PZC Packet 0917191 Agenda posted on Friday, September 13, 2019 at the following public places within the Town of Avon:
-Avon Municipal Building, Avon Recreation Center, Avon Public Library, Town of Avon Website www.avon.org
Please call 970-748-4023 for questions.
Planning & Zoning Commission
Meeting Agenda
Tuesday, September 17, 2019
100 Mikaela Way – Avon Municipal Building
If you require special accommodation, please contact us in advance and we will assist you. You may call David McWilliams at 970-
748-4023 or email cmcwilliams@avon.org for special requests.
I. Call to Order – 5:00pm
II. Roll Call
III. Conflicts of Interest
IV. Additions & Amendments to the Agenda
V. Minor PUD Amendment & Vested Rights Extension – CONTINUED PUBLIC HEARING – 42 Riverfront Lane
File: PUD19002 & VPR19001
Applicant: Points of Colorado, Inc.
Property: Lot 1, Riverfront Subdivision
Summary: PUD Amendment to permit modified building locations and building height. A vested
rights extension is concurrently being sought for future projects beyond March 2021,
extending to March 2024 for ‘phase one’ and March 2025 for ‘phase two’.
VI. Major Development Plan – Wildridge Road East – PUBLIC HEARING
File: MJR19004
Applicant: Bobby Ladd with RAL Architects
Property: Lot 38B, Block 4, Wildridge Subdivision
Summary: Application for a new single-family house.
VII. Major Development Plan – Walking Mountains Lane – PUBLIC HEARING
File: MJR19005
Applicant: Brian Sipes
Property: Lot 2A, Buck Creek Subdivision
Summary: Application for three dorm-style structures.
VIII. Minor Development Plan – Nottingham Fit Court Fence and Landscaping – PUBLIC HEARING
File: MNR19026
Applicant: Town of Avon
Property: Tract G, Block 2, Benchmark at Beaver Creek Subdivision
Summary: Application for an enclosure fence around the new fit court in Nottingham Park.
IX. Consent Agenda
A – PZC Meeting Minutes – September 3, 2019
B – Record of Decisions:
i. AEC19006, Lot 53A, Block 3, Wildridge Roof Pitch
ii. AEC19005 & MNR19018, Lot 65, Block 1, Wildridge Fence
X. Adjourn
PZC Record of Decision: #AEC19006 Page 1 of 1
PLANNING AND ZONING COMMISSION
FINDINGS OF FACT AND RECORD OF DECISION
DATE OF DECISION: September 17, 2019
TYPE OF APPLICATION: Alternative Equivalent Compliance
PROPERTY LOCATION: Lot 53A, Block 3, Wildridge Subdivision / 4691 North Point Unit A
FILE NUMBER: AEC19004
APPLICANT: Bobby Ladd
CASE #AEC19006 This Record of Decision is made in accordance with the Avon Development Code (“Development Code”) §7.16.120(b):
DECISION: Approval of the application with the following findings:
FINDINGS: 1. The proposed application was reviewed pursuant to §7.16.080(f), Development Plan, §7.16.090(f), Design Review, and §7.16.120 Alternative Equivalent Compliance; 2. The AEC achieves the intent of the roof design standard to the same or better degree than the subject standard; 3. The AEC achieves the goals and policies of the Avon Comprehensive Plan to the same or better degree than the roof design standards; 4. The AEC results in benefits to the community that are equivalent to or better than compliance with the roof design standards and results in less impact (reflectivity) on an adjacent non-conforming window by utilizing shake shingles as opposed to metal roofing; 5. The AEC imposes no greater impacts on adjacent properties than would occur through compliance with the specific requirements of the Avon Development Code; and 6. The roof pitch measures 3.25:12.
THESE FINDINGS OF FACT AND RECORD OF DECISION ARE HEREBY APPROVED:
BY:______________________________________ DATE: ___________________ PZC Chairperson
PZC Record of Decision: #AEC19005 & MNR19018 Page 1 of 2
PLANNING AND ZONING COMMISSION
FINDINGS OF FACT AND RECORD OF DECISION
DATE OF DECISION: September 3, 2019
TYPE OF APPLICATION: Alternative Equivalent Compliance & Minor Development Plan
PROPERTY LOCATION: Lot 65, Block 1, Wildridge Subdivision / 2345 Fox Lane
FILE NUMBER: AEC19005 & MNR19018
APPLICANT: Ben Usatch
CASE #AEC19005 This Record of Decision is made in accordance with the Avon Development Code (“Development Code”) §7.16.120(b):
DECISION: Approval of the application with the following findings and conditions:
FINDINGS: 1. The proposed application was reviewed pursuant to §7.16.120, Alternative Equivalent Compliance, and §7.16.080(f), Development Plan. 2. The proposed alternative achieves the intent of the subject design or development standard to the same or better degree than the subject standard; 3. The proposed alternative achieves the goals and policies of the Avon Comprehensive Plan to the same or better degree than the subject standard; 4. The proposed alternative results in benefits to the community that are equivalent to or better than compliance with the subject standard; and 5. The proposed alternative does not impose greater impacts on adjacent properties than would occur through compliance with the specific requirements of the Code.
CONDITIONS 1. The height of the fence shall be lowered to 4 (four) feet and the modification shall only include 2 (two) horizonal rails, not including bottom rail; and 2. All modifications shall be performed by November 2, 2019.
CASE #MNR19018 This Record of Decision is made in accordance with the Avon Development Code (“Development Code”) §7.16.080(c):
DECISION: Approval of the development plan with the following findings:
FINDINGS: 1. The application is complete; 2. The application provides sufficient information to allow the PZC to determine that the application complies with the relevant review criteria; 3. The proposed application was reviewed pursuant to §7.16.080(f), Development Plan, §7.16.090(f), Design Review. The design meets the development and design standards established in the Avon Development Code; 4. The application complies with the goals and policies of the Avon Comprehensive Plan; 5. No extra demand for public services is made by the application; and
PZC Record of Decision: #AEC19005 & MNR19018 Page 2 of 2
6. The design relates the development to the character of the surrounding community.
THESE FINDINGS OF FACT AND RECORD OF DECISION ARE HEREBY APPROVED:
BY:______________________________________ DATE: ___________________ PZC Chairperson
1 Tuesday, September 3, 2019 Planning and Zoning Commission Meeting Minutes
Planning & Zoning Commission
Meeting Minutes
Tuesday, September 3, 2019
I. Call to Order – The meeting was called to order at 5:03pm by Chairperson Hardy.
II. Roll Call – All Commissioners were present except for Commissioner Barnes, who arrived during Item VI.
III. Conflicts of Interest - Employment status disclosure by Commissioner Hardy, who is now working for Zehren
and Associates.
Action: Commissioner Nusbaum motioned to find no conflict of interest with Commissioner
Hardy. Commissioner Howell seconded the motion and it passed with a 4-0 vote;
Commissioner Hardy and Commissioner Smith abstained.
Action: Commissioner Hardy and Commissioner Smith had conflicts of interest with Item V
due to employment with the same firm as applicant’s representative, and therefore
did not participate.
IV. Additions & Amendments to the Agenda - None
V. Minor PUD Amendment & Vested Rights Extension – PUBLIC HEARING – 42 Riverfront Lane
File: PUD19002 & VPR19001
Applicant: Points of Colorado, Inc.
Property: Lot 1, Riverfront Subdivision
Summary: PUD Amendment to permit modified building locations and building height. A vested
rights extension is concurrently being sought for future projects beyond March 2021,
extending to March 2024 for ‘phase one’ and March 2025 for ‘phase two’.
Public Comment: None
Action: Commissioner Howell motioned to continue the public hearing until the September
17, 2019 PZC meeting. Commissioner Nusbaum seconded the motion and it carried
with a 4-0 vote.
VI. Alternative Equivalent Compliance– PUBLIC HEARING – 4691 North Point #A
File: AEC19006
Applicant: Bobby Ladd, RAL Architects
Property: Lot 53A, Block 3, Wildridge
Summary: Application to modify an approved Minor Development Plan (#MNR18038) for a roof
material, from metal to shingle, which requires an AEC due to roof pitch of less than
4:12.
Public Comment: None.
Action: Commissioner Golembiewski moved to approve case AEC19006 with the following
findings:
2 Tuesday, September 3, 2019 Planning and Zoning Commission Meeting Minutes
1. The proposed application was reviewed pursuant to §7.16.080(f), Development
Plan, §7.16.090(f), Design Review, and §7.16.120 Alternative Equivalent
Compliance;
2. The AEC achieves the intent of the roof design standard to the same or better
degree than the subject standard;
3. The AEC achieves the goals and policies of the Avon Comprehensive Plan to the
same or better degree than the roof design standards;
4. The AEC results in benefits to the community that are equivalent to or better
than compliance with the roof design standards and results in less impact
(reflectivity) on an adjacent non-conforming window by utilizing shake shingles
as opposed to metal roofing;
5. The AEC imposes no greater impacts on adjacent properties than would occur
through compliance with the specific requirements of the Avon Development
Code.
The motion was seconded by Commissioner Smith. The motion was discussed.
Commissioner Golembiewski added another finding:
6. The roof pitch measures 3.25:12.
Commissioner Smith agreed with the condition. The motion passed with all
Commissioners in favor and a 7-0 vote.
VII. Alternative Equivalent Compliance and Minor Development Application – PUBLIC HEARING – 2345 Fox Lane
File: MNR19018 & AEC19005
Applicant: Ben Usatch
Property: Lot 65 Block 1 Wildridge Subdivision
Summary: Application to approve an already constructed fence that requires an AEC due to
height, materials, and form.
Public Comment: None.
Action on AEC19005: Commissioner Nusbaum moved to approve with the following findings and
conditions:
Findings:
1. The proposed application was reviewed pursuant to §7.16.120, Alternative
Equivalent Compliance, and §7.16.080(f), Development Plan.
2. The proposed alternative achieves the intent of the subject design or
development standard to the same or better degree than the subject standard;
3. The proposed alternative achieves the goals and policies of the Avon
Comprehensive Plan to the same or better degree than the subject standard;
4. The proposed alternative results in benefits to the community that are
equivalent to or better than compliance with the subject standard; and
5. The proposed alternative does not impose greater impacts on adjacent
properties than would occur through compliance with the specific requirements
of the Code.
3 Tuesday, September 3, 2019 Planning and Zoning Commission Meeting Minutes
Conditions:
1. The height of the fence shall be lowered to 4 (four) feet and the modification
shall only include 2 (two) horizonal rails, not including bottom rail; and
2. All modifications shall be performed by November 2, 2019.
Commissioner Golembiewski seconded the motion. The motion passed with a 4-3
vote.
Action on MNR19018: Commissioner Barnes moved to approve with the following findings:
1. The application is complete;
2. The application provides sufficient information to allow the PZC to determine
that the application complies with the relevant review criteria;
3. The proposed application was reviewed pursuant to §7.16.080(f), Development
Plan, §7.16.090(f), Design Review. The design meets the development and
design standards established in the Avon Development Code;
4. The application complies with the goals and policies of the Avon
Comprehensive Plan;
5. No extra demand for public services is made by the application; and
6. The design relates the development to the character of the surrounding
community.
Commissioner Nusbaum seconded the motion and it passed with a 6-1 vote.
VIII. Consent Agenda
A – PZC Meeting Minutes: August 20, 2019
B – Record of Decision: REZ19001, Rezoning of Lot 16, Block 2, BMBC/420 W. Beaver Creek Blvd.
Action: Commissioner Barnes motioned to approve the Consent Agenda. Commissioner
Nusbaum seconded the motion and it passed unanimously with a 7-0 vote.
IX. Other Business
A – Upcoming Joint Session with Town Council
i. Tract N and Tract O, Wildridge Community Housing Application(s)
ii. Code Amendments
B – IC Zone District Update
X. Adjourn The meeting was adjourned at 6:25pm.
Approved this 17th Day of September 2019
SIGNED: ___________________________________________
Chairperson
Page 1 of 1
MEMORANDUM
To: Planning and Zoning Commission
From: Matt Pielsticker, Planning Director
Meeting Date: September 17, 2019
Topic: CONTINUED PUBLIC HEARING – 42 RIVERFRONT LANE
VESTED RIGHTS EXTENSION & MINOR PUD AMENDMENT
These two land use applications and the corresponding public hearings were continued from the
September 3, 2019 meeting at the applicant’s request. The packet materials are included behind this
memorandum for the consideration by the Planning and Zoning Commission for the September 17, 2019
hearing. Staff encourages the Planning and Zoning Commission to visit the property in advance of the
meeting.
