PZC Packet 111803Town of Avon
Planning & Zoning Commission
Site Tour
November 18th12003
12:00 PM
Town of Avon Municipal Building
400 Benchmark Road
A. Mountain Center
B. Lot 6, McGrady Acres
Please meet at the Community Development Department
Conference Room
Town of Avon
:C�issioninoZ�I
Work Session
November 18th1 2003
5:30 PM
Council Chambers
Town of Avon Municipal Building
400 Benchmark Road
I. AGENDA
A. Discussion of regular meeting agenda items.
Estimated times for each agenda item are shown for
informational purposes only, and subject to change without
notice.
Posted on November 14"', 2003 at the following public places within the Town of Avon:
• Avon Municipal Building, main lobby
• Avon Recreation Center, main lobby
• Alpine Bank, main lobby
• City Market, main lobby
• ()n tha IntarnPt At httn-/Aniww avnn nrn
Town of Avon
Planning & Zoning Commission
Regular Meeting
November 18th3 2003
6:00 PM
Council Chambers
Town of Avon Municipal Building
400 Benchmark Road
AGENDA
I. Call to Order (6:00pm)
II. Roll Call
III. Additions and Amendments to the Agenda
IV. Conflicts of Interest
V. Consent Agenda
Approval of the October 21 St, 2003 Planning & Zoning Commission
Meeting Minutes [Tab 1 ]
PUBLIC HEARING (6:05pm — 7:05pm)
VI. Special Review Use Applications
A. Confluence Overflow Parking
The Confluence PUD
Avon Road
Resolution No. 03-18
Applicant: Beaver Creek Resort Company [Tab 2]
Posted on November 14`", 2003 at the following public places within the Town of Avon:
• Avon Municipal Building, main lobby
• Avon Recreation Center, main lobby
• Alpine Bank, main lobby
• City Market, main lobby
• On tha lntPrnat at httn-/AAi\Am avnn nrn
Beaver Creek Resort Company is proposing to use the Confluence site for
overflow parking for Beaver Creek Resort. The permit would allow for up to
400 vehicles once all other overflow parking options are utilized.
B. Drive-thru Bank
Lot 6, McGrady Acres Subdivision
86 Post Boulevard
Resolution No. 03-19
Applicant: Edinburgh Corporation [Tab 3]
Edinburgh Corporation is proposing a drive-thru facility on Post Boulevard
for a bank. A bank drive-thru facility is the subject of this review and permit
application, not the actual bank (which is a use by right in this zone district).
Access to the site is from Post Boulevard.
VII. Variance Application
A. Lots 26/27/28, Block 1, Benchmark at Beaver Creek Subdivision
910 Nottingham Road
Resolution No. 03-20
Applicant: Vail Resorts/Mark Donaldson [Tab 4]
A variance request from the Town's off-street parking and off-street loading
regulations. Section 17.24.020.1 of Town Code states "off street parking
spaces, including the adjacent area used for turning movements necessary
to enter or leave the parking spaces ... may be located in any yard except
the front ten feet of the required front yards." Section 17.24.030.3 of Town
Code states "...loading berths shall be designed with appropriate means of
vehicular access to a street or alley in a manner which will least interfere
with traffic movement." A newly configured loading dock is proposed in a
separate design application, with access and turning movements that
would encroach the front yard and partly in the existing driving lane of
Nottingham Road.
PUBLIC HEARING CLOSED
Vill. Sketch Design Plan (7:05pm — 7:20pm)
A. Lots 26/27/28, Block 1, Benchmark at Beaver Creek Subdivision
910 Nottingham Road
Mountain Center
Applicant: Vail Resorts/Mark Donaldson [Tab 5]
Posted on November 14'h, 2003 at the following public places within the Town of Avon:
• Avon Municipal Building, main lobby
• Avon Recreation Center, main lobby
• Alpine Bank, main lobby
• City Market, main lobby
• On the IntPrnPt nt httn-//www nvnn nrn
The applicant is proposing this sketch design plan for the existing Mountain
Center building, on Nottingham Road just west of the Metcalf Road
intersection. The sketch design plan is to approve a newly configured
loading dock and revised floor plan and elevation. This application is being
reviewed in conjunction with the Variance application.
IX. Master Sign Program (7:20pm — 7:35pm)
A. Lot A, Avon Center at Beaver Creek Subdivision
100 Beaver Creek Boulevard
Applicant: VAG Architects [Tab 6]
VAG Architects is proposing a Master Sign Program (MSP) for the Avon
Center building. This application proposes all new signs for the property,
making the existing signage obsolete.
X. Sign Design Approvals (7:35pm — 7:40pm)
A. Lot 1, Block 2, Benchmark at Beaver Creek Subdivision
30 Benchmark Road (Unit #102)
"Central Rockies Mortgage"
Applicant: Paul W. Jardis
Sign application for 2 un-lit building mounted signs at the Avon Town
Square building. Both signs comply with the current Master Sign Program
(MSP) for the building.
B. Lot 21, Block 2, Benchmark at Beaver Creek Subdivision
182 Avon Road (Unit #200 & 210)
"Prestige Cleaners"
Applicant: Patricia Prewitt
Staff approval for a sign application for a new tenant, Prestige Cleaners, in
the former Earth Wireless suite. Two signs were approved and both
comply with the MSP for the Christy Sports Building.
C. Lot 63, Block 2, Benchmark at Beaver Creels Subdivision
137 Benchmark Road
"Mountain Burger"
Applicant: Brian Nolan
Sign application for a north facing "Mountain Burger" sign on the Seasons
building. This building has a MSP, and the sign is in conformance.
Posted on November 14th, 2003 at the following public places within the Town of Avon:
• Avon Municipal Building, main lobby
• Avon Recreation Center, main lobby
• Alpine Bank, main lobby
• City Market, main lobby
• nn the IntPrnPt at httn-//UiXnnni avnn nrn
XI. Minor Project Approvals (7:40pm — 7:45pm)
A. Lot 41 B, Block 3, Wildridge Subdivision
4350 Flat Point
Deck addition, additional space, & new entryway
Applicant: RYS Olsen
Staff has approved this Minor Project on Flat Point for a deck addition, and
a small building addition. A new front entryway was also included.
Materials and colors match the existing home.
B. Lot 12, Filing 2, Eaglebend Subdivision
4995 Eaglebend Drive
New window
Applicant/Owner: Kristina Bruce
Minor Project for a new window on an Eaglebend Drive single-family home.
Window and trim matches existing home.
C. Lot 8, Wildridge Acres Subdivision
2823 Ked Spur
Shed addition
Applicant/Owner: Mark A. Nelson
Minor Project approval for a shed addition on Ked Spur. The attached
accessory structure will match the building materials and colors of the
home.
XII. Other Business (7:45pm — 7:55pm)
A. Lots 1 &2, Nottingham Station PUD
0025 Hurd Lane
Minor Project — Doors and handrail repaint
Applicant: O'Halloran Construction
This Minor Project application proposes to repaint all sets of doors and both
handrails on the Nottingham Station building with the "California Rustic"
color. The Commission is being requested to make a motion on this
application. The color sample will be available for review at the site tour
and work session.
XIII. Adjourn (7:55pm)
Posted on November 14`n, 2003 at the following public places within the Town of Avon:
• Avon Municipal Building, main lobby
• Avon Recreation Center, main lobby
• Alpine Bank, main lobby
• City Market, main lobby
• Can tha IntPrnPt nt httn-//Xnrww nvnn nrn
Minutes of Planning and Zoning Commission
October 21, 2003
Council Chambers
Town of Avon Municipal Building
400 Benchmark Road
I. Call to Order
The meeting was called to order at 6:00 pm.
II. Roll Call
All Commissioners were present with the exception of Commissioner Chris
Evans.
III. Additions and Amendments to the Agenda
There was one amendment to the agenda for Item VI I, A Lot 45C, Block 2, 2520
Old Trail Road, Wildridge Subdivision, to be moved as the first item of discussion
on the agenda.
IV. Conflicts of Interest
Commissioner Him disclosed a conflict with item VII, A, Lot 45C, Block 2, 2520
Old Trail Road, Wildridge Subdivision.
V. Consent Agenda
Commissioner Him motioned for the approval of the Meeting Minutes from the
October 7, 2003, Planning & Zoning Commission Meeting. Commissioner
Smith seconded the motion. The motion passed unanimously.
PUBLIC HEARING OPENS
VI. Special Review Use Application
A. Fiasco Restaurant(Tavern
Lot 13, Block 1, Benchmark at Beaver Creek Subdivision
411 Metcalf Road
Resolution No. 03-17
Applicant/Owner: David Svabik
Existing Beaver Creek Automotive is seeking approval for a restaurant and
tavern in an industrial/commercial zone district.
Matt Pielsticker presented the Staff Report, which recommended denial. David
Svabik, applicant/owner, approached the podium to discuss his position. Walter
Gus, Dawn DeLucia, Elaino Valez, Steve Nelson, Steve Smith, Bob Mach, Chris
Lucier, and Paul Benacoff offered their words of support of this application. An
email received by staff was opposed to this application, signed by four Town
residents Jane and Howard Leavitt, Shelly Miller, and Allan Sandburg.
Vice Chairman Karow took a moment to disclose the three criteria for review in
order for the public to focus their comments on these areas. 1). Whether the
proposed use otherwise complies with all requirements imposed by the Town
Zoning Code; 2). Whether the proposed use is in conformance with the Town
Comprehensive Plan; and, 3). Whether the proposed use is compatible with
adjacent uses. Such compatibility may be expressed in appearance,
architectural scale and features, site design and the control of any adverse
impacts including noise, dust, odor, lighting, traffic, safety, etc. These three
criteria are the considerations for this Special Review Use Application.
PUBLIC HEARING CLOSES
Tom Boni, Knight Planning Services, employed by Mr. Svabik to discuss the
compliance and conformance of this project with the Master Plan made a
presentation. He discussed the Town of Avon mission statement that discussed
its sense of community, as this project would create an enhanced sense of
community. Visual quality of urban design to help the area develop, to maintain
Avon's sense of identity with having said establishment in closer proximity to
residential areas would balance land use in this area. Landscaping plan exceeds
and parking requirements are met by this project. The lack of residential uses in
this commercial/industrial area removes local/residential impact. Tom continued
to mention how Mr. Svabik continuously has worked to appease the parameters
as set by the Town of Avon.
George Rosenberg, Mr. Svabik's attorney, approached the podium. He began
with mentioning the support presented by Mr. Svabik. Three focal points are the
"Cheers" concept in a tourist town to accommodate locals primarily, better use of
the property, increased revenues to the Town, assessed value would increase
and it would be an amenity to the area. Mr. Svabik is prepared to commit to a
bike path and walkway on his property as mentioned in the Master Plan.
Commissioner review begins. Commissioner Neville in his review had difficulty
with A3.3 that discussed traffic and D1.4 dealing with safety of site, E1.2
regarding the location of this use relative to existing transit routes, E1.4 to
minimize in town vehicle traffic and E1.6 which deals with bicycle facilities, all
traffic accessibility and access issues. No transit service or pedestrian pathways
exist in this area as well as the parking is still not adequate. All restaurants have
transit or sidewalk access in the Town of Avon. Plus, Commissioner Neville is
skeptical of the parking provided since it calculated to only 37% of the building
being used as seating area. He was curious as to why so little seating is being
provided if the use is going to be successful.
Commissioner Smith concurred with Commissioner Neville in the concerns
regarding traffic, parking and safety issues. She believes that Metcalf Road is
dangerous already and this would encourage more traffic. She does not believe
that opening the area to retail and additional pedestrian use is compatible with
the area, to the contrary of the presentation and what those in support think.
Commissioner Him mentioned the lack of support from the immediate
neighborhood and does not feel that alcohol at this site is the best use for the
public as traffic is quite an issue here. He mentioned a restaurant on this site
may be okay but that this type of business would cause increased conflicts with
traffic and parking. He agreed with Commissioner Neville's concern of the
parking numbers as well as the site's steep grades, driving access and existing
street curves.
Commissioner Didier voiced his support of this application, reiterated the support
from the neighbors, and believed it is compatible to its location but agreed that
the traffic was a serious issue.
Commissioner Trueblood brought to light that the liquor license petition included
names of business owners in the area that were not residents of Avon and
mentioned that handing out a petition not reviewed by staff at the hearing was
inappropriate. He stated that it is a great concept, but not at this location. He
was concerned that one could not walk to this location. He believes it is just
dangerous with the road design already in place.
Commissioner Karow agreed with Commissioner Neville on the parking issues
and Comprehensive Plan issues. The building use meets the consideration of
the plan; mixed -use development is warranted in the area, no concerns with
noise, dust or odors, or lighting. The roads are designed to handle the traffic and
safety is not an issue in his opinion. Commissioner Karow was in support of this
application.
Commissioner Trueblood motioned for denial of this project, with the staff's listed
recommendations in Resolution 03-17. Commissioner Smith seconded this
motion. Mr. Rosenberg then approached the podium for recourse.
