PZC Packet 081694PLANNING AND ZONING COMMISSION STAFF iMPORT
August 16, 1994
Lot 1, Riverside PUD
54 Unit Complex
Amendment to PUD
PROJECT TYPE: 54 Units
ZONING: PUD AMENDMENT COMPLIES WITH ZONING?
THIS IS A PUBLIC HEARING FOR THE AMENDMENT THE PUD ON LOT 1,
RIVERSIDE SUBDIVISION.
Jay Harkins, of Harkins & Asso., has submitted an application on behalf of Eaglebend
Affordable Housing Enterprise, to amend the Riverside PUD. Currently, the Riverside
PUD has expired thereby leaving Lot 1 of Riverside Subdivision with a PUD designation
and no development standards.
Attached to this Staff report is the proposed PUD amendment proposal for Lot 1 of
Riverside Subdivisions, which details the proposed project.
STAFF COMMENTS
DESIGN CRITERIA:
The Zoning Code has established design criteria for evaluating a PUD. The criteria is
listed below and comments pertaining to each.
1. Conformity with the Avon Comprehensive Plan, goals, and objectives
Staff has identified some goals and objectives listed in the Comprehensive Plan the
Commission should consider. They are:
Goal Al. Ensure that all land uses are located in appropriate locations with
appropriate controls.
Is this an appropriate location for high density residential? Is this use appropriate
for this location?
Goal A3. Upon full development of the community, all land uses should work
together as a balanced system.
Will this land use, in this location, promote a balanced system?
Goal B2. Enhance the Town's role as a principal, year round residential and
commercial center in the Vail Valley.
Will this project help Avon's role as a year round residential center?
PLANNING A" ZONING COMMISSION STAFF IMPORT
August 16, 1994
Lot 1, Riverside PUD
54 Unit Complex
Amendment to PUD
Goal C 1. Provide for an appropriate mix of residential dwelling unit types for both
permanent residents and tourists.
Does this project provide for a mix of residential types?
Goal C2. Affordable housing, both rental and owner occupied, should be made
available through a combination of private and public efforts.
Does the project meet the objective of this goal?
Goal H2. Establish the Eagle River as greenbelt corridor through the Town.
Is this being achieved by the dedication of the open space along the Eagle River?
2. Conformity and compliance with the overall design theme of the Town, the sub-
area design recommendations and design guidelines adopted by the Town.
This project is in Sub -Area 10, the Riverfront District, and the standards indicated in the
Comprehensive Plan are attached to this Staff report. The main recommendation this
proposal is not in conformance with is to provide for public access to the river and
construction of the pedestrian trail along the river. In addition, the Recreation Master
Plan specifies this path in this location.
3. Design compatibility with the immediate environment, neighborhood, and
adjacent properties relative to architectural design, scale, bulk, building height, buffer
zones, character, and orientations.
Existing land uses found in the area are as follows:
North: Proposed Boulder PUD, with 150 units approved;
Eaglebend Apartments, with an existing 240 units
South: River Oaks Condominiums;
Folson Property PUD(there is no development plan approved)
West: Undeveloped Lot 2, Riverside Subdivision;
Red house at comer of Avon Rd. and HWY. 6/24(commercial)
East: Tract A Open Space;
River Forge Duplexes and apartment complex.
The overall design, scale, bulk and building height of the buildings fit with the established
character found north of the Eagle River. River Oaks Condominiums, southeast of the
site, has a tall character, with facades broken up architecturally. The mass of these
buildings are being reduced and broken by stepping the building down on the ends and
providing a break in the middle and on the ends of the building.
PLANNING A1" ZONING COMMISSION STAFF kEPORT
August 16, 1994
Lot 1, Riverside PUD
54 Unit Complex
Amendment to PUD
4. Uses, activity, and density which provide a compatible, efficient, and workable
relationship with surrounding uses and activity.
The proposed density is 21.6 units per acre, which is lower than the 32.5 units per acre at
the existing Eaglebend apartments. Does the Commission feel this proposal meets the
intent of the above criteria?
S. Identification and mitigation or avoidance of natural and/or geologic hazards
that affect the property upon which the PUD is proposed
The proposal states there will be a construction/erosion control fence placed along the 30'
setback, however, the buildings are on the 30' setback, which indicates grading taking
place in the 30' setback and this may not occur. Further, with the building wall on the
setback, will footings and/or overhangs encroach into the setback?
6. Site plan, building design and location and open space provisions designed to
produce a functional development responsive and sensitive to natural feature,
vegetation and overall aesthetic quality of the community.
The applicant is not providing public access to the river, nor are they providing a
pedestrian path along the river, however, they will be dedicating the area within the 30'
stream setback to the Town of Avon.
Staff is not clear what trees and vegetation will be impacted. The applicant will have the
site staked for the site visit on Tuesday and Commission should consider whether or not
the proposed landscape plan mitigates the taking of existing trees.
7. A circulation system designed for both vehicles and pedestrians addressing on
and off-site traffic circulation that is compatible with the Town Transportation Plan.
The circulation for the site is limited by the one access point permitted by the State.
8. Functional and aesthetic landscaping and open space in order to optimize and
preserve natural feature, recreation, views and function.
Landscaping is called for in the 10' between the parking and HWY. 6/24, this area is also
designated as snow storage. The Commission should focus on the 10' buffer and the
landscape treatment, which can help soften the front facade of the building, which contain
the garages.
PLANNING A" ZONING COMMISSION STAFF MPORT
August 16, 1994
Lot 1, Riverside PUD
54 Unit Complex
Amendment to PUD
The applicants will be dedicating the area within the 30' stream setback as open space to
the Town, which will protect the natural feature along the river.
9. Phasing plan or subdivision plan that will maintain a workable, functional and
efficient relationship throughout the development of the PUD.
Phasing is not proposed. The project will be built at one time.
10. Adequacy of public services such as sewer, water, schools, transportation
systems, roads parks, and police and fire protection.
The developer must provide the Town of Avon letters from the respective agencies
indicating the services can be provided to the project. As a note to the developer, this
project is not located in the Avon Metropolitan District.
11. That the edsting streets and roads are suitable and adequate to carry
anticipated traffic within the proposed PUD and in the vicinity of the proposed PUD.
This project is accessed by HWY. 6/24 and the traffic study conducted and provided
indicates the highway is suitable to carry the added traffic.
SITE PLAN COMMENTS:
Eagle River: The site plan has the buildings placed on the 30' setback from the mean
annual high water mark. This indicates grading, site disturbance and the footings may be
taking place in the setback, which is not allowed. Grading and site disturbance must be
confined and kept out of the 30' setback.
Building A and the parking on the west end of the site are proposed on a 35% slope. Fill
will be brought in to even the slope, thereby creating a strong potential for encroachment
into the 30' setback, which is not allowed. This is, also, a vegetated area, with the type of
vegetation not known. The applicant will be staking the site for the visit on Tuesday.
The developer must address riparian issues, which include wetlands delineation on the site
plan, and checking for rapture nesting in the trees.
The site plan does not reflect a pedestrian path which is specified in the Comprehensive
Plan and the Recreation Master Plan. The developer must install the pedestrian path as
specified in the two plans.