September 3, 2019 PZC Meeting – Lot 1 Riverfront PUD 1
Staff Report Minor PUD Amendment
Vested Property Rights Extension
September 3, 2019 Planning & Zoning Commission Meeting
File #PUD19002 & #VPR19001
Legal description Lots 1, Riverfront Subdivision
Address 0042 Riverfront Lane
Prepared By Matt Pielsticker, AICP, Planning Director
Introduction
Points of Colorado, Inc. (“the Applicant”), is requesting a Planned Unit Development (PUD) Amendment
and Vested Property Rights Extension (collectively “the Application”) to allow greater flexibility for a
future phased project on Lot 1, Riverfront PUD and Subdivision (“the Property”). The Riverfront PUD
Development Plan, the governing zoning document, entitles the Property with two separate buildings on
the property. The Application proposes the following amendments thereto:
• Removal of building footprint stipulations and resultant building massing requirements
• Ability to construct aerial encroachments into the 10’ road setback
• Architectural Guideline changes for retaining walls, massing approaching the river, and overhangs
• Modification to building height for areas within 50’ of the south property line
The Vested Property Rights are currently slated to expire on March 18, 2021. With a phased project
contemplated, the prospective owners of the Property are requesting an extension to March 18, 2024
for a first phase, and March 18, 2025 for the second and final phase.
All of the details of the Application are included as: Exhibit A – Riverfront Village Narrative, Exhibit B –
Cover Letter for Vested Rights Extension, and Exhibit C – Riverfront Subdivision PUD Development Plan.
Process
Minor PUD Amendment
This request is processed under §7.16.060(h), Amendments to a Final PUD, AMC. Subsection (1)(ii), sets
forth criteria for a Minor Amendment, while subsection (2)(ii) sets forth the review procedures for the
same process. According the Avon Development Code, a proposed PUD amendment is considered minor
if it meets the following criteria for decision and has been determined as such by the Director:
(A) The PUD amendment does not increase density, increase the amount of nonresidential land use
or significantly alter any approved building scale and mass of development.
(B) The PUD amendment does not change the character of the development and maintains the intent
and integrity of the PUD.
(C) The PUD amendment does not result in a net decrease in the amount of open space or result in a
change in character of any of the open space proposed within the PUD.
The application, as submitted, meets the criteria for a Minor Amendment. The review procedures require
a public hearing with the PZC. Council will make the final decision after another public hearing and action
on an Ordinance for approval, or denial by motion and vote.
September 3, 2019 PZC Meeting – Lot 1 Riverfront PUD 2
Vested Property Rights
Landowners may request extensions of vested property rights by submitting an application at least six
(6) months prior to the expiration of the vested property rights. Public hearings are required by the
Planning and Zoning Commission and Town Council. Action is by ordinance of the Town Council.
Public Notification
In compliance with the Public Hearing and noticing requirements, this report verifies that mailed notice
was provided to property owners within 300’ of the property on August 21, 2019. Additionally, a notice
was published in the Vail Daily on August 23, 2019. Certification of these requirements can be obtained
from the office of Community Development.
PUD Amendment Review Criteria
Pursuant to §7.16.060(e)(4), Review Criteria, AMC, the PZC shall consider the following criteria when
forming the basis of a recommendation:
(i) The PUD addresses a unique situation, confers a substantial benefit to the Town, and/or incorporates
creative site design such that it achieves the purposes of this Development Code and represents an
improvement in quality over what could have been accomplished through strict application of the
otherwise applicable district or development standards. Such improvements in quality may include, but
are not limited to: improvements in open space provision and access; environmental protection;
tree/vegetation preservation; efficient provision of streets, roads, and other utilities and services; or
increased choice of living and housing environments.
Staff Response: The stated purposes of §7.04, Development Code, AMC, and §7.16.060, PUD, AMC,
includes statements regarding the implementation of the Comprehensive Plan; regulating intensity of
use; avoiding increased demands on public services and facilities; and providing for compatibility with
the surrounding area, among other statements. The Application and amendments would preserve the
environmental resources of the river and result in more flexibility with the form of future development.
Open space provisions, access, preservation of the river corridor, trails, and sidewalks are established
and unaffected with this amendment. Other development standards would remain intact (i.e. allowed
uses, special review uses, parking). The Application advances many Comprehensive Plan policies, along
with subsections (n) from the Purpose Statement of the Development Code.
When the Riverfront PUD was established, Lot 1 was designed at a conceptual level for a timeshare
development. It is highly unlikely that timeshare use would be pursued with a new development team,
thus new housing choices could be created by a different project type with a variety of unit sizes. As
noted in the applicant’s narrative, the density will be less than the currently approved development.
The current approval for Lot 1 comprises 101 timeshare units, each with the ability to lock off a separate
accommodation unit.
Lastly, the removal of the building footprint requirements would by its nature afford a more creative
site design that can adapt to the current conditions and tie into the Westin Hotel, adjacent streetscape,
and riverfront path connection.
(ii) The PUD rezoning will promote the public health, safety, and general welfare;
Staff Response: Staff finds no detrimental effects on the public health, safety and/or welfare of the
Town, its residents, or guests.
September 3, 2019 PZC Meeting – Lot 1 Riverfront PUD 3
(iii) The PUD rezoning is consistent with the Avon Comprehensive Plan, the purposes of this
Development Code, and the eligibility criteria outlined in §7.16.060(b);
Staff Response: The proposed PUD
amendment is part of an established
PUD, and is therefore not subject to the
eligibility criteria or Public Benefit
requirements outlined in §7.16.060(b).
Consistency with the Comprehensive
Plan is required, and analysis is
provided below. The Comprehensive
Plan includes this property within
District 2: The Riverfront District.
The Riverfront District encompasses all
property surrounding the Eagle river
along the entire length of Town. The
planning principals for The Riverfront
District speak heavily to connectivity
and respecting the river environment.
All of the planning principles are
included herein, with bolded principles
that relate specifically to this
Application.
• Improve and enhance connections to the linear park along the river, the Eagle Valley Trail, Town
Center, Beaver Creek, and Nottingham Park.
• Seek easements where appropriate for river access.
• Limit access to the Eagle River to strategic locations for overall riparian health.
• Provide transit connections between Town Center and Riverfront District.
• Add sidewalks and landscaping along roads.
• Orient buildings to capitalize on the Eagle River as an amenity. Use sensitive site planning,
architectural detailing, articulation, and appropriate setbacks, color, screening, and scale of
structure to preserve the character of the river and its associated natural habitat.
• Limit building height to a scale that is subordinate to Town Center and compatible with the
river environment. Buildings should be designed to step down in height as they near the river
and in response to the natural topography.
• Adhere to the Eagle River Watershed Management Plan for river setbacks and best practices for
development in proximity to the river.
• Locate parking areas and building services away from the river and reduce their impact on the
river corridor.
• Plant indigenous trees and shrubs to screen existing large residential buildings along U.S. Highway
6 and provide landforms and landscaping between residences and U.S. Highway 6.
• Minimize the loss of trees and impact to the riparian area while achieving urban design goals.
• Develop a vibrant mix of uses consisting of bed-base development, commercial development,
recreation, and open space along the river in the area closest to Town Center.
• Examine the potential to develop pedestrian and bicycle connections between Stonebridge Drive
and the Village at Avon District.
September 3, 2019 PZC Meeting – Lot 1 Riverfront PUD 4
A previous amendment in 2017 provided for an easement and another riverfront path connection to
the regional bike trail. Buildings would be sited to protect the river by maintaining the 75’ riparian
setback, and stepping down when approaching the river side of the development. It is expected that
future development will be at a lower overall scale compared to the existing development plan
approvals.
The following Goals and Policies from the Comprehensive Plan are reinforced by this application:
Policy A.1.4: Encourage development that is consistent with the overall Built Form according to
the Built Form Diagram (page 8 of the Comprehensive Plan).
Policy B.1.2: Focus lodging and guest accommodation in the Town Center.
Goal B.1: Provide a balance of land uses that offer a range of housing options, diverse
commercial and employment opportunities, inviting guest accommodations, and high quality civic
and recreational facilities that work in concert to strengthen Avon’s identity as both a year-round
residential community and as a commercial, tourism and economic center.
Goal C.1: Ensure that development is compatible with existing and planned adjacent
development and contributes to Avon’s community image and character.
Goal D.3: Increase the number of visitors to Avon by enhancing the year-round mountain
resort community.
(iv) Facilities and services (including roads and transportation, water, gas, electric, police and fire
protection, and sewage and waste disposal, as applicable) will be available to serve the subject property
while maintaining adequate levels of service to existing development;
Staff Response: This PUD amendment does not change the demands or ability of future development
to be served by existing installed or planned facilities and services.
(v) Compared to the underlying zoning, the PUD rezoning is not likely to result in significant adverse
impacts upon the natural environment, including air, water, noise, storm water management, wildlife,
and vegetation, or such impacts will be substantially mitigated;
Staff Response: When compared to the existing zoning, the proposed Minor PUD Amendment will
not result in any adverse impacts upon the natural environment, wildlife, vegetation, noise, or air. The
site was platted and graded out during the formation of the Riverfront PUD and Subdivision in 2006-
2007. Since that time, it has been used occasionally for overflow or event parking. It is expected that
the entire site would be disturbed for construction, and storm water management must be tied into
the existing systems in place.
The Planning and Zoning Commission must consider the 6’ encroachment request into the platted 10’
roadway easement bordering Riverfront Lane. This type of aerial encroachment is akin to the
allowance for projections of balconies and roof overhangs into the 75’ river setback, however, the
context of aerial encroachments adjacent to the Riverfront sidewalk and road must be reviewed
carefully given the possible height of building(s), and is concerning to staff.
(vi) Compared to the underlying zoning, the PUD rezoning is not likely to result in significant adverse
impacts upon other property in the vicinity of the subject tract; and
September 3, 2019 PZC Meeting – Lot 1 Riverfront PUD 5
Staff Response: No impacts exceeding those expected with the current development plan approval
would be experienced. Impacts are generally contained within the property and would be mitigated
accordingly.
(vii) Future uses on the subject tract will be compatible in scale with uses or potential future uses on
other properties in the vicinity of the subject tract.
Staff Response: The future uses on the subject tracts would remain residential/resort and consistent
with other properties in the vicinity. The scale and density of development is retained with existing
setbacks and overall dwelling unit range for the subdivision.
Vested Rights Extension Guidelines
Pursuant to §7.16.140(e)(2), Duration of Vested Right, AMC, the following criteria shall be considered when
determining whether to grant vested property rights extensions.
(i) The size and phasing of the development, specifically, but not limited to, whether the
development can be reasonably completed within the vested rights period;
(ii) Economic cycles and specifically but not limited to resort community economic cycles,
regional and state economic cycles and national economic cycles;
(iii) Market conditions and specifically but not limited to absorption rates for leasing and sales
of similar development projects;
(iv) Compliance with the Avon Comprehensive Plan and other community planning
documents;
(iv) Proposed public amenities and benefits that enhance the project and the overall
attractiveness of the Avon community, including the degree to which such public amenities
and benefits are defined in terms of design, timeframe and phasing with development;
(v) Projected public financial benefits or costs estimated to be caused by the development
project, including the timeframe for realization by the Town or other public entities and
potential costs for operation and maintenance of any new public amenities or
infrastructure dedicated to the Town or other public entities;
(vi) The breadth and scope of the requested vested property right, including but not limited to
the extent to which such vested property right restricts the Town's ability to apply future
legislatively adopted fees and regulations for the purpose of providing public
infrastructure, public services and public facilities and for the purpose of meeting evolving
community needs;
(vii) The terms of any existing site-specific development plans with development agreements
for the applicant's property that specify the duration of vested property rights;
(ix) Any proposed modifications to previously approved vested property rights to
address changed conditions within the Avon community, compliance with the
Comprehensive Plan and other community planning documents or performance of
previously approved site-specific development plans; and
(x) Any other factors deemed relevant by the Council when determining to grant a
vested property right for a period greater than three (3) years.
September 3, 2019 PZC Meeting – Lot 1 Riverfront PUD 6
Staff Response: Absorption rates, and the ability to design and phase a project on this property
are real and valid considerations for PZC. The request for an addition one year of vested rights
for a second phase of a phased project is commensurate to an elongated schedule for completion
and appears to be reasonable in this case.
Recommended Motions
PUD Amendment
“I move to recommend that the Avon Town Council approve Case #PUD19002, an application for a Minor
PUD Amendment for Lot 1 Riverfront PUD, citing the following findings:
1. The application meets the eligibility requirements for a Minor PUD Amendment by not increasing
density, increasing the amount of nonresidential land use, or significantly altering any approved
building scale or mass of development;
2. The application is complete;
3. The application provides sufficient information to allow PZC to determine that the application
complies with the relevant review criteria;
4. The application complies with the goals and policies of the Avon Comprehensive Plan;
5. There is no extra demand for public services or infrastructure exceeding current capacity by the
Application;
6. The PUD Amendment does not substantively change the character of the development and
maintains the intent and integrity of the Riverfront PUD which consists of common development
standards and architectural theme established in the design guidelines; and
7. The application is in conformance with AMC §7.16.060(e)(4), Review Criteria, and compared to the
underlying zoning, the Minor PUD Amendment is not likely to result in significant adverse impacts
upon the natural environment.”
Vested Property Rights Extension
“I move to recommend that the Avon Town Council approve Case #VPR19001, a Vested Rights Extension
for Lot 1 Riverfront PUD, citing the following findings:
1. The application was submitted in a timely fashion at least six (6) months prior to the expiration of
the vested property rights;
2. The application is complete;
3. The application provides sufficient information to allow PZC to determine that the application
complies with the relevant review criteria in AMC §7.16.140(e)(2), Duration of Vested Right;
4. The application complies with the goals and policies of the Avon Comprehensive Plan;
5. There is no extra demand for public services or infrastructure exceeding current capacity by the
Application;
6. Economic cycles of our resort economy coupled with absorptions rates for sales of similar
development projects in our region warrant the extension of vested rights; and
7. AMC §7.16.140(e)(4) allows for separate vesting periods for a multi-phase development plan.
Optional Motions in the Negative
PUD Amendment
“I move to recommend that the Avon Town Council approve Case #PUD19002, an application for a Minor PUD
Amendment for Lot 1 Riverfront PUD, citing the following findings:
September 3, 2019 PZC Meeting – Lot 1 Riverfront PUD 7
1. The application meets the eligibility requirements for a Minor PUD Amendment by not increasing
density, increasing the amount of nonresidential land use, or significantly altering any approved
building scale or mass of the development;
2. The application is complete;
3. The application provides sufficient information to allow PZC to determine that the application
fails to comply with the relevant review criteria; and
4. The application is not in compliance with the goals and policies of the Avon Comprehensive Plan;
5. The PUD Amendment changes the character of the Riverfront PUD.”
Vested Property Rights Extension
“I move to recommend that the Avon Town Council deny Case #VPR19001, an application for Vested Rights
Extension for Lot 1 Riverfront PUD, citing the following findings:
1. The Application was submitted in a timely fashion at least six (6) months prior to the expiration
of the vested property rights;
2. The application is complete;
3. The application provides sufficient information to allow PZC to determine that the application
does not comply with the relevant considerations; and
4. The application does not demonstrate compliance with the goals and policies of the Avon
Comprehensive Plan.”
Attachments
A: Narrative from East West Partners & Letter from Points of Colorado, Inc.
B: Riverfront Subdivision, Amendment to PUD Development Plan for Lot 1
RIVERFRONT VILLAGE
Minor PUD Amendment
Minor PUD Amendment Submitted:
Lot 1 | Riverfront Village PUD August 5, 2019
FOR TOA REVIEW
ATTACHMENT A
2 | Page
A. INTRODUCTION
The applicant and owner Points of Colorado, Inc. is hereby requesting a Minor PUD Amendment to
amend Lot 1 of the Riverfront PUD and Subdivision.
As represented in Exhibit B to Ordinance 17-16 (see Sheet 3 of 3 below) the PUD Development Plan
currently in effect identifies specific building footprints for Lot 1. The specific development plan and
density represented is no longer valid. The goal of the request is to amend the exhibit to remove the
specific building footprints in order to provide greater flexibility in site design. In addition, the minor
PUD amendment proposes the density for Lot 1 to be lowered to a range of 60 to 100 units, where
previously a density of close to 100 units was targeted for Lot 1. This maintains the density in the
current PUD for Lot 1 while allowing flexibility for a reduced density of units and different configuration
upon the site to be determined during the development plan design and review process. These updates
in the PUD will allow the development to adapt to site and market conditions.
Sheet 3 of 3 of Riverfront Subdivision – Exhibit B to Ordinance 17-16
*Note specific building outlines and footprints that are included in the development plan for Lot 1.
These outlines are proposed to be removed from Lot 1 by this minor PUD amendment application.
ATTACHMENT A
3 | Page
Specifically, the applicant is requesting the Town of Avon to remove Sheet 3 of Exhibit B of the PUD
Development Plan and replace with an updated exhibit showing a sub-division plan with no specific
building footprints upon Lot 1 (reference figure A). In addition, an enlargement plan of just Lot 1 is
included with the amendment as new Sheet 4, showing all existing easements and setbacks in Lot 1
maintained per the original PUD (reference figure B).
Figure A. New Sheet 3 of Exhibit B for Lot 1 PUD Development Plan showing building footprints on Lot 1 removed.
Figure B. New Sheet 4 of Exhibit B Lot 1 PUD Development Plan showing Lot 1 with PUD setbacks and easements.
ATTACHMENT A
4 | Page
The applicant is also requesting minor amendments to Sheets 1 and 2 of Exhibit B, consisting of re-
defining the minimum building setback along the southern boundary of Lot 1, the allowance for a 6’
encroachment for balconies and eaves into the 10’ road right-of-way setback, adjustment to Lot 1 height
limitation in the Land Use Table, and a minor revision to language in the design standards, specifically
to site and architectural guidelines that apply to Lot 1 exclusively.
Minor amendment to General Notes of Sheet 1 - Item 2a and 2c:
In reference to item 2a of the General Notes, the current language identifies the minimum building
setback for the southern portion of Lot 1; as the Northern Boundary of Tract “A” or 75’ from the Mean
Annual High-Water Mark. The applicant is proposing that the minimum setback from the river on Lot 1
coincide with the northern boundary of the utility, path, and drainage easement located along the
southern boundary of Lot 1, because this easement line is essentially the de facto setback. This proposed
setback is more restrictive than what the current language describes and will ensure ample space
between the development, pedestrian path, and the river. The applicant is proposing the following
language for item 2a. “River: all buildings shall be setback the more restrictive of i) seventy-five feet
(75') from the Mean Annual High Water Mark or ii) the northern boundary line of Tract "A".
Notwithstanding the foregoing, Lot 1's minimum setback shall be the northern boundary line of the
utility, path, and drainage easement located along the southern boundary line of Lot 1.
Encroachments for porches/decks/overhangs/eaves are permissible subject to design review and
easement grantees approval as to specific locations and dimensions.”
In reference to item 2c of the General Notes, the current language allows for 3’ aerial encroachments
into the 10’ minimum building setback from road rights-of-way, but only for the northwest wing of
Building F, which is currently the Westin Hotel. The applicant would like to allow for 6’ aerial
encroachments of eaves and balconies into the right-of-way building setback on Lot 1. This will allow
the applicant to maximize the useable building area within the lot and provide design flexibility that will
translate into a more interesting roof design and building façade. The applicant is proposing the
following language for item 2c. “Right -of -way: Buildings shall have a minimum setback of ten feet
(10') from road rights-of -way. Subterranean encroachments shall be permitted into this setback.
Aerial encroachments (such as balconies and eaves) of up to six feet (6') shall be permitted into this
setback for all buildings located on Lot 1.”
Minor amendment of Land Use Table, Lot 1 Height Limitations:
The applicant is proposing eliminating reference to buildings ‘G’ and ‘H’ in the portion of the table
addressing height limitations for Lot 1, and in keeping with the elimination of specific building
footprints for buildings G and H in Sheet 1 of the Exhibit B. The applicant is proposing the following
language to replace the prior language: “105’ maximum height limitation, except areas of the lot falling
within 50’ from the southern boundary, where a maximum height of 55’ will apply.”
This new language addresses the prior height limitation along the southern edge of the project where
Building ‘H’ was previously proposed along the majority of the southern frontage of Lot 1 and the Eagle
River open space and recreation corridor. The current development concepts for Lot 1 contemplate a
greater opening to the River, with less massing along the southern edge of Lot 1 than the original design
of Building H, which was contemplated to be 45’ maximum height. The proposed maximum height of
55’ within the first 50’ of the lot along its southern boundary, will ensure the River corridor is
maintained, while allowing the development to take advantage of the river frontage in a manner that is
in scale and compatible with surrounding development and the adjacent recreation path connection.
ATTACHMENT A
5 | Page
Only small portions of new buildings are contemplated to be within 50’ of the southern boundaries, and
these minor protrusions are anticipated to be no greater than 3 to 4 stories, within the proposed 55’
height limit for this zone.
Minor amendment of Architectural Guidelines:
The following amendment to PUD Design Standards Section II. Site and Village Guidelines, C. Site,
Materials and Colors, 2. Site Walls, and Section IIIA. Architectural Design Guidelines, A. Building Form
and Massing items 2 and 7 are proposed to apply to Lot 1 only, to introduce more flexibility in the
architectural expression of the future development and use of natural materials: (reference bold
italicized text for new proposed text additions and or strike-out and deletions).
Section II. Site and Village Guidelines, C. Site, Materials and Colors, 2. Site Walls, a):
Site walls shall make use of more contemporary materials such as colored concrete masonry,
stained concrete, board-formed concrete, and similar materials, in colors complementary to the
site and its buildings. Site walls shall relate to plaza materials and building bases to help visually
merge the ground plane around the site. Boulder walls shall be permitted in those areas where
walls transition the project to natural and surrounding grades and shall require the approval of
the Planning and Zoning Commission during design and development plan review.
Section IIIA. Architectural Design Guidelines, A. Building Form and Massing Item 2
Smaller masses, such as portions of the building or elements such as porte-cocheres, etc., will be
used to break up the apparent size of larger building forms. Smaller masses positioned in front
of large masses will be used to reduce the visual dominance of the larger forms, with particular
emphasis in stepping back building height, bulk, and mass in the areas of Lots that are located
along the river corridor and recreation path interface.
Section IIIA. Architectural Design Guidelines, A. Building Form and Massing Item 7
Given the modern alpine character of the architecture at Riverfront Village, relatively small roof
overhangs are encouraged for buildings on Lots 1, which are visually and compositionally related
to the Hotel. At these locations the minimum roof overhang permitted shall be six inches. At
other locations within Riverfront Village the minimum roof overhang shall be 24 inches for
primary roofs and 12 inches at secondary dormers.
Aside from the items requested in this Minor PUD Amendment, all other aspects of the current PUD
remain un-altered and in effect for all Lots that are part of the PUD.
The overall property is 1.7 acres and is surrounded by the Eagle River to the south, Riverfront Lane to
the north, Avon Road to the east and the Westin Riverfront Hotel to the west. The Eagle Valley Regional
Trail and the Riverfront park that border the site to the south are part of the program of amenities and
public benefits that have been implemented as part of the Riverfront PUD. The proposed Minor PUD
amendment respects setbacks and easements established by the original PUD in 2006 and recorded
amendment in 2017. The PUD amendment proposes only to remove specific building footprints
previously assigned to Lot 1. There are no proposed changes in allowed uses or density for the
ATTACHMENT A
6 | Page
Riverfront PUD as part of this amendment. A range of density from 60 to 100 units is requested to
provide greater flexibility for the development to adjust to market conditions. Preliminary development
concepts will be shared with the Town during the minor PUD amendment review demonstrating the
intended development plan consistent with the requested PUD amendment.
The remainder of this narrative provides an evaluation of the proposed Minor PUD amendment against
the criteria for review as set forth by the Town, as well as an analysis of compliance against the Town’s
Comprehensive Plan and Development Code.
B. CRITERIA FOR REVIEW
Section 7.16.060. (e)(4) establishes the criteria for review of a PUD amendment. Section
7.16.060(e)(4) states:
Review Criteria. The PZC and Town Council shall consider the following criteria as the basis for a
recommendation or decision to rezone a property to PUD Overlay, and approve a preliminary PUD
plan, or process a PUD amendment:
(i) The PUD addresses a unique situation, confers a substantial benefit to the Town, and/or
incorporates creative site design such that it achieves the purposes of this Development Code and
represents an improvement in the over what could have been accomplished through strict application
of otherwise applicable district or development standards. Such improvements in quality may include
but are not limited to: improvements in the open space provision and access: environmental
protection; trees / vegetation preservation; efficient provision of streets, roads, and other utilities and
services; or increased choice of living and housing environments.
Applicant Response: The proposed minor amendment to the Riverfront Village PUD is to remove the
specific development plan and building footprints previously assigned to Lot 1 and to allow a decreased
range of density from 60 to 100 units. This request will provide greater flexibility for the development to
adjust to market conditions. The request is appropriate as it respects all original easements and setbacks
of the property and remains consistent with the original approval of the Riverfront Village PUD.
