PZC Packet 041185L.7
C7
fO'
STAFF REPORT TO PLANNING & ZONING COMMISSION - 4/11/85
Lot 9, Block 1, Benchmark at Beaver Creek
Sherwood Meadows Condominiums
Design Review - Change Exterior Colors
Applicants have applied for design review for a color change on the exterior
of the Sherwood Meadows Complex at 0371 Nottingham Road, Lot 9, Ol ock 1,
Benchmark at Beaver Creek.
The new colors will be a combination of grays. Colors and photographs will
be presented at the meeting for review.
Respectfully S mitte�
an Fogland
Building and Zoning Administrator
Planning and Zoning Action:
Approved as Submitted ( ) Approved with Recommended Conditions
Approved with Modified Conditions ( ) Continued ( ) Denied 't, drawn
Date L �/� �� Seccrettaarry
IL
grn K �aowl?I�i�
D F 1111w ]
STAFF REPORT TO PLANNING & ZONING COMMISSION - 4/11/85
Lot 65, Block 2, Benchmark at Beaver Creek
Avon Executive Center
Design Review
Applicants have submitted a proposal for development on Lot 65, Block 2,
Benchmark at Beaver Creek. Attached is a well prepared document providing
information on this project. Basically as proposed, it is a combination
commercial/residential project. The project as proposed is a 5 story building
with surface and covered parking.
This project is in the heart of the Development Plan for District I. This
project raises some of the questions as to Avon's plans for roads, access, malls,
etc., that have been being prepared for this area in conjunction with, and as
a part of the Development Plan.
Generally, we prefer to have informal discussions with applicants at the Staff
level before proceeding with design review applications. We received these
plans February 28, 1985 and had hoped the applicant would be able to visit with
Staff to compare their project with the planning we have been doing in that area.
However, the applicant has been unable to visit with us. It appears now that
the applicant will be in the day of the meeting. Therefore, he will not have
seen our precise plans in this area. With this in mind, the Staff would
recommend that discussion be aimed towa^ds general comments regarding the site
layout and building design. Our preliminary review indicates that it may be
possible to shift the building a little to the north and avoid conflicts with
any access or roads which we have been looking at for this area. However, we
feel the applicant should be given time to address our proposed Development
Plan as to how it may effect their proposed development plan.
Considerations should be given to:
1. Development Plan, Goals, and policies for District I;
2. Effect of airport height requirements on this project;
3. Further study, i.e., drainage study and plan, as this area is in
desperate need of a drainage plan;
4. Site grading and topography plans, utilities, ditches, etc.;
5. Traffic flow, impact on adjacent streets, effect of the possible
closure of the Avon Road access point, etc.
Jim Lamont is also reviewing and preparing a report regarding this project.
Staff Report to Planning & Zoning Commission - 4/11/85
Lot 65, Block 2, Benchmark at Beaver Creek
Avon Executive Center
s Design Review
Page 2 of 2
Ib
Ib
Ply recommendation is that the applicant be asked to review the Development Plan,
Goals, policies, the above considerations, and/or other considerations and report
back within 30 to 60 days as to how their proposed project fits in.
Respectfully bmit ed;
�/
Dan Foglan
Building and Zoning Administrator
Planning and Zonina Action:
Approved as Submitted ( ) Approved with Recommended Conditions
Approved with Modified Conditions ( ) Continued ( Viol' Denie ( thdrawn ( )
Date Secret'ary
DF/mml
STAFF REPORT TO PLANNING & ZONING COMMISSION - 4/11/85
Lot 1, Wildwood Resort
Holiday Inn - Preliminary Design Review
Continued from 3/28/85 Regular Meeting
Applicants have submitted several revised plans attempting to arrange the building
and site with all of the factors involved. It appears at this time a majority
of the major problems have teen worked out, however a number of miscellaneous
items still have yet to be resolved and most are mentioned later in this Staff
report. At the time this report was written, the Town Counc;l had not
finalized the Special Review Use on the large parking lot reduction. This
Staff report and current plans assume the Council will approve tiie parking
reduction. Failure of the Town Council to approve the parking reduction will be
cause for major revisions to this project.
As you were informed at the previous meeting, the buildinq and site have been
modified in the following ways:
1. Added: 16 parking spaces, north lot;
2. Buildi:g footprint was reduced in size;
3. An additional floor was added to the middle section of the building;
4. A walkway was added to the bus stop and toward Pizza Hut;
5. Increased landscaping and site in the front of the building, (south);
At the March 14, 1985 Commission meeting, preliminary approval was given. Since
that meeting, significant changes have been made such as the additional story
on the middle portion, increased and rearranged parking on the north lot, etc.,
and those items mentioned earlier.
If the Commission feels it is appropriate, preliminary approval of the revised
plans would be in order.
The Staff feels that final approval would not be appropriate until the followina
ite,ns have been addressed, clarified and/or approved:
1. Revise color .evations and site plan;
2. Review light fixtures to be used in the parking lots;
3. Exterior - south sign;
4. Sign program for building and site, size, types, styles, locations, etc.:
iW \
Staff Report to Planning & Zoning Commission - 4/11/85
Lot 1, Wildwood Resort
Holiday Inn - Preliminary Design Review
Continued from 3/28/85 Regular Meeting
Page 2 of 3
5. Building encroaches into utility easement;
a. Upper Eagle Valley Sanitation District approval for
relocation;
6. Nottingham-Puder Ditch piping out of easement;
a. Avon Metro District approval;
7. Avon Metro District approval for piping Buck Creek and
Nottingham-Puder Ditch;
a. Meeting April 17, 1985;
8. Building dimensions not shown on site plan;
9. Agreement regarding Swift Gulch Road access must be approved by developer;
10. Snow storage is inadequate - will require trucking;
11. Utility plan does not match revised site plans;
12. Drainage plan does not match site plan;
13. Landscape plan should show location, materials and heights of
retaining walls;
14. Landscaping should be more sensitive to site distance at intersections;
15. Native grasses may not be appropriate as shown - What about irrigation
system?