Mr. Rosenberg mentioned the petitions would be avoided in the future. He
mentioned that the traveling public would benefit from this use. He stated that
traffic was based on the residents of Wildridge and not the industrial and
commercial area. He mentioned that traffic issues such as speeding and
drinking and driving are not under the control of the applicant, and precedent has
been set for mixed uses by the Barrancas development in the immediate area.
Mr. Rosenberg stated that the character of the light industrial and storage area
will change slowly, and that this business will help bring in retail and commercial
business. He said that restaurant type uses go well with all other types of retail
uses. The character of the area will change as a result of this project, and that
the Commission should consider this area will change and not remain the same
as it is today.
Tom Boni approached the podiunn to discuss safety and pedestrian issues. He
mentioned that if someone is unable to drive, they should be the responsible
party and that line of sight is not an issue for this access drive.
David Svabik, applicant, approached the podium to "problem solve" this issue.
He defined commercial uses from the Comprehensive Plan. He requested
reconsideration of the motion.
The motion carried 4-2 with Commissioner Didier and Commissioner Karow
opposing denial of the resolution.
VII. Final Design
A. Lot 45C, Block 2, Wildridge Subdivision
2520 Old Trail Road
Revised Elevations
Applicant: Bob Mach
This single-family residence is modifying the exterior to comply with Planning and
Zoning Commission recommendations and design review. Sketch Plan was
approved at the October 7, 2003, Planning and Zoning Commission meeting with
the condition that Final Design be improved. Bob Mach, applicant, complied with
conditions as stated at Sketch Plan by adding banding to the stucco, revision to
roof eave and another window on the North elevation. Commissioner Didier
motioned for approval with Commissioner Trueblood seconding the motion. The
approval included the 7 conditions from the Staff Report. The motion carried
unanimously.
VIII. Minor Project Approvals
A. Lot 94, Block 2, Wildridge Subdivision
2390 Old Trail Road
Re -roof with asphalt shingles
Applicant: Keith Harrison
B. Lot 47, Block 2, Wildridge Subdivision
2540 Old Trail Road
Additional parking space
Applicant/Owner: Vincent Guercio
IX. Other Business
A. Lot 61 Update - This is an overview on the planning process with
the developer for a new transit center and revised development
plan.
Current development rights expire in February 2004. Michael Hazard and Stuart
Borne, representing the developer, have been working with staff to reconfigure
Lot 61 to make it a transit center and accommodate a development plan.
Considerations were being made regarding the movement of pedestrians through
the transit center via a pedestrian bridge to access the confluence site for future
gondola access. This would allow this area to be more viable with the
Confluence access. Staff showed a two level structure and how is would impact
the site. Parking area would be underground and transit service above. An older
model of Town Center was presented for visualization of the current project
ideas.
Developer is looking for additional height for its design concept. Staff is working
to provide both the developer and the pedestrian with maximum of access via
transportation in a viable design. Consideration for the railroad tracks in the plan
for pedestrian access is still up for discussion. A gateway to the Mall is
envisioned and the Town of Avon currently owns the property with restrictions on
the site. Staff have also submitted for federal funding to assist with this
development through the Federal Transit Authority. This money is available to
the Town and contemplated in the approved Capital Improvement Program
budget. 'Staff is still working through issues with the developer but noted that if
the g ondola n ever w ere t o happen, a n e xpanded and a dequate t ransit c enter,
new alignment to benchmark road, and active retail mall area would be a great
benefit to the Town and it's residents and guests.
There will be an upcoming work session with Town Council to address the Lot 61
issue. Developer will bring to P&Z an amended PUD for this site after several
more issues are worked through. The Commission generally supported the work
and thanked the developer for working with staff on this project.
X. Adjourn
Commissioner Trueblood made the motion to adjourn. Commissioner Him
seconded and the motion was unanimously approved. The meeting adjourned at
8:10 pm.
Respectfully submitted,
Ruth Weiss
Recording Secretary
APPROVED:
Andrew Karow
Vice Chairman
Terry Smith
Secretary
FAPlanning & Zoning Comm ission\Minutes\2003\102103.doc
Staff Report
SPECIAL REVIEW USE
a
,A the VALLEY
C 0 L O R A D 0
November 18, 2003 Planning & Zoning Commission meeting
Report date November 13, 2003 (PUBLIC HEARING)
Project type Overflow Skier Parking Lot
Legal description The Confluence PUD
Zoning PUD
Address Avon Road
Introduction
The applicant, Beaver Creek Resort Company, is requesting a Special Review Use (SRU) Permit
for an overflow skier parking on the property known as "The Confluence". This use is proposed
for a temporary basis (29 potential days) beginning on November 28, 2003 and running until
March 28, 2004. The lot is currently unimproved, with access just south of the railroad overpass
on Avon Road. Included with the application are a site plan, schedule of potential parking days,
bus traffic plan, and the basic procedures for how the parking plan will run.
As outlined in the memo from Jim Funk (attached) dated October 29, 2003, before any parking at
The Confluence site takes place all other parking options must be exhausted for parking at
Beaver Creek Resort. Once all other parking options are used, procedures for parking at The
Confluence are outlined in the memo. A 40 passenger bus would transport guests to the resort
until upload is complete, and then a 14 passenger "people mover" would transport guests back to
The Confluence on a as needed basis from the east parking lot of the resort on.
As proposed, buses and private vehicles entering the site would make a left turn from Avon road.
In order to avoid traffic conflicts on Avon Road and to be consistent with the Rodeo SRU
approval, staff is recommending that private vehicles only be allowed to make right turns in and
out of the site.
Criteria for Review
According to section 17.48.040 of the Avon Municipal Code, the Planning & Zoning
Commission shall consider the following criteria when evaluating an application for a Special
Review Use permit:
1. Whether the proposed use otherwise complies with all requirements imposed by the Town
Zoning Code.
This property is currently zoned PUD. Since the Confluence site is zoned as a PUD, the zoning
for this site is governed by a development agreement. The document titled "Development
Town of Avon Community Development (970) 748-4030 Fax (970) 949-5749
The Confluence PUD, Special Review Use for Temporary Overflow Parking Lot
November 18, 2003 Planning & Zoning Commission meeting Page 2 of 3
Agreement, Confluence and Tract C" outlines the allowed uses on this parcel of land. In this
document "Day Skier Parking" is an allowed use.
The Off-street parking regulations (17.24.020.2) state "in cases where parking facilities are
permitted on land other than the lot on which the building or use served is located, such facilities
shall be in the same possession as the lot occupied by the building or use to which the parking
facilities are accessory." Beaver Creek Resort Company owns The Confluence property.
Access to the site and minimizing conflicts with traffic on Avon Road is critical to this
application functioning properly. Section 17.24.020.4 of Town Code states "all off-street
parking facilities shall be designed with appropriate means of vehicular access to a street or alley
in a manner which will least interfere with traffic movement." As proposed, vehicles would be
allowed to make a left turn into the lot, which may interfere with traffic on Avon Road. Staff
recommends that right turn in and out be the only turning movements allowed for private
automobiles, in order to minimize obstruction with other traffic on Avon Road and comply with
this requirement without the need to apply for a variance from the code.
Lighting for the parking lot is proposed with this application. The applicant's memo states that
lighting for the lot would be provided with generator lights "that would only run on an as needed .
basis and would not be used after 8pm." In order far the temporary lights to comply with Town
Code, "any light used to illuminate parking areas ... shall be so arranged as to shield the light
away from nearby residential properties and vision of passing motorists (17.50.090)."
Additionally, Section 17.24.020.11 of Town Code requires all lighting for off-street parking to
be "a sodium vapor type light."
2. Whether the proposed use is in conformance with the Town Comprehensive Plan.
At the time the Comprehensive Plan was adopted, The Confluence was not included in the Town
of Avon boundaries. However, there are policies and goals in the Comprehensive Plan that can
be applied to this application. These policies and goals set the vision for the Town and provide a
direction from which all planning decisions are made.
The goals in the Comprehensive Plan help guide the community's decisions about public and
private investment and development. Land Use Goal Al states that the Tov�n should "Ensure a
balanced system of land uses that maintains and enhances Avon's identity as a ....tourism and
entertainment center." The parking lot will provide both Beaver Creek Resort and Avon guests
with another parking option for high demand skier days. Since the majority of resort guests
arrive in an automobile, this land use would help to accommodate high volumes of skier traffic.
Along with promoting mixed -use development, the Comprehensive Plan encourages a diverse,
balanced economic base. Policy B3.1 provides direction to "promote development of facilities
and activities which strengthen the Town's year-round tourism base, and relationship to the
resort community." The Confluence provides an opportunity to strengthen the Town's
relationship with Beaver Creek Resort Company, and promote a more enjoyable guest
experience by avoiding parking along Highway 6.
3. Whether t he p roposed use is c ompatible w ith adjacent u ses. S u>ch c ampatibility may b e
expressed in appearance, architectural scale and features, site design and the control of
any adverse impacts including noise, dust, odor, lighting, traffic, safety, etc.
It appears that this use is compatible with the adjacent land uses. Impacts of this use may
include: increased vehicular traffic on Avon Road, light glare onto, adjacent properties, mud
Town of Avon Community Development (970) 748-4030 Fax (970) 949-5749
The Confluence PUD, Special Review Use for Temporary Overflow Parking Lot
November 18, 2003 Planning & Zoning Commission meeting Page 3 of 3
being tracked onto Avon Road from vehicles leaving the site, and parking in areas that have not
been identified as parking areas on the site plan.
With three to four guest attendants on -site to direct traffic, internal traffic control is addressed
and parking should only occur in the areas highlighted on the site plan as designated parking
areas. Staff feels that any potential traffic conflicts have been addressed with the appropriate
signage being posted, vehicle -turning movements limited to right in right out only for private
automobiles, and a guest attendant on Hurd Lane to flag guests in to park. The traffic control
(guest attendant) on Hurd Lane must be on duty at all times.
Recommended Motion
Staff recommends approval of Resolution 03-18 to allow for the operation of a temporary
overflow parking lot as described in the plans dated October 20, 2003 on The Confluence PUD
with the following conditions:
1. Traffic control must be provided at all times by Beaver Creek Resort Company when
vehicles are accessing The Confluence property.
2. Any lighting for the parking area must be a sodium vapor type light and must be arranged
to shield the light away from nearby residential properties and the vision of passing
motorists. All lights must be turned off no later than 8pm on days in use.
3. Signs must be adequately posted on Avon Road to direct vehicles into and out of the site.
All signs must be temporary, and removed once the overflow parking lot has been
vacated.
4. Turning movements will be limited to right turn only for private vehicles in and out of the
Confluence property. Coordination of transit (bus services) will occur between the Town
and Beaver Creek Resort Company prior to operation.
5. This SRU permit is limited to the 2003/2004 ski season and shall expire on March 28,
2004.
6. Except as otherwise modified by this permit approval, all material representations made
by the applicant or applicant representative(s) in this application and in public hearing(s)
shall be adhered to and considered binding conditions of approval.
If you have any questions regarding this or any other project or community development issue,
please call me at 748-4030, or stop by the Community Development Department.
Respectfully submitted,
Matt Pielsticker
Planning Technician
Town of Avon Community Development (970) 748-4030 Fax (970) 949-5749
TOWN OF AVON
PLANNING & ZONING COMMISSION
RESOLUTION NO.03-18
A RESOLUTION APPROVING A SPECIAL REVIEW USE PERMIT
FOR A TEMPORARY OVERFLOW SKIER PARKING LOT ON
THE CONFLUENCE PUD, TOWN OF AVON, EAGLE COUNTY,
COLORADO
WHEREAS, Beaver Creek Resort Company of Colorado has applied for a special
review use permit to operate a temporary parking lot, as described in the application
dated October 20, 2003, as stipulated ir. Title 17, of the Avon. Municipal Code; and
WHEREAS, a public hearing has been held by the Planning & Zoning Commission of .
the Town of Avon, pursuant to notices required by law, at which time the applicant and
the public were given an opportunity to express their opinions and present certain
information and reports regarding the proposed Special Review Use permit
application; and
WHEREAS, the Planning & Zoning Commission of the Town of Avon has considered
the following:
A. Whether the proposed use otherwise complies with all requirements imposed
by the zoning code; and
B. Whether the proposed use is in conformance with the town comprehensive
plan; and
C. Whether the proposed use is compatible with adjacent uses.
NOW, THEREFORE, BE IT RESOLVED, that the Planning & Zoning Commission of
the Town of Avon, Colorado, hereby approves a Special Review Use for the operation of
a temporary parking lot, as described in the application dated October 20, 2003, as
stipulated in Title 17, of the Avon Municipal Code for The Confluence PUD, Town of
Avon, Eagle County, Colorado, based upon the following findings:
That the proposed use otherwise complies with all requirements imposed by the zoning
code.