Eliminating specific building footprints may allow a reduction in the overall size, bulk and mass of the
proposed condominium buildings. The amendment will allow future developments to apply different
units and development prototypes that are more appropriate for present day market conditions and
demands.
The amendment honors the town’s 75’ riparian stream setback, and the open space and recreation
corridor previously established by the Riverfront Village remains intact. With the 2017 PUD
amendment an easement for a trail connection from the Eagle Valley Regional Trail to Riverfront Lane
was provided to the Town by the Owner of Lot 7, significantly benefitting the Town’s overall pedestrian
circulation network. As part of the creation of the PUD in 2006 an Employee Housing Contribution of
$846,000 was made by the master developer to meet the Town’s housing requirements, and with the
2017 PUD amendment (2) deed restricted units are included in the Lot 4 Riverfront Lodge development.
These are examples of actions taken as part of the PUD that are of substantial benefit to the Town.
ATTACHMENT A
7 | Page
This PUD Amendment is not subject to the Town’s new inclusionary housing standards as Ordinance
19-03 clearly states that “Properties with pre-existing vested rights are exempt from these
requirements.” [Section 3(c)(3)] The Town has specifically acknowledged and approved the currently
existing vested rights for Lot 1 per Ordinance 17-16. All obligations as related to employee housing
were included as part of the original PUD approval for Riverfront Village. In that density is not being
increased for Lot 1 by this Amendment, the minor design changes do not trigger additional employee
housing obligations.
(ii) The PUD rezoning will promote the public health, safety, and general welfare;
Applicant Response: All aspects of the current Riverfront Village PUD remain in place and in effect as
originally approved in 2006. The PUD amendment only seeks flexibility in density for Lot 1, to allow a
revised development concept but otherwise remains consistent with the overall vision and land uses for
the area within Lot 1. Remaining consistent with the original PUD will promote the public health,
safety, and general welfare of the Town. Open space has been preserved and public river access is
being maintained via this Minor PUD Amendment application.
(iii) The PUD rezoning is consistent with the Avon Comprehensive Plan, the purposes of this
Development Code, and the eligibility criteria outlined in §7. I 6.060(b);
The eligibility criteria for a PUD are outlined in Section 7. I 6.060(b) and state the following:
(I) Property Eligible. All properties within the Town of Avon are eligible to apply for PUD
approval.
(2) Consistency with Comprehensive Plan. The proposed development shall be consistent with the
Avon Comprehensive Plan.
(3) Consistent with PUD Intent the proposed development shall be consistent with the intent and
spirit of the PUD purpose statement in §7. I 6.060(a).
(4) Compatibility with Existing Uses. The proposed development shall not impede the continued
use or development of surrounding properties for uses that are permitted in the Development Code or
planned for in the Avon Comprehensive Plan.
(5) Public Benefit. A recognizable and material benefit will be realized by both the future residents
and the Town as a whole through the establishment of a PUD, where such benefit would otherwise be
infeasible or unlikely.
(6) Preservation of Site Features. Long-term conservation of natural, historical, architectural, or
other significant features or open space will be achieved, where such features would otherwise be
destroyed or degraded by development as permitted by the underlying zoning district
(7) Sufficient Land Area for Proposed Uses. Sufficient land area has been provided to comply with
all applicable regulations of the Development Code, to adequately serve the needs of all permitted uses
in the PUD projects, and to ensure compatibility between uses and the surrounding neighborhood.
ATTACHMENT A
8 | Page
Applicant Response: As demonstrated within this document, all aspects of the current Riverfront Village
PUD remain in place and in effect as originally approved in 2006 and amended in 2017, and therefore
the PUD amendment is consistent with the Avon Comprehensive Plan and the eligibility criteria
outlined in §7. I 6.060(b) and the purpose of the Town’s Development Code. The PUD amendment
seeks greater flexibility in density as well as minor revisions to the site guidelines of the PUD
Development Plan as described in the introduction. No deviations or variances from the Town’s
Development Code are proposed nor anticipated in association with the minor PUD amendment. The
proposal is consistent with the eligibility criteria for a PUD given the conformance and adherence to all
aspects of the original PUD Development Plan approval granted in 2006 and amended in 2017.
The purpose of the Development Code is provided in Section 7.04.030 Purposes of the Avon
Development Code:
The Development Code is intended to promote and achieve the following goals and purposes for the
Avon community, including the residents, property owners, business owners and visitors:
(a) Divide the Town into zones, restricting and requiring therein the location, erection,
construction, reconstruction, alteration and use of buildings, structures and land for trade, industry,
residence and other specified uses; regulate the intensity of the use of lot areas; regulate and determine
the area of open spaces surrounding such buildings; establish building lines and locations of buildings
designed for specified industrial, commercial, residential and other uses within such areas; establish
standards to which buildings or structures shall conform; establish standards for use of areas adjoining
such buildings or structures;
(b) Implement the goals and policies of the Avon Comprehensive Plan and other applicable
planning documents of the Town;
(c) Comply with the purposes stated in state and federal regulations which authorize the
regulations in this Development Code;
(d) Avoid undue traffic congestion and degradation of the level of service provided by streets and
roadways, promote effective and economical mass transportation and enhance effective, attractive and
economical pedestrian opportunities;
(e) Promote adequate light, air, landscaping and open space and avoid undue concentration or
sprawl of population;
(f) Provide a planned and orderly use of land, protection of the environment and preservation of
viability, all to conserve the value of the investments of the people of the Avon community and
encourage a high quality of life and the most appropriate use of land throughout the municipality;
(g) Prevent the inefficient use of land; avoid increased demands on public services and facilities
which exceed capacity or degrade the level of service for existing residents; provide for phased
development of government services and facilities which maximizes efficiency and optimizes costs to
taxpayers and users; and promote sufficient, economical and high-quality provision of all public
services and public facilities, including but not limited to water, sewage, schools, libraries, police,
parks, recreation, open space and medical facilities;
ATTACHMENT A
9 | Page
(h) Minimize the risk of damage and injury to people, structures and public infrastructure created
by wildfire, avalanche, unstable slopes, rock fall, mudslides, flood danger and other natural hazards;
(i) Achieve or exceed federal clean air standards;
j) Sustain water sources by maintaining the natural watershed, preventing accelerated erosion,
reducing runoff and consequent sedimentation, eliminating pollutants introduced directly into streams
and enhancing public access to recreational water sources;
(k) Maintain the natural scenic beauty of the Eagle River Valley in order to preserve areas of
historical and archaeological importance, provide for adequate open spaces, preserve scenic views,
provide recreational opportunities, sustain the tourist-based economy and preserve property values;
(I) Promote architectural design, which is compatible, functional, practical and complimentary to
Avon's sub-alpine environment;
(m) Achieve innovation and advancement in design of the built environment to improve efficiency,
reduce energy consumption, reduce emission of pollutants, reduce consumption of non-renewable
natural resources and attain sustainability;
(n) Achieve a diverse range of attainable housing which meets the housing needs created by jobs
in the Town, provides a range of housing types and price points to serve a complete range of life stages
and promotes a balanced, diverse and stable full time residential community which is balanced with
the visitor economy;
(o) Promote quality real estate investments which conserve property values by disclosing risks,
taxes and fees; by incorporating practical and comprehensible legal arrangements; and by promoting
accuracy in investment expectations; and
(p) Promote the health, safety and welfare of the Avon community.
Applicant Response: As demonstrated within this document, the proposal is consistent with and in
substantial compliance with the purpose of the Development Code by allowing greater flexibility in
overall density, and a potential reduction than is currently allocated for Lot 1. The proposal will
maintain setbacks to the sensitive riparian area within the 75’ stream setback that will remain mostly
open space. A previous amendment in 2017 resulted in a new easement at the west end to allow for
additional connectivity from Riverfront Lane to the Eagle Valley Regional Trail. This easement has been
provided to the Town in 2018. No deviations or variances from the recorded PUD for Riverfront Village
are proposed nor are anticipated in association with the minor PUD amendment. The ultimate
development plan will meet the goals of Avon’s Comprehensive and Development codes by providing a
development concept that promotes quality real estate compatible with surrounding land uses and
fulfills the vision of the Riverfront Village PUD. Further, we have complied with the requirements for
employee housing as part of the PUD in 2006 and 2018.
(iv) Facilities and services (including roads and transportation, water, gas, electric, police and fire
protection, and sewage and waste disposal, as applicable will be available to serve the subject
property while maintaining adequate levels of service to existing development;
ATTACHMENT A
10 | Page
Applicant Response: Facilities are in place and available per the current development in place at
Riverfront Village PUD and the infrastructure and service network is already implemented in
anticipation of the full build-out for the PUD. All utility and access easements are in place as originally
established by the original PUD, and they are being honored and preserved. The development may
connect underground to the Westin hotel garage, which would further alleviate stacking on Riverfront
Lane when large volumes of traffic are entering the hotel drop-off.
(v) Compared to the underlying zoning, the PUD rezoning is not likely to result in significant
adverse impacts upon the natural environment, including air, water, noise, storm water management,
wildlife, and vegetation, or such impacts will be substantially mitigated;
Applicant Response: Given the proposed flexibility in density from the current PUD underlying zoning,
the PUD amendment proposal is not likely to result in significant impacts to the natural environment.
The existing easements including the 75’ stream setback will be maintained and respected along the
Eagle River and the Eagle Valley Regional Trail.
(vi) Compared to the underlying zoning, the PUD rezoning is not likely to result in significant
adverse impacts upon other property in the vicinity of the subject tract; and
Applicant Response: The proposed PUD remains consistent with the current PUD in effect, with the
same land use assignments and similar condominium concept. Only greater flexibility in the overall
density is proposed by the PUD amendment, which is not likely to result in significant adverse impacts
upon other property in the vicinity of the subject tract.
(vii) Future uses on the subject tract will be compatible in scale with uses or potential future uses
on other properties in the vicinity of the subject tract.
Applicant Response: The proposed amendment is to allow greater flexibility in the overall density of
development in the areas occupied by Lot 1. The proposed range of density of 60 to 100 units will
allow the applicant to create a development plan that responds to current economic and market
conditions. The density is not increased per the original PUD approval and there is no change in the
existing underlying residential land use. Therefore the uses on the subject tract will be compatible in
scale with uses or potential future uses on other properties in the vicinity of the subject tract.
