retaining wall.
The drainage and contours are indicated by existing dotted contours, the
new contours are shown on the plans as the solid lines, all the drainage
comes around the driveway, down the edge of the sodded area and down into
the ditch. The retaining wall worked out to be 4' high of the initial lower
wall, an 8' flat shelf and then a 1 to 2' slope up across the property line
and about 8 to 10' into the common green belt area. It is now a 4' 6x6
spruce cribbing retaining wall. The driveway slope is 10% from the road-
way all the way up to a point, then flattens out to a 6% slope. Final
approval was granted Lubject to soil test, building permit.
Item #2, P.P.L., Inc., Lot 22, Block 1, File No. 79-3-17
Represented by John Wheeler. The roof material on the warehouse of
P.P.L. is asphalt. shingles. It was noted that a slope roof should be
shake shingles. The slope of this roof is a 8-12 pitch.
They have completed the roof with asphalt shingles and wa'not built
according to the presentation to the Design Review Board. After lengthly
discussion the Chairman noted there were two issues, 1) being whether
the material is acceptable and 2) whether people can just go ahead and change
something and them being aware that it shouldn't be changed. This roof was
presented to the Design Review Board as a standing rib -metal roof.
A motion by Mike Blair that the Board finds it unacceptable that P.P.L., Inc.
has deviated from the material as was approved in his final design,
seconded by Cyrthia Jordan that the Board finds the modification to the
approved design of the P.P.L, Inc, roof unacceptable. Approved unanimously.
The Building Administrator will follow through.
There being no further business the meeting was adjourned at 8:15 P.M.
Pespectfully Submitted:
Patricia J. Doyle
Approved: