PZC Packet 100422_______________________________________________________________________________
MEETING AGENDAS AND PACKETS ARE FOUND AT: WWW.AVON.ORG
AGENDAS ARE POSTED AT AVON TOWN HALL, AVON RECREATION CENTER, ONLINE AND AVON PUBLIC LIBRARY
IF YOU HAVE ANY SPECIAL ACCOMMODATION NEEDS, PLEASE, IN ADVANCE OF THE MEETING,
CALL MATT PIELSTICKER AT 970-748-4413 OR EMAIL MATT@AVON.ORG WITH ANY SPECIAL REQUESTS.
1
AVON PLANNING & ZONING COMMISSION
MEETING AGENDA
TUESDAY, OCTOBER 4, 2022 - MEETING BEGINS AT 5:00 PM
100 MIKAELA WAY – TOWN COUNCIL CHAMBERS – AVON TOWN HALL
1.CALL TO ORDER AND ROLL CALL
2.APPROVAL OF AGENDA
3.DISCLOSURE OF ANY CONFLICTS OF INTEREST OR EX PARTE COMMUNICATION RELATED TO AGENDA ITEM
4.PUBLIC HEARING – MINOR DEVELOPMENT PLAN AND ALTERNATIVE EQUIVALENT COMPLIANCE FOR FENCE | 950
W.BEAVER CREEK BLVD - EAGLE RIVER WATER AND S ANITATION DISTRICT FENCE - FILES #AEC22003 &
MNR22021 (PLANNER 1+ MAX MORGAN)
5.CONSENT AGENDA
5.1. SEPTEMBER 6, 2022 PLANNING AND ZONING COMMISSION MEETING MINUTES5.2. APPROVAL OF RECORD OF DECISION FOR FILE #CTA22003 – DEVELOPMENT BONUSES
6.STAFF UPDATES
6.1. MT2030 SUSTAINABILITY CONFERENCE RECAP
6.2. AMERICAN PLANNING ASSOCIATION, COLORADO CHAPTER ANNUAL CONFERENCE RECAP6.3. STRS
7.ADJOURN
[970.748.4014] [mmorgan@avon.org]
TO: FROM:
RE:
DATE:
Planning and Zoning Commission Max Morgan, Planner 1+
MNR22021 and AEC22006 - PUBLIC HEARING
Tracts H, N, & O / Benchmark at Beaver
Creek / 950 W. Beaver Creek / ERWSD
October 4, 2022
STAFF REPORT OVERVIEW: This staff report contains two applications for consideration by the Planning
and Zoning Commission (“PZC”): Minor Development Plan (“MNR”) and Alternative Equivalent Compliance
(“AEC”) for a proposed fence on the property (“the Application”).
SUMMARY OF REQUEST: The Eagle River Water & Sanitation District (“ERWSD”) has been enacting
their Avon Wastewater Treatment Facility Nutrient Upgrades Project, which included the installation of a
construction fence surrounding the property in May 2020. Melissa Marts, P.E., on behalf of ERWSD, (“the Applicant”) proposes a new, permanent fence to replace the existing temporary construction fence that
currently encompasses the Avon Wastewater Treatment facility. Deviation from the Avon Development
Code (“ADC”) for height requires an AEC application, public hearing, and final decision by this board. This
application specifically requests that the majority of the new fence exceeds the 42-inch height limit outlined
in the ADC, and that the fence is solid, thus an AEC is required.
FENCE REGULATIONS: Section 7.28.080(b), of the ADC offers the following intent and design of fence
structures in the Town:
(i)Compatibility. Walls and fences shall be architecturally compatible with the style, materials
and colors of the principal buildings on the same lot. If used along collector or arterial
streets, such features shall be made visually interesting by integrating architectural
elements, such as brick or stone columns, varying the alignment or setback of the fence,
softening the appearance of fence lines with plantings or through similar techniques.
A fence or wall may not consist of a solid, unbroken expanse length of more than fifty (50)
feet.
(ii)Materials:
A.Stone walls or brick walls with a stone or cast stone cap, treated wood fences,
decorative metal, cast iron fences, stucco walls and stone piers are encouraged. Solid
walls and fences are permitted only in rear and side yards. Retaining walls are
permitted where required for grading purposes. Hedges may be used in the same
manner and for the same purposes as a fence or wall.
B.Fences used in front yards shall be at least fifty percent (50%) open. Allowable fences
are split rail, wrought iron, picket or other standards residential fences of a similar
nature approved by the Director.
C.Solid fences shall be constructed to meet the wind design criteria of the adopted
International Building Code, using a basic wind speed of ninety (90) miles per hour.
D.Other materials may be incorporated in fences and walls and may be approved by the
Director.
