Loading...
L42 B1 BMBC PUDTown of Avon Rezoning/PUD Staff Report January 19, 1999 Planning & Zoning Commission meeting Report date December 20, 2019  Legal description Lot 42, Block 1, Benchmark at Beaver Creek Subdivision  Current zoning Industrial Commercial (IC)  Proposed zoning Planned Unit Development (PUD) – 12 unit multi-family residential  Address 0690 Nottingham Road  Introduction Cordevco, hired by Vail Resorts, is proposing to build a 12-unit deed restricted employee housing project. The site is currently zoned Industrial Commercial (IC) and would require a rezoning to Planned Unit Development (PUD) to allow the residential use. The project would consist of ten 2 bedroom units (approximately 1,000 square feet each) and two 1 bedroom units (approximately 700 square feet each). Vail Resorts intends for this project to provide a portion of the employee housing units required by the recently approved Lot C and Confluence PUDs. The lot faces south, rising up from Nottingham Road. It is relatively steep, with slopes between 18% to 25%. It is boarded by Beacon Hill and Bristol Pines condominiums on the east and Tract B to the west. Process Summary Review of this application involves a two-step process - rezoning and establishment of a PUD. Rezoning is necessary to rezone the parcel from its current zoning to Planned Unit Development (PUD). The PUD review process establishes PUD Development Standards and the PUD Development Plan. For any proposed Rezoning or PUD, the Planning & Zoning Commission shall conduct an initial formal hearing comprised of a public hearing and Commission review. A report of the Commission stating its findings and recommendations along with the staff report shall then be transmitted to the Town Council. Any Rezoning or PUD Development Plan requires approval by ordinance of the Town Council. The Council shall, after receiving the report and recommendation from the Planning & Zoning Commission, hold a public hearing and act upon the proposed project. Following the required hearing, the Town Council shall consider the comments and evidence presented at the hearing and evaluate the application and approve, approve with conditions or deny the application in whole or in part. Rezone Review Considerations According to the Town of Avon Municipal Code, Section 17.28.080, the following evaluations shall be made in reviewing rezone applications: Is the proposed rezoningin justified by changed or chaging conditions in the character of the area proposed to be rezoned? (Enter comment here) Is the proposed rezoning consistent with the town’s comprhesive plan? (Enter comment here) Is the proposed use(s) compatible with the surrounding area or uses? (Enter comment here) Are adequate facilitiies available to serve develomentfor the type and scope suggested by the proposed zone? (Enter comment here) PUD Design Criteria According to the Town of Avon Zoning Code, Section 17.20.110, the following shall be used as the principal criteria in evaluating a PUD. Conformance with the Town of Avon Comprehensive Plan’s Goals and Objectives. (Enter comment here) Conformity and compliance with the overall design theme of the town, the sub-area design recommendations and design guidelines of the Town. (Enter comment here) Design compatibility with the immediate environment, neighborhood, and adjacent properties relative to architectural design, scale, bulk, building height, buffer zones, character, and orientation. (Enter comment here) Uses, activity, and density provide a compatible, efficient, and workable relationship with surrounding uses and activity. (Enter comment here) Identification and mitigation or avoidance of natural and/or geologic hazards that affect the property upon which the PUD is proposed. (Enter comment here) Site plan, building design and location and open space provisions designed to produce a functional development responsive and sensitive to natural features, vegetation and overall aesthetic quality of the community. (Enter comment here) A circulation system designed for both vehicles and pedestrians addressing on and off site traffic circulation that is compatible with the town transportation plan. (Enter comment here) Functional and aesthetic landscaping and open space in order to optimize and preserve natural features, recreation, views and function. (Enter comment here) Phasing plan or subdivision plan that will maintain a workable, functional, and efficient relationship throughout the development of the PUD. The phasing plan shall clearly demonstrate that each phase can be workable, functional and efficient without relying upon completion of future project phases. (Enter comment here) Adequacy of public services such as sewer, water, schools, transportation systems, roads, parks, and police and fire protection. (Enter comment here) That the existing streets and roads are suitable and adequate to carry anticipated traffic within the proposed PUD and in the vicinity of the proposed PUD. (Enter comment here) Development Standards Development Standards including lot area, site dimensions, setbacks, height, density control, site coverage, landscaping and parking shall be determined by the town council as part of the approved development plan with consideration of the recommendation of the Planning commission. (Enter comment here) Staff Recommendation Approve, disapprove, approve with conditions, or... Recommended Motion Approve Resolution 99-__, recommending to the Town Council of the Town of Avon to (approve, disapprove, approve with conditions) the (project name) PUD, Lot __, Block _, _ Subdivision, Town of Avon, Eagle County, Colorado based upon the following findings: with the following conditions: If you have any questions regarding this project or any planning matter, please call me at 748-4030, or stop by the Community Development Department. Respectfully submitted, Karen Griffith, AICP Town Planner