ATTACHMENT A
ATTACHMENT A
ATTACHMENT A
PUD Signature BlocksOwner's CertificateKnow all men by these presents that being the sole owners in fee simple of all that realproperty described as follows:Lot 1 Riverfront Subdivision: located in the south 1/2 of Northwest 1/4 Section 12, Township 5 South,Range 82 West of the Sixth Principal Meridian.We agree to develop the plan as depicted on this site plan.By: _______________________________Points of Colorado, Inc.Address: CONFIRM ADDRESS TO USE FOR POINTS OF COLORADO, INCThe foregoing signatures were acknowledged before me this________ day of__________________, 2019, by _____________________________My Commission expires: _____________________ Witness my hand and seal ______________________ Notary PublicTown CertificateThis Planned Unit Development Plan and the uses, zoning standards and densities areapproved for The Riverfront PUD, (Ordinance 19-XX by the Town Council ofthe Town of Avon, County of Eagle, State of Colorado, this ______ day of________________, 2019, for filing with the Clerk and Recorder of the County ofEagle. Said approval shall in no way obligate the Town of Avon for any improvementsand approval of this PUD Development Plan by the Town is a consent only and is not to be confused as anapproval of the technical correctness of this plan or any documentation relating there to.WITNESS MY HAND AND SEAL OF THE TOWN OF AVON: TOWN COUNCIL OF THE TOWN OF AVON By: ________________________________ Sarah Smith-Hynes, Mayor Attest: _____________________________ XXXXX XXXXXXXX, Town ClerkDevelopment Standards* NO CHANGE - ALL DEVELOPMENT STANDARDS UNDER EXISTING PUD DEVELOPMENTPLAN APPLY TO LOT 1Residential/Lodging Uses1. Hotel rooms and suites;2. Lodge rooms;3. Condominiums;4. Townhomes;5. Time-share, vacation ownership, and fractional fee ownership; and6. Accessory or incidental uses consistent with Residential/Lodging Uses at the discretion of the Zoning Administrator.Lodging Support Uses1. Fitness facilities, locker rooms, reception, and related amenities and services;2. Indoor and outdoor recreation (e.g. pools, jacuzzis, game rooms);3. Ski valet and storage;4. Front desk and lobby;5. Concierge, valet and bell service areas;6. Business centers;7. Housekeeping and laundry facilities;8. Storage;9. Mechanical rooms;10. Restrooms;11. Administrative spaces used by personnel providing Hotel/lodging services (e.g. reservations, accounting);12. Maintenance facilities;13. Meeting pre-function and support spaces; and14. Other accessory or incidental uses consistent with Lodging Support Uses at the discretion of the Zoning AdministratorStandard Commercial Uses1. Retail Stores;2. Specialty Shops;3. Restaurants, Bars and Cocktail Lounges;4. Wellness Centers (such as physical therapy, medical);5. Personal service shops;6. Professional offices, including real estate brokerage and development offices;7. Ski School Facilities;8. Lift Ticket Sales Facilities;9. Financial Institutions;10. Offices; and11. Other accessory or incidental uses consistent with Standard Commercial Uses at the discretion of the Zoning AdministratorIncidental Commercial Uses1. Spa treatment rooms, spa retail, spa salon, and2. Meetings and conference rooms;Public Uses1. Transportation facilities;2. Public plazas;3. Public restrooms; and4. Public parks and walkways.Temporary Facilities1. Vacation Ownership/Time Share sales centers of up to 7,000 square feet within the Hotel or Vacation Ownership/Time Sharebuildings for up to ten years from the issuance of a Temporary Certificate of Occupancy of the first Vacation Ownership/TimeShare building; and2. Other temporary facilities are subject to Special Review Use.Special Review Uses1. Theatres;2. Churches;3. Bed and Breakfast lodges; and4. Temporary facilities not approved (above) under Temporary Facilities.Land Use Table:LAND USE TABLE MODIFIED FOR LOT 1 ONLY AS FOLLOWS:Parking* NO CHANGE - ALL PARKING STANDARDS UNDER EXISTING PUDDEVELOPMENT PLAN APPLY TO LOT 1.Specific requirements by UseFive (5) spaces/1000 GLFA:1. Retail Stores;2. Specialty Shops;3. Restaurants, Bars and Cocktail Lounges public spaces (excludes storage, kitchens and other"back of house" spaces);4. Wellness Centers (such as physical therapy, medical);5. Personal service shops;6. Professional offices, including real estate offices at the plaza level;7. Ski School Facilities;8. Lift Ticket Sales Facilities; and9. Financial Institutions;Four (4) spaces per 1000 GLFA1. Professional Offices/Offices, if any, on the fifth floor of the Hotel.Two (2) spaces per 1,000 GLFA1. Spa treatment rooms, spa retail, spa salon; and2. Meetings and conference rooms.Hotel1. One (1) space for each Accommodation Unit (as defined in the Development Agreement).2. 1.2 spaces for each Dwelling Unit (as defined in the Development Agreement).Vacation Ownership1. 0.75 spaces per bedroom, maximum of 1.5 spaces per Residential Unit.Condominiums and Townhomes other than a Hotel1. Lots 1,2 & 3 - no change proposed (1.2 space per unit for Lot 1)2. Lot 4 Condominium Units - 1.0 spaces per unit or as approved in the development plan.3. Lot 4 Townhome Units - 1.2 spaces per unit or as approved in the development plan.General:1. Compact parking spaces shall not exceed ten percent (10%) of total parking for the entireproject.2. Total required parking (as defined above) shall be reduced by 15% for facilities on Lots 1, 2and 3 only.3. Standard parking spaces on Lots 1 and 3 shall be a minimum width of 8'9'", with standardlength of 18' and standard drive lane width of 24'.Lot 1 PermittedUses byRight SpecialReviewUsesBuildingHeight*StandardCommercial;IncidentalCommercial;ResidentialLodging Uses;LodgingSupport Uses;TemporaryUses and Facilities;Public UsesTheatres;Churches;OtherTemporaryFacilities;105' maximumheight limitation,except areas ofthe lot fallingwithin 50' fromthe southernboundary,where amaximum heightof 55' will apply.General Notes* ITEMS 2a AND 2c AMENDED. ITEMS 3 AND 4 ADDED TO THE GENERAL NOTES. ALL OTHER GENERAL NOTES UNDER EXISTING PUDDEVELOPMENT PLAN APPLY TO LOT 1.1. This PUD Plan contains the development standards and uses for the Riverfront PUD. Other uses and provisions of the Town of Avon Municipal Code not specifically addressed herein, or in the related development agreement, shall apply to the Riverfront PUD.2. The minimum building setbacks shall be as follows: a. River: all buildings shall be setback the more restrictive of i) seventy five feet (75') from the Mean Annual High Water Mark or ii) the northern boundary line of Tract "A". Notwithstanding theforegoing, Lot 1's minimum setback shall be the northern boundary line of the utility, path, and drainage easement located along the southern boundary line of Lot 1. Encroachments for porches/decks/overhangs/eaves are permissible subject to design review and easement grantees approval as to specific locations and dimensions. b. Lot Lines: Buildings shall have a zero foot (0') setback from internal lot lines. Buildings shall have a minimum twenty-foot (20') setback from Riverfront Subdivision perimeter lines. Notwithstanding the foregoing, Lot 7's setback from its northern perimeter line shall be ten (10) feet. c. Right-of-way: Buildings shall have a minimum setback of ten feet (10') from road right-of-ways. Subterranean encroachments shall be permitted into this setback. Aerial encroachments (such as balconies and eaves) of up to six feet (6') shall be permitted into this setback for all buildings located on lot 1.3. The purpose of this PUD Amendment is to modify the height limitation, architectural guidelines, and remove the specific building footprints for Lot 1 to allow for greater flexibility in design andphasing.4. This Amendment to PUD Development Plan amends the PUD Development Plan for Riverfront Subdivision adopted by Town Ordinance No. 17-16 and recorded at Reception No. 201800835,Eagle County, Colorado (the “Existing PUD Development Plan”) solely with respect to Lot 1, Riverfront Subdivision (“Lot 1”). References herein to new or modified PUD standards,requirements and/or uses apply to Lot 1 only. Except as herein amended for Lot 1, the Existing PUD Development Plan remains fully binding and valid.Notes:Actual building heights at various locations on each Lot shall be establishedthrough the Town's design review approval process, based on the criteriaestablished in the Town of Avon Municipal Code.In all instances, the maximum allowable percentage of a building ridgeline tobe at or near the maximum height shall be governed by the more restrictivecriteria of the Riverfront Design Standards and the Town of Avon MunicipalCode.Architectural Design and Massing: Final building design shall be establishedthrough the Town's design review approval process, based on the criteriaestablished in the Town of Avon Municipal Code.ATTACHMENT B
R I V E R F R O N T V I L L A G EAvon, ColoradoDESIGN STANDARDSFebruary 23, 2006*amended December 12, 2017*amended August 5, 2019 for Lot 1I. Vision Statement for Riverfront VillageNO CHANGE - VISION STATEMENT AND DESIGN STANDARDS RECORDED UNDER EXISTING PUD DEVELOPMENT PLAN REMAIN IN PLACE AS RECORDED. A. Scope of Design Standards 1) The following Design Standards for Riverfront Village have been established to ensure the overall quality and compatibility of the Village with the Town of Avon and its riverfront site. In general these Standards shall apply to all buildings and plaza areas within Riverfront Village, with the exception of the Hotel building, or as otherwise noted. 2) An important aspect of the Riverfront Village vision is responsible care for the environment and sustainability of the architecture and landscape. To this end, best efforts will be made to meet the principles set forth in the LEED (Leadership in Energy and Environmental Design) Green Building System for the Hotel. In addition, all other buildings within the Village will be designed with sensitivity to the sustainability aspects of site and architectural design. B. Architectural Theme 1) Riverfront Village represents an important interface between the Town of Avon and Beaver Creek Ski Resort. It is envisioned as a lively gathering place connecting the river, mountain and town- a pedestrian friendly environment where townspeople and guests can stroll from Avon's western Town Center, through the resort retail plaza, to ride the gondola up to the mountain or to step down to the river. 2) The village is situated on the seam between the town and the mountain landscape and should therefore strike a balance between the two environments, creating an architectural expression that captures both alpine and townscape traditions. To achieve this balance, the architecture shall take advantage of materials inherent to successful mountain resort architecture-such as stone, wood, and other natural materials, combined with more contemporary materials such as stucco, metal, and recycled products. 3) The Architectural Theme will also feature the use of large areas of glass, clean building forms based on pure geometries, strong, simple detailing (not overly rustic, "heavy," or overstated), and the bolder proportions appropriate to the larger scale of the Town. C. Design of Public Spaces 1) A public plaza will be used to link the Town of Avon to the Eagle River. This link should be reinforced in both a physical and perceptual way through the use of paving materials, landscaping, and sensitive spatial planning. Spatial planning shall include components that reinforce the connectivity of the Town to the River, and avoid elements that act as barriers to this connection, such as planter walls that block pedestrian flow, landscaping that screens the visual connection between Town and River, etc. D. Pedestrian orientation 1) A pedestrian corridor, connecting the town to a retail plaza with gondola, will gracefully transition from the plaza to the riverfront promenade by way of a staircase and stepped terraces merging with the natural landscape. This transition will avoid barriers from the Town to the River, and include elements which reinforce this connection, including similar paving materials, wide pedestrian ways that encourage movement, active signage and wayfinding, and a gracious grand stair with oversized treads and minimal risers. 2) Pathways shall also create a network within the Village itself, linking the different buildings along the length of the site and providing pedestrian access to defined access/gathering points along the River. The Plaza and pathways within Riverfront Village should encourage a pedestrian-friendly environment. E. View Corridors 1) A primary southern view corridor to the mountains shall be maintained from the eastern railroad crossing through the public plaza to help reinforce the connection between the Town and the ski mountain. 2) An east-west view corridor along the Eagle River will also be maintained through the preservation of a 75-foot river setback throughout most of the site, with limited minor encroachments as allowed in the development plan. In addition, the Riverfront Park will act as a natural corridor along the river edge portion of the Village and act to enhance this view corridor. F. The Natural Environment 1) The Eagle River is a primary amenity for the Town of Avon and Riverfront Village. Links to the River shall be developed as special pedestrian ways to help activate this wonderful amenity. 2) The 75-foot river setback will be largely left in its natural state, and certain defined river access and gathering points should be created along the linear riverfront path. 3) In general, additional plantings within the river setback will be riparian in character and relate to plantings indigenous to river edge environments. More formal planting areas -- such as small sections of lawn, however, are encouraged at special gathering and access points to highlight these more formal features. Formal plantings featuring annuals are not permitted within the 75-foot setback. 4) In an effort to enhance the natural environment, site walls and site walkways should become more "organic" as they approach the river edge portion of the Village. Any walls installed south of the bike path shall be limited to boulder walls. Accessibility shall be considered when designing walkways.II. Site and Village GuidelinesITEM C.2. SITE WALLS AMENDED. ALL OTHER SITE AND VILLAGE GUIDELINES UNDER EXISTING PUD DEVELOPMENT PLAN APPLY TO LOT 1. A. Primary Building Entries 1) Primary building entries shall be emphasized as welcoming portals through careful attention to massing, scale, and materials. This will ensure that Riverfront Village will not turn its back to Avon. Portals will be scaled to encourage pedestrian movement through them-and avoid overwhelming or diminutive massing-and they will be treated with materials that enhance this experience. The front doors of buildings should be treated in interesting ways, either through the use of glass or special designs and materials that provide interest to these special areas of each building. 