L3 Brookside Park PUD amendmentTown of Avon
PUD Amendment Staff Report
May 19, 1998 Meeting) Planning & Zoning Commission meeting
Report date
December 20, 2019
Project type
Multi-family
Legal description
Lot 2 and 3, Brookside Park Subdivision
Zoning
PUD-R
Introduction
Resort Concepts has applied to expand the building envelope of Building C4 approximately 12 feet to the west.
Process Summary
For any proposed PUD or PUD Amendment, the Planning & Zoning Commission shall conduct an initial formal hearing comprised of a public hearing and Commission review. A report of the Commission
stating its findings and recommendations along with the staff report shall then be transmitted to the Town Council.
Any PUD Plan or PUD Amendment requires approval by ordinance of the Town Council. The Council shall, after receiving the report and recommendation from the Planning & Zoning Commission,
hold a public hearing and act upon the proposed project. Following the required hearing, the Town Council shall consider the comments and evidence presented at the hearing and evaluate
the application and approve, approve with conditions or deny the application in whole or in part.
PUD Design Criteria
According to the Town of Avon Zoning Code, Section 17.20.110, the following shall be used as the principal criteria in evaluating a PUD.
Conformance with the Town of Avon Comprehensive Plan’s Goals and Objectives.
(Enter comment here)
Conformity and compliance with the overall design theme of the town, the sub-area design recommendations and design guidelines of the Town.
(Enter comment here)
Design compatibility with the immediate environment, neighborhood, and adjacent properties relative to architectural design, scale, bulk, building height, buffer zones, character, and
orientation.
(Enter comment here)
Uses, activity, and density provide a compatible, efficient, and workable relationship with surrounding uses and activity.
(Enter comment here)
Identification and mitigation or avoidance of natural and/or geologic hazards that affect the property upon which the PUD is proposed.
(Enter comment here)
Site plan, building design and location and open space provisions designed to produce a functional development responsive and sensitive to natural features, vegetation and overall aesthetic
quality of the community.
(Enter comment here)
A circulation system designed for both vehicles and pedestrians addressing on and off site traffic circulation that is compatible with the town transportation plan.
(Enter comment here)
Functional and aesthetic landscaping and open space in order to optimize and preserve natural features, recreation, views and function.
(Enter comment here)
Phasing plan or subdivision plan that will maintain a workable, functional, and efficient relationship throughout the development of the PUD. The phasing plan shall clearly demonstrate
that each phase can be workable, functional and efficient without relying upon completion of future project phases.
(Enter comment here)
Adequacy of public services such as sewer, water, schools, transportation systems, roads, parks, and police and fire protection.
(Enter comment here)
That the existing streets and roads are suitable and adequate to carry anticipated traffic within the proposed PUD and in the vicinity of the proposed PUD.
(Enter comment here)
Development Standards
Development Standards including lot area, site dimensions, setbacks, height, density control, site coverage, landscaping and parking shall be determined by the town council as part of
the approved development plan with consideration of the recommendation of the Planning commission.
(Enter comment here)
Staff Recommendation
Staff recommends (approve, disapprove, approve with conditions,) or...
Recommended Motion
Approve Resolution 97-__, recommending to the Town Council of the Town of Avon to (approve, disapprove, approve with conditions) the (project name) PUD, Lot __, Block _, _ Subdivision,
Town of Avon, Eagle County, Colorado based upon the following findings:
with the following conditions:
Final Grading and Drainage Plans to be approved by staff.
If you have any questions regarding this project or any planning matter, please call me at
949-4280 (extension 131), or stop by the Community Development Department.
Respectfully submitted,
Karen Griffith, AICP
Town Planner