Loading...
L45 B1 BMBC final designTown of Avon Final Design Staff Report June 1, 1999 Planning & Zoning Commission meeting Report date December 20, 2019  Project type Church Parsonage  Legal description Lot 45, Block 1, Benchmark at Beaver Creek Subdivision  Zoning Residential Low Density (RLD)  Address 0480 Nottingham Road  Introduction The Anointed Christain Fellowship Church received Final Design approval . Design Review Considerations According to the Commission’s Procedures, Rules & Regulations, Section 4.10, the Commission shall consider the following items in reviewing the design of this project: The conformance with setbacks, massing, access, land use and other provisions of the Zoning Code. Allowed use: Conforms with the approved Special Review Use. Density: The three dwelling units are allowed accessory to the church as approved by the Special Review Use. Lot Coverage: The proposed __% of building coverage complies with the 50% maximum. Setbacks: No proposed encroachments. Extreme care will be required to ensure Easements: No proposed encroachments and proposed grading in the 10' Slope Maintenance, Drainage and Snow Storage Easement is acceptable. Building Height: The largest scaled height of ___' on the ____ elevation complies with the 35' maximum limit. Grading: All proposed slope grades conform with the maximum of 2:1 slope guideline and the proposed driveway grades comply with Town standards. Parking: The two (2) garage and the two (2) surface parking spaces conform with the required three (3) spaces. Snow Storage: Submitted plans show snow storage area equal to the minimum standard of 20% of the proposed impermeable surface area. Landscaping: Submitted landscape plan appears suitable. The conformance with other applicable rules and regulations of the Town of Avon. The type and quality of materials of which the structure is to be constructed. The design of site grading and drainage to minimize impacts to adjacent sites, rights-of-way and easements. The compatibility of proposed improvements with site topography, to minimize site disturbance, orient with slope, step building with slope, and minimize benching or other significant alteration of existing topography. The appearance of proposed improvements as viewed from adjacent and neighboring properties and public ways, with respect to architectural style, massing, height, orientation to street, quality of materials, and colors. The objective that no improvement be so similar or dissimilar to others in the vicinity that monetary or aesthetic values will be impaired. The general conformance of the proposed improvements with the adopted Goals, Policies and Programs for the Town of Avon. Staff Recommendation Based upon the project’s general compliance with the above considerations, staff recommends approval with conditions. Recommended Motion “I move to approve the final design of the church parsonage for Lot 45, Block 1, Benchmark at Beaver Creek Subdivision as depicted on the application and plan set dated May 5, 1999, with the following conditions: That a landscape plan be provided with the building permit submittal. That exterior light fixtures cut-sheets be provided with the building permit submittal. That the colors and materials require approval prior to issuance of a building permit. That an additional Improvement Location Certificate (ILC) will be required prior to any framing inspections to confirm all ridge heights comply with the maximum allow height. That a licensed surveyor stakes the building to ensure that the structure does not encroach into any setbacks.” If you have any questions regarding this project or any planning matter, please call me at 748-4030, or stop by the Community Development Department. Respectfully submitted, George H. Harrison Planner Planning & Zoning Commission Action ( Approved as submitted ( Approved with conditions (noted below) ( Denied ( Tabled ( Withdrawn by applicant Conditions of approval, reasons for tabling or withdrawal of application, or basis for denial (refer to code or guidelines by number): _______________________________________________________________________ _______________________________________________________________________ _______________________________________________________________________ _______________________________________________________________________ _______________________________________________________________________ _______________________________________________________________________ _______________________________________________________________________ Signed: _________________________________ Date __________ Chris Evans, Chair Attest: _________________________________ Date __________ Brian Sipes, Secretary