(iii)Prohibited Materials. Contemporary security fencing such as razor wire or barbed wire or
electrically charged fences are prohibited. Chain-link fencing with or without slats shall not
be used as a fencing material for screening purposes.
(iv)Height Limitations.
[970.748.4014] [mmorgan@avon.org]
Page 2 of 5
A. No more than forty-two (42) inches high between the front building line and the front
property line. For corner lots, front yard fence regulations shall apply to both street
sides of lot.
B. No more than forty-two (42) inches high if located on a side yard line in the front
yard, except if required for demonstrated unique security purposes.
C. No more than five (5) feet high for an opaque privacy fence located on a rear property
line or on a side yard line in the rear yard.
D. No more than six (6) feet high for opaque privacy fences that are located directly
adjacent to and integrated with the architecture of the house or connected to a
courtyard.
E. No more than thirty (30) inches high when located within the sight distance triangle.
Fences within this sight distance triangle shall not be solid.
Staff Response: The proposed fence is an improvement to the site. It provides a permanent means to
screen the property from neighboring sites and passers-by along the Eagle River Trail and the railroad
tracks. The proposed fence will mitigate noise, as well as dust and debris spreading to neighboring
properties.
[970.748.4014] [mmorgan@avon.org]
Page 3 of 5
PUBLIC NOTICE: Notice of the public hearing was published in the September 19, 2022 edition of the Vail
Daily in accordance with Sec 7.16.020(d) of the ADC. Mailed notice is not required for this application type.
There have been no public comments received.
PROPERTY DESCRIPTION: The Property is located south of Nottingham Lake and the railroad tracks in
the Riverfront District (District 2). Notably, the property is immediately east of Liftview Condominiums, a
165-unit residential complex, and immediately north of the Eagle River Trail and Eagle River.
RECOMMENDATION: I recommend that PZC take action to approve both applications based on
compliance with the review criteria as outlined in this report. Suggested review criteria and findings are
included below.
ALTERNATIVE EQUIVALENT COMPLIANCE
7.16.120 ALTERNATIVE EQUIVALENT COMPLIANCE: Alternative equivalent compliance is a procedure
that allows development to meet the intent of the design-related provisions of the code through an
alternative design. It is not a general waiver or weakening of regulations; rather, this application procedure
permits a site-specific plan that is equal to or better than the strict application of a design standard specified
in the Development Code. This procedure is not intended as a substitute for a variance or administrative
modification or a vehicle for relief from standards in this Chapter. Alternative compliance shall apply only to
the specific site for which it is requested and does not establish a precedent for assured approval of other
requests.
REVIEW CRITERIA: §7.16.120(d):
1. The proposed alternative achieves the intent of the subject design or development
standard to the same or better degree than the subject standard;
2. The proposed alternative achieves the goals and policies of the Avon Comprehensive
Plan to the same or better degree than the subject standard;
3. The proposed alternative results in benefits to the community that are equivalent to or
better than compliance with the subject standard; and
4. The proposed alternative imposes no greater impacts on adjacent properties than would
occur through compliance with the specific requirements of this Title
Staff Response: The ADC is largely silent on standards for fencing in and around commercial and
industrial areas however, Screening Standards (§7.28.060(d)) require that Ground-Mounted Mechanical
Equipment “shall be screened from view by landscaping, a fence, or a decorative wall…”
Additionally, the Screening Standards require that “the fence or wall shall be of a height equal to or greater
than the height of the mechanical equipment being screened.”
The existing fence, while intended to be temporary, currently exceeds the 42-inch fence height limit in most
places, and has been in place for more than two year. The applicant’s proposed replacement fence actually
reduces the height of the existing fence, while advancing efforts to screen the property effectively. Staff
finds that the application achieves the intent of the development standards and offers site improvements
that enhance screen, reduce construction and workplace noise, and advance the natural character along
the Eagle River Trail as well as the railroad tracks.
[970.748.4014] [mmorgan@avon.org]
Page 4 of 5
MINOR DEVELOPMENT PLAN – R EVIEW CRITERIA
REVIEW CRITERIA: §7.16.080(g):
1. Evidence of substantial compliance with the purpose of the Development Code as
specified in 7.04.030, Purposes;
Staff Response: Staff finds the Application generally complements the property and intent of the subject
design standards.
2. The design conforms with the Avon Comprehensive Plan and other applicable, adopted
plan documents;
Staff Response: The site is located in the Riverfront District (District 2 of the Comprehensive Plan, linked
here), which has “significant residential, lodging, commercial, and service uses.”
The Comprehensive Plan includes the following Planning Principle for District 2:
Orient buildings to capitalize on the Eagle River as an amenity. Use sensitive site planning,
architectural detailing, articulation, and appropriate setbacks, color, screening, and scale of
structure to preserve the character of the river and its associated natural habitat.