Respectful y Sub i ed,
Fogl nd
Buildin and Zoning Administrator
Staff Report to Planning & Zoning Commission - 4/11/85
Lot 1, Wildwood Resort
Holiday Inn - Preliminary Design Review
• Continued from 3/28/85 Regular Meeting
Page 3 of 3
Planning and Zoning Action:
Approved as Submitted ( ) Approved with Recommended Conditions
"0 Approved with Modified Conditions ( ) Continued ( ) Denie ( ) thdrawn
J
Date 1� ►a 7 > �`�u�
St?� PG�1�� 1Ssrv�33 aruc- �� K,t�cP,ure� UMtege�
+a> w r,�t ►
DF/mml
04
STAFF REPORT TO PLANNING & ZONING COMMISSION - 4/11/85
Tract P, Block 2, Benchmark at Beaver Creek
Water Treatment Building
Conceptual Review
r
As most of you know, the Upper Eagle Regional Water Authority wishes to construct
a new water treatment facility on Tract P.
The Town of Avon and others have an interest in Tract P. The town has plans to
construct a facility of its own on or adjacent to the Water Treatment building.
Due to these and other factors, the design process needs to be coordinated.
With all of this in mind, RBD Engineering Consultants working with the Upper
Eagle Water Authority, wish to begin the design review process and have applied
for conceptual design review.
The plans as submitted are conceptual in nature. Due to all other entities
involved, the designs and layouts may change to some degree. Therefore, the
Staff would recommend the discussion be limited to general perception and
review of the site layout and building design. Any approvals may not be
apriopriate until all parties involved have agreed on the site layout and
building concerns.
Respectfully bmitted,
Dan Fogland
Building and Zoning Administrato,-
Planning and Zoning Action:
Approved as Submitted ( ) Approved with Recommended Conditions )
Approved with Modified Conditions ( ) Continued (V/) Deni Y ithdrawn ( )
Fill. .IDSCIJ a'j 4
Date_�_�_�� a '�+*Y, Secretary
lig
Staff Report to Planning & Zoning Commission - 4/11/85
Lot 63, Block 2, Benchmark at Beaver Creek
Peregrine Vil -:
Preliminary Plat
Page 2 of 2
Parking is the last of the problem areas to be resolved prior to approval of
the Preliminary Plat for Peregrine Village Condominiums. If the above parking
program is acceptable to the Planning and Zoning Commission and the developers
of Peregrine Village, it is suggested that the Planning and Zoning Commission
recommend Town Council approval of the Prelminary Plat for Peregrine Village
Condominiums subject to the above conditions and correction of minor technical
errors.
Respectfully Submitted,
Norm Wood
Town Engineer
Planning and Zoning Action:
Approved as Submitted ( ) Approved with Recommended Gond i
Approved
,�.,,with Modified Conditions ( ) Continued ( ) 1 Withdrawn
>"'Q
Date 01111c7 �, ecretary e
MW/mml
STAFj REPORT TO PLANNING & ZONING COMMISSION - 4/11/85
Lot 63, Block 2, Benchmark at Beaver Creek
Peregrine Village
Preliminary Plat
In the course of reviewing the Preliminary Plat for Peregrine Village Condominiums,
the Planning and Zoning Commission has approved plans establishing open space
and the actual number of parking and loading spaces available on site. The
original design review for this project was started in 1979 and final design
review approval was granted May 21, 1980. Since the original.approval, various plans
and correspondence have been submitted with commercial space ranging from
51,000 SF to 61,000 SF, and with on-site parking spaces ranging from 360 spaces
to 377 spaces. The Preliminary Plat and related plans show 58,056 SF of
commercial space and 349 on-site parking spaces.
During a recent meeting, representatives of Peregrine Village indicated a
willingness to construct a surface parking lot on the triangular portion of
Tract G immediately adjacent to the west end of the Peregrine project. This
parking lot would be a public lot owned by the Town and would primarily provide
additional parking for activities in the park. It could also function as
overflow parking for Peregrine Village as it is unlikely that peak parking
demands for Peregrine Village and Nottingham Park will occur at the same time.
Preliminary studies performed by Town Staff indicate approximately 31 spaces
can be developed in this area. This would in essence expand the peak parking
capacity of Peregrine Village to 380 spaces. This is more spaces than was
included on any proposal submitted during the review and approval process and
is within 2 - 6% of the parkim; required under current ordinances, depending
upon actual uses.
Due to conditions existing at the time of the original design review approval
and the unresolved questions regarding what was actually approved in the
original design review, it is recommended that parking for Peregrine Village
Condominiums be approved subject to:
1. The construction of public parking facilities on the triangular portion
of Tract G immediately adjacent to the west end of Peregrine Village
Condominiums. L2sign and construction shall include landscaping,
shall be subject to review and approval by the Town of Avon and shall
be completed at no cost to the Town of Avon;
2.. Uses within the project shall be limited to general commercial such as
office retail, restaurants and bars, and time-share condominiums or
short term rentals. Substantial changes from these general uses shall
require reevaluation and approval of parking requirements and provisions
by the Town of Avon.