2. That the proposed use is in conformance with the Town Comprehensive Plan.
3. The proposed use is compatible with adjacent uses.
Subject to the following conditions:
1. Traffic control must be provided at all times by Beaver Creek Resort Company when
vehicles are accessing The Confluence property.
2. Any lighting for the parking area must be a sodium vapor type light and must be
arranged to shield the light away from nearby residential properties and the vision of
passing motorists. All lights must be turned off no later than 8pm on days in use.
3. Signs must be adequately posted on Avon Road to direct vehicles into and out of the
site. All signs must be temporary, and removed once the overflow parking lot has
been vacated.
4. Turning movements will be limited to right turn only for private vehicles in and out of
the Confluence property. Coordination of transit (bus services) will occur between the
Town and Beaver Crcek Resort Company prior to operation.
S. This SRU permit is limited to the 2003/2004 ski season and shall expire on March 28,
2004.
6. Except as otherwise modified by this permit approval, all material representations
made by.the applicant or applicant representative(s) in this application and in public
hearing(s) shall be adhered to and considered binding conditions of approval.
ADOPTED THIS 18th DAY OF NOVEMBER, 2003
Signed:
Attest:
Date:
Chairman
Date:
Secretary
FAPIanning & Zoning Commission\Resolutions\2003\Res 03-18 The Confluence PUD Overflow Parking SRU.doc
Memo
To: Bob Mcllveen
From: Jim Funk
CC: Bill Simmons
Date: 10/29/03
Re: 2002/2004 Confluence Ski Season Parking
As discussed the following would be the parking plan for the up coming ski season.
Before any parking at the confluence parking lot the following will occur.
• All Village core parking lots will be full
• The East and West parking lots will be full
• Both sides of Prater Road will be parked
• Special event days approved parking on Highway Six will be parked
Once the above parking has occurred, the following would be the procedures for parking at the
Confluence parking lot.
• Appropriate signage will be placed at the left and right turn lanes going into Hurd lane.
• A guest attendant will be on Hurd lane at the intersection of Hurd Lane and Avon
Road to flag guests in to park.
• 3 to 4 guest attendants will be in the Confluence lot organizing the parking of vehicles
• All parking will be in the lot, up to 400 vehicles
• Guest Attendants will be positioned at the East and West lots directing guests to the
Confluence lot.
• Signage will be placed at the round a bout at the entrance to Beaver Creek directing
guests to park at the Confluence lot.
• Page 1
Bus traffic configuration
Once all lots as described are full, the 40 passenger bus would be directed to the Confluence
lot, turning left from Avon Road onto Hurd Lane to drop off skiers. The bus stop would be
similar to the Rodeo bus stop configuration. The 40 passenger busses would always turn right
out onto Avon Road.
Once up load is complete the bus service to the Confluence lot would become on demand
only with a 14 passenger people mover staged over at the east lot to transport guests to the
Confluence on a as needed basis only. This would limit traffic in and out of the Confluence lot.
Lighting
Lighting for the lot would be provided with generator lights that would only run on an as needled
basis and would not be used after 8 p.m.
Confluence Schedule
Potential Confluence Parking days
Nov.28tn 29tn 30th
Dec. 6tn, 7tn, 20tn 21', 27tt', 28tn
Jan. 171n 181n 19tn
Feb. 7tn 8tn, 14tn, 15tn' 16tn, 21', 22', 28tn, 29tn
Mar. 6tn Mtn 13tn, 14tn 20tn 21 St 27tn 28tn
♦ Page 2
P:\E dwgBRIDGE\BRD El(S wg t'/� /�00301z005'r'x
r /
(
xI,�ilrl't�J:
/ li '' fi �l i +ID
r
gas
� 7
/
IF
all
Ilit I . �\• \ I • / 3 "^•� _,. �..�. / Q
ID
,i
°E51N� NO. 'ATE KEM9DHi B. CONFLUENCE BRIDGE
NYDeem 0
m GMEGKEKut D
` jo/"D. Iw°o EXISTING CONDITIONS MAP ENcll
Memo
To: Planning & Zoning Commission
From: Matt Pielsticker, Planning Technician
Date November 14, 2003
Re: Special Review Use (SRU) for a drive-thru
Lot 6, McGrady Acres Subdivision
VON
C 0 L 0 R A D 0
The Edinburgh Corporation has submitted a SRU application for the operation of a drive-thru
facility incorporated into a bank. The Property is currently zoned as Neighborhood Commercial
(NC). The development standards for parcels in the NC zoning district allow for a bank.
However, a Special Review Use (SRU) permit is required to operate this use with a three -bay
drive-thru. All drive through facilities require a SRU permit.
Staff Recommendations: There are several planning and circulation issues that we are
working through and therefore recommend the Commission table this application until the
next regularly scheduled meeting on December 2, 2003.
Memo to Planning & Zoning — November 18, 2003 Page 1 of 1
F:\Planning & Zoning Commission\Memos\2003\McGrady Acres SRU ta.ble.doc
TOWN OF AVON
PLANNING & ZONING COMMISSION
RESOLUTION NO.03-20
SERIES OF 2003
A RESOLUTION DENYING A VARIANCE FROM CHAPTER
17.24.020.1 AND CHAPTER 17.24.030.3 AS STIPULATED IN
TITLE 17 (ZONING) OF THE AVON MUNICIPAL CODE, FOR
LOTS 26/27/28, BLOCK 1, BENCHMARK AT BEAVER
CREEK SUBDIVISION, TOWN OF AVON, EAGLE COUNTY,
WHEREAS, Vail Resorts, owner of Lots 26/27/28, Block 1, Benchmark at Beaver
Creek Subdivision has applied for a variance from the "Off -Street Parking" and
the "Off -Street Loading" requirements as stipulated in Title 17, of the Avon
Municipal Code in order to accommodate truck maneuvering into a proposed
loading dock (as more specifically described in the application date November 5,
2003); and
WHEREAS, a public hearing has been held by the Planning & Zoning Commission
f the Town of Avon pursuant to notices by law, at which time the re
o ,p q
applicant and the public were given an opportunity to express their opinions and
present certain information and reports regarding the proposed Zoning Variance
application and has considered:
A. The relationship of the requested variance to other existing or potential uses and
structures in the vicinity; and
B. The degree to which relief from the strict or literal interpretation and
enforcements of a specified regulation is necessary to achieve compatibility and
uniformity of treatment among sites in the vicinity, or to attain the objectives of
this title without grant of special privilege; and
C. The effect of the requested variance on light and air, distribution of population,
transportation and traffic facilities, public facilities and utilities, and public safety;
and
D. Such other factors and criteria as the Commission deems applicable to the
proposed variance.
F:\Planning & Zoning Commission\Resolutions\2003\Res 03-20 L26,27,28 B1 BMBC MtnCtrDenlal.doc
WHEREAS, the Planning & Zoning Commission finds:
A. That the granting of the variance will constitute a grant of special privilege
inconsistent with the limitations on other properties classified in the same district;
The application has not demonstrated that the limitations of this property are vastly
differentfrom any other properties classified in the same district, as reviewed in staff
comments.
B. That the granting of the variance may be detrimental to the public health, safety,
or welfare, or materially injurious to properties or improvements in the vicinity;
The application has not, demonstrated that the proposed access movements in the
front yard and the right of way will not be detrimental to the public or injurious to
properties of potential development (such as the .Land .Trade property) in the vicinity,
as reviewed in staff comments.
C. That the variance is not warranted for one or more of the following reasons:
I. The strict, literal interpretation and enforcement of the specified regulation
would result in practical difficulty or unnecessary physical hardship
inconsistent with the objectives of this title;
II. There are no exceptional or extraordinary circumstances or conditions
applicable to the site of the variance that do not apply generally to other
properties in the vicinity;
III. The strict, literal interpretation and enforcement of the specified regulation
will not deprive the applicant of privileges enjoyed by the owners of other
properties in the same district.
The application has not demonstrated that there is not an alternate design that
will effectively achieve off-street loading for the applicant. Further, the
enforcement of the specified regulation will not deprive the applicant ofprivileges
enjoyed by the owners of other properties. There are no exceptional conditions or
circumstances that the application has adequately demonstrated that would
require this variance
NOW, THEREFORE, BE IT RESOLVED; that the Planning and Zoning
Commission of the Town of Avon, Colorado, hereby disapproves a Zoning variance
from the "Off -Street Parking" and the "Off -Street Loading" requirements of Title 17
of the Avon Municipal Code for Lot 26/27/28, Block 1, Benchmark at Beaver Creek
Subdivision, Town of Avon, Eagle County Colorado.
ADOPTED THIS DAY OF
Signed:
Chris Evans, Chair
2003
Date:
FAPlanning & Zoning Commission\Reso1utions\2003\Res 03-20 L26,27,28 B1 BMBC MtnCtrDenial.doc
Attest:
Date:
Terry Smith, Secretary
FAPlanning & Zoning Commission\Resolutions\2003\Res 03-20 L26,27,28 B1 BMBC MtnCtrDenial.doc
Staff Report
SKETCH PLAN VON
C O L
November 18, 2003 Planning & Zoning Commission meeting
Report date November 11, 2003
Project type Sketch Design Plan for new loading dock
Legal description Lots 26/27/28, Block 1, Benchmark at Beaver Creek
Subdivision
Zoning Industrial/Commercial
Address 910 Nottingham Road
Introduction
The applicant, Vail Resorts, has submitted this sketch design plan to create a new loading dock at
the Mountain Center. Staff and the applicant conducted a pre -application meeting on October 20,
2003, at which time review of the proposed truck turning movements, existing tenants, and
parking demands were discussed. At that time, it was clarified that a variance application would
be required for the proposed turning movements in the front yard to support the off-street loading
proposal. Therefore, the sketch design should be reviewed in conjunction with the variance
application submitted.
The application proposes to remove the existing garage entrance and replace this with an
enclosed loading dock. Along with the loading dock are new trash enclosures on the west and
east side of the dock entrance, and a new trash enclosure at the end of the front east surface
parking area. This will require the demolition of the existing garage door elevation, regrading of
a new entrance, and the demolition of the first level floor immediately above the loading area.
The proposal will remove approximately 11 surface level parking spaces. Also removed in this
proposal is the small landscape island in front of the west surface parking area. This area is
proposed as an at grade concrete island that provides a seamless driving surface from the existing
edge of asphalt of Nottingham Road. On the other side of the loading dock (east side), a portion
of the existing landscape island is also being proposed for removal in order to create the
necessary taper in the access drive for truck exit movements from the dock.
The loading dock and removal of the two existing landscape islands will require the placement of
two new retaining walls that vary in height from approximately 3 to 10 feet tall. These walls are
proposed as concrete. Sheet C2 of the submitted plans provides site plan details on the proposed
improvements. Sheets C3 through C5 provide details on the anticipated truck turning movements
required to access the loading dock. Sheets A 1.0 through AI A provide floor plans, elevations,
and several section views of the improvements. All new materials are proposed to match
existing materials, however, the application does note the entire building is proposed for
repainting to match existing color schemes after this project is completed.
Town of Avon Community Development (970) 748-4030 Fax (970) 949-5749
Lots 26/27/28, Block 1, Benchmark at Beaver Creek Subdivision, Sketch Design Plan
November 18, 2003 Planning & Zoning Commission meeting Page 2 of 6
Background
In March of 1986, the Town Planning and Zoning Commission approved a Final Design. for the
Mountain Center. The Mountain Center was designed as an 82,400 square foot, 3-story
warehouse and commercial building — a use by right in the Industrial and Commercial zone
district.
The lower (basement) level of the Mountain Center was approved as mini -warehouse (self -
storage), and the parking requirements of 1 space per 800 square feet of gross floor area for
industrial and warehouse uses was waived for the self storage area through the approval of a
variance in 1986. The basement area of the Mountain Center was thus excluded from the
required parking calculation on the basis of its use as a self -storage space only.
Also, a Special Review Use was granted in 1987 to Jerry Verke to operate an auto repair shop in
the building. This use has since expired.
Phase I was constructed shortly after the original final design approval, and consisted of
approximately 34,333 square feet of warehouse and commercial space. Phase II was approved in
July of 1993 for final design, and built shortly thereafter. Issues discussed at the time of original
final design approval for Mountain Center were related to limited snow storage, limited parking,
minimal landscaping and the size and extent (required grading) of the actual building itself.
In 1988, Phase I (the subject area of this application) was resubdivided to create commercial
condominiums.
The mini -storage area on the basement level has been eliminated and is proposed as use by Vail
Resorts for an unspecified type of warehouse use (including food service and office supply). As
previously mentioned, three tenants remain in the project including Capco, Vogelman West, and
the Vail Recreation District.
Design Review Considerations
According to the Town of Avon Residential Commercial and Industrial Design Review
Guidelines, Section 7, the Commission shall consider the following items in reviewing the
design of this project:
1. The conformance with setbacks, massing, access, land use and other provisions of the
Town of Avon Zoning Code.