The proposed fence represents enhanced screening and improved aesthetic of an active job site and
workplace.
3. Consistency with any previously approved and not revoked subdivision plat, planned
development, or any other precedent plan or land use approval for the property as
applicable;
Staff Response: The existing, temporary fence was approved by the Community Development
department previously, and this application represents a replacement fence that Staff has anticipated and
encouraged as part of the larger site-improvement project.
4. Compliance with all applicable development and design standards set forth in this Code
including but not limited to the provisions in Chapter 7.20, Zone Districts and Official
Zoning Map, Chapter 7.24, Use Regulations, and Chapter 7.28, Development Standards;
Staff Response: The analysis contained in this staff report, including AEC analysis, addresses all
applicable ADC standards.
5. That the development can be adequately served by city services including but not
limited to roads, water, wastewater, fire protection; and emergency medical services;
and
Staff Response: Not applicable.
6. That development design conforms with the character of the surrounding community;
or, where redevelopment is anticipated, relates the development to the character of
Avon as a whole.
Staff Response: The property borders dense residential development with some greenspace. It is
reasonable to assume that blending a waste water treatment facility with residential space poses some
challenges with respect to character and conformity however, the applicant has advised that they have
engaged with Liftview Condominiums to seek their input on fencing and screening. Staff appreciates the
[970.748.4014] [mmorgan@avon.org]
Page 5 of 5
initiative and collaboration, and feels that Liftview Condominiums and the applicant’s property will continue
to be respectful, harmonious neighbors to one another.
AEC22005 – RECOMMENDED MOTION: “I move to approve Case #AEC22006, an Alternative Equivalent
Compliance application for Tracts H, N & O at 950 W. Beaver Creek with the findings as recommended by
staff.”
Findings:
1.The proposed application was reviewed pursuant to 7.16.120, Alternative Equivalent Compliance;
2.The proposed alternative achieves the intent of the subject design or development standard to the
same or better degree than the subject standard;
3.The proposed alternative achieves the goals and policies of the Avon Comprehensive Plan to the same
or better degree than the subject standard;
4.The proposed alternative results in benefits to the community that are equivalent to or better than the
compliance with the subject standard;
5.The proposed wire mesh does not impose greater impacts on adjacent properties than would occur
through compliance with the specific requirements of the Avon Municipal Code (“AMC”).
MNR22015 – RECOMMENDED MOTION: “I move to approve Case #MNR22021, a Minor Development
Review application for Tracts H, N & O at 950 W. Beaver Creek together with the findings as
recommended by staff.”
Findings:
1.The proposed application was reviewed pursuant to 7.16.080(f), Development Plan;
2.The design meets the development and design standards established in the Avon Development Code,
with alternative design approved by AEC application;
3.The application is complete;
4.The application provides sufficient information to allow the PZC to determine that the application
complies with the relevant review criteria;
5.The application complies with the goals and policies of the Avon Comprehensive Plan;
6.The demand for public services is unaffected; and
7.The design of the fence relates to the character of the surrounding community and other similar
improvements in the Riverfront District
ALTERNATIVE ACTIONS:
•Deny the application: If the features of the fence, including height or design, are disagreeable to
PZC, staff suggests denying the application after considering public comments.
•Continue the Public Hearing: If PZC feels that more information is needed, staff suggests
continuing the applications to your next regularly scheduled meeting.
ATTACHMENT:
A.Application Materials
September 8, 2022
Planning Division
Town of Avon
100 Mikaela Way
Avon, CO 81620
Dear Planning Division,
This Alternative Equivalent Compliance application proposes alternate fence material and height at the
Avon Wastewater Treatment Facility (AWWTF) at 950 W. Beaver Creek Blvd. This proposal will replace
the existing fencing along the perimeter of the site, instead of just in the vicinity of LiftView Condominiums
structures.
The District would like to request Alternative Equivalence Compliance for the following:
•Trex material
•Heights up to 8’
ERWSD is proposing to replace the existing chain-link fence with plastic privacy slats with Trex fencing
around the entire perimeter. Trex was chosen to meet the following District goals:
•Security
•Privacy
•Low Maintenance
•Longevity
•Consideration of costs to ratepayers
•Mountain Rustic Aesthetics
The height of the fence is proposed to be 3-ft to 8-ft tall, depending on topography, as shown in the
drawings. This height is required to secure the facility’s critical infrastructure.
Review Criteria from Code Chapter 7.16.120 (d)
(1)The proposed alternative achieves the intent of the subject design or development standard to
the same or better degree than the subject standard
The proposed fence is architecturally compatible with the style, materials and colors of the
principal buildings at the facility. the Trex material should have a longer lifespan than wood and
will require less maintenance and risk of breakage.