2) Massing of entries shall relate to the overall massing of the buildings but be presented as special forms different than typical building bays. Sensitivity to scale should be considered when transitioning from the overall larger building mass to the more intimate scale of the pedestrian visitor. Designers are encouraged to use materials in interesting ways at primary building entries to reinforce their unique role as part of the building and as part of the overall Village streetscape. B. Solar Access 1) A solar access study shall be required for buildings exceeding 3 stories in height. These studies will convey shading impacts at summer and winter solstice (Jun 21 and Dec 21), and at vernal and autumnal equinox (Mar 21 and Sept 21). C. Site Materials and Colors 1. Plaza materials a) Rustic materials common in mountain towns and/or a more contemporary interpretation of these materials such as cut stone pavers, colored concrete pavers, and stained or colored concrete slabs are appropriate to the Village. Colors shall be complementary to the site and its architecture, avoiding bright or brilliant hues that distract from the pedestrian experience.the le 2. Site walls a) Site walls shall make use of more contemporary materials such as colored concrete masonry, stained concrete, board-formed concrete, and similar materials, in colors complementary to the site and its buildings. Site walls shall relate to plaza materials and building bases to help visually merge the ground plane around the site. Boulder walls shall be permitted in those areas where walls transition the project to natural and surrounding grades, and shall require the approval of the Planning Commission during design and development plan review. D. Site Signage - Design, materials, and colors 1) Site signage shall be designed to help animate the plaza and be consistent and compatible with the design and materiality of the buildings. Site lighting will also be used to enhance the pedestrian experience at the Plaza level.III. Architectural Design GuidelinesITEMS A. 2) AND 7) AMENDED. ALL OTHER ARCHITECTURAL DESIGN GUIDELINES UNDER EXISTING PUD DEVELOPMENT PLAN APPLY TO LOT 1. A. Building Form and Massing 1) In general the form and massing within Riverfront Village will follow the intent of the Town of Avon Design Guidelines by incorporating form articulation to avoid the monolithic. However, specific buildings within the Village shall be subject to less or more stringent requirements relative to building form and massing as identified within this document to form a coherent, pleasant composition for the entire neighborhood. 2) Smaller masses, such as portions of the building or elements such as porte cocheres, etc, will be used to break up the apparent size of larger building forms. Smaller masses positioned in front of large masses will be used to reduce the visual dominance of the larger forms,with particular emphasis in stepping back building height, bulk, and mass in the areas of Lots that are located along the river corridor and recreation path interface. 3) The development of building bases will help to tie together individual buildings within the Village and will also tie the Village to its riverfront site. Site walls, and other site features shall relate to building bases in a way that reinforces visual connectivity to the ground plane. The plaza and gondola terminal, with its cantilevered structure will stand out as an elevated element from the south, drawing people up from the river. 4) In general the middles of buildings will be more visually subtle, but broken by primary and secondary elevation features and material accents that help to avoid monotonous facades. On any given elevation at Lots 1, 3, and 4, 80 percent of the vertical wall area will be permitted to be within the same plane, with a minimum of 1-foot offset for plane changes. Vertical forms comprised of stacked decks and balconies will be considered plane changes. At Lots 5, 6, and 7, 70 percent of the vertical wall area will be permitted to be within the same plane. 5) The roofscape of Riverfront Village is also critical to the success of the neighborhood and its relationship to the Town of Avon. The visual coherency of the Village should be reinforced through the use of similar and compatible roofing materials and colors throughout the Village, helping to knit the individual buildings together when seen from the Gondola or Beaver Creek above. 6) Pitched roofs expressive of an alpine tradition and the incorporation of dormers, shed roofs and chimney forms, should be employed, while allowing variation in roof pitches to break up building mass and height. Primary roofs will have pitches ranging from a minimum of 2:12 to a maximum of 8:12. Secondary roofs-such as at dormers, porte cocheres, building protrusions, and similar additive forms-may be flat, but only if they are finished in materials similar in quality to roof or wall materials on the building, such as pavers, colored stone, etc. When secondary roofs are pitched roofs, the minimum pitch required shall be 2:12. Flat roofs may be permitted for primary roof forms in order to help address views and reduce overall height of buildings along the river interface. Ideally flat roofs should be developed as terraces and other functional spaces. 7) Given the modern alpine character of the architecture at Riverfront Village, roof overhangs are encouraged for buildings on Lot 1, which are visually and compositionally related to the Hotel. At these locations the minimum roof overhang permitted shall be six inches. At other locations within Riverfront Village the minimum roof overhang shall be 24 inches for primary roofs and 12 inches at secondary dormers. 8) To help ensure that roof ridges for the Village remain interesting and contribute to the overall success of building massing, uninterrupted ridgelines shall be avoided. To this end, roof ridgelines are limited to 150 feet before a change in height (elevation above sea level) is required. These breaks (elevation changes) shall run horizontally for at least 10% of the overall building ridge length before returning to the prior elevation. Overall building ridge length is defined as the sum of all primary ridge lengths for the entire building. B. Building Height 1) Building heights for the Riverfront Village will be restricted to the heights described in the approved Development Plan, as measured according to the Town of Avon Code. Architectural features such as chimneys, cupolas, and other similar elements will not be included when calculating maximum building height. 2) In addition, the percentage of ridge height allowed at the maximum allowable building height for any given building will be limited to 25% of the overall building ridge length. Overall building ridge length is defined as the sum of all primary ridge lengths for the entire building. 3) The maximum height for building facades fronting the Public Plaza will be limited to 75 feet from the Plaza elevation. The only exception to this facade height limitation shall be for the western façade of the central tower of the hotel, which shall be permitted to be as tall as 100 ft. from Plaza elevation. This central tower façade may run horizontally for up to 60 feet along the plaza. 4) The minimum horizontal setback required for building facades exceeding the maximum height for building facades fronting the Public Plaza will be 2 feet from the building façade fronting the Public Plaza. This shall only apply to the central tower portion of the Hotel. 5) The minimum setback required for maximum allowable height per the Development Standards from the Public Plaza will be 60 feet from building façade fronting the Plaza C. Exterior Materials, Detailing, and Colors 1. Materials and colors for walls and roofs at Riverfront Village will have a Light Reflective Value (LRV) not exceeding 60%. a) Materials inherent to the mountains, including stone and wood, will be used at lower levels of buildings in areas of direct pedestrian interface, as well as metals. These materials should be used in refreshing ways within the Village, reinterpreted for the urban nature of Avon towards a "mountain modern" character. b) Stucco conveys mass in a subtle, "quiet" way and is therefore a recommended material for building middles and tops. However, building accents comprised of non-stucco materials, such as metal, wood and cement materials replicating wood, shall be allowed in building middles and tops to help provide interest, except as prohibited by Codes. When used, stucco shall be carefully detailed to ensure longevity when it comes near the ground plane at building walls. Greater variation in materials for town homes is contemplated with less reliance on the use of stucco in lieu of use of recycled and other siding materials. c) Roof materials will include rubber shingles, asphalt shingles and other materials suitable for mountain environments. Standing seam metal may be used for primary roof planes and for small and/or special roof features such as shed dormers, retail roof forms, porte cocheres, and other selective roof elements. d) In general, colors used within the Village should be complementary to the site, and be comprised of greens, grays, golds, browns, and other earth-tone hues. However, due to the desire for a highly activated retail experience at the Plaza level, the colors used along the retail edges of the Public way may be more vibrant and active in nature. 2. Minimum window area at plaza level a) At a minimum, 50% of the 1st level of building facades facing the plaza from the east and the west shall be glass. For this calculation the plaza shall be deemed to begin at the northwest corner of the hotel and the northeast corner of timeshare west and shall terminate at the east-west plane where the staircase down to the river begins. This calculation shall exclude the gondolaterminal, control booth and public restrooms.ATTACHMENT B
ATTACHMENT B
ATTACHMENT B
September 17, 2019 PZC Meeting – 5032 Wildridge Road East Unit B 1
Staff Report – Major Development Plan
September 17, 2019 Planning and Zoning Commission
Case #MJR19004
Project type Major Development Plan
Public Hearing Required
Legal Description Lot 38B Block 4 Wildridge Subdivision
Zoning Planned Unit Development (PUD)
Address 5032 Wildridge Road East Unit B
Prepared By David McWilliams, Town Planner
Staff Report Overview
This staff report contains one application for consideration by the PZC: Major Development Plan with
Design Review for a new proposed single-family house.
Summary of Request
Bobby Ladd (the Applicant) proposes a new house for Lot 38B. The building is three (3) stories,
4,348 s.f. of livable space and 922 s.f. garage. The main (middle) level is ground-level at the south
side and located above grade on the uphill (west) side of the house. It has a mix of shed and gable roofs,
mainly at 6:12 for the shingled roofs and 3:12 for the metal roofs.
Public Notice
Notice of the public hearing was published in the September 6, 2019 edition of the Vail Daily in
accordance with Sec. 7.16.020(d) of the Avon Municipal Code (AMC). Mailed notice is not required
for this application type.
Property Description
Lot 38B is .54 acres located at a steep
portion of Wildridge Road East. Lot 38
(shown in its entirety, right) is zoned
PUD and was modified in 2018 to
accommodate two single family
houses. It borders duplex and single-
family houses.
Planning Analysis
Lot Coverage, Setback and
Easements: Lot 38B was modified
with a defined building envelope on a
flat bench of the property and the
project complies with the envelope.
Drainage easements have not been proposed on this project. They are required before subdivision and
there appears to be enough space for drainage easements.
Building Height: The maximum building height permitted for this property is thirty-five feet (35’),
with a “glass ceiling” at elevation of 8450 feet. The applicant is proposing a maximum building height
of 34.70’ and maximum elevation of 8435.1’. An ILC will be required to assure compliance with the
September 17, 2019 PZC Meeting – 5032 Wildridge Road East Unit B 2
building height.
Parking: The project is required three (3) parking spaces, and all spaces are provided in the garage.
Design Standards Analysis
Landscaping & Irrigation: The building is proposed to be landscaped primarily with aspen, spruce,
deciduous shrubs, native grasses, and mulch areas (attachment A, sheet A0.2). The Landscape Unit
count provided is 155, with 155 required. Permanent irrigation quantities are unknown. An irrigation
plan showing compliance with AMC will be required before a building permit is issued.
Building Design, Building Materials and Colors: The primary exterior building materials are stucco,
(painted tan), stone tiles, and wood board siding (painted tan) (Attachment A, sheet A2.2 and Attachment
B). Colors were reviewed for conformance with Sec. 7.28.090(j)(4)(viii), Building Materials, and
determined to comply with the design standards. All materials are of high quality and compliment
Avon’s built landscape and the other properties along the driveway.
Retaining Walls: All retaining walls are subject to the following standards, Sec. 7.28.070:
(1) Retaining walls may be utilized only where finished grades cannot meet the recommended standards
of this Development Code due to naturally occurring topography and other site development
constraints.
(2) Retaining walls over four (4) feet in height shall be designed with a series of retaining walls with
landscaped terraced steps. The width of the terrace between any two (2) four-foot vertical retaining
walls shall be at least three (3) feet. Retaining walls higher than four (4) feet shall be separated from
any other retaining walls by a minimum of five (5) horizontal feet. Terraces created between
retaining walls shall be permanently landscaped.
(3) A retaining wall shall not exceed seven (7) feet in height unless approved by the PZC and it is
demonstrated that no alternative site layout is functional.
(4) The design of retaining walls shall be constructed of materials compatible with the site and materials
of the structures on the site. Retaining walls and cribbing should utilize natural materials, such as
boulders, cut rocks, stone-veneer or textured, color-tinted concrete. Timbers and railroad ties are
prohibited as retaining wall materials. Where two (2) alternatively designed retaining walls meet, a
cohesive transition between walls must be demonstrated.
(5) Walls over four (4) feet in height or any wall supporting a vehicle load or structure shall be
structurally designed and certified by a Colorado licensed professional engineer.
There are a series of three (3) boulder retaining walls at or near four (4) feet each, totaling roughly 16 feet
on the south side of the driveway connecting Lot 38B with 39A (attachment A, sheet A0.2). Staff
recommends careful PZC review of the walls for compliance with the above standards, and to add the
condition that an engineer certify the wall.
Roof Material and Pitch: The roof material and pitch were reviewed for compliance with Sec.
7.28.090(d)(3) Roofs. The applicant is proposing primarily 6:12 shingled and 3:12 metal roof pitches
and are compliant with applicable AMC regulations.
Exterior Lighting: No proposed lighting is presented. Staff suggests a condition of approval to require
confirmation of Dark Sky Compliant fixtures whose locations and quantity are compliant with lighting
code.
September 17, 2019 PZC Meeting – 5032 Wildridge Road East Unit B 3
Design Standards for the Wildridge Subdivision: AMC states:
(1) Intent:
(i) To preserve and enhance the aesthetic qualities of the natural hillsides by designing
projects which relate to the slope of the land and minimize the amount of project grading; and
(ii) To promote development which is visually compatible with the natural topography of the
surrounding area.
(2) Building Height on Steep Slopes. Determining building height on steep slopes has frequently
resulted in three-story walls on the downhill side that create an overbearing presence on properties
below. Therefore, the visual impact of building height and massing on lots with steep slopes shall be
reduced by articulating the building facades and creating proportional stories in a multi-story
building. Building height will be reduced for buildings or portions of buildings with flat roofs as
follows:
(A) Four-to-twelve (4:12) roof slopes or greater: thirty-five (35) feet.
(B) Less than a four-to-twelve (4:12) roof slope: thirty (30) feet.
(3) Building Design:
(i) Buildings shall have street-facing architectural details and elements which provide a
human scale to the facade. Flat, monotonous facades shall be avoided.
(A) The design of a structure shall create variety and interest along the street
elevation. A significant alteration of the massing and composition (not just the exterior
colors and materials) of each house or each townhouse or duplex unit must be
accomplished.
(B) The use of architectural features that increase visual prominence should be
avoided. Massive, tall elements, such as two-story entries, turrets and large chimneys,
should be avoided. Such elements on the downhill face of the structure are of
particular concern.
Staff is satisfied that the building complies with these standards. While this unit does not really face a
street, its interaction with the driveway is positive.