• Allowed use: The use complies with the existing project and the Industrial/Commercial
zoning.
• Density: Density is unchanged in this proposal.
• Lot Coverage: There is a slight increase in lot coverage of impermeable surface. More
detailed information on snow removal and storage, conforming to Section 17.50..100 of
the Town Zoning Code will be required by final design.
• Setbacks: All setbacks remain intact with this proposal. A variance application its being
applied for the turning movements and access required by the loading dock in th.e front
yard setback.
• Easements: The proposal continues to comply with existing easements; however-, there is
no longer viable access to a garage -parking scenario for future uses of the building.
Town of Avon Community Development (970) 748-4030 Fax (970) 949-5749
Lots 26/27/28, Block 1, Benchmark at Beaver Creek Subdivision, Sketch Design Plan
November 18, 2003 Planning & Zoning Commission meeting Page 3 of 6
• Building Height: Building height is not being proposed to change with this proposal.
• Grading: Grading will require some clarification at Final Design.
• Parking: Parking appears to comply with Town requirements. Clarification of the
available existing parking behind the building will be required by Final Design.
• Snow Storage: Snow storage and removal as proposed and calculated is not per Town
Zoning Code standards. The applicant will be required to demonstrate compliance with
snow storage requirements on the site plan, including (if necessary) an approved off -site
snow removal location, contract and schedule.
• Landscaping: The project will remove an existing landscaping island. The application
will be required to clarify that a minimum of 20% of the project is being provided as
landscaping area (per the Town Zoning minimum for I/C zone district) and show this
delineated area on a site plan.
2. The general conformance with Goals and Policies of the Town of Avon Comprehensive
Plan, and any sub -area plan which pertains.
The Comprehensive Plan lists several pertinent goals and policies regarding this type of
remodel:
Policy A1.4: Service and light industrial uses, including warehousing and light
manufacturing, should be directed to terrain that supports effective vehicular access and
circulation, and allows effective screening from adjacent uses and public ways.
Policy H1.4: Enhance the image of the Town as viewed from Interstate 70 and State
Highway 6/24.
Subarea 4 (Metcalf/Nottingham Road Light Industrial District):
■ "Encourage new development that ...provides for proper on -site parking and circulation"
■ "Require new development ... to add architectural or landscaping screening of storage,
HVAC equipment, loading docks, and trash containers"
Develop Nottingham Road as a secondary streetscape, including:
■ "Providing for vehicular access"
■ "Any planning of vehicular access and parking must take into consideration the safe and
convenient movement of pedestrians from parking to building entrances".
3. Whether adequate development rights exist for the proposed improvements.
The proposed improvements do not affect the development rights of the proposal.
4. The sketch plan is in general compliance with all design requirements.
• Site Development:
o Site Design: The proposal is generally in compliance with the site design criteria,
since the proposal is considered a `remodel'.
o Site Access: The project conflicts with several of the intention statements and
requirements of the guidelines, including the lack of proposed screening (in park
through the removal of existing landscaping) and the 6% grade proposed directly
Town of Avon Community Development (970) 748-4030 Fax (970) 949-5749
Lots 26/27/28, Block 1, Benchmark at Beaver Creek Subdivision, Sketch Design Plan
November 18, 2003 Planning & Zoning Commission meeting Page 4 of 6
outside of the new loading dock garage doors. Heating this grade may be
required to provide safe access. Additionally, the accompanying variance
application must find that the proposed maneuvering required for this loading
dock is being provided.
o Parking and Loading: The application proposes that the existing GFA of the
building is 79,070. It also proposes that approximately 7,080 of GFA is being
essentially `removed' through the required demolition. Thus, the resultant GFA is
proposed at 71,990 and only 90 spaces are required. The applicant contends that
101 surface parking spaces are being provided.
The application submitted does not support these assumptions. Sheet C1 only
shows 97 parking spaces as proposed (not 101). Further, the Improvement
Location Certificate and Topographic Map only surveyed 79 existing parking
spaces. A site visit by staff revealed that many of the parking spaces at the back
of the project (along the retaining wall) are unstriped and unusable as shown on
the Sheet C I.
Also, the contention that the demolition of what is essentially an access ramp
constitutes the removal of GFA in the calculation of required parking for the
project is not supportable. The original approved plans for this building and what
appears to have been constructed was based on a total GFA of 82,400 sqare feet.
The only time the basement GFA was excluded from the 1 space per 800 square
feet of GFA parking standard was when it operated as a self -storage use through a
variance approval that has since lapsed.
Staff would recommend that the existing parking spaces be re-established by the
applicant, resurveyed, and that clarification on the actual existing GFA of this
building be established before moving forward with a project that will remove at
least 11 existing surface parking spaces.
o Easements: The project does not appear to conflict with existing easements,
however, approval of the accompanying variance application for the proposed
turning movements in the front yard is required for this project.
o Site Grading: Grading can be minimized on this proposal through the use of
retaining walls as proposed. Specific information on the finished surface of
proposed retaining walls and the certification of a licensed Professional Engineer
on the design is required at Final Design.
o Drainage: The applicant's engineer has submitted correspondence indicating that
the existing site pollution control measures will need repair or replacement to
accommodate the proposed improvements. The timing, sizing, and engineered
designs to accomplish this will be required should the project move forward to
Final Design.
o Snow Removal and Storage: Sheet C1 proposes a snow storage calculation that is
not easily interpreted nor based on the specific language outlined in the Town
Zoning Code Section 17.50.100. Clarification on the ability to provide on -site
snow storage (or alternately, off -site removal) that meets the requirements of the
Zoning Code is required at Sketch Plan.
Town of Avon Community Development (970) 748-4030 Fax (970) 949-5749
Lots 26/27/28, Block 1, Benchmark at Beaver Creek Subdivision, Sketch Design Plan
November 18, 2003 Planning & Zoning Commission meeting Page 5 of 6
o Water, Sewer, and Trash Storage: The trash enclosures are not specifically
detailed as to materials and colors (other than the use of metal doors). This
information will be required at Final Design, and may also require the submittal
of specific material samples and details.
o Sidewalks: No sidewalks are proposed with this project.
• Building Design:
o Design Character: The new loading dock will match the existing building in
design character. Since the project is considered a `remodel', the improvements
should at least match or improve the existing building condition and appearance.
o Building Height: Height is not proposed to change with this proposal.
o Building Materials and Colors: Clarification on building materials and colors will
be required at Final Design submittal. The proposed concrete wall may be
acceptable with clarification on the finish material. Trash receptacles are also
unspecified materials and will require further clarification. The application
proposes to repaint the entire building with the existing color scheme at the
completion of this project.
o Exterior Walls, Roofs, and Architectural Interest: The concrete wall used along
the loading dock requires further clarification to be approvable.
o Outdoor Lighting: No lighting is being proposed with the application, though it
some degree of lighting for safely utilizing the loading area may be required. The
application must address any lighting requirements by final design.
• Landscaping:
o Design Character: The landscaping islands immediately to the west and to the;
east of the proposed loading dock are being eliminated. No landscaping is being
proposed with this application to screen the improvements or to replace the lost
landscaping islands. Staff is concerned that the project is losing two existing
landscape buffers and that these buffers and the overall landscaping for this
project should be addressed prior to moving forward.
As an additional comment on the existing design, there remain a number of
obsolete signs that should be removed by the applicant as a part of this application
should the project move forward to Final Design.
o Fencing and Screening: The guidelines state that "All service areas, loading and
unloading docks must be screened from public view". No screening is being
proposed with this proposal, other than the use of overhead doors. Detail of these
doors (including material and color) has not been submitted by the applicant.
o Retaining Walls: The application proposes the use of a large retaining wall to
create the loading dock. This wall will require certification by a licensed engimeer
at Final Design. Also, the wall is being proposed as a poured in place concrete;
wall and the treatment is not specified.
Town of Avon Community Development (970) 748-4030 Fax (570) 949-5749
Lots 26/27/28, Block 1, Benchmark at Beaver Creek Subdivision, Sketch Design Plan
November 18, 2003 Planning & Zoning Commission meeting Page 6 of 6
Staff Recommendation
Staff recommends that the action on this application correspond to the action on the
accompanying variance application. There are several options for proceeding at this time:
■ Table the application until clarification is made on the issues summarized in this report,
and an action is made on the accompanying variance application.
■ Approve the application, allowing staff to return to the Commission at the next regularly
scheduled hearing date with a comprehensive list of conditions to address the issues
summarized in this report prior to moving to a Final Design submittal. The revised
sketch plan should be coordinated with the variance.
■ Deny the application as submitted.
If you have any questions regarding this project or any planning matter, please call me at
748-4030, or stop by the Community Development Department.
Respect c s mitted,
Tambi Katieb, AICP
Town of Avon Community Development (970) 748-4030 Fax (97'0) 949-5749
Staff Report
MASTER SIGN PROGRAM
VON-
C 0 L 0 R A D 0
November 18t", 2003 Planning & Zoning Commission meeting
Report date November 12th52003
Sign type Master Sign Program
Legal description Lot A, Avon Center at Beaver Creek Subdivision
Zoning Town Center (TC)
Address 100 Beaver Creek Boulevard
Introduction
This is a summary of review criteria, staff comments and recommendations regarding the
proposed Master Sign Program (MSP) for the Avon Center building. A MSP acts as a sign code
for a project and allows the sign administrator to approve specific signs that are mi compliance
with the MSP without going before the Planning and Zoning Commission.
The MSP under review would require all signs that exist on the Avon Center taday to conform to
the new program, except for the existing 8th floor building attached "Lodge at Avon Center"
sign. The "Ce" logo, which was taken from this existing building mounted sign, is incorporated
into this program. The proposed MSP includes signage criteria for two monument signs, five
building identification signs, up to nine retail space signs, and up to nine arcade signs.
All signs are to be internally illuminated, except for the arcade signs. As submitted, this MSP
proposes a maximum of 256 square feet of signage. Following is a summary of the program:
Monument Signs: Two freestanding monument signs are proposed with this application.
Both signs are the same size and design, and are located at the two vehicular entrances to
the property. The signs are each 23 square feet in size. Materials include a stainless steel
base and an aluminum background. As proposed, the signs would stand four feet tall.
Building Identification Signs: Included with this MSP application are five building
identification signs. All five signs are identical in size, design, and colors. These signs
are building mounted in three different locations on the building: one on each of the three
sides of the new port cochere at the newly configured eastern entrance, one on the
existing port cochere on the west elevation, and one above the entrance to the
underground parking on the west elevation. Each sign measures approximately twenty
square feet in size (2'x10').
Retail Signs: There is a design for nine retail signs with this submittal. All signs are
building mounted near the entrances to the retail spaces on the ground level of the
building, as can be seen on the "Site Map." All signs would be the same size, design, and
colors. The signs measure 13 square feet each. The font used for these signs appears to
be the same as that used for the monument and the building identification signs.
Town of Avon Community Development (970) 748-4030 Fax (970) 949-5749
Lots A, Avon Center at Beaver Creek Subdivision, Master Sign Program Design
November 18'`, 2003 Planning & Zoning Commission meeting Page 2 of 3
Arcade Signs: The proposed arcade signs all measure 3.6 square feet. As proposed, the
arcade signs would hang underneath the awning at retail store entrances and would be
non -illuminated.
Design Review Considerations
According to the Town of Avon Sign Code, Section 15.28.070, the Planning & Zoning
Commission shall consider the following items in reviewing proposed designs:
1. The suitability of the improvement, including materials with which the sign is to be
constructed and the site upon it is to be located.
Some of the proposed materials (aluminum and plexiglass-faced letters) are encouraged by
the sign code. Stainless steel is not addressed in the sign code, however, if appropriate to the
location, maybe approved at the discretion of the Commission. Interior -lit signs are
encouraged by the sign code. All signs appear to be well sited.
2. The nature of adjacent and neighboring improvements.
The immediate area consists of retail, timeshares, and neighborhood commercial land uses.
3. The quality of the materials to be utilized in any proposed improvement.
All proposed materials are of high quality.
4. The visual impact of any proposed improvement, as viewed from any adjacent or
neighboring property.
The proposed MSP should have a beneficial effect as viewed from any adjacent or
neighboring property. Currently, the signs on the Avon Center building are inconsistent in
terms of font design, size, and colors. This MSP would be a. positive improvement for the
neighborhood, and create uniformity in tenant signage.
5. The objective that no improvement will be so similar or dissimilar to other signs in the
vicinity, that values, monetary or aesthetic, will be impaired.
The two freestanding signs are proposed with a stainless steel base. It is staff s opinion that
this material may so dissimilar to the other signs in the vicinity that values may be
impaired. However, this material may be approved by the Commission.
The "Ce" logo does not appear to have any relation to the building, except for the similarity
with the pre-existing sign. Staff is recommending that this logo be removed from the
program altogether and replaced with a more identifiable logo if possible.