Solid fences shall be constructed to meet the wind design criteria of the adopted International
Building Code, using a basic wind speed of ninety (90) miles per hour.
The proposed Trex fencing is solid. Trex published reports demonstrating their ability to withstand
winds of over 90 miles per hour up to 8 ft heights.
(2)The proposed alternative achieves the goals and policies of the Avon Comprehensive Plan to the
same or better degree than the subject standard
The AWWTF is included in the District 2: The Riverfront District in the Avon Comprehensive Plan.
The proposed alternative addresses “Orient buildings to capitalize on the Eagle River as an
amenity. Use sensitive site planning, architectural detailing, articulation, and appropriate
setbacks, color, screening, and scale of structure to preserve the character of the river and its
Page 2 of 2
associated natural habitat.” The current fence is chain link with privacy slats which still afford a
look into the facility along the recreation path. The proposed fencing would act as an architectural
barrier to the AWWTF and redirect users attention to the river.
(3)The proposed alternative results in benefits to the community that are equivalent to or better than
compliance with the subject standard
The proposed fencing will significantly improve the visual impacts to the community over the
existing chain-link fence with privacy slates that is expressly prohibited by Town code.
(4)The proposed alternative imposes no greater impacts on adjacent properties than would occur
through compliance with the specific requirements of this Title.
The District does not believe there will be an increase in impacts on adjacent properties. LiftView,
our closest neighbor, has approved of the Woodland Brown and has directed us to use a height
of 8’ along their residences.
Please reach out with any questions or for additional information.
Sincerely,
Melissa Marts
Project Engineer
February 25, 2022
Matt Pielsticker
Town of Avon
100 Mikaela Way
Avon, Colorado, 81620
Re: File No. TEN19001 1041 Annual Report
Dear Mr. Pielsticker,
Eagle River Water and Sanitation District is pleased to present our annual report on the Avon
Wastewater Treatment Facility Nutrient Upgrades Project as required by Permit No. TEN 19001. The
project continues to be in compliance with all conditions of the Permit and applicable regulations.
Overview of Work Completed
Work Completed in 2020
Moltz Construction, the general contractor, mobilized on May 4, 2020. Work began with site
demolition, and installation of a construction fence with noise mitigation fabric along the west
property line near LiftView condominiums. Concrete work for expansion of the aeration basins was
completed and concrete placements started for the new secondary clarifier tank. The tower crane,
erected on a micropile foundation, can be seen from Nottingham Lake.
Figure 1: Construction site aerial image (fall 2021)
Page 2 of 5
Work Completed in 2021
Structural shotcrete was applied to the existing aeration basin 2 walls allowing for the walkways to be
poured. The building over the new aeration basin volume was erected, with precast concrete wall and
roof panels set during a single week. The process was repeated in November 2021 and the building
over existing aeration basin 2 was set in less than a week. New screens, screw conveyor, and
washer compactors were installed and commissioned in the headworks, and an increase in
screenings capture quantity was immediately observed. Moltz’s crews have also installed the new
secondary clarifier mechanism and scum skimmer. Significant progress has been made with
installation of the carbon scrubber odor control equipment. In order to perform the work in the primary
treatment process, the entire flow through the facility was bypassed using a temporary pipeline and
pumps for the duration of one month.
Work Completed in 2022
The project team has completed the largest commissioning event of the project, bringing half of the
new aeration basin volume, blowers, diffusers, instrumentation, and associated piping online in early
January 2022. This event essentially starts the new secondary wastewater process, improving
process control, access, and treatment capability. Once the new internal mix liquor recycle (IMLR)
system is installed in early 2022, the facility will be able to operate in either an A2O or 5-stage
Bardenpho configurations exceeding Regulation 85 nutrient limits.
Figure 2: Inside existing aeration basin building
Page 3 of 5
Figure 3. Existing blowers (left) and new blowers (right)
Additional upcoming project work will include
• Modifications of aeration basin 1 including soil removal, installation of temporary shoring,
shotcrete and rebar installation, construction of baffle walls, and equipment installation
• Forming, reinforcing, and pouring concrete for the secondary clarifier basin upper floor slab
and erecting the clarifier building
• Commissioning of the carbon scrubber odor control equipment
• Commissioning of the Strobic fan odor control equipment
• Completion of internal facility process piping
The project is on schedule to meet the final completion date of January 9, 2023. Through the end of
2021, $29,078,837.94 has been spent of the $49,627,732 contractor budget, about 59%. Currently,
we are 66% complete with the project schedule and have used less than 20% of our owner’s
contingency. ERWSD operations staff deserves special recognition for supporting the needs of the
construction project while keeping the Avon WWTF operating efficiently. ERWSD has maintained and
exceeded environmental compliance while operating the facility at half the final design capacity
through the busy ski season.