PLANNING A" ZONING COMMISSION STAFF ld�,PORT
August 16, 1994
Lot 1, Riverside PUD
54 Unit Complex
Amendment to PUD
Building Location: The buildings will be located 25' apart from each other. Does this
provide enough of a break in the building facades facing HWY. 6/24? The proposed
building locations are pushing the edges of the site.
Drainage: A drainage plan has not been provided for Staff review. The drainage will be
closely considered due to the proximity to the Eagle River.
Site Coveraize: The proposal is for 60% site coverage, which is not defined. Staff would
like to know if 60% site coverage equates to 40% landscaped area, whether it is formal or
natural.
Gradina: There are areas on the site plan showing finished grades exceeding the allowed
2:1 slopes.
Landscape Plan: The Commission should comment on the proposed landscape plan. The
plant list indicates material that does not meet the Town of Avon minimum size
requirements. The minimum size requirements are 2" caliper for deciduous trees, 6' high
for coniferous trees and 5 gallon for shrubs.
Another question to consider is does the landscape plan mitigate removal of existing trees
and vegetation?
Parking: The applicant is requesting a reduction in the parking required for guest spaces.
The plan shows the required amount, however, a reduction in the 10 additional guest
spaces is being requested. Staff is not supportive of this request since there may be more
than 2 cars per unit in the complex.
The snow storage for the parking area is indicated in the 30' setback from the mean annual
high water mark. Snow storage may not be located in the setback due to direct discharge
into the Eagle River. An alternative location for these areas must be found.
Dumpster: The two proposed dumpster location are in a 10' landscape buffer zone, but
not indicated on any site plans. The dumpsters need to be shown and not located in the
25' front yard setback.
STAFF RECOMMENDATION
Staff recommendation is for Commission to give serious consideration to the attached
proposed PUD information and answer the questions posed by Staff in the report. Should
the Commission decide to approve the proposal at this hearing, attached Resolution 94-16
must be referenced and approved. If following the public hearing, the Commission does
PLANNING Aft ZONING COMMISSION STAFF ICEPORT
August 16, 1994
Lot 1, Riverside PUD
54 Unit Complex
Amendment to PUD
not concur with the findings, Resolution 94-16 should be amended accordingly prior to
adoption.
1. Introduce Application
2. Applicant Presentation
3. Open Public Hearing
4. Close Public Hearing
5. Commission Review
6. Commission Action
Respectfully Submitted,
Mary Holden
Town Planner
RECOMMENDED ACTION
PLANNING AND ZONING ACTION:
Approved as submitted ( ) Approved with recommended conditions ( )
Approved with modified conditions (✓f Continued ( ) Denied ( )
Withdrawn ( ) Conceptual, No Action ( )
Date /ff,4 Sue Railton, Secretary
Sae attached Page
Lot 1, Riverside Subdivision, Eaglebend II PUD
Public Hearing
The Commission approved Planning and Zoning Commission Resolution 94-16, A
Resolution Recommending to the Avon Town Council Approval of a PUD Development
Plan and Development Standards Related to Lot 1, Riverside Subdivision, citing
the following findings and conditions:
FINDIGS:
1. The PUD is consistent with the development patterns and locations set forth
in the Town of Avon Comprehensive Plan.
2. The PUD is consistent with the Comprehensive Plan goals and o-jectives.
related to the Town's role as a principal year round residential center in the
Vail Valley.
3. The PUD is consistent with the Comprehensive Plan goals and objectives
related to an appropriate mix of residential dwelling units for permanent
residents.
4. The PUD is consistent with the Comprehensive Plan goals and Objectives
related to open space dedication along the Eagle River corridor.
5. The PUD is consistent with the Comprehensive Plan goals and objectives
related to sensitivity to the natural riparian environment along the Eagle
River corridor.
6. The PUD is consistent with the Comprehensive Plan goals and objectives
related to the Riverfront District (Subarea 10) related to buildings capitalizing
on the River, setback from the River to preserve its natural character, limit
building heights to three or four stories, and, where possible, locate buildings
and parking to preserve and promote the health of existing quality trees.
CONDITIONS:
1. The PUD Guidelines and Standards described in the report (including allowed
uses, density, site access and development standards) be incorporated into and
binding upon the PUD zone district designation for the parcel.
2. No site disturbance (including grading or structures) be allowed within the
30' mean high water setback, with the exception of the northwest corner of
Building A and a 12 foot radius on that corner, and the developer agrees to
return area acceptable to Staff.
3. A protective and erosion control fence be installed along the 30' setback
from the mean annyal high water prior to and during construction.
Lot 1, Rivers Subdivision, Eaglebend III, f�
Public Hearing, (_cont)_
CONDITIONS (cont)
4. A pedestrian trail/pathway, consistent with the Town's Recreation Plan
be shown on the PUD Plan along the Eagle River. The developer shall construct
this pathway prior to any temporary or permanat certificates of occupancy
being issued.
5. A drainage.plan be submitted to Staff and approved by Staff prior to any
application for a building permit. The drainage plan must address all
engineering concerns.
6. The landscape plan be adequate to mitigate the removal of existing trees
and vegetation on site. The landscape plan must be brought back before the
Planning and Zoning Commission for review and approval.
7. The dumpster location be shown on the site plan and approved by Planning*
and Zoning Commission.
September 2, 1994
Mr. Jeff Spanel
Wintergreen Homes LLC
P0Box 9;8
Avon, CO 81620
RE: Lot 1, Riverside Subdivision Eaglebend III PUD
Public Hearing
Lot 1, Riverside Subdivision, Eaglebend II
54 Unit Complex, Final Design Review
Dear Ivir. Spanel
Thank you for your presentation to the Planning and Zoning Commission on August 16,
1994.
Eaglebend III, PUD
The Commission approved Planning and Zoning Commission Resolution. 94-16, A
Resolution Recommending to the Avon Town Council Approval of a PUTD Development
Plan and Development Standards Related to Lot 1, Riverside Subdivision, citing the
following findings and conditions:
1. The PUD is consistent with the development patterns and locations set forth
in the Town of Avon Comprehensive Plan.
2. The PUD is consistent with the Comprehensive Plan goals and objectives
related to the Town's role as a principal year round residential center in
the Vail Valley.
3. The PUD is consistent with the Comprehensive Plan goals and objectives
related to an appropriate mix of residential dwelling units for permanent
residents.
4. The PUD is consistent with the Comprehensive Plan goals and objectives
September 2, 1994
111r. Jeff Spanei
Lot 1, Riverside Subdivision, Eaglebend III PUD
Page 2
related to open space dedication along the Eagie River corridor.
The PUD is consistent with the Comorehensive Plan Qoals and objectives
related to sensitivity to the natural riparian environment along the Eagie
River corridor.
6. The PUD is consistent with the Comprehensive Plan goals and objectives
related to the Riverfront District (Subarea 10) related to buildings capitalizing
on the River, setback from the River to preserve its natural character, limit
building heights to three or four stories, and, where possible, locate buildings
and parking to preserve and promote the health of existing quality trees.