6. Whether the type, height, size, and/or quality of signs generally complies with the sign
code, and are appropriate for the project.
The proposed signs appear to comply with the sign code in terms of type, height, size, and
quality. All signs are appropriate for the project and will help the aesthetic appearance of the
building.
7. Whether the sign is primarily oriented to vehicular or pedestrian traffic, and whether
the sign is appropriate for the determined orientation.
The signs are oriented to vehicular traffic, with the exception of the arcade signs. This
orientation is appropriate.
Town of Avon Community Development (970), 748-4030 Fax (970) 949-5749
Lots A, Avon Center at Beaver Creek Subdivision, Master Sign Program Design
November 18'h, 2003 Planning & Zoning Commission meeting Page 3 of 3
Staff Recommendation
Staff recommends approval of the Master Sign Program for the Avon Center located on lot A,
Avon Center at Beaver Creek Subdivision with the following conditions:
1. A narrative that addresses the following items must be submitted: temporary signs,
window signs, and who is responsible for the sign permits and fees.
2. All existing signs (with the exception of the eighth floor building mounted "Lodge at
Avon Center" sign) must be removed by March 30, 2004.
3. The "Ce" logo should be removed from the program and replaced with a more
identifiable logo.
4. A revised master program specifying these requirements must be submitted and approved
by staff prior to issuance of a sign permit;
5. Except as otherwise modified by this permit approval, all material representations made
by the applicant or applicant representative(s) in this application and in public hearing(s)
shall be adhered to and considered binding conditions of approval_
If you have any questions regarding this project or any planning matter, please call me at
748.4413, or stop by the Community Development Department.
Respectfully submitted,
v"
Matt Pielsticker
Town of Avon Community Development (970) 748-4030 Fax (970) 949-5749
Staff Report
VARIANCE
AVON
C O L O R A D 0
November 18, 2003 Planning & Zoning Commission meeting
Report date November 11, 2003 (PUBLIC HEARING)
Variance type Access & Turning movement in front yard & off-street
loading (17.24.020.1 & 17.24.030.3 of the Town
Zoning Code)
Legal description Lots 26/27/28, Block 1, Benchmark at Beaver Creek
Subdivision
Zoning Industrial Commercial
Address 910 Nottingham Road
Introduction
The applicant, Vail Resorts, is requesting a variance from Section 17.24.020.1 (Off-street
parking) and Section 17.24.030.3 (Off-street loading) of the Town Zoning Code to allow truck -
turning movements in the front yard of the project. This variance is being reviewed in
conjunction with a sketch design plan application that proposes to remodel the existing garage
entry to Mountain Center to create a large loading dock area.
The Town Zoning Code specifically states in Section 17.24.020. 1 (Off-street parking) that:
"Off-street parking spaces, including the adjacent area used for turning movements
necessary to enter or leave the parking spaces when open to the sky, may be located in
any yard except the front ten feet of the required front yards, and unless otherwise
specifically restricted by this chapter. Enclosed buildings and carports containing off-
street parking shall be subject to the applicable district yard requirements."
Section 17.24.030.3 (Off-street loading), also part of the variance request, states:
"Each required Off-street loading berth shall be designed with appropriate means of
vehicular access to a street or alley in a manner which will least interfere with traffic
movement, and shall meet engineering department specifications."
This application proposes to construct a concrete driving lane in the Town Right of Way and the
front yard setback of the existing Mountain Center building, requiring that certain turning
movements be made to create a functional access.
The proposal includes a review of truck turning movements of three trucks anticipated by Vail
Resorts to be utilized in delivery of materials and supplies to the site. A letter submitted by the
applicant proposes that a total of anywhere from 10 to 21 trucks will utilize the loading dock per
day. These trucks will service both the Warehouse and Mountain Dining Divisions of Vail
Town of Avon Community Development (970) 748.4030 Fax (970) 949.5749
Lots 26/27/28, Block 1, Benchmark at Beaver Creek Subdivision, Access/Turning Movement Variance
November 18, 2003 Planning & Zoning Commission meeting Page 2 of 6
Resorts. The October 31, 2003 letter detailing the current truck deliveries and anticipated
scheduling is attached for your review.
Vail Resorts has taken over ownership of the Mountain Center project, and is currently leasing to
only three tenants: Capco, Vogelman West, and Vail Recreation District. Vail Resorts intends to
utilize the Mountain Center as their main distribution point for food services. They are also
utilizing the building for warehousing and distribution of other supplies for their resort
operations. The warehousing and distribution of products from this facility continue to comply
with the allowed uses (uses by right) in the Industrial/Commercial zone district.
Background
In March of 1986, the Town Planning and Zoning Commission approved a final design for the
Mountain Center. The Mountain Center was designed as an 82,400 square foot, 3-story
warehouse and commercial building — a use by right in the Industrial and Commercial zone
district.
The lower (basement) level of the Mountain Center was approved as mini -warehouse (self -
storage), and the parking requirements of 1 space per 800 square feet of gross floor area for
industrial and warehouse uses was waived for the self storage area through the approval of a
variance in 1986. The basement area of the Mountain Center was thus excluded from the
required parking calculation on the basis of its use as a self -storage space only.
Also, a Special Review Use was granted in 1987 to Jerry Verke to operate an auto repair shop in
the building. This use has since expired.
Phase I was constructed shortly after the original final design approval, and consisted of
approximately 34,333 square feet of warehouse and commercial space. Phase 11 was approved in
July of 1993 for final design, and built shortly thereafter. Issues discussed at the time of original
final design approval for Mountain Center were related to limited snow storage, limited parking,
minimal landscaping and the size and extent (required grading) of the actual building itself.
In 1988, Phase I (the subject area of this application) was resubdivided to create commercial
condominiums.
The mini -storage area on the basement level has been eliminated and is proposed as use by Vail
Resorts for an unspecified type of warehouse use (including food service and office supply). As
previously mentioned, three tenants remain in the project including Capco, Vogelman West, and
the Vail Recreation District.
Variance Criteria
According to the Section 17.36.040, the Avon Municipal Code, the Planning & Zoning
Commission shall consider the following factors with respect to the requested variance:
1. The relationship of the requested variance to other existing or potential uses and
structures in the vicinity;
2. The degree to which relief from the strict or literal interpretation and enforcement of a
specified regulation is necessary to achieve compatibility and uniformity of treatment
among sites in the vicinity, or to attain the objectives of this title without grant of
special privilege;
Town of Avon Community Development (970) 949-4280 Fax (970) 949-5749
Lots 26/27/28, Block 1, Benchmark at Beaver Creek Subdivision, Access/Turning Movement Variance
November 18, 2003 Planning & Zoning Commission meeting Page 3 of 6
3. The effect of the requested variance on light and air, distribution of population,
transportation and traffic facilities, public facilities and utilities, and public safety;
4. Such other factors and criteria as the Commission deems applicable to the proposed
variance.
Findings Required
According to Section 17.36.050 of the Avon Municipal Code, the Planning & Zoning
Commission shall make the following written findings before granting a variance:
A. That the granting of the variance will not constitute a grant of special privilege
inconsistent with the limitations on other properties classified in the same district;
B. That the granting of the variance will not be detrimental to the public health, safety or
welfare, or materially injurious to properties of improvements in the vicinity;
C. That the variance is warranted for one or more of the following reasons:
1. The strict, literal interpretation and enforcement of the specified regulation would
result in practical difficulty or unnecessary physical hardship inconsistent with the
objectives of this title;
2. There are exceptional or extraordinary circumstances or conditions applicable to
the site of the variance that do not apply generally to other properties in the same
zone;
3. The strict or literal interpretation and enforcement of the specified regulation
deprive the applicant of privileges enjoyed by the owners of other properties in the
same district.
Staff Comments
The application raises several issues to establish the requisite findings for issuance of a variance.
The proposal, in as much as it limits the amount of truck movement outside of the paved
roadway, still requires that a significant portion of the truck turning and access movements occur
in the Right -of -Way. Additionally, there remains a large portion of the backing movement that
must occur on the existing paved surface as the design is currently proposed for all three trucks
listed. These movements do not appear to be designed in a manner that "... will least interfere
with traffic movement" (17.24.030.3)
The applicant contends that this proposal grants no special privilege because of the depth of the
lot measured from the front yard setback and the north edge of the driving lane of Nottingham
Road. T he a pplicant s tates t hat " All o ther o ptions i nclude in aneuvering i n t he s treet a nd t he
solution proposed is the most severe while recognizing existing quality construction". Also, the
application states that the proposed variance will "...greatly enhance and improve" public safety
and transportation.
While the architectural solutions to providing a design for the loading dock, new garage doors,
retaining walls, and trash enclosures all appear functional, staff is concerned that this variance
request has not adequately demonstrated that no other possible solution exists for this
application.
Town of Avon Community Development (970) 949-4280 Fax (970) 949-5749
Lots 26/27/28, Block 1, Benchmark at Beaver Creek Subdivision, Access/Turning Movement Variance
November 18, 2003 Planning & Zoning Commission meeting Page 4 of 6
In reviewing the Variance Criteria, the Commission may also consider other factors and criteria
that are applicable to the proposed variance. Staff would suggest a review of several existing
Comprehensive Plan policies and goals to be directly applicable, including:
Policy A1.4: Service and light industrial uses, including warehousing and light
manufacturing, should be directed to terrain that supports effective vehicular access and
circulation, and allows effective screening from adjacent uses and public ways.
Policy H1.4: Enhance the image of the Town as viewed from Interstate 70 and State
Highway 6/24.
Subarea 4 (Metcalf/Nottingham Road Light Industrial District):
■ "Encourage new development that ...provides for proper on -site parking and circulation"
■ "Require new development ... to add architectural or landscape screening of storage,
HVAC equipment, loading docks, and trash containers"
Develop Nottingham Road as a secondary streetscape, including:
■ "Providing for vehicular access"
■ "Any planning of vehicular access and parking must take into consideration the safe and
convenient movement of pedestrians from parking to building entrances".
It is also a concern of staff that the proposed truck movements require such a degree of accuracy
by the drivers to remain out of the existing travel lanes that the impending future development
(by Vail Resorts) of Parcel B (the proposed land trade project) will result in a public safety issue
with increased traffic use of what currently exists as a limited use cul-de-sac.
Clearly, the variance application review for this type of frequent loading operation should
consider the potential character change to the area — a conceptual number of 300 new dwelling
units (and associated traffic and pedestrian impacts) at this time.
Further, since the applicant (Vail Resorts) will largely reduce the required parking through the
elimination of existing floor area, it appears a more supportable solution may exist through the
elimination of more surface parking area on the west end of the project.
As currently proposed, staff is concerned that the variance would grant a special privilege on this
project that is not enjoyed by other properties with the same physical limitations. The project site
is not so unusual in its limitations (size, shape, setbacks etc.) from other similar projects found
along both Nottingham and Metcalf Roads. Staff is concerned that this project may also be
detrimental to public safety of those traveling along this portion of Nottingham Road.
As a final comment, the applicant has suggested that several adjacent properties have no similar
difficulties with loading (Deep Rock, Hughes Plumbing, and Avon Self -Storage) because they
have "ample maneuvering room into and out of their site" or enjoy the use of a "common loading
dock".
It may be productive for the applicant to examine an alternative to this application that eliminates
the few remaining parking areas immediately above the retaining wall (provided the project
continues to comply with the parking requirements) and to construct a physically separated truck
loading lane that provides a barrier from the existing roadway.
Town of Avon Community Development (970) 949-4280, Fax (970) 949-5749
Lots 26/27/28, Block 1, Benchmark at Beaver Creek Subdivision, Access/Turning Movement Variance
November 18, 2003 Planning & Zoning Commission meeting Page 5 of 6
The applicant and/or the Commission may choose to table the application to examine another
loading configuration that further removes the impact on the Town Right of Way and existing
driving lane.
Staff Recommendation
Staff recommends that you approve Resolution 03-20 denying the proposed variance from
Section 17.24.020.1 and Section 17.24.030.3 of the Town Zoning Code (as more specifically
described in the application dated November 5, 2003) for Lots 26/27/28, Block 1, Benchmark at
Beaver Creek Subdivision with the following findings:
A. That the granting of the variance will constitute a grant of special privilege inconsistent with
the limitations on other properties classified in the same district;
Recommendation:. The application has not demonstrated that the limitations of this property
are vastly different from any other properties classified in the same district, as reviewed in
staff comments.
B. That the granting of the variance may be detrimental to the public health, safety or welfare,
or materially injurious to properties of improvements in the vicinity;
Recommendation: The application has not demonstrated that the proposed access
movements in the front yard and the right of way will not be detrimental to the public or
injurious to properties of potential development (such as the Land Trade property) in the
vicinity, as reviewed in staff comments.