Conditions of the 1041 Permit
Construction activities that produce audible noise shall be limited to the hours of 7am to 7pm Monday
through Saturday, and 8am to 6pm on Sundays and Holidays;
All audible noise has been limited to between the hours of 7am to 7 pm Monday through
Saturday, and 8 am to 6 pm on Sundays and Holidays. No noise complaints were received in
2021 related to this construction work.
Page 4 of 5
Physical condition of Millie’s Lane will be documented prior to construction. If significant deterioration
of the road surface is found resulting from construction related activities, the District must restore the
roadway to pre-existing condition or better prior to the permit being closed;
ERWSD documented the condition of Millie’s Lane at the beginning of construction and
photographs were included in the 2021 Annual Report. The condition of the road after
completion of construction in 2022 will be compared to the condition before construction.
ERWSD is also planning to install a water main along Millie’s Lane which will impact the
road condition. Plans for the water main will be submitted the Town of Avon for a Right of
Way permit. The District will collaborate with the Town of Avon on paving following this
project.
A Minor Subdivision Application is required to modify lot lines prior to building permit issuance;
The Minor Subdivision Application was approved by the Town of Avon on May 14, 2020.
The plat was filed for record with Eagle County on May 28, 2020.
Screening alternatives, color schemes, and architectural elements will be brought before PZC to
alleviate south and west elevations prior to completion of the project;
Screening alternatives, color scheme and architectural elements were presented to and
approved by the Planning and Zoning Commission on September 1, 2020.
A new landscape plan must be approved by PZC and installed prior to completion of the project. The
former Hahnewald Barn area shall be planted with appropriate riverine trees to replace, at a 1:1 value
or better, any trees removed and not replanted on the adjacent property (Lot 9 Block 3 Benchmark at
Beaver Creek) and to properly screen the Eagle Valley Trail;
ERWSD presented the landscaping plan to Planning and Zoning Commission on January 19,
2021. The Commission approved the plan with conditions.
The fence design will be presented to Planning Staff for approval before its construction;
ERWSD submitted the fence design to Planning Staff in February 2022, however the
proposed fencing requires further review. Minor Development Plan and Alternative
Equivalent Compliance applications are currently in development.
All lighting on the property shall comply with Avon’s Dark Sky Ordinance before a final Certificate of
Occupancy will be issued; and
All lighting specified in this project complies with Avon’s Dark Sky Ordinance. ERWSD staff
shall conduct an inspection at night after all the external lighting has been installed to ensure
there will be no nuisance light to the neighboring community.
On or before March 1, 2021, and each year thereafter for the life of the permit, ERWSD shall submit
a written report to the Town Council, via the Director, detailing all past activities conducted by the
applicant pursuant to the Permit, including a satisfactory showing that the Permittee is in compliance
with all conditions of the Permit and applicable regulations.
This report is intended to fulfill the written report permit condition.
Page 5 of 5
ERWSD would like to thank the Town of Avon Planning Staff, Planning and Zoning Commission, and
Town Council for their support and feedback through the Nutrient Upgrades Project and for their
continued collaboration throughout permit condition resolution. Please contact me if you require
additional information or have any questions or concerns about the information presented herein.
Sincerely,
Melissa Marts
Project Manager
mmarts@erwsd.org
(970) 401-1329
Y=658725.64
X=710219.13
Z=7412.13
Y=658803.81
X=710219.13
Z=14408.89
X
X
X
EX-SS
EX-SS
EX-SS
EX-SS
EX-SS
EX-
S
S
EX-
S
S
EX-
S
S
EX-
S
S
EX-
S
S
LIFTVIEW
CONDOS
135 LF OF 8'
FENCE, TYP.
388 LF OF 6'
FENCE, TYP.
424 LF OF 8'
FENCE, TYP.
1,110 LF OF 8'
FENCE, TYP.
8' GATE, MECHANISM
AND HARDWARE BY
OTHERS
FENCING SUMMARY
1,705 LF OF 8' HT. FENCE
1,133 LF OF 6' HT. FENCE
115 LF OF 3' HT. FENCE
289 LF OF 6'
FENCE, TYP.
36 LF OF 8'
FENCE, TYP.
AVON WWTF
115 LF OF 3'
FENCE, TYP.
68 LF OF 6'
FENCE, TYP.Co
p
y
r
i
g
h
t
©
2
0
1
9
b
y
Z
e
h
r
e
n
&
A
s
s
o
c
i
a
t
e
s
I
n
c
.