CONDITIONS
I. The PLD Guidelines and Standards described in the report ,'including allowed
uses, density; site access and development standards) be incorporated into and
binding upon the PUD zone district designation for the parcel.
2. No site disturbance (including grading or structures) be allowed within the
30' mean high water setback, with the exception of the northwest corner of
Building A and a 12 foot radius on that corner, and the developer agrees to
return area acceptable to staff.
A protective and erosion control fence be installed along the 30' setback
from the mean annual high water prior to and during construction.
4. A pedestrian trail/pathway, consistent with the Town's Recreation Plan be
shown on the PUD Plan along the Eagle River. The developer shall
construct this pathway prior to any temporary or permanent certificates
of occupancy being issued.
5. A drainage plan be submitted to Staff and approved by Staff prior to any
application for a building permit. the drainage plan must address all
engineering concerns.
6. The landscape plan be adequate to mitigate the removal of existing trees and
vegetation on site. The landscape plan must be brought back before the
September 2, 1994
Mr. Jeff Spanel
Lot 1, Riverside Subdivision, Eaglebend III PLD
Page 3
Planning and Zoning Commission for review and approval.
7. The dumpster location be shown on the site plan and approved by Planning
and Zoning Commission.
Eaglebend III, 54 ti nit Complex, Final Design Review
The Commission granted final design review approval with the following conditions:
1. The flues, flashings and vents be painted to match the color scheme of the
buildings.
2. The building lighting be approved by Staff prior to issuance of a building
permit.
3. Revegetation include native bushes.
4. Meters be concealed.
5. Prior to any site disturbance, a construction/erosion control fence be placed
on the 30' stream setback.
6. The developer install the pedestrian path along the Eagle River as specified
in the Recreation Master Plan and the Comprehensive Plan prior to any
certificates of occupancy being issued.
7. No site disturbance of any kind may take place in the 30' stream setback,
except as noted in Resolution 94-16.
8. The developer provide to the Town of Avon, Colorado Department of
Transportation permission for the access off of Highway 6/24 prior to
application for a building permit.
9. A drainage plan be submitted to Staff and approved by Staff prior to .
application for a building permit. The drainage must address all
September 2, 1994
Mr. Jeff Spanel
Eagiebend I11, PUD and Final Design Review
Page 4
engineering concerns.
10. The landscape plan must be brought back before the Planning and Zoning
Commission for their review and approval, with the addition of a variety of
species.
11. The dumpster location be shown on the site plan and approved by Planning and
Zoning Commission.
12. The developer provide to the Town letters from the respective agencies
indicating they are able to provide taus site with services, such as water,
sewer, electric, gas and others.
13. Center building to be offset 10 feet to the north, to be approved by Staff.
14. Playground equipment to be provided, to be approved by Star
15. A strong recommendation that the applicant take a good look at
providing a picnic area as part of the proposal.
Please do not hesitate to contact this office, should you have any questions.
Sincerely,
C/ �
Charlette Pascuzzi��
Recording Secretary
Copy/File
I
APPLICATION FOR REZONING
-he undersigned hereby recuests that a REZONING be granted in accordance with the teens
f the Town of Avon Municipal Code. In
tares: support of this application, the undersigned
The Rezoning requested is: PUD Amendment
to Lot 1 - Riverside
Legal description of property: Lot 1, Riverside; Accor
ding to the sinal
Plat recorded September
1, 1989 in boor 512at page 802 County of Eagle
Address of property is: No address
Owner of described property: Golden Buff Enterprises
dba. Kenneth 1.
and Donald 1. Kriz
Applicant for Rezoning: �A
Zoning classification ofert
ro
p p y: Existing PUD - Accomodations
Existing improvements on property consist of: not a
pplicable - none
Duration of proposed Rezoning: Permanent xx
Temporary Years
There is hereby attached a list of the names and addresses of all property owners
within 300 feet of the property upon which the Rezoning is requested, and the
required notices for mailing and posting.
Additional convents:
do hereby certify that the above statements are true and correct and the application
signed as an acknowledgement of that fact. I am the owner of the above described
lop-e1rty or authorized to act as agent for the owner.
plicant
77 Isetcalf Road Suite'
dressPhone ,Number
Avon, Colorado 81620
303-94g-5072
:ed
Same
Owner
Address and Phone Number
Da ted
kPPLICATION FOR REZONING PAGE 2
have examined this application and it has been accepted or rejected for the following
easons:
oning Official Dated
ate Filed Fee Paid Date Posted
earing Date Received by
August 4, 1994
NOTICE OF PUBLIC HEARING
TO: TO WHOM IT MAY CONCERN
You are hereby notified pursuant to the provisions of Section 17.28.050 of
the Avon Municipal Code, that a public hearing on the following matter will
be held and considered at the meeting of the Planning and Zoning Commission
of the Town of Avon, on August 16, 1994 at 7:30 PPR, in the Avon Municipal
Complex, 400 Bench Mark Road, Avon, Colorado, at which time and place you
are hereby invited to be present and be heard.
PROPERTY OWNER: Golden Buff Enterprises
APPLICANT: Wintergreen Homes
77 Metcalf Road
Avon Colorado 81620
LEGAL DESCRIPTION OF PROPERTY: Lot 1, Riverside: According to the Final
Plat recorded September 1, 1989, in Book
512 at Page q02, County of Eagle.
ADDRESS OF PROPERTY: 38568 Highway 6 & 24.
REQUESTED CHANGE / PROPOSED USE: Amended P U D from Accommodations &
Commercial to Multi -Family Apartments.
DEADLINE: If you wish to be heard on this matter you may appear
personally of by designated agent at the public meeting on
August 16, 1994 or you may file a written statement with the
Recording Secretary, Planning and Zoning Commission, Town of
Avon P.O. Box 975, Avon, Colorado, 81620.
In order to be considered by the Planning and Zoning
Commission, such written statement must be received in the
Town Offices no later then 4:00 PM, Tuesday, August 16, 1994.
OTHER: Applicant is represented by: H. Jay Harkins, Architect
2784 So. Wheeling Way
Aurora, Coloardo 80014
303-755-4718
ATTEST: J
Patty New art, Town Clerk ecording Secretary
Planning and Zoning Commission
POSTED AT THE FOLLOWING PUBLIC PLACES WITHIN THE TOWN OF AVON - R/4/g4
COASTAL MART STATION
ENTRANCE TO CITY MARKET
ENTRANCE TO AVON POST OFFICE
MAIN LOBBY, AVON MUNICIPAL COMPLEX
LIST OF NOTIFIED OWNERS WITHIN 300':
Town of Avon
P.O. Box 975
Avon, Colorado 81620
Craig Folson
c/o Folson Exploration Company
200 Crescent Court, 1310
Dallas, Texas 75201
Vail Associates
P.O. Box 7
Vail, Colorado 81658
Nottingham Associates
c/o Maurice Nottinqham
P.O. Box 953
Avon, Colorado 81620
Imogene Doll
P.O. Box 5060
Avon, Colorado 81620
JULY 18, 1994
PUD AMENDMENT
LOT 1
RIVERSIDE SUBDIVISION
AVON, COLORADO.