C. That the variance is not warranted for one or more of the following reasons:
1. The strict, literal interpretation and enforcement of the specified regulation would result
in practical difficulty or unnecessary physical hardship inconsistent with the objectives of
this title;
2. There are no exceptional or extraordinary circumstances or conditions applicable to the
site of the variance that do not apply generally to other properties in the same zone;
3. The s trict o r l iteral i nterpretation a nd e nforcement o f t he s pecified r egulation w ill not
deprive the applicant of privileges enjoyed by the owners of other properties in the same
district.
Recommendation: The application has not demonstrated that there is not an alternate design
that will effectively achieve off-street loading for the applicant. Further, the enforcement of
the specified regulation will not deprive the applicant of privileges enjoyed by the owners of
other properties. There are no exceptional conditions or circumstances that the application
has adequately demonstrated that would require this variance.
Recommended Motion
"I move to approve Resolution 03-20, denying the Variance for Lots 26/27/28, Block 1,
Benchmark at Beaver Creek Subdivision (Mountain Center) from the requirements of Section
17.24.020.1 and Section 17.24.030.3 of the Town Zoning Code (as more specifically described
in the application dated November 5, 2003) based on staff recommendations and according to
Section 17.36.050 of the Avon Municipal Code, that the Planning & Zoning Commission cannot
make the following written findings before granting a variance:
Town of Avon Community Development (970) 949-4280 Fax (970) 949-5749
Lots 26/27/28, Block 1, Benchmark at Beaver Creek Subdivision, Access/Turning Movement Variance
November 18, 2003 Planning & Zoning Commission meeting Page 6 of 6
A. That the granting of the variance will not constitute a grant of special privilege
inconsistent with the limitations on other properties classified in the same district;
B. That the granting of the variance will not be detrimental to the public health, safety or
welfare, or materially injurious to properties of improvements in the vicinity;
C. That the variance is warranted for one or more of the following reasons:
1. The strict, literal interpretation and enforcement of the specified regulation would
result in practical difficulty or unnecessary physical hardship inconsistent with the
objectives of this title;
2. There are exceptional or extraordinary circumstances or conditions applicable to
the site of the variance that do not apply generally to other properties in the same zone;
3. The strict or literal interpretation and enforcement of the specified regulation
deprive t he a pplicant of p rivileges a njoyed b y t he o wners o f o ther p roperties i n t he
same district.
If you have any questions regarding this or any other project or community development issue,
please call me at 748.4030, or stop by the Community Development Department.
Respectfully submitted,
Tambi Katieb, AICP
Town of Avon Community Development (970) 949-4280 Fax (970) 949-5749
Town of Avon
Planning & Zoning Commission
Regular Meeting
November 18th3 2003
6:00 PM
Council Chambers
Town of Avon Municipal Building
400 Benchmark Road
AGENDA
I. Call to Order (6:00pm)
II. Roll Call
III. Additions and Amendments to the Agenda
IV. Conflicts of Interest
V. Consent Agenda
Approval of the October 21 St, 2003 Planning & Zoning Commission
Meeting Minutes [Tab 1 ]
PUBLIC HEARING (6:05pm — 7:05pm)
VI. Special Review Use Applications
A. Confluence Overflow Parking
The Confluence PUD
Avon Road
Resolution No. 03-18
Applicant: Beaver Creek Resort Company [Tab 2]
Posted on November 14` 2003 at the following public places within the Town of Avon:
• Avon Municipal Building, main lobby
• Avon Recreation Center, main lobby
• Alpine Bank, main lobby
• City Market, main lobbv
Beaver Creek Resort Company is proposing to use the Confluence site for
overflow parking for Beaver Creek Resort. The permit would allow for up to
400 vehicles once all other overflow parking options are utilized.
B. Drive-thru Bank
Lot 6, McGrady Acres Subdivision
86 Post Boulevard
Resolution No. 03-19
Applicant: Edinburgh Corporation [Tab 3]
Edinburgh Corporation is proposing a drive-thru facility on Post Boulevard
for a bank. A bank drive-thru facility is the subject of this review and permit
application, not the actual bank (which is a use by right in this zone district).
Access to the site is from Post Boulevard.
VII. Variance Application
A. Lots 26/27/28, Block 1, Benchmark at Beaver Creek Subdivision
910 Nottingham Road
Resolution No. 03-20
Applicant: Vail Resorts/Mark Donaldson [Tab 4]
A variance request from the Town's off-street parking and off-street loading
regulations. Section 17.24.020.1 of Town Code states "off street parking
spaces, including the adjacent area used for turning movements necessary
to enter or leave the parking spaces... may be located in any yard except
the front ten feet of the required front yards." Section 17.24.030.3 of Town
Code states "...loading berths shall be designed with appropriate means of
vehicular access to a street or alley in a manner which will least interfere
with traffic movement." A newly configured loading dock is proposed in a
separate design application, with access and turning movements that
would encroach the front yard and partly in the existing driving lane of
Nottingham Road.
PUBLIC HEARING CLOSED
Vill. Sketch Design Plan (7:05pm — 7:20pm)
A. Lots 26/27/28, Block 1, Benchmark at Beaver Creek Subdivision
910 Nottingham Road
Mountain Center
Applicant: Vail Resorts/Mark Donaldson [Tab 5]
Posted on November 14th, 2003 at the following public places within the Town of Avon:
• Avon Municipal Building, main lobby
• Avon Recreation Center, main lobby
• Alpine Bank, main lobby
• City Market, main lobbv
The applicant is proposing this sketch design plan for the existing Mountain
Center building, on Nottingham Road just west of the Metcalf Road
intersection. The sketch design plan is to approve a newly configured
loading dock and revised floor plan and elevation. This application is being
reviewed in conjunction with the Variance application.
IX. Master Sign Program (7:20pm — 7:35pm)
A. Lot A, Avon Center at Beaver Creek Subdivision
100 Beaver Creek Boulevard
Applicant: VAG Architects [Tab 6]
VAG Architects is proposing a Master Sign Program (MSP) for the Avon
Center building. This application proposes all new signs for the property,
making the existing signage obsolete.
X. Sign Design Approvals (7:35pm — 7:40pm)
A. Lot 1, Block 2, Benchmark at Beaver Creek Subdivision
30 Benchmark Road (Unit #102)
"Central Rockies Mortgage"
Applicant: Paul W. Jardis
Sign application for 2 un-lit building mounted signs at the Avon Town
Square building. Both signs comply with the current Master Sign Program
(MSP) for the building.
B. Lot 21, Block 2, Benchmark at Beaver Creek Subdivision
182 Avon Road (Unit #200 & 210)
"Prestige Cleaners"
Applicant: Patricia Prewitt
Staff approval for a sign application for a new tenant, Prestige Cleaners, in
the former Earth Wireless suite. Two signs were approved and both
comply with the MSP for the Christy Sports Building.
C. Lot 63, Block 2, Benchmark at Beaver Creek Subdivision
137 Benchmark Road
"Mountain Burger"
Applicant: Brian Nolan
Sign application for a north facing "Mountain Burger" sign on the Seasons
building. This building has a MSP, and the sign is in conformance.
Posted on November 14`r, 2003 at the following public places within the Town of Avon:
• Avon Municipal Building, main lobby
• Avon Recreation Center, main lobby
• Alpine Bank, main lobby
• City Market, main lobbv
XI. Minor Project Approvals (7:40pm — 7:45pm)
A. Lot 41 B, Block 3, Wildridge Subdivision
4350 Flat Point
Deck addition, additional space, & new entryway
Applicant: RYS Olsen
Staff has approved this Minor Project on Flat Point for a deck addition, and
a small building addition. A new front entryway was also included.
Materials and colors match the existing home.
B. Lot 12, Filing 2, Eaglebend Subdivision
4995 Eaglebend Drive
New window
Applicant/Owner: Kristina Bruce
Minor Project for a new window on an Eaglebend Drive single-family home.
Window and trim matches existing home.
C. Lot 8, Wildridge Acres Subdivision
2823 Ked Spur
Shed addition
Applicant/Owner: Mark A. Nelson
Minor Project approval for a shed addition on Ked Spur. The attached
accessory structure will match the building materials and colors of the
home.
XII. Other Business (7:45pm — 7:55pm)
A. Lots 1 &2, Nottingham Station PUD
0025 Hurd Lane
Minor Project — Doors and handrail repaint
Applicant: O'Halloran Construction
This Minor Project application proposes to repaint all sets of doors and both
handrails on the Nottingham Station building with the "California Rustic"
color. The Commission is being requested to make a motion on this
application. The color sample will be available for review at the site tour
and work session.
XIII. Adjourn (7:55pm)
Posted on November 14", 2003 at the following public places within the Town of Avon:
• Avon Municipal Building, main lobby
• Avon Recreation Center, main lobby
• Alpine Bank, main lobby
• City Market, main lobbv
C 0 L 0 R A D,. 0
Applicant: Via
VARIANCE ARPLICATION
Variance Review Fee:
RUAFETOMEMA
Mailing Address: sftzn City: State: Co. Z:p:
Phone #: ql��-rjZ� Fax #: �t��'- 'rj2p�j Cell #: �,a _ c:5;!;e
Owner of Property: ft , W5=2-9 ,
Mailing Address: ] �jg City: State: &0. Zip: gj&t
Phone #: j ;� Fax #: . L Cell
Lot: ee) Block_Subdivision:
Project Name:M rvED
Street Address.:
Current 'Zoning
Describe the Variance Requested: , -k!::)� 64G��
Eo
A. Describe the relationship of the requested variance to other existing or potential uses
and structures in the vicinity:
We are requesting to construct a realistic and functional concrete driving lane (totally separate
from the road driviing lanes) within the Nottingham Road right-of-way to allow for a full range of —
delivery trucks to access the proposed (interior) loading docks being designed into Mountain
Center. The Avon Self -Storage project has no such need for loading docks for their self -storage
uses and all users can achieve full site access with a simple "turn -in" and subsequent "turn -out" —
of the site. The Hughes Plumbing warehouse and retail center has ample maneuvering room into
and out of their site so as to not require additional truck maneuvering on Nottingham Road. Deep —
Rock Water Distribution Center has traditionally sub -let a portion of their warehouse to a similar
type user as their regional distribution operations, and together have a common loading dock. —
CommunOy Development, P.U. Box 975 Avo O SIG20 97 4 F 4( 11/27/01 Pa.ec 1.of 2
B. Describe the degree to which relief from the strict or literal interpretation and
enforcement of a specific regulation is necessary to achieve compatibility and
uniformity of treatment among sites in the vicinity, or attain the objectives of Title
17.36.040 without grant of special privilege:
The degree of relief needed from the strict and literal interpretation and enforcement of customary
zoning is the distance, in the north -south direction, as measured from our front yard setback and
the north edge of the driving lame of Nottingham Road so as to allow r - -
p opentruck
turning/maneuvering (ke. not on town streets). Without this relief, that does not grant a special
privilege, we are unable to meet the Town requirements for construction of proper loading berths
as is needed for the allowed uses within this development. All other options include maneuvering
in the street and the solution proposed is the most severe while recognizing existing quality
construction.
C. Describe the effect of the requested variance on tight and air, distribution. of
population, transportation and traffic facilities, public facilities and utilities, and public
safety:
These issues will be greatly enhanced and improved, particularly regarding transportation and
public safety.
D. Any such other factors and criteria as the Planning Commission may deem applicable
to the proposed variance:
Mountain Center was constructed in 2 phases over 3 years and was designed to handle the
trucking, loading, warehousing, and distribution standards of the day. The project has operated j—
successfully with a variety of manufacturing, retailing, dining, warehousing and storage uses for
about 20 years. Along with other progress, some trucks on the roads are larger which in turn requires more turning radii, all the while without proper loading berths. Approval of this
Variance request will allow loading dock development that will mitigate current maneuvering.
I (we) represent that all information provided to the Town ofAvon in connection with this application
-as true and colTect, that I (we) understand the Town of Avon regulations applicable to this project,
and understand that incomplete submittals will delay application review. Owner designates Appli-
cant as indicate act as owner's representative in all application submittals related to this project.
.-applicant: Owner: V,&1L
(Print (N,,ame): L 4-4wm (Print Name):
t
Date: �,.` 1 I 1� Date:
f m;ruts ICI. cloplicnt. 11.0. Box 975 Avon. CO 81620 (970)748-4030 Fax (970)949-5749 (rev. 12/27/01) Page 2 of 2
ALPINE ENGINEERING, INC. 1
October 31, 2003
Chris Juergens
Victor Mark Donaldson
P.O. Box 5300
Avon, CO S 1620
RE: Mountain Center — Town of Avon Sketch Plan Comments
Dear Chris,
I have revised the plans to reflect the comments provided by the Town of Avon. In brief;,
the following is a list of the revised items on the plans.
l . Existing contours have been made bolder to more clearly reflect how the proposed
contours relate with the existing grades_
2. I reviewed the cab length for the WB-50 truck size and the cab is shown as is
dimensioned in the AASHTO — Geometric Design of Highways and Streets. I have.
included a copy of this detail (see attached).