SCALE: 1" = 40'
20' 40'0 80'
FENCING PLAN
SCALE: 1" = 40'-0"L1.01
1
Photos of existing fence and site
Figure 1: North side of site from Nottingham Lake.
Figure 2: North-east side of site from Nottingham Lake.
Figure 3: South-east side of site along recreation path.
Figure 4: South-east side of site along recreation path.
Figure 5: South-west side of site along recreation path – fence is proposed to be above retaining wall on
the District site.
Figure 6: West side of site along LiftView Condominiums.
Figure 7: West entrance to facility.
Figure 8: Areal view of the site.
Figure 9: Areal view of the site with location of proposed lab HVAC chase.
Building Face for
HVAC chase
96" O.C.
91"
Concrete
Fill
3 8"
12"
Typ
Fencing
COMPOSITE FENCE SYSTEMS FENCE DISTRIBUTORS
091619
36" Min. Typ.
(Consult local
codes)
5 3 4"
97 5 8"Fence
Height 96"
Post
Height
98 14"
Br
a
c
k
e
t
H
e
i
g
h
t
108
NOTES:
1. INSTALLATION TO BE COMPLETED PER
MANUFACTURER'S SPECIFICATION.
2. REFER TO YourNextFence.com FOR
CONSTRUCTION DETAILS AND PRODUCT
INFORMATION
3. DRAWING NOT TO SCALE.
CUT VIEWS
2 14"
Top Rail
Picket
Post Cap
Aluminum
Bottom Rail
Fence Bracket
Bottom Rail 3 8"
12"
FD
S
543 E. 600 S. Provo, UT 84606
1-877-700-8739 - YourNextFence.com
Copyright © 2019. FDS FENCE DISTRIBUTORS. All rights reserved.
Modification or reproduction is prohibited without written permission.
Fence Height: 8'
144"
91"
91"
90 1/2"
1 5/8"
N/A
N/A
91"
1
1
19
2
1
4
24
1
Component lengths may vary
COMPONENT
Post Cap
Pyramid Flat Crown
Bottom Rail / Picket
5" x 5"Post
Top Rail
1" x 5 3/4"
Fence Bracket
Ext. Wood Screw
1" x 5 3/4"
2 3/4" x 5 1/8"
1 1/4" x 3 1/8"
#7
LENGTHQTY.
Bottom Rail
/ Picket
COMPONENT LENGTHQTY.
Aluminum Bottom
Rail
4" x 5"
COMPOSITE FENCE SYSTEMS
EX-SS
EX-SS
EX-SS
EX-SS
EX-SS
EX-FWR
EX-FWR
EX-
S
S
EX-
S
S
EX-
S
S
EX-
S
S
EX-
S
S
EX-
S
S
EX-UE
EX-GAS
EX-T
EX-SS
EX-FWR
Pl
o
t
S
t
a
m
p
Y=658725.64X=710219.13Z=7412.13
Y=658803.81X=710219.13Z=14408.89
X
X
X
EX-SS
EX-SS
EX-SS
EX-SS
EX-SS
EX-SS
EX-SS
EX-SS
EX-SS
EX-SS
LIFTVIEW
CONDOS
135 LF OF 8'
FENCE, TYP.
388 LF OF 6'
FENCE, TYP.
424 LF OF 8'
FENCE, TYP.
1,110 LF OF 8'
FENCE, TYP.
8' GATE, MECHANISM
AND HARDWARE BY
OTHERS
FENCING SUMMARY
1,705 LF OF 8' HT. FENCE
1,133 LF OF 6' HT. FENCE
115 LF OF 3' HT. FENCE
289 LF OF 6'
FENCE, TYP.
36 LF OF 8'
FENCE, TYP.
AVON WWTF
115 LF OF 3'
FENCE, TYP.
68 LF OF 6'
FENCE, TYP.Co
p
y
r
i
g
h
t
©
2
0
1
9
b
y
Z
e
h
r
e
n
&
A
s
s
o
c
i
a
t
e
s
I
n
c
.
SCALE: 1" = 40'
20' 40'0 80'
FENCING PLAN
SCALE: 1" = 40'-0"L1.01
1
Avon Wastewater Treatment Facility
Avon, CO
Trex Fencing
Woodland Brown
Trex Composite Fencing provides a beautiful, unique,
low-maintenance alternative to wood and vinyl fences. Trex is a
combined brilliance of melding innovation with environmental
responsibility and beautiful form with powerful function.
FENCING PLAN N
Y=658725.64X=710219.13Z=7412.13
Y=658803.81X=710219.13Z=14408.89
X
X
X
EX-SS
EX-SS
EX-SS
EX-SS
EX-SS
EX-SS
EX-SS
EX-SS
EX-SS
EX-SS
LIFTVIEW
CONDOS
135 LF OF 8'
FENCE, TYP.