APPLICANT: EAGLEBEND AFFORDABLE
HOUSING ENTERPRISE
303-949-5072
ARCHITECT: H. JAY HARKINS
1415 LARIMER STREET #206
DENVER, COLORADO 80202
303-755-4718
303-534-2200
Eaglebend III
July 18, 1994
Page 2
PROJECT DESCRIPTION
Overview:
The proposed PUD amendment and project does require any variances
or special permits.
A total of 54 apartments are being proposed, with 30 enclosed
garaqes and 94 on-site parkinq stalls being provided. The units
will be housed in three buildings with each building containing
18 units. Each Building will have:
Three bedroom - 8 units at 1063 SF each
Two bedroom - 4 units at 827 SF each
Two bedroom - 2 units at 790 SF each
One bedroom - 4 units at 606 SF each
Each building will also contain 10 enclosed garages for rental by
residents of the project.
The project is to be operated as a rental complex with the same
controls and management conditions as the earlier completed
Eaglebend projects.
The 10 foot setback from Annual High Water Line is proposed to he
dedicated to the Town of Avon as Open Space.
There is to be an access to the Eagle River within the property.
Site Layout:
The site is located between Colorado State Highway 6 and the
Eagle River approximately 1/2 mile east of the Beaver Creek and
Colorado State Highway 6 intersection. The site has: to the
north, the Eagle River with Multi -family directly across the
river (Nottingham Station); to the east and west, Open Space
dedicated to the Town of Avon; to the south, Colorado State
Highway 6. Across the river to the north-east, there are two
single-family homes and further to the east, the first two phases
of Eaglebend Apartments.
The site fairly narrow and at the far east and west ends the
property falls steeply to the river. The center of the site is
relatively flat and presents the best opportunity to build.
The existing vegetation is made up of: riparian growth within
the 30' River setback; "buck" brush along the west end and east
end; and several individual mature fir and spruce trees along
the river corridor. The project has designed to not remove or
destroy any major trees or the riparian growth within the river
corridor.
Eaglebend III
July 18, 1994
Page 4
PROPOSED PUD CONDITIONS
T _i. T---
Does not apply
Site Dimensions:
Does not apply
0-+-1.-..1...
Setbacks shall be consistent with Title 17 and as further noted:
1. The north property line (River corridor) setback will be 30'
from the Annual High Water Line as shown on the attached
site plan to the building structure with no penetration of
balconies and/or roof eaves into the setback.
2. The south property line (Highway 6) setback shall be 25' to
structures and 10' to parking stall edge.
3. Side setbacks shall be 7.5' from property lines (not
applicable at that site).
4. Building to building setbacks to be a minimum of 15' from
face of primary structures with an allowed encroachment of
2' for roof overhangs and balconies.
Height:
A maximum building height of 48'is proposed.
Density:
The residential density proposed is 54 units or approximately
63,000 square feet of gross enclosed living space. This
represents approximately 21.6 units Per acre for Lot 1 (2.5
acres) or 6.60 units per acre if the Open Space Tract A (8.9
acres) is used in the calculation.
Site Coverage:
We propose that the maximum site coverage be .6.
Eaglebend III
July 19, 1994
Page 6
OTHER DESIGN STANDARDS
Snow Storage_ (as shown on landscape plan)
Storage shall be at the east and west ends of the parking areas
and along the 10' setback between parking and Highway 6.
Parking/Pavement = 33,013SF x .2 = 6,603 SF
Trash:
Two dumpsters will be provided and placed an enclosure within the
10' landscape zone. Scheduled pickup will used to allow parking.
Lighting:
All parking, drive and walkways will be lit per approved fixtures
and will be considered an aesthetic element of the design.
Retaining wall:
Wall on Grading/Drainage plan will be river boulders (1:2 slope).
Signage:
Project signage will be per Town of Avon Code and as approved.
Building Materials/Roofs:
The buildings are to be constructed as Type V - 1 hour (fully
sprinkled). Exterior materials will be durable and easily
maintained. The siding will be a fibrous hard board siding
material (wood texture and color) and the base of the structure a
panel -board with stucco -like finishes. The roof will be
composite shingles, similar to a "Timberline" product, with a
deep shadow line and "mottled" earth tone colors. The general
character of the project will be consistent with the texture and
tones of the structures built in Beaver Creek and Avon area.
Adequacy of Public Services:
See attached letter from Inter -Mountain Engineering.
Traffic Impacts:
See attached letter from Inter -Mountain Engineering.
Wetlands:
See attached letter from Inter -Mountain Engineering.
00
ECL
o Ac`
W
E
CL
E.
Cd
LL
0
a� r
iC OvN
C N
�� T
a� o 9
NCD
� O
CC0
U
G c
3 C O 0
O 0 < Cl
cCd
o co
Z 2OcncaU
L �9 LO- co,
Q 2NQccco
t
I
z
Q
W
COco j
z�QH3
e fill
II
Q
.Q
R�
all
D
All,
51
0
a� r
iC OvN
C N
�� T
a� o 9
NCD
� O
CC0
U
G c
3 C O 0
O 0 < Cl
cCd
o co
Z 2OcncaU
L �9 LO- co,
Q 2NQccco
t
HtRt.
F
P
� 404 4
RpR t
a—
z
Q
J
CL
w
Y
X
w
Z?
'
Q
z�QH3
e fill
II
Q
R�
all
All,
51
o
g
HtRt.
F
P
� 404 4
RpR t
a—
z
Q
J
CL
w
Y
X
w
Z?
'
Q
z�QH3
II
51
PLANNING AND ZONING COMMISSION STAFF REPORT
August 16, 1994
Lot 1, Riverside PUD
54 Unit Complex
Amendment to PUD
PROJECT TYPE: 54 Units
ZONING: PUD AMENDMENT COMPLIES WITH ZONING?
THIS IS A PUBLIC HEARING FOR THE AMENDMENT THE PUD ON LOT 1,
RIVERSIDE SUBDIVISION.
Jay Harkins, of Harkins & Asso., has submitted an application on behalf of Eaglebend
Affordable Housing Enterprise, to amend the Riverside PUD. Currently, the Riverside
PUD has expired thereby leaving Lot 1 of Riverside Subdivision with a PUD designation
and no development standards.
Attached to this Staff report is the proposed PUD amendment proposal for Lot 1 of
Riverside Subdivisions, which details the proposed project.
STAFF COMMENTS
DESIGN CRITERIA:
The Zoning Code has established design criteria for evaluating a PUD. The criteria is
listed below and comments pertaining to each.
1. Conformity with the Avon Comprehensive Plan, goals, and objectives
Staff has identified some goals and objectives listed in the Comprehensive Plan the
Commission should consider. They are:
Goal Al. Ensure that all land uses are located in appropriate locations with
appropriate controls.
Is this an appropriate location for high density residential? Is this use appropriate
for this location?
Goal A3. Upon full development of the community, all land uses should work
together as a balanced system.
Will this land use, in this location, promote a balanced system?
Goal B2. Enhance the Town's role as a principal, year round residential and
commercial center in the Vail Valley.
Will this project help Avon's role as a year round residential center?