Major Development Plan & Design Review - Review Criteria
§ 7.16.080(f), Development Plan
1. Evidence of substantial compliance with the purpose of the Development Code as
specified in §7.04.030, Purposes;
Staff Response: The application complies with the applicable purposes outlined in the
Development Code. Purpose (a) states, “Divide the Town into zones, restricting and requiring therein
the location, erection, construction, reconstruction, alteration and use of buildings, structures and land
for trade, industry, residence and other specified uses; regulate the intensity of the use of lot areas;
regulate and determine the area of open spaces surrounding such buildings; establish building lines and
locations of buildings designed for specified industrial, commercial, residential and other uses within
such areas; establish standards to which buildings or structures shall conform; establish standards for
use of areas adjoining such buildings or structures.”
2. Evidence of substantial compliance with §7.16.090, Design Review;
Staff Response: This Major Design and Development Plan Application should be assessed for
compliance with the Design Review criteria of the Development Code, found below. The Design
Review section seeks quality development and structures that are visually harmonious with the
site and the surrounding vicinity.
September 17, 2019 PZC Meeting – 5032 Wildridge Road East Unit B 4
3. Consistency with the Avon Comprehensive Plan;
Staff Response: The site is located in the Northern Residential District (District 11 of the
Comprehensive Plan), which states, “Due to the limited number of existing trees and shrubs and the
open character of the property, special care should be taken to ensure that all structures are compatible
with one another and in harmony with the natural surroundings.” This District includes principles that
encourage minimal alteration to the natural environment and steep slope development. The Goals and
Policies contained in the Comprehensive Plan, include, “Policy G.2.1: Identify and avoid
development in environmentally sensitive areas or steep hillsides.” PZC should carefully assess if this
application is consistent with the Comprehensive Plan.
4. Consistency with any previously approved and not revoked subdivision plat, planned
development, or any other precedent plan or land use approval for the property as
applicable;
Staff Response: The application is in conformance with the accompanying requirements of the PUD
zoning and the Development Code. Conformance with the building envelope and maximum elevation
are confirmed with the application.
5. Compliance with all applicable development and design standards set forth in this Code,
including but not limited to the provisions in Chapter 7.20, Zone Districts and
Official Zoning Map, Chapter 7.24, Use Regulations, and Chapter 7.28, Development
Standards; and
Staff Response: The analysis contained in this staff report addresses all applicable Development Code
standards.
6. That the development can be adequately served by city services including but
not limited to roads, water, wastewater, fire protection, and emergency medical
services.
Staff Response: Staff referred the proposal to the Eagle River Water and Sanitation District
(ERWSD) for compliance with the property’s’ water allocation and received no response. Staff added
the successful completion of any ERWSD requirements as a condition of approval for this application.
All special services are well established in the subdivision.
§7.16.090(f), Design Review
1. The design relates the development to the character of the surrounding community;
or, where redevelopment is anticipated, relates the development to the character of
Avon as a whole;
Staff Response: The application proposes a design that relates to the character of the surrounding
community.
2. The design meets the development and design standards established in this Development
Code; and
Staff Response: The design is compliant with the development and design standards contained in the
Development Code.
3. The design reflects the long- range goals and design criteria from the Avon
Comprehensive Plan and other applicable, adopted plan documents.
September 17, 2019 PZC Meeting – 5032 Wildridge Road East Unit B 5
Staff Response: Applicable adopted plans include the Avon Comprehensive Plan and provisions of the
Development Code. The design has been evaluated for conformance with these plans and staff has
determined the proposed design meets the requirements.
Staff Recommendation for MJR19004 Major Design & Development Plan:
Staff recommends approval of the Major Development Plan for Lot 38B Block 4 Wildridge, with the
following findings and conditions:
Findings:
1. The proposed application was reviewed pursuant to §7.16.080(f), Development Plan,
§7.16.090(f), Design Review. The design meets the development and design standards
established in the Avon Development Code;
2. The application is complete;
3. The application provides sufficient information to allow the PZC to determine that the
application complies with the relevant review criteria;
4. The application complies with the goals and policies of the Avon Comprehensive Plan;
5. The demand for public services or infrastructure exceeding current capacity is mitigated by
the application; and
6. The design relates the development to the character of the surrounding community.
Conditions:
1. An irrigation plan complying with Avon Municipal Code will be presented before a
building permit will be issued;
2. The successful completion of any Eagle River Water & Sanitation District requirements
shall be verified before a building permit will be issued;
3. The retaining wall design is required to be stamped by a licensed engineer;
4. Drainage easements are required to be presented during subdivision; and
5. Dark Sky compliant fixtures will be demonstrated to staff before a building permit will be
issued.
Motion to Approve the Application:
“I move to approve Case #MJR19004, an application for Major Design and Development Plan for
Lot 38B Block 4 Wildridge Subdivision together with the findings of fact outlined by Staff.”
Exhibits
A. Application Materials
B. Color Board
GRATE AND DRAIN PIPE
01
02
03
04
07
08
09
00
05
99
06
10
11
12
13
14
15
19
14.93
16.37
15.43
16.20
20
15.83
15.83
16.47
13.50
15.33
16
17.00
17.00
17
16.92
16.92
1820
20.20 18
15.5
15.5
15.5
15.5
14.0
14.0
12.5
11.5
9.5
9.5
8.0
3.0
19
21
22
23
24
25
212 SF
63 SF
69 SF
911 SF
SNOW STOR
A
G
E
SNOW STOR
A
G
E
STORAGE
SNOW
STORAGE
SNOW
ENTRY FLOORELEVATION 20.20
GARAGE FLOOR
ELEVATION 17.0
GARAGE FLOOR
ELEVATION 15.83 ENTRY FLOORELEVATION 15.83
MAIN FLOOR
ELEVATION 17.0
LOWER FLOOR
ELEVATION 5.0
LOWER FLOOR
ELEVATION 2.0
MAIN FLOOR
ELEVATION 14.0
CONCRETE PATIO
4.5
CONCRETEWALK
CONCRETEWALK
EXISTING ASPHALT DRIVEWAY
ASPHALT DRIVEWAY
5%120 SF
SNOW STOR
A
G
E
137 SF
SNOW STOR
A
G
E
77 SF
SNOW STOR
A
G
E
54 SF
SNOW STOR
A
G
E
EXTEND EXISTING STORM
EXISTING CULVERT
TO REMAIN
CENTERLINE OF
DRAINAGE SWALE
NEW CULVERT
NEW STONE RIP RAP
1.5
CONCRETE PATIO
DRAIN PIPEEXISTING 8" STEEL
DRAIN PIPE
EXISTING 6" DUCTILE
EXISTING WATER VALVES
NEW STONE RIP RAP
DRAIN PIPEEXTEND 6" DUCTILE
DRAIN PIPEEXISTING 2" PVC
DRAIN PIPE
EXISTING 4" PVC
DRAIN PIPE
EXTEND 2" PVC DRAINAGE AND UTILITY EASEMENTDRAINAGE AND UTILITY EASEMENTELEC
GRAVEL ROAD
GRAVEL ROAD
ROCK OUTCROP
SEWER
SEWER
TV
TV
ELECNEW DRAI
NAGE AND UTILITY EAS
MENT
NEW DRAINAGE AND UTILITY EASMENT
NEW DRAINAGE AND UTILITY EASMENT
DRAIN PIPEEXTEND 4" PVC
NEW STONE RIP RAP DRAIN PIPE
EXTEND 8" STEEL
EXISTING 48" DRAIN PIPE
VERTICALLY TO MEET
NEW GRADE
02
03
04
05
04
03
02
01
21
25
34
26
31
24
19
19
20
21
22
25
22
21
20
19
23
15
14
13
SILT F
E
N
C
E
SILT FENCELIMITS OF DISTURBANCEROCK OUTCROP
ROCK OUTCROP
20
33
24
25
26
27
28
32
29
30
34
35
26
29
31
27
35
35
24
25
32
29
30 28
33
36
37
38
17.25
ENTRY FLOOR
ELEVATION 17.50
14.71
15.50
15.80
GARAGE FLOOR
ELEVATION 15.5
14.71
15.80
15.42
15.80
GARAGE FLOORELEVATION 15.80
MAIN FLOORELEVATION 14.5
LOWER FLOOR
ELEVATION 2.5
UPPER FLOOR
ELEVATION 25.5
LOWER FLOOR
ELEVATION 1.80
MAIN FLOORELEVATION 13.80
17
18
19
25
22 22 23
23
33
34
35
27
32
25
181716
15.50
15.42
2.0
14.31
13.50
20 21
21
22
24
25
26 26
272726
26 27
28
28
29
30
3131
3232
36
37
LIMITS
O
F
D
I
S
T
U
R
B
A
N
C
E
15.25
15.50
14.96
17.05
16.75 16.95
15
ROOF - 8441.58ROOF - 8433.90CONCRETE PATIO
CONCRETE
PATIO
15.80 13.56
11.0
6.0
2.0
CONCRETE PATIO
CONCRETE
PATIO
13.26
13.0
ROOF - 8431
.
4
7
ROOF - 8432.55ROOF - 8430.63SNOW - 579SF
SNOW - 196SF
SNOW - 239SF
SNOW - 119SF
SNOW - 74SF
SNOW - 66SF
SNOW - 44SF
SNOW - 39SF SNOW - 71SF
SNOW - 40SF
SNOW - 47SF
SNOW - 48SFSNOW - 105SF
2
3
1
4
5
GAS METER
GAS METER
6
SEWERWATER
GAS
ELECTRICMETERS
12
11
10
09
08
07
02
05.67
00
96
96 00 02
06
06
91
81
02
0096
85
89
90
91
92
93
93
93
06
06
02
02
00
00
96
96
94
90
91
9187
87
87
85
85
85
81
81
102.67
102.75
14
10
SNOW - 59
S
F
SNOW - 73
S
F
SNOW - 397
S
F
SNOW - 151
S
F
SNOW
-
7
7
S
F
13.50
8.00
8.50
97.00
7.90
7.90
GARAGE FL
O
O
RELEVATION
8
4
0
8
.
0
MAIN FLO
O
RELEVATION
8
4
0
8
.
5
LOWER FLO
O
RELEVATION
8
3
9
7
.
5
UPPER FLO
O
RELEVATION
8
4
1
8
.
5
CONCRETE
P
A
T
I
O
CONCRETE
P
A
T
I
O
CONCRETE
P
A
T
I
O
ASPHALT DR
I
V
E
W
A
Y
SEWER
GAS
GAS
LI
M
I
T
S
O
F
D
I
S
T
U
R
B
A
N
C
E
SIL
T
F
E
N
C
E
LI
M
I
T
S
O
F
D
I
S
T
U
R
B
A
N
C
E
GARAGE FL
O
O
RELEVATION
8
4
0
8
.
0
MAIN FLO
O
RELEVATION
8
4
0
4
.
5
LOWER FLO
O
RELEVATION
8
3
9
2
.
5
LOWER FLO
O
RELEVATION
8
3
9
4
.
5
7.90
7.90
7.50
4.50
6.00
92.00 94.50
ASPHALT D
R
I
V
E
W
A
Y
RIDGE HEIG
H
T
-
8
4
3
5
.
1
RIDGE HEIG
H
T
-
8
4
2
5
.
7
1
2
3
RIDGE HEIG
H
T
-
8
4
2
8
.
2
Overall
Site Plan
A0.1
1" = 30'
Architectural
I S S U E S
L A N D S C A P E
A R C H I T E C T
N O T E S
DATEDESCRIPTIONNO.