388 LF OF 6'
FENCE, TYP.
424 LF OF 8'
FENCE, TYP.
1,110 LF OF 8'
FENCE, TYP.
8' GATE, MECHANISM
AND HARDWARE BY
OTHERS
FENCING SUMMARY
1,705 LF OF 8' HT. FENCE
1,133 LF OF 6' HT. FENCE
115 LF OF 3' HT. FENCE
289 LF OF 6'
FENCE, TYP.
36 LF OF 8'
FENCE, TYP.
AVON WWTF
115 LF OF 3'
FENCE, TYP.
68 LF OF 6'
FENCE, TYP.Co
p
y
r
i
g
h
t
©
2
0
1
9
b
y
Z
e
h
r
e
n
&
A
s
s
o
c
i
a
t
e
s
I
n
c
.
SCALE: 1" = 40'
20' 40'0 80'
FENCING PLAN
SCALE: 1" = 40'-0"L1.01
1
•Fencing weathers several weeks after installation to a
lighter color
•Trex fences should last around 30 years with almost no
maintenance cost after installation
•The interlocking picket design gives full privacy and
creates secure structural features
8/16/22
Avon Community Development Department
100 Mikaela Way
PO Box 975
Avon, Colorado 81620
www.avon.org
AUTHORIZED REPRESENTATIVE
I/We permit _Melissa Marts__________________________(Authorized Representative name) to act as my/our
representative in any manner regarding this application, to answer questions and to represent me/us at any meeting
and public hearing(s) which may be held on this application.
I/WE understand that the Town will send all correspondence to the authorized representative. It will be the
representative’s responsibility to keep the owner(s) adequately informed as to the status of the application.
__________________________________________________
Signature
_Linn Brooks________________________________________
Property Owner Name (printed )
_846 Forest Road, Vail CO 81657______________________
Address
_970-477-5444_______________________________________
Phone Number
Notice of Regular Avon Planning and Zoning
Commission Meeting
100 Mikaela Way, Avon
October 4, 2022 at 5:00 p.m.
File Number: MNR22021
Application Type: Minor Development Plan
Legal: Tracts H, N, & O - Benchmark at Beaver Creek
Address: 950 W. Beaver Creek – Avon Waste Water Treatment Plant
Summary: Eagle River Water and Sanitation District has applied to replace
fencing along the entire perimeter of the facility and modify the
roof to include analytical lab equipment with duct chase. The new
Trax fence will range from 3’ to 8’ and will be visible to the public
however, the roof modification is likely to be imperceptible upon
completion.
Map:
Copies of the application materials may be found at www.avon.org/planning under
“Current Applications”. Written comments may be submitted to the Community
Development Department ComDev@Avon.org no later than 12pm on the hearing date.
_______________________________________________________________________________
MEETING AGENDAS AND PACKETS ARE FOUND AT: WWW.AVON.ORG
AGENDAS ARE POSTED AT AVON TOWN HALL, AVON RECREATION CENTER, ONLINE AND AVON PUBLIC LIBRARY
IF YOU HAVE ANY SPECIAL ACCOMMODATION NEEDS, PLEASE, IN ADVANCE OF THE MEETING,
CALL MATT PIELSTICKER AT 970-748-4413 OR EMAIL MATT@AVON.ORG WITH ANY SPECIAL REQUESTS.
1
AVON PLANNING & ZONING COMMISSION
MEETING MINUTES
TUESDAY, SEPTEMBER 6, 2022 - MEETING BEGINS AT 5:00 PM
100 MIKAELA WAY – AVON TOWN HALL
1.CALL TO ORDER AND ROLL CALL
ACTION: THE MEETING WAS CALLED TO ORDER AT 5:02PM BY CHAIRPERSON NUSBAUM
A ROLLCALL WAS TAKEN, AND PLANNING COMMISSIONERS PRESENT WERE BILL GLANER, STEVE NUSBAUM, TOM
SCHAEFER, AND ANTHONY SEKINGER. ALSO PRESENT WERE TOWN MANAGER ERIC HEIL, PLANNING DIRECTOR MATT
PIELSTICKER, SENIOR PLANNER JENA SKINNER, AND PLANNER 1+ MAX MORGAN. COMMISSIONERS MARTY
GOLEMBIEWSKI, KEVIN HYATT, AND DONNA LANG WERE NOT IN ATTENDANCE.
2.APPROVAL OF AGENDA
ACTION: COMMISSIONER SCHAEFER MOTIONED TO APPROVE THE AGENDA. THE MOTION WAS SECONDED BY
COMMISSIONER SEKINGER, AND ALL WERE IN FAVOR. THE MOTION PASSED UNANIMOUSLY WITH A 4-0 VOTE.