PLANNING AND ZONING COMMISSION STAFF REPORT
August 16, 1994
Lot 1, Riverside PUD
54 Unit Complex
Amendment to PUD
4. Uses, activity, and density which provide a compatible, efficient, and workable
relationship with surrounding uses and activity.
The proposed density is 21.6 units per acre, which is lower than the 32.5 units per acre at
the existing Eaglebend apartments. Does the Commission feel this proposal meets the
intent of the above criteria?
S. Identification and mitigation or avoidance of natural and/or geologic hazards
that affect the property upon which the PUD is proposed
The proposal states there will be a construction/erosion control fence placed along the 30'
setback, however, the buildings are on the 30' setback, which indicates grading taking
place in the 30' setback and this may not occur. Further, with the building wall on the
setback, will footings and/or overhangs encroach into the setback?
6. Site plan, building design and location and open space provisions designed to
produce a functional development responsive and sensitive to natural feature,
vegetation and overall aesthetic quality of the community.
The applicant is not providing public access to the river, nor are they providing a
pedestrian path along the river, however, they will be dedicating the area within the 30'
stream setback to the Town of Avon.
Staff is not clear what trees and vegetation will be impacted. The applicant will have the
site staked for the site visit on Tuesday and Commission should consider whether or not
the proposed landscape plan mitigates the taking of existing trees.
7. A circulation system designed for both vehicles and pedestrians addressing on
and off-site traffic circulation that is compatible with the Town Transportation Plan.
The circulation for the site is limited by the one access point permitted by the State.
& Functional and aesthetic landscaping and open space in order to optimize and
preserve natural feature, recreation, views and function.
Landscaping is called for in the 10' between the parking and HWY. 6/24, this area is also
designated as snow storage. The Commission should focus on the 10' buffer and the
landscape treatment, which can help soften the front facade of the building, which contain
the garages.
PLANNING AND ZONING COMMISSION STAFF REPORT
August 16, 1994
Lot 1, Riverside PUD
54 Unit Complex
Amendment to PUD
BuildiniLocation: The buildings will be located 25' apart from each other. Does this
provide enough of a break in the building facades facing HWY. 6/24? The proposed
building locations are pushing the edges of the site.
Drainage: A drainage plan has not been provided for Staff review. The drainage will be
closely considered due to the proximity to the Eagle River.
Site Coverage: The proposal is for 60% site coverage, which is not defined. Staff would
like to know if 60% site coverage equates to 40% landscaped area, whether it is formal or
natural.
Grading: There are areas on the site plan showing finished grades exceeding the allowed
2:1 slopes.
Landscape Plan: The Commission should comment on the proposed landscape plan. The
plant list indicates material that does not meet the Town of Avon minimum size
requirements. The minimum size requirements are 2" caliper for deciduous trees, 6' high
for coniferous trees and 5 gallon for shrubs.
Another question to consider is does the landscape plan mitigate removal of existing trees
and vegetation?
Parking: The applicant is requesting a reduction in the parking required for guest spaces.
The plan shows the required amount, however, a reduction in the 10 additional guest
spaces is being requested. Staff is not supportive of this request since there may be more
than 2 cars per unit in the complex.
The snow storage for the parking area is indicated in the 30' setback from the mean annual
high water mark. Snow storage may not be located in the setback due to direct discharge
into the Eagle River. An alternative location for these areas must be found.
Dumpster: The two proposed dumpster location are in a 10' landscape buffer zone, but
not indicated on any site plans. The dumpsters need to be shown and not located in the
25' front yard setback.
STAFF RECOMIMENDATION
Staff recommendation is for Commission to give serious consideration to the attached
proposed PUD information and answer the questions posed by Staff in the report. Should
the Commission decide to approve the proposal at this hearing, attached Resolution 94-16
must be referenced and approved. If following the public hearing, the Commission does
Lot 1, Riverside Subdivision, Eaglebend II PUD
Public Hearing
The Commission approved Planning and Zoning Commission Resolution 94-16, A
Resolution Recommending to the Avon Town Council Approval of a PUD Development
Plan and Development Standards Related to Lot 1, Riverside Subdivision, citing
the following findings and conditions:
FINDIGS:
1. The PUD is consistent with the development patterns and locations set forth
in the Town of Avon Comprehensive Plan.
2. The PUD is consistent with the Comprehensive Plan goals and o-jectives.
related to the Town's role as a principal year round residential center in the
Vail Valley.
3. The PUD is consistent with the Comprehensive Plan goals and objectives
related to an appropriate mix of residential dwelling units for permanent
residents.
4. The PUD is consistent with the Comprehensive Plan goals and Objectives
related to open space dedication along the Eagle River corridor.
5. The PUD is consistent with the Comprehensive Plan goals and objectives
related to sensitivity to the natural riparian environment along the Eagle
River corridor.
6. The PUD is consistent with the Comprehensive Plan goals and objectives
related to the Riverfront District (Subarea 10) related to buildings capitalizing
on the River, setback from the River to preserve its natural character, limit
building heights to three or four stories, and, where possible, locate buildings
and parking to preserve and promote the health of existing quality trees.
CONDITIONS:
1. The PUD Guidelines and Standards described in the report (including allowed
uses, density, site access and development standards) be incorporated into and
binding upon the PUD zone district designation for the parcel.
2. No site disturbance (including grading or structures) be allowed within the
30' mean high water setback, with the exception of the northwest corner of
Building A and a 12 foot radius on that corner, and the developer agrees to
return area acceptable to Staff.
3. A protective and erosion control fence be installed along the 30" setback
from the mean annyal high water prior to and during construction.
September 2, 1994
NTr. Jeff Spanei
Lot 1, Riverside Subdivision, Ea`;Iebend III PLS
Page 2 W
related to open space dedication along the Eagie River corridor.
The PUD is consistent with the Comprehens=ive Plan goals and objectives
related to sensitivity to the natural riparian environment along the Eagie
River corridor.
6. The PUD is consistent with the Comprehensive Plan goals and objectives
related to the Riverfront District (Subarea 10) related to buildings capitalizing
on the River, setback from the River to preserve its natural character, limit
building heights to three or four stories, and, where possible, locate buildings
and parking to preserve and promote the health of existing quality trees.
CONDITIONS
1. The PCD Guidelines and Standards described in the report (includi_*ig allowed
uses, density, site access and development standards) be incorporated into arid
binding upon the PUD zone district designation for the parcel.
/2. No site disturbance (including grading or structures) be allowed witlu
30' mean high water setback, with the exception of the northwest corner of
Building A and a 12 foot radius on that comer, and the developer agrees to
return area acceptable to staff. .-
3. A protective -and erosion control fence be installed along the 30' setback
from the mean annual high water prior to and during construction.
4. A pedestrian traiUpathway, consistent with the Town's Recreation Plan be
shown on the PUD Plan along the Eagle River. The developer shall
construct this pathway prior to any temporary or permanent certificates
of occupancy being issued.
A drainage plan be submitted to Staff and approved by Staff prior to any
application for a building permit. the drainage plan must address all
engineering concerns.