3. The Striping and lane directions have been clearly identified on the plans"
4. A new plan labeled "Lot Coverage Plan" has been included to show the
Impervious, Green space, and Snow Storage areas. A table has also been included
to show the acreages and percentage of lot coverage.
5. Review of the existing site pollution control measures showed them to be in need
of repair or replacement. The site grading and drainage plan now reflects
collecting run off from the existing and proposed paved areas and directing them
through a proposed Sand/Oil interceptor_ Additionally, the inlets located inside
the building are planned to be routed to the existing Sand/Oil interceptor located
inside the garage.
Sincerely
Lee C. Whittington
Attachment
Edwards Business Center • P0. Box 97 - Ed�vaods, Colorado 81632.1970) 9?6-3373 • Fax (970) 916- 390
AASHTO—Geomeri gn of Highways and Streets
vehicles.
These combination trucks are identified by the designation WB, together with the wheel
base or another length dimension in both metric and U.S. customary units. The combination truck
design vehicles are: (1) the WB-12 [WB-40] design vehicle representative of intermediate size
tractor -semitrailer combinations, (2) the WB-15 [WB-50] design vehicle representative of a
slightly larger intermediate size tractor -semitrailer combination commonly in use, (3) the WB-19
[WB-62] design vehicle representative of larger tractor semitrailer combinations allowed on
selected highways by the Surface Transportation Assistance. Act,of.19$2, (4) the WB-20 [WB-65
or WB-671 design vehicle representative of a larger tractor -semitrailer allowed to operate on
selected highways by "grandfather" rights under the Surface Transportation Assistance Act of
1982, (5) the WB-20D [WB-67D] design vehicle representative of a tractor-semitrailer/full trailer
(doubles or twin trailer) combination commonly in use,
vehicle representative of tractor-semitrailer/full trailer/full thtrailer c mb[ ina ion ] design
selectively in use, and (7) the WB-33D [WB-109D] design vehicle representative oflargertractor-semitrailer/full trailer combinations (turnpike double) selectively in use- .Although;
turnpike doubles and triple trailers are not permitted on many highways, their occurrence does
warrant inclusion in this publication.
The minimum turning radii and transition lengths shown in the exhibits are for turns -at less
than 15 km/h [ 10 mph]. Longer transition curves and larger curve radii are needed for roadways
with higher speeds. The radii shown are considered appropriate minimum values for use in
design, although skilled drivers might be able to turn with a slightly smaller radius.
The dimensions of the design vehicles take into account recent trends in motor vehicle sizes
manufactured in the United States and represent a composite of vehicles currently in operation.
However, the design vehicle dimensions are intended to represent vehicle sizes that are critical to
geometric design and thus are larger than nearly all vehicles belonging to their corresponding
vehicle classes.
The turning paths shown in Exhibits 2-3 through 2-10 and Exhibits 2-13 through 2-23 were
derived by using commercially available computer programs.
The P design vehicle, with the dimensions and turning characteristics shown in Exhibit 2-3,
represents a larger passenger car.
The SU design vehicle represents a larger single -unit truck.. The control dimensions indicate
the minimum turning path for most single -unit trucks now in operation (see Exhibit 24).
long-distance facilities serving large over -the -road truck traffic or inter-citybuses On
tor
coaches), the design vehicle should generally be either a combination truck or an inter -city bus
(see Exhibit 2-5 or Exhibit 2-6).
For intra-city or city transit buses, a design vehicle designated as CITY -BUS is shov,�n in
Exhibit 2-7. This design vehicle has a wheel base of 7.62 m [25 ftJ and an overall length of
12.'_0 m (t0 ftJ. Buses serving particular urban areas may not conform to the dimensions shown
in Exhibit '-7. For example, articulated buses, which are now used in certain cities, are loatger
than a conventional bus, with a permanent hinge near the vehicle's center that allows rin
maneu%erahility. Exhibit 2-10 displays the critical dimensions for the A -BUS design vehicle.
AASHTO—Geom, ; L ,n of Highways and Streets =~
12.95 m 42.5 ft Trailer _
Pr4
2m 10.82m 35.5ft
;ftl
0 5ft loft [ 2.29m17.5 ft]
0 1-m 2.5m 0.91 mscale [3 ftjm 1.28 m
[4 ftj 3.17 m ' 0.91 m
[4.2 ftj [10.4 ftj , [3 ft]
.35 MI ` 3.81 m 1.
15.24 m [50 ft] Wheelbase [4.42 ftj [12.5 ftj
I 16.77 m [55 ft] or greater [
Path of left Path of front
front wheel ,,�•�j��----~ �`•��� overhang
' �
NS
►�� 1 �
2.44 m T
[8 ftj
F9
0 5ft 1 o ft Path of right
rear wheel
0 2.5 m i
scale
I
1
• Assumed steering angle is 17.90 1
• Assumed tractor/trailer angle is 560 1
• CTR = Centerline turning radius I
at front axle
i59 m [
H*-- l
[8.5 ft]
Exhibit 2-14. Minimum Turning Path for Intermediate Semitrailer (WB-15 [WB_501)
Design Vehicle
32
ARCHITECTS
Tambi,
0 N 0048 E BEAVER CREEK -BL
SUITEJ2
-� October 31, 2003 Box 53
AVON, CO 816
970■949.52
TambiKatieb,A1CP vmdo@vmdo.cc
Community Development Department Fax•949.52
Town of Avon
Avon, CO 81620
Hand delivered
OECE,VED
Re: Operational Schedule for ivy V 0 5 200
Trucks at Mountain Center 3
Co► "Unity DeVelopmen
t
The following is a summary review for a typical day of truck traffic (proposed) for
Mountain Center, based on current and past delivery patterns documented by the. Vail
Resorts Warehouse Division. These truck summaries include the Warehouse and
Mountain Dining Divisions (i.e. the proposed programmed user groups). These Dock
activity times and patterns are subject to change.
A typical day with current Dock activity (which is perceived to carry forward to MC)
would be a total of 10 trucks (42 minutes each) for Mountain Dining Division plurs 5
trucks (15 minutes each) for the Warehouse Division, and 3 van (5 minutes each)
deliveries from UPS/FedEx/Etc. for a total of 8.5 hours of Dock activity. On this typical
day, each Dock would experience a total duration estimated to be less than 3 of t1he 16
hours the docks are proposed to be open.
On a peak day under the current Dock activity, there would be a total of 21 trucks (42
minutes each) for the Mountain Dining Division, 10 trucks (15 minutes each) for the
Warehouse Division, and 6 van (5 minutes each) deliveries from TJPS/FedEx for aL total
of 18 hours of Dock activity. On a peak day, each Dock would experience a total
duration of 6 of the 16 hours the Docks are proposed to be open.
Mountain Dining Division:
Mountain Dining has a total of 24 trucks/vans that propose to deliver goods to Mountain
Center in any given week. The peak delivery day is Friday with up to 21 trucks mmking
deliveries with and average loading time of 42 minutes each. The slowest day would be
Saturday with only 8 deliveries scheduled. Deliveries being made will be from vehicles
ranging from vans to a maximum of 50-foot truck.
(Ste attached sheet for truck schedules_)
Tambi Katieb, AICP
October 31, 2003
Page Two
Vail & Beaver Creek Warehouse Division:
There are three major truck Imes that serve Vail and Avon_ Vail Resorts also uses one
other major truck line to move janitorial supplies, etc. Therefore, a peak day would be a
total of ten trucks, seven of which would be 24'-30' semis and three 40, semis_ The --
average time to unload each truck would be about 15 minutes. Fedex, UPS, etc_ use step
vans, with a maximum of six vans a day with an average loading time of 5 minutes each.
Respectfiilly. Submitted,
Chris Juergen
CC: Paul Schwarz(VRDC
Rick Sackbauer/VRDC
VENDER
)O WEST
N DAIRY
BAKERX
M
ISEATTLE
GAMES SALES
GRAND VIN
INNER MTN DIST
CHEESEIMP
TARA PRODUCE
DAYS
81
UNLOADIN
6:00 AM DAILY
-
VAN
10 MIN
6:00 AM DAILY
50 FT
20 MIN
6:00 AM DAILY
VAN
10 MIN
9:00 AM W F
35 FT
45 MIN
9:00 AM M T W TH F
45 FT
30 MIN
9:00 AM M W F
35 FT
10 MIN
10:0.0 AM F
35 FT
15 MIN
10:00 AM W F
35 FT
20 MIN
10:00 AM T F
45 FT
10 MIN
11:00 AM W
35 FT
10 MIN
11:00 AM T TH SAT
45 FT
45 MIN
1:00 PM M W F
1 112 HOUR
1.00 PM M F
49 FT
35 MIN
1:30 PM F
VAN
10 MIN
2:00 PM T F
30 FT
30 MINS
2:00 PM M W F
35 FT
30 MINIS
2:00 PM T W F
35 FT
30 MIN
11AM-2PM W SAT
45 FT
1 HOUR
2:30 PM DAILY
23 FT
1 HOUR
3:00 PM T F
49 FT
1 HOUR
3:00 PM F
VAN
120 MIN
4:00 PM W F
35 FT
1 HOUR
4:00 PM M W TH F SAT
54 FT
3 HOUR
6:00 PM M W TH F SAT
54 FT
14 HOUR
MEMO TO FILE:
File: S-DR2003-13
Mountain Center Sketch Design Plan Pre -Application Meeting
Date: October 20, 2003 Time: 11.30am
Lot 28, Block 1, Benchmark At Beaver Creek Subdivision
Meeting with: Paul Schwartz/Vail Resorts & Mark Donaldson/VMDA Architects
Staff: Norman Wood, Ruth Borne, Tambi Katieb
Meeting Notes:
Mark Donaldson presented the application submitted for sketch design plan (date
stamped October 9, 2003). Tambi reviewed the need to submit a stamped survey for the
application to be deemed complete, and Mark Donaldson said this would be submitted
later today. Norman commented that it was important to relate the proposed finished
grades to existing grades on a survey.
Mark and Paul discussed the tenant situation and stated that outside of Vail Resorts, Vail
Recreation District and Capco are the only other tenants. Capco loading would not be
allowed to utilize the proposed loading dock, and continue to load off the street or in their
parking area. The proposed dock will service only Vail Resorts, whichh will move all of
its food service deliveries to this building.
Paul and Mark said the truck turning, according to the plans submitted, would take place
in the Right of Way however not on the existing paved road surface. Norman noted that
the cab length shown on the turning radius plans for the three truck sizes appeared
incorrect at 17 feet. Mark Donaldson said he would check with Alpine Engineering to
see that this was correct. Paul and Mark discussed the need to make sure operational
policing of the project was in place with all tenants after this was constructed to make
sure no loading would take place in the road (particularly Capco). Mark suggested the
Town provide a statement to the tenants regarding the loading through the design review
process that Paul could incorporate in their lease agreements.
Mark and Paul clarified that garage access would not exist after the loading dock was in
place for parking. Mark would provide a parking break down, showing how the square
footages were being changed in this proposal and the resultant parking demand. Mark
would clarify this point on the plans to ensure that parking was sufficient for the proposal
and consistent with the 1/800 requirement of the I/C zone district.
Norm informed Mark and Paul that a variance from the zoning code would be required to
support the truck movements in the right of way, and provided Mark with an application.
Norm also asked Mark to provide the lanes, striping, and widths as existing on their plan
submittal. Mark said he could do this and resubmit these plans with the changes.
Tambi requested that Mark review the required snow storage areas and the required
landscaping area percentages in the zone district and provide sufficient detail on these
items for review. Mark said this would be forthcoming.
Mark and Paul also said the trash enclosure in the Cul de sac could be moved back onto
the property per staff comments. Paul will also try to get an operational schedule on
truck deliveries to ensure there is no conflict with several trucks arriving at once on site_
Norman asked Mark to pull the existing Mountain Center site plans and review the
existing conditions of the drainage and pollution control facilities to ensure this plan
complies with the existing pollution control (detention) plans. Mark agreed to do so.
Mark said he would resubmit a clarification of the affected square footage as proposed in
the sketch and asked that staff consider using this number in determining the fee for this
application. Staff agreed with this approach, and Mark said this information would be
forthcoming shortly. Paul asked that Tambi call him directly at 845.2351 when a fee has
been calculated so he could issue a check to the Town for this application.
Mark and Paul requested that the Variance and Sketch plan be scheduled on the
November 18`h Planning & Zoning Commission meeting.
Staff said they should be able to schedule this meeting date provided the required
variance application (and public notice) and the items requested in this meeting (for
Sketch Plan review) be provided in a timely manner.
There were no further questions of staff and the meeting was adjourned.
T.K.
Cc: Ruth Borne, Director of ComDev
Norman Wood, Town Engineer
Larry Brooks, Town Manager
F:\Correspondence\Internal\Application Meeting Minutes\L28 B1 BMBC Mountain Center PreAp Sketch
2003.doc
- uQ I 4) _
a
0
rn
0
m
CD
mCD
- -
i u
_pf"JR.wjff gli7; .