3.DISCLOSURE OF ANY CONFLICTS OF INTEREST OR EX PARTE COMMUNICATION RELATED TO AGENDA ITEM
THERE WERE NONE
4.PUBLIC HEARING – CODE TEXT AMENDMENTS FOR DEVELOPMENT BONUSES | FILE #CTA22003
(MATT PIELSTICKER, PLANNING DIRECTOR)
PUBLIC COMMENTS: THERE WERE NO PUBLIC COMMENTS
ACTION: COMMISSIONER SCHAEFER MOTIONED TO APPROVE APPLICATION #CTA22003. THE MOTION WAS SECONDED
BY COMMISSIONER GLANER. THE MOTION TO APPROVE WAS APPROVED UNANIMOUSLY, 4-0.
5.CONSENT AGENDA
5.1. JULY 19, 2022 PLANNING AND ZONING COMMISSION MEETING MINUTES5.2. FINDINGS OF FACT AND RECORD – TMP22002 – TEMP USE 332. E. BEAVER CREEK BOULEVARD
5.3. FINDINGS OF FACT AND RECORD – MNR22015/AEC22003 – FENCE 2480 SADDLERIDGE LOOP
ACTION: COMMISSIONER SCHAEFER MOTIONED TO APPROVE THE CONSENT AGENDA. THE MOTION WAS
SECONDED BY COMMISSIONER SEKINGER. THE MOTION TO APPROVE THE CONSENT AGENDA WAS APPROVED
UNANIMOUSLY, 4-0
6.STAFF UPDATES
6.1. AMERICAN PLANNING ASSOCIATION
6.2. SHORT TERM RENTALS
7.ADJOURN
_______________________________________________________________________________
MEETING AGENDAS AND PACKETS ARE FOUND AT: WWW.AVON.ORG
AGENDAS ARE POSTED AT AVON TOWN HALL, AVON RECREATION CENTER, ONLINE AND AVON PUBLIC LIBRARY
IF YOU HAVE ANY SPECIAL ACCOMMODATION NEEDS, PLEASE, IN ADVANCE OF THE MEETING,
CALL MATT PIELSTICKER AT 970-748-4413 OR EMAIL MATT@AVON.ORG WITH ANY SPECIAL REQUESTS.
2
ACTION: COMMISSIONER NUSBAUM ADJOURNED THE MEETING.
THESE MEETING MINUTES ARE ONLY A SUMMARY OF THE PROCEEDINGS OF THE MEETING.
THEY ARE NOT INTENDED TO BE COMPREHENSIVE OR TO INCLUDE EACH STATEMENT,
PERSON SPEAKING OR TO PORTRAY WITH COMPLETE ACCURACY. THE MOST ACCURATE
RECORDS OF THE MEETING ARE THE AUDIO RECORDING OF THE MEETING, WHICH CAN BE
OBTAINED FROM THE TOWN CLERK’S OFFICE BY SUBMITTING A PUBLIC INFORMATION
REQUEST.
APPROVED:
X
CHAIRPERSON
PZC Record of Decision: CTA22003 Page 1 of 1
PLANNING AND ZONING COMMISSION
FINDINGS OF FACT AND RECORD OF DECISION
DATE OF PUBLIC HEARING: September 6, 2022
TYPE OF APPLICATIONS: Code Text Amendment
PROPERTY LOCATION: NA
FILE NUMBER: #CTA22003
OWNER/APPLICANT: Matt Pielsticker, AICP – Community Development Director
This Record of Decision is made in accordance with the Avon Development Code §7.16.080(c):
DECISION: Approved
Findings:
1.The development application is reviewed pursuant to the general review procedures set forth in
Avon Development Code Section 7.16.110, Variance, and Section 7.16.020, General Procedures
and Requirements;
2.The application is complete;
3.The development application provides sufficient information to allow PZC to determine that the
development application complies with the relevant review criteria;
4.A public hearing was conducted on September 6, 2022, meeting all noticing requirements;
5.The development application complies with the goals and policies of the Avon Comprehensive
Plan;
6.The text amendment DOES promote the health, safety and general welfare of the Avon community
for the reasons as provided by Staff;
7.The text amendment DOES promote or implements the goals and policies of the Avon
Comprehensive Plan and Avon Housing Plan for reasons provided in this analysis;
8.The text amendment DOES promote or implements the purposes stated in this Development
Code, as is cited in this report;
9.The text amendment IS necessary or desirable to respond to changed conditions, new planning
concepts or other social or economic conditions.
THESE FINDINGS OF FACT AND RECORD OF DECISION ARE HEREBY APPROVED:
BY:______________________________________ DATE: ___________________
Chairperson