6. The landscape plan be adequate to mitigate the removal of existing trees and
AUTHORIZATION WITH RESPECT TO
APPLICATION FOR REVISED SITE PLAN
This Authorization is made and given as of May 1, 1994, by
Golden Buff Enterprises, Kenneth L. Kriz and Donald L. Kriz
("Sellers") to and for the benefit of Wintergreen Homes Limited
Liability Company, a Colorado limited liability company
("Purchaser").
Recitals
Sellers and Purchaser have entered into the Land Sale
Contract dated as of April 20, 1994 (the "Contract") by which
Sellers have agreed to sell and Purchaser has agreed to purchase,
on the terms and conditions stated in the Contract, the real
property located in the Town of Avon (the "Town"), Eagle County,
Colorado, legally described as Lot 1, Riverside Subdivision (the
"Property"). The Town previously approved an SPA site plan for
the Property, but that approval has expired. During the
Inspection Period (as defined in the Contract), Purchaser wishes
to apply to the Town for approval of a revised SPA site plan for
the Property. Sellers are willing to authorize Purchaser to make
and pursue such application.
Authorization
For good and valuable consideration, the receipt and
adequacy of which are hereby acknowledged, Sellers agree as
follows:
1. Sellers hereby authorize Purchaser to make application
to the Town for, and obtain from the Town approval of, a revised
SPA site plan for the Project (as defined in the Contract) on the
Property, acceptable to Purchaser in its sole discretion.
Without limiting the generality of the foregoing, Purchaser is
authorized to take all actions necessary or desirable, in its
determination, properly to make and pursue such application and
obtain such approval, including but not limited to meeting with
the Town's planning and zoning board and communit1— development
staff, appearing before the Town's Mayor and Council, and
executing and delivering such documents and instruments as are
required by any of them, in each case as if Purchaser were the
owner of the Property.
2. This Authorization is coupled with an interest, and may
be revoked by Sellers only upon or after termination of the
Contract in accordance with its terms.
3. Sellers and Purchaser acknowledge that the Town may rely
upon this Authorization in accepting, evaluating and granting the
application of Purchaser for approval of a revised SPA site plan
for the Property.
4. Purchaser may assign its rights under this Authorization
to any Issuer (as that term is defined in the Contract)
succeeding to the rights of Purchaser under the Contract.
S. Nothing in this Authorization shall be construed to
authorize Purchaser to incur any liability or obligation for or
on behalf of, or otherwise binding upon, any of Sellers, other
than the effect on the Property of a revised SPA site plan for
the Property, or to require any of Sellers to incur any liability
or expense.
6. This Authorization shall be construed in accordance with
the internal laws of the State of Colorado.
Sellers have executed and delivered this Authorization as of
the date first written above.
[F: \CLIENTS\02549.000\AUTHORIZ.2J
Golden Buff Enterprises
BY:
Name:
General Partner
Kenn th L. Kriz
Donald L. Kriz
2
n Inter -Mountain
Engineering Ltd.
MEMORANDUM
Date: May 17, 1994
To: Jay Harkins
From: Russell Thrasher
Re: Eaglebend Phase III
PUD Submittal
Project No. 94076
Section 17.20.110.H.10 - Adequacy of Public Services:
1.) Sewer - An eighteen inch sewer main runs along the south
side of Highway 6 & 24 in the vicinity of the project.
It should be adequate for the flows generated by this
project.
2.) Water - A twelve inch water main runs along the north
side of Highway 6 & 24 in the vicinity of the project.
Water lines can be looped through the apartments to
provide adequate water pressure and fire flows.
3.) Schools - Based out experience at Eaglebend Apartments we
anticipate the following:
Preschool - 9 children
School Age - 9 children with 6 relocating from
within the school district
4.) Transportation system - The apartments would be on an
existing bus route.
5.) Roads - The Town of Avon Transportation Plan as prepared
by Felsburg Holt & Ullevig projected 70 units and 25,000
S.F. of commercial development on this site. With only
59 units proposed by the developer the existing roads and
proposed improvements as per the transportation plan
should be adequate.
6.) Parks - The site is located adjacent to Tract A which is
open space and is within walking distance at Nottingham
Park.
7.) Police - Based on our experience at Eaglebend, we project
that the apartments will generate an additional 33 calls
per year to the police department for thefts, domestic
disputes and parking violations.
Box No. 978 • Avon, Colorado 81620 • 949-5072 Denver 893-1531
1420 Vance Street 9 Lakewood, Colorado 80215 • Phone: 232-0158
Jay Harkins - Memo
Page No. 2
Date: May 17, 1994
8.) Fire Protection - We project an additional two calls per
year for the fire department. Based upon our experience
at Eaglebend.
n Inter -Mountain
Engineering Ltd.
MEMORANDUM
Date: May 17, 1994
To: Jay Harkins
From: Russell Thrasher
Re: Eaglebend III
PUD Submittal
Project No. 94076
Section 17.20.110.H.11 - Adequacy of existing streets and roads to
carry the anticipated traffic:
CRITERIA:
The following references were used in preparing this memo:
1.) Town of Avon Transportation Plan prepared by Felsburg
Holt & Ullevig, dated December 1991 and Peak Hour Turning
Movements for March 1993.
2.) Highway Capacity Manual Special Report 209 prepared by
the Transportation Research Board, dated 1985.
3.) Trip Generation 5th Edition prepared by the Institute of
Transportation Engineers, dated 1991.
APARTMENT TRAFFIC GENERATION:
From Reference No. 3:
1.) 59 apartments will generate 388 trips per day.
2.) During the AM peak (7-9 AM) there will be 28 trips per
hour with 6 entering and 22 exiting.
3.) During the PM peak (4-6 PM) there will be 34 trips per
hour with 23 entering and 11 exiting.
The greatest potential for conflict with existing traffic will be
apartment generated traffic exiting onto Highway 6 & 24. Thus only
the AM peak is considered in the attached analysis.
Box No. 978 • Avon, Colorado 81620 • 949-5072 Denver 893-1531
1420 Vance Street • Lakewood, Colorado 80215 • Phone: 232-0158
Jay Harkins - Memo
Page No. 2
Date.: May 17, 1994
IMPACT ON HIGHWAY 6 & 24 TRAFFIC:
The following assumptions were made for the attached analysis:
1.) Eaglebend III traffic will be equally divided with regard
to the direction it is exiting to or entering from
Highway 6 & 24.
2.) Traffic on Highway 6 & 24 was derived from Reference No.
1, specifically the March 1993 traffic counts.
Results of the analysis indicate the following:
1.) Left and right hand turns out of the apartments will
experience average traffic delays.
2.) Left hand turns from Highway 6 & 24 into the apartments
will experience short traffic delays.
CONCLUSIONS:
The development of 59 apartments on this site will not
significantly effect traffic on Highway 6 & 24.
Actual movements out of the apartments will be better than
indicated. The analysis method used assumes that gaps in
conflicting traffic flows are randomly distributed, by in
actuality, the traffic signal at Avon Road and Highway 6 & 24 will
effectively platoon Highway 6 & 24 traffic creating larger gaps for
movements out of the apartments.