�} gilt �
a ° = a G s a s s 9 a a 4 a s n
m
f1. go 'sa is r
R."
ao➢�� omz .r t�cn
m-, c-=1
�� p� m�
ZZ .74
D
=ZTZ�1v 'SOT mn NZ
G7 —I p p T 0-_
m w Z
�� mcn jcc� D G')F5
n
• �
Z�.. p�oZ m c
>cn n�
co r
G)c G1C I cn m
m cn
C ) Z rn
77c o m Z a
o m r
�o> 0
c�
0
D m
0
m
D
c C)
�m��000b0�
�s
v —
z z M('-)hfi
zg P
N N
z
z
Fq
X
x
rn
_u
m y ITI
rz co O
z o C �— O
D G7 z O O
X c� O z D O
zn
_ z
- G z ==4
ZCl) D O �:D a*
V Jatoll
G7 0 O 0 D
oz �no
0 0 Do Z
C CX) o 0
m
O C"j*
� —' z m
U) D
n �3 rn n ��D�3 ��prn<
O OO�d� :!9 � z �'n'3 C Z 0000�
rnrn ��u
q:<
�� T6,
cucu��pG�SEA Z �a,p (3x
00r�D
r nr�0, 3 000
rn r� rn
-TIO rn
O m D O
'60) cn ' cp p0 x
�zn O n m O K �.
O O � � O
o m �
m 6
m
U)
z
n
MASTER PLANNING FOR
MOUNTAIN CENTER
a
t
_
VAIL RESORTS DEV. CO.
m
o -
AVON COLORADO 81620
I���IIIIII���I
o
0 0 0 27
\
/ £ x
Y
f g�i��•i
/�
�'/
u(T.
.
y
q-
�!
i
y 8
z
a
D_
_
Z ti
n
no Z
}
x
rn
x
e
O�
s
F
A
x
�-
a
0o.
s 9a
+q
'
a
\\
V
V
F
reiES
x
a
f
o D
ga A a(5
o
C O
O
N
O
O N 1
c
9 N
o
m1 1
y m r
O
1 (n
o o
M
C N
A O
A
O
m �i 0
A D U
r
S C
D m
A A
A
A S
n
3
Z D D
O O A
c)
m
�_
A
o
o z
0
> m
z
N
N z
-�
x0
9
y O
Z
G
IA
O
Z
m
m D
PO
O
Z
n
m
N
g
0
�71
o
(Y"
m
r
u m o '• w o N a N m
D D D 9 N G)
O O r 9 9 9 m z A A Z
4g O O , F Z Z Z T^ m m 0
z z
o �0
o
TM�y9 n.,e
9 jN�
x r y%C
u3��
$�bLF�op Rohm
y
W
It
i moo=`G 4 y-•<
- p ^
m m° u
�o^o
A
�z
a
s�I
^z' m
i
o
`gME
�mv,R R O K
4
z
i i zk
o
O
C
n
n
z �4
A
z
oP * A og
B
A
x_
-
SI
I R z A
O
y =
F,v
n
b a
r� rsl �n
y o
I �Nm lz m��
I
O
N
Ci]
Z N
CA
T
i
9
F
8
NO. DATE REVISIONS
IMPROVEMENT LOCATION CERTIFICATE AND TOPOGRAPHIC MAP
A—L-M- E
SECTION 2,F TOWNSHIP SOUTH, RANGE 82 WEST
xx
/`V VG � ��/"� II
MOUNTAJN CENTER —PHASE
®=
OF THE 6lh PRINCIPAL MERIDIAN
I
A RESUBDIVISION OF MOUNTAIN CENTER AND
�
— —
Q =
m
FIELD BOOK 370 PACE 077
LOT 28, BLOCK 1, BENCHMARK AT BEAVER CREEK
ENGINEERING INC
m
—1-CE
ANr E' �crroN
TOWN OF AVON. EAGLE C.OUrRY• COL
f --4
DRAWN BY: RDG CHECKED BY: DEIS
Nonce Accal9«c To I.— uw you wsT
9.Y0 VY9N ANv 9CICC1 «INK SUNKr «TN«
fvR51 paCOKw SIIM OfRCI. iN NO [KNT wAr
n«Lf KARS YTCw Y9U
u�r ACTd wAYO UwON
BOOK 32 PAGE 272
328.'i2�
COWAROSO���SSa(�M1[N V.0 BOM 9T
C C 011/�00 E16�I
fAM 97E-J390
DATE ISSUED: 06/27/03 JOB No. 84259
.N. ZEET « mzcw.rc•.n� sw�Nao Noa
IN+N TEN rc.ws rww
REC:EPTIOP� P:O.
9)0 916-JSI]
I,. 1 - .,....1.) . .i,r.-I',, \:+I .t1:. , n.a r.i i 1• ,P•�•: I. .. /. /:,.):)-, ) ..,S::'i6 PP1. H6 I a::•r.P •l 5Si -I :m.l ,, 11 3
0)
0
r
m
1
N
O
r
�
aO�
Am
oion
Q rn
N
N
Op
rn
Nn
i
-r-
mm
��OO
DESiGDED LCw 00. DATE REVi51005 d. MOUNTAIN CENTER'-'
U) DRAWO lCW
(2 m CHECKED KAK, LCW TRUCK LOADING DOCK ADDITION
m ENGINEERING INC
-� JOB 00. 84259
EDWR EWADSCLO0 •B63t D% 97
DATE 10-31-03 LOT COVERAGE PLAN (SEAL) DRiORA09i6-3390910936-J373 FA%
!'. �F.:).i')') `..I,r'I`,., 1;•(F'� 11:. _ .r.'1:Iini1-;'..ba•:I. ., �. �:')'):i :.i :i� I'F1. 1-II' 1-1,.-h•I 5ii-I:ut.l .:q I:3
7445.4 ...
.. ........I
]445.8
i
I � !
1 0'
50
X
�Nf
D
7445.1
1 i
(A
a0y
+:
rD0
m mT
r
x$
7445.9
x
s
R
74468 4
pp i
A i1 I
•1 I
8
7447.6
0
>
�=
o
8�
0
pAp
A�
74450
7443.5
30>
�Dr
7442.6__
1 _
(1)
D0�
s
�mm
O
7441 6 Q
u
7441.E----------------
,
O
«>1 11
(a)SL SQZ M„60 9f ZZN
S`JNIaVj6.-d0 SIStl9-(i),LL SOZ M-91 Z{ ZZN
rn
_ _
1 �
� o
I �. o
o n T v
o r
Ott o
po
LIMITS OF COeSiff . I ^
aN
Sin
"off o
IjV •H bat. ,`I I "
I
I
I
I
I
11 l!"L
00. DATE REVISIOOS BY
DESICOED LCW DRAwp LCW MOUNTAIN CENTER _
N Im CHECKED KAK, LCW TRUCK LOADING DOCK ADDITION
JOB 00. 84259 ENGINEERING INC
DATE 10-31-03 SITE GRADING AND DRAINAGE PLAN EDWARDS BUSNESS CENTER • P.O. BOx 97
(SEAL) EDWARDS. COIORA 0 01632
• 910 926-332] — 926-3390
1.. ? . ! Y., , �:,I-I,,.I I: -, I..Ii rr1-:..rI-,ra, ")').; ) :.,. dS: r,ii. I I r I.,%r•E.I.-1 5S.i I:mr1:.. .,I I''.,
a
a s �
r
b
\ os+o ,� or+o oz+o oo'd
I
1
1
r I II I
Z �
O �I
Z
N UD Z
= I O
I D 1 1 { m
1 l
I II I m
O
0
DESIGNED LCW NO. DATE REVISIONS BY
cn DRAWN LCW MOUNTAIN CENTER
W= TRUCK LOADING DOCK ADDITION
m CHECKED KAK, LCW
rn
4 JOB NO. 84259 ENGINEERING INC
DATE 10-31-03 WB50 TRUCK TURNING MOVEMENTS EDwMDS BAC- FA.26 3909
(SEAL) 926-3373
EDWPM -
RDS O� A O Bt6jI
P': ! ,.�:))'• P,r,t•• 1,:�1"V',P1;. � ,,r rairr.t-;. I,�;t ,..1.).r ') i•I:�I:) �11. I -If I u.c•iJ.•1 :�rii I.uil, �q�;'.t�:.i
D
r
m
O
N0. DATE REVISIONS BY ffE
MOUNTAIN CENTER "`r ""
DESIGNED LCW _ _
DRAWN LCW
o m CHECKED KAK LCW TRUCK LOADING DOCK ADDITION
rriENGINEERING INC
J08 N0, 84259
WB62 TRUCK TURNING MOVEMENTS EDWAaD58�5aE5c CEN ER•P0 BOx 97
DATE 10-31-03 SEAL E92 a33 ca o 8t6S2
) 9)0 936-]]]] - FAX 936-]]90
I,..'. I, n )."7 i.. ,.1 ,''1 .. 1: -P; , I!:. .r:lii I rl I "'I I. . /:-11. .1' .-,'i' d - P1-1, 1il-, I r.: r.I:-I 5si I .I, .il
/)/�
l/
D
r �
m �\
0
II
1
O
O_
N
I �
�
O
D_
'00
_ O
Z
D
70
m
C)
=
<
71
r
DES,GOED LCW
U1
DRAWO LCW
� m
CHECKED KAK LCW
m
.JOB 00. 84259
DATE 10-31-03
DATE REVISIOD5 BY MOUNTAIN CENTER
TRUCK LOADING DOCK ADDITION
WB67 TRUCK TURNING MOVEMENTS (SEAL)
ENGINEERING INC
EOwAAOS
oxn o�BcADSS CENTfRix •9,6-]610O9091
RS
],] 1
L
I
I
I
1
I
I
1
I
I
_ J D
m
D
0
MASTER PLANNING FOR
MOUNTAIN CENTER
VAIL RESORTS DEV. CO.
AVON COLORADO 81620
I
I
�
I
- - -
- -
- -
- - - -
I
I
_
i
1
1
I 1
1 I
----
1
D (�j
1
I
1
1
1
1
1
m
D
O
I
I
I
I
I
—
_
I
I
o D
o
a z �
000��
�D�
M
7A
I I Iv v
-------- -------------------
I
I S I r I
I
I I ,
I I I
' I Z I
I
I � I
I I
I I �
II I I o I I
�inns
N
I O
J111S)
b �,
�1
° -0i fo m
DD
I
_ e
■
MASTER PLANNING FOR
MOUNTAIN
CENTER
VAIL
RESORTS DEV. CO.
AVON
COLORADO 81620
D
o>
DID
n
O
A
N �
Z
d N
_ may
u n Z
- �n
CD
6
6
E
a m ti
Z N
a k a
O x
m
ca N
os c � O
1
MASTER PLANNING FOR
MOUNTAIN CENTER
VAIL RESORTS DEV. CO.
AVON COLORADO 81620
-n D
DD
C�
N
� X
N
O zz
I IIIII IIIIIIII o y G
e
m �
a C
m
oo��
MASTER PLANNING FOR
MOUNTAIN CENTER
VAIL RESORTS DEV. CO.
AVON COLORADO 81620
HIP
0
0
0
o
III III �
Z
d m oo m 1
I►������I���II - - o -=-9:
oo�� Z
6
liI
MASTER PLANNING FOR
MOUNTAIN CENTER
VAIL RESORTS DEV. CO.
AVON COLORADO 81620
c D
a � _
C
Z
m c m
CO o C�1.
O
n
n
t1 i� p
t;
r � \
1
IIIIIIIIII;II
MJ I IIIII^ 1
CD
b CD
III
I II I I (IIIII I
I I I I I
[AAiyy�• (III III I (III
r N IIIII I III II I�'
II IIIII II II I � III IIIII
W I
I IIIII
I I
I
�' I (IIIII O
/ I
NIIIII III I
O
O
W
I
Q
W
k
m
aa
7t.-I/
`_ �� 4w 5�
1'-D "
5" 5"
2°
W
O
K
III
III i
men
11"1/
/
/
� �
�� ■
�
a
�
�
M
�
�
a
K
e
#`
«
a
a
$_\
/ƒ
m�
2R
8/
|�
\ \ �
MG
\@
A
$�
G
\
k
T
p/ .,>
>:�>'•>
0
1O _ --
v
o,
CD
�o
r4,
O �• mul
o b
IO
m�� rn�uj CJ aJQ)r np] c
Dr �> 1�vm�tl�m
rnz Rr9 c mmmZ�z
n (l Z A Cl O p Cl n
z z - z z
m m zm
z
E� E-A-' C) mcriE-+m
N
O()EE ofzj�Em cn �'rn i>0 m , Or r rmO
m0 1>m z zm7�\
zzrn Zzm m ZE1
0w -0 rn m ()
W T Q3 u Z lP K)
k. �w
-n < m < m
m m m m
z
N