U`'SIG`'ALIZED INTERSECTIONS
l WORKSHEET FOR ANALYSIS OF T INTERSECTIONS
LOCATION: 'cJ��" ` �9 E�sl L r c7/�L%�
HOURLY VOLUMES
Major Street: % ® N
N = 0 VS S
Grade — V, _ 7 V, 1 Z
V7 V9
Date of Counts:�oI I(o ❑ STOP
Time Period: RM — ❑ YIELD
Average Running Speed: N =
Minor
Street:
PHF: Grade --4%
VOLUME ADJUSTMENTS
Movement No. I 2
Volume (vph) T-887
Vol. (pcph), see Table 10-1
STEP 1: RT from Minor Street
Conflicting Flow, Vc
Critical Gap, Tc , and Potential Capacity, c
Actual Capacity, crt,
STEP 2: LT From Major Street
NAME: ?M
VOLUMES IN PCPH
r V-
V3
V7 V9
I I F
10-37
(— V9
1/2 V3 + Vz vph (V,)
Tc sec (Table 10-2) cP9 = 270pcph (Fig. 10-3)
c'9 = cP9 = Z —0 cph
V4
Conflicting Flow, Vc V3 + V2 = 12- {% = S` —
vph (Vc,)
Critical Gap, Tc , and Potential Capacity, cP Tc = sec (Table 10-2) Cp4 = 3 �pcph (Fig. 10-3)
Percent of cP Utilized and Impedance Factor (Fig. 10-5) (v,/Cp,) X 100 = S P4 =
Actual Capacity, cm
Cma = cP; _ �Opcph
STEP 3: LT From Minor Street —) `,7
Conflicting Flow, Vc 1/2 V3 +V +V +V — 6,+ 667 O = ( 5
2 5 4 - + -- + vph (V,7)Critical Gap, Tc , and Potential Capacity, cP Tc = g sec (Table 10-2) cP7 =': O pcph (Fig. 10-3)
Actual Capacity, crt, C,.i7 = cP7 X P4 = Sb X =Z SOpCph
SHARED -LANE CAPACITY
CSH = V7 + V9 if lane is shared
(v7/Cm7) + (Vg/C,,)
Movement No. v( c h)
cR, (pcph) CSH ( h)
2 � �
Z Sb
c R
zoo
LOS
C
9 ►
2_70
�6v0
G
%J 80b UCA y
L
�
�
r
Q
-C
'IZ
I
Low -Rise Apartment
(221)
Average Vehicle Trip Ends vs: Occupied Dwelling Units
On a: Weekday
Number of Studies: 22
Average Number of Occupied Dwelling Units: 264
Directional Distribution: 50% entering, 50% exiting
Trip Generation per Occupied Dwelling Unit
Average Rate Range of Rates Standard Deviation
6.59 5.10-9.24 2.84
Data Plot and Equation
I�
7,000
6,000
5,000
4,000
3,000
1,000 ...
X
0
0 100 200 300 400 500 600 700 800 900 1000 1100
X = Number of Occupied Dwelling Units
X Actual Data Points Fltted Curve ------ Average Rate
Fitted Curve Equation: Ln(T) = 0.821 Ln(X) + 2.898
R2 = 0.91
Trip Generation, January 1991 348 Institute of Transportation Engineers
....................
X
..............
............... : .....
X,
......XX...
.....
...............
.....
X.
1,000 ...
X
0
0 100 200 300 400 500 600 700 800 900 1000 1100
X = Number of Occupied Dwelling Units
X Actual Data Points Fltted Curve ------ Average Rate
Fitted Curve Equation: Ln(T) = 0.821 Ln(X) + 2.898
R2 = 0.91
Trip Generation, January 1991 348 Institute of Transportation Engineers
Lot 1, Riverside Subdivision, Eaglebend III, PUD
Public Hearing, (cont).
CONDITIONS (cont)
4. A pedestrian trail/pathway, consistent with the Town's Recreation Plan
be shown on the PUD Plan along the Eagle River. The developer shall construct
this pathway prior to any temporary or permanat certificates of occupancy
being issued.
5. A drainage.plan be submitted to Staff and approved by Staff prior to any
application for a building permit. The drainage plan must address all
engineering concerns.
6. The landscape plan be adequate to mitigate the removal of existing trees
and vegetation on site. The landscape plan must be brought back before the
Planning and Zoning Commission for review and approval.
7. The dumpster location be shown on the site plan and approved by Planning -
and Zoning Commission.
PLANNING AND ZONING COMMISSION STAFF REPORT
August 16, 1994
Lot 1, Riverside PUD
54 Unit Complex
Amendment to PUD
not concur with the findings, Resolution 94-16 should be amended accordingly prior to
adoption.
1. Introduce Application
2. Applicant Presentation
3. Open Public Hearing
4. Close Public Hearing
5. Commission Review
6. Commission Action
Respectfully Submitted,
�Z
Mary Holden
Town Planner
RECOMMENDED ACTION
PLANNING AND ZONING ACTION:
Approved as submitted ( ) Approved with recommended conditions ( )
Approved with modified conditions (✓f Continued ( ) Denied ( )
Withdrawn ( ) Conceptual, No Action ( )
Date �9�Sue Railton, Secretary
See attached Page
PLANNING AND ZONING COMMISSION STAFF REPORT
August 16, 1994
Lot 1, Riverside PUD
54 Unit Complex
Amendment to PUD
The applicants will be dedicating the area within the 30' stream setback as open space to
the Town, which will protect the natural feature along the river.
9. Phasing plan or subdivision plan that will maintain a workable, functional and
efficient relationship throughout the development of the PUD.
Phasing is not proposed. The project will be built at one time.
10. Adequacy of public services such as sewer, water, schools, transportation
systems, roads parks, and police and fire protection.
The developer must provide the Town of Avon letters from the respective agencies
indicating the services can be provided to the project. As a note to the developer, this
project is not located in the Avon Metropolitan District.
11. That the existing streets and roads are suitable and adequate to carry
anticipated traffic within the proposed PUD and in the vicinity of the proposed PUD.
This project is accessed by HWY. 6/24 and the traffic study conducted and provided
indicates the highway is suitable to carry the added traffic.
SITE PLAN COMMENTS:
EaWe River: The site plan has the buildings placed on the 30' setback from the mean
annual high water mark. This indicates grading, site disturbance and the footings may be
taking place in the setback, which is not allowed. Grading and site disturbance must be
confined and kept out of the 30' setback.
Building A and the parking on the west end of the site are proposed on a 35% slope. Fill
will be brought in to even the slope, thereby creating a strong potential for encroachment
into the 30' setback, which is not allowed. This is, also, a vegetated area, with the type of
vegetation not known. The applicant will be staking the site for the visit on Tuesday.
The developer must address riparian issues, which include wetlands delineation on the site
plan, and checking for rapture nesting in the trees.
The site plan does not reflect a pedestrian path which is specified in the Comprehensive
Plan and the Recreation Master Plan. The developer must install the pedestrian path as
specified in the two plans.
PLANNING AND ZONING COMMISSION STAFF REPORT
August 16, 1994
Lot 1, Riverside PUD
54 Unit Complex
Amendment to PUD
Goal C 1. Provide for an appropriate mix of residential dwelling unit types for both
permanent residents and tourists.
Does this project provide for a mix of residential types?
Goal C2. Affordable housing, both rental and owner occupied, should be made
available through a combination of private and public efforts.
Does the project meet the objective of this goal?
Goal H2. Establish the Eagle River as greenbelt corridor through the Town.
Is this being achieved by the dedication of the open space along the Eagle River?
2. Conformity and compliance with the overall design theme of the Town, the sub-
area design recommendations and design guidelines adopted by the Town.
This project is in Sub -Area 10, the Riverfront District, and the standards indicated in the
Comprehensive Plan are attached to this Staff report. The main recommendation this
proposal is not in conformance with is to provide for public access to the river and
construction of the pedestrian trail along the river. In addition, the Recreation Master
Plan specifies this path in this location.
3. Design compatibility with the immediate environment, neighborhood, and
adjacent properties relative to architectural design, scale, bulk, building height, buffer
zones, character, and orientations.
Existing land uses found in the area are as follows:
North: Proposed Boulder PUD, with 150 units approved;
Eaglebend Apartments, with an existing 240 units
South: River Oaks Condominiums;
Folson Property PUD(there is no development plan approved)
West: Undeveloped Lot 2, Riverside Subdivision;
Red house at corner of Avon Rd. and HWY. 6/24(commercial)
East: Tract A Open Space;
River Forge Duplexes and apartment complex.
The overall design, scale, bulk and building height of the buildings fit with the established
character found north of the Eagle River. River Oaks Condominiums, southeast of the
site, has a tall character, with facades broken up architecturally. The mass of these
buildings are being reduced and broken by stepping the building down on the ends and
providing a break in the middle and on the ends of the building.
Eaglebend III
July 18, 1994
Page 7
ATTACHMENTS:
1. Plans:
2. Appendix
Cover sheet Owner
Architect
Project Team
Drawing Index
Key Plan (Vicinity Plan)
Project Statistics
PUD STandards
Survey/Legal description
Aerial/existing Conditions
Site Grading/Drainage
Site Utilities
Preliminary Landscape Plan
Site Development Plan
Basement and First Floor Plans
Second and Third Floor Plans
Building Elevations - 1/8"
Building Elevations - 1/4" (2)
Site Sections and Elevations
Legal Description
List of owners within 300'
Written Consent of owners to Amend PUD
Adequacy of Public Services
Traffic study
Wetlands identification
Eaglebend III
July 18, 1994
Page 5
Landscapinq:
The landscaping is to be per the attached preliminary landscape
plan and the standards proposed be the minimum.
1. There is to be a 10' landscape buffer between the parking
and Highway 6 ROW.
2. The number of trees is to be no less then that shown on the
attached Landscape plan.
3. The 30' setback area along the River be protected. during
construction and any disturbed areas be reseeded with native
grasses in this area as will as along the south, east and
west edges of all site disturbed construction.
4. As described on the attached landscape plan the edges of the
buildings are to be a "no" water zone and entries are to be
sodded and irrigated.
Open Space:
The 30' setback from the Eagle River be dedicated open space the
length of the project.
A playground area is to be developed between buildings B and C.
Parking:
The parking requirements will be consistent with Title 17, Avon
Zoning Code. Calculation shows there is a need for a total of
124 places of which we propose 30 (25%) be garages.
1. Three-bedroom units
24
x 2.5 =
60
Two-bedroom units
18
x 2.0 =
36
One -bedroom units
12
x 1.5 =_
18
Sub total
54
units =
114
Visitors
=
10
Totals
124
2. Garages are to be assigned spaces.
3. We would propose enhancement the screening of the Highway
and buildings that there be consideration for the reduction
of visitor parking to 4 cars or a total of 118 cars
required.
Phasing:
The project is to be built at one time.
Eaglebend III
July 18, 1994
Page 3
We laid out the site incorporating the following:
1. The river is the "best" amenity to the site.
2. The maximum solar orientation is south.
3. Our desire to minimize disturbance to the river corridor.
The buildings have been placed, east -west along the grade break
between the River and mainly on the flatter area of the site.
This will give the maximum number of units orientation to the
river; provide good solar orientation for units not on the
river7 and locate buildings away from Hiqhwav 6.
The parkinq is placed between the structures and Highway 6 to
mitigate (by distance) sound and movement disturbances to
residents by Highway traffic and to create the minimum vehicular
penetration into the site.
A landscaped buffer of 10' has been placed between the parking
stalls and Highway 6 to mitigate possible visual impacts on
vehicles passing the site. Supplementary landscaping is proposed
along the river, between buildings and at the ends of the
buildings and parking lots to soften edges and provide screening.
We would not propose any construction or development within the
30' setback along the river because we feel that the bank is
steep and any disturbance in the area would destroy riparian
growth and change the character of the river corridor.
Site Access:
The site is to be accessed from Highway 6 approximately in the
center of the existing flat area of the site or about 175 feet
east of the existing guardrail at the west end of the site.
We have discussed with CDOT, the possibility of developing more
then one entrance into the site and were told this was not
feasible. This is due to available distance (length) of the
property along Highway 6 and existing grade changes to the site.
The entry proposed is to be a split driveway with one-way lanes
into and out of the site. The entry driveways are to be asphalt
and the curbed divider and outside edges of the driveways,
landscaped. All driveway slopes and radii will be per CDOT and
Town of Avon Code for vehicular and emergency access. The
maximum distance from the entry drive to an end of the buildings
will not be more then 290'.
AR K INS I"-mlftf
3�; ,Y 4
HARKINS & ASSOCIATES, ARCHITECTS
APPLICATION FOR PUD AMENDMENT
FOR LOT 1
RIVERSIDE SUBDIVISION
JULY 18,1994
Prepared by: Harkins Associates
2784 South 1,Theelinc7 *-lav
Aurora, Colorado 80014
303-755-4715
For: Eaglebend Affordable Housing Enterprise
s Jeff Spanel
77 Metcalf Road
Avon, Colorado 81620
303-949-5072
INTRODUCTION
This is a "PUD Amendment" for a portion of the Riverside
Subdivision in the Town of Avon. The portion of the Riverside
Subdivision to be considered in this application is "Lot 1".
It is the intent of the Anplicant to develop this project as a
third phase to the existing Eaglebend Project located to the
northeast and across the river.
ZONING SUMMARY
The Riverside Subdivision (approved on February 28th, 1889)
included approximately 9.2711 acres designated as a Specially
Planned. Area including Lot 1, Lot 2, and Tract A (an open snace
dedication to the Town of Avon). Lot 1 is presently owned by the
Kriz family and under contract to Jeff Spanel and Art Kleinstein.
The applicant does not own or hold interest in Lot 2 or Tract A.
Lot 1 is a 2.5 acres site within the Specially Planned Area
designation with an approved use for an Accommodation density of
150 units, in addition to commercial space. Our proposal
represents both a density and use down -zoning from the high
density/traffic Accommodations zoning to Multi -Family zoning.
The project will have 54 rental apartments and related support
facilities (parking, garages, managers office, laundry and
storage). The gross square footage of the proposed project is
approximately 53,000 SF.