A PZC Submittal 08.24.19
16-221C
July 24, 2019
ral
RAL Architects, Inc.2019C Edwards, Colorado 81632 email ~ bobbyl@ralarch.comP.O. Box 1805Phone ~ 970.376.42275032 Wildridge Rd
Wildridge PUD
S T R U C T U R A L
-
Block 4
Lot 38
Avon, CO 81620
Residence B
Attachment A
SILT FENC
E LIMITS OF DISTURBANCE17
LIMITS OF DISTU
R
B
A
N
C
E
SNOW - 239
S
F
1
GAS METER
1211
10
09
08
07
02
05.67
00
96
96
00
02 06
06
91
81
020096
85
89
90
91
92 93
93
93
06
0602
02
00
00
96
96
94
90
91 91
87
87
87
85
85
8581
81
102.67
102.75
14
10
SNOW - 59 SF
SNOW - 73 SF
SNOW - 397 SF
SNOW - 151 SF
S
N
OW
-
7
7
S
F
13.50
8.00
8.50
97.00
7.90
7.90
GARAGE FLOOR
ELEVATION 8408.0
MAIN FLOOR
ELEVATION 8408.5
LOWER FLOOR
ELEVATION 8397.5
UPPER FLOOR
ELEVATION 8418.5
CONCRETE PATIO
CONCRETE PATIO
CONCRETE PATIO
ASPHALT DRIVEWAY
GAS
GAS
LIM
I
T
S
O
F
D
I
S
T
U
R
B
A
N
C
E
SILT
F
E
N
C
E
LIM
I
T
S
O
F
D
I
S
T
U
R
B
A
N
C
E
GARAGE FLOOR
ELEVATION 8408.0
MAIN FLOOR
ELEVATION 8404.5
LOWER FLOOR
ELEVATION 8392.5
LOWER FLOOR
ELEVATION 8394.5
7.90
7.90
7.50
4.50
6.00
92.00
94.50
ASPHALT DRIVEWAY
RIDGE HEIGHT - 8435.1
RIDGE HEIGHT - 8425.7
1
2
3
RIDGE HEIGHT - 8428.2
SNOW STORAGE CALCULATION
DRIVEWAY AREA 3439 SF
REQUIRED SNOW STORAGE 688 SF
PROVIDED SNOW STORAGE 757 SF
LOT SUMMARY
LOT AREA (TOTAL)44,515 SF
LOT 38A 20,817 SF
LOT 38B 23,698 SF
BUILDING COVERAGE
LOT 38A 2,621 SF (12.6%)
LOT 38B 2,579 SF (10.9%)
TOTAL 5,200 SF (11.7%)
IMPERVIOUS COVERAGE
LOT 38A BUILDING 2,621 SF
LOT 38A PATIOS 1,052 SF
LOT 38A DRIVEWAY 2,035 SF
LOT 38A TOTAL 5,708 SF (27.4%)
LOT 38B BUILDING 2,579 SF
LOT 38B PATIOS 874 SF
LOT 38B DRIVEWAY 1,404 SF
LOT 38B TOTAL 4,857 SF (20.5%)
TOTAL 10,565 SF (23.7%)
LANDSCAPE AREA
LOT 38A 5,888 SF (28.3%) - 118 LANDSCAPE UNITS
LOT 38B 7,741 SF (32.7%) - 155 LANDSCAPE UNITS
EVERGREEN TREE
DECIDUOUS TREE
8'+ HEIGHT
SIZE
2.5" CALIPER
REVEGETATED WITH NATIVE GRASSES
ALL DISTURBED AREAS ON THE SITE NOT TO BE SODDED OR MULCHED ARE TO BE
POPULUS TREMULOIDES
MULCH PLANTING BED
SPRINKLER SYSTEM TO BE INSTALLED WITH AN AUTOMATIC RAIN SENSOR
PICEA PUNGENS
BOTANIC NAME
PLANT LIST - LOT 38A
PP
KEY
PT
TREES
COLROADO BLUE SPRUCE
COMMON NAME
QUAKING ASPEN
5
#
6
SHRUB
PLANT LEGEND
AAS AMELANCHIER ALNIFOLIA NATIVE SERVICEBERRY
SHRUBS
5 GALLON14
5 GALLONARTEMISIA TRIDENTATAATS TALL WESTERN SAGE 29
40
LANDSCAPE UNITS
42
14
29
125
BUILDING HEIGHT CALCULATION
RIDGE GRADE HEIGHT
1 8425.7 8391.0 34.7'
2 8428.2 8394.5 33.7'
3 8435.1 8401.0 34.1'
4 ---'
5 ---'
6 ---'
8'+ HEIGHT
SIZE
2.5" CALIPERPOPULUS TREMULOIDES
PICEA PUNGENS
BOTANIC NAME
PLANT LIST - LOT 38B
PP
KEY
PT
TREES
COLROADO BLUE SPRUCE
COMMON NAME
QUAKING ASPEN
7
#
9
AAS AMELANCHIER ALNIFOLIA NATIVE SERVICEBERRY
SHRUBS
5 GALLON18
5 GALLONARTEMISIA TRIDENTATAATS TALL WESTERN SAGE 18
56
LANDSCAPE UNITS
63
18
18
155
Architectural
Site Plan
A0.2
1" = 10'
I S S U E S
L A N D S C A P E
A R C H I T E C T
N O T E S
DATEDESCRIPTIONNO.
A PZC Submittal 08.24.19
16-221C
July 24, 2019
ral
RAL Architects, Inc.2019C Edwards, Colorado 81632 email ~ bobbyl@ralarch.comP.O. Box 1805Phone ~ 970.376.42275032 Wildridge Rd
Wildridge PUD
S T R U C T U R A L
-
Block 4
Lot 38
Avon, CO 81620
Residence B
Attachment A
QueenQueenQueenFLOOR AREA - 1582 SF
MECHANICAL AREA - 91 SF
LIVING ROOM
MECHANICAL
LAUNDRY
BEDROOM 3
BEDROOM 4
BEDROOM 5
BATH 3
BATH 5
PATIO
UP
WINE ROOM
BATH 4
I S S U E S
L A N D S C A P E
A R C H I T E C T
N O T E S
DATEDESCRIPTIONNO.
A PZC Submittal 08.24.19
16-221C
July 24, 2019
ral
RAL Architects, Inc.2019C Edwards, Colorado 81632 email ~ bobbyl@ralarch.comP.O. Box 1805Phone ~ 970.376.42275032 Wildridge Rd
Wildridge PUD
S T R U C T U R A L
-
Block 4
Lot 38
Avon, CO 81620
Residence B
Lower
Floor
Plan
A1.1
Attachment A
Dining Table
3'6" x 8'0"
FLOOR AREA - 1657 SF
GARAGE AREA - 922 SF
GREAT ROOM
SITTING ROOM
DINING ROOM
KITCHEN
PANTRY
PATIO
DECK
MUD ROOM
GARAGE
POWDER
ENTRY
COATS
DN
UP
CLOSET
I S S U E S
L A N D S C A P E
A R C H I T E C T
N O T E S
DATEDESCRIPTIONNO.
A PZC Submittal 08.24.19
16-221C
July 24, 2019
ral
RAL Architects, Inc.2019C Edwards, Colorado 81632 email ~ bobbyl@ralarch.comP.O. Box 1805Phone ~ 970.376.42275032 Wildridge Rd
Wildridge PUD
S T R U C T U R A L
-
Block 4
Lot 38
Avon, CO 81620
Residence B
Main
Floor
Plan
A1.2
Attachment A
KingQueenFLOOR AREA - 1018 SF
MASTER BEDROOM
MASTER
CLOSET
MASTER
BATH
BEDROOM 2
BATH 2DN
DECK
I S S U E S
L A N D S C A P E
A R C H I T E C T
N O T E S
DATEDESCRIPTIONNO.
A PZC Submittal 08.24.19
16-221C
July 24, 2019
ral
RAL Architects, Inc.2019C Edwards, Colorado 81632 email ~ bobbyl@ralarch.comP.O. Box 1805Phone ~ 970.376.42275032 Wildridge Rd
Wildridge PUD
S T R U C T U R A L
-
Block 4
Lot 38
Avon, CO 81620
Residence B
Upper
Floor
Plan
A1.3
Attachment A
3:123:126:126:126:126:126:126:126:123:12
3:12
3:122'-0"2'-0"2'-0"2'-0"
2'-0"2'-0"2'-0"2'-0"5'-0"2'-0"
2'-0"2'-0"1'-6"2'-0"1'-6"7'-0"2'-0"2'-0"2'-0"2'-0"2'-0"2'-0"CHIMNEYI S S U E S
L A N D S C A P E
A R C H I T E C T
N O T E S
DATEDESCRIPTIONNO.
A PZC Submittal 08.24.19
16-221C
July 24, 2019
ral
RAL Architects, Inc.2019C Edwards, Colorado 81632 email ~ bobbyl@ralarch.comP.O. Box 1805Phone ~ 970.376.42275032 Wildridge Rd
Wildridge PUD
S T R U C T U R A L
-
Block 4
Lot 38
Avon, CO 81620
Residence B
Roof
Plan
A1.4
Attachment A
LOWER FLOOR LEVEL
ELEVATION - 8497.5
MAIN FLOOR LEVEL
ELEVATION - 8508.5
UPPER FLOOR LEVEL
ELEVATION - 8518.5
GARAGE FLOOR LEVEL
ELEVATION - 8508.0
A
A
A
B
B
C
C
C
C
C C
D
F
F
G G
G
J J
J J
I
I
I
K
K
K
N
N
N
N
N
M
M
M
M
M
O
O
O
O
O
LOWER FLOOR LEVEL
GARAGE FLOOR LEVEL
ELEVATION - 8508.0
UPPER FLOOR LEVEL
ELEVATION - 8518.5
MAIN FLOOR LEVEL
ELEVATION - 8508.5
B
C
C
C
C
F
F
G
J J
J
K
K
K
N
M
O
O
O
EXTERIOR MATERIAL LEGEND
A ASPHALT ROOF SHINGLES
B STANDING SEAM METAL ROOFING
C 2-PIECE 2X WOOD FASCIA
D 8x14 TIMBER BEAM/OUTLOOK
E TIMBER BEAM/KING POST
F TIMBER COLUMN
G METAL RAILING
H 8x8 TIMBER BRACKET
I VERTICAL BOARD and BATTEN WOOD SIDING
J 2x6 CORNER BOARD
K 2x4 WINDOW/DOOR TRIM
L 10" TIMBER HEADER
M STUCCO
N STUCCO CONTROL JOINT
O STONE VENEER
P STONE CAP
I S S U E S
L A N D S C A P E
A R C H I T E C T
N O T E S
DATEDESCRIPTIONNO.
A PZC Submittal 08.24.19
16-221C
July 24, 2019
ral
RAL Architects, Inc.2019C Edwards, Colorado 81632 email ~ bobbyl@ralarch.comP.O. Box 1805Phone ~ 970.376.42275032 Wildridge Rd
Wildridge PUD
S T R U C T U R A L
-
Block 4
Lot 38
Avon, CO 81620
Residence B
Exterior
Building
Elevations
A2.1
Front (South) Elevation
Side (East) Elevation
Attachment A
LOWER FLOOR LEVEL
ELEVATION - 8497.5
GARAGE FLOOR LEVEL
ELEVATION - 8508.0
UPPER FLOOR LEVEL
ELEVATION - 8518.5
ENTRY FLOOR LEVEL
ELEVATION - 8508.5
A
A
B
C
C
C
C
C
F
G
JJ
J
K KN
N
I
I
I
I
M
M
M
O
M
LOWER FLOOR LEVEL
ELEVATION - 8497.5
MAIN FLOOR LEVEL
ELEVATION - 8508.5
B
C
C
C C
C
C
G
I
I
II
I
J
J
J
JJJ
K
K
L
N
N
N
M
M
M
M M
P
P
O
O
O
M
EXTERIOR MATERIAL LEGEND
A ASPHALT ROOF SHINGLES
B STANDING SEAM METAL ROOFING
C 2-PIECE 2X WOOD FASCIA
D 8x14 TIMBER BEAM/OUTLOOK
E TIMBER BEAM/KING POST
F TIMBER COLUMN
G METAL RAILING
H 8x8 TIMBER BRACKET
I VERTICAL BOARD and BATTEN WOOD SIDING
J 2x6 CORNER BOARD
K 2x4 WINDOW/DOOR TRIM
L 10" TIMBER HEADER
M STUCCO
N STUCCO CONTROL JOINT
O STONE VENEER
P STONE CAP
I S S U E S
L A N D S C A P E
A R C H I T E C T
N O T E S
DATEDESCRIPTIONNO.
A PZC Submittal 08.24.19
16-221C
July 24, 2019
ral
RAL Architects, Inc.2019C Edwards, Colorado 81632 email ~ bobbyl@ralarch.comP.O. Box 1805Phone ~ 970.376.42275032 Wildridge Rd
Wildridge PUD
S T R U C T U R A L
-
Block 4
Lot 38
Avon, CO 81620
Residence B
Exterior
Building
Elevations
A2.2
Side (West) Elevation
Rear (North) Elevation
Attachment A
METAL ROOF
STANDING SEAM CORTEN
WOOD SIDING/TRIM
SW3541 HARBOUR MIST
METAL FLASHING
CORTEN
STUCCO
SW6806 SAND DUNE
5032 WILDRIDGE ROAD, UNIT B
LOT 38B, BLOCK 4
WILDRIDGE
AVON, COLORADO
WINDOWS
SIERRA-PACIFIC - DARK BRONZE
STONE
#25W COLORADO BUFF STAINED STRIP
FASCIA/TIMBERS
SW3532 HILL COUNTRY
Attachment B
September 17, 2019 PZC Meeting – Walking Mountains Employee Housing
Staff Report – Major Development Plan
September 17, 2019 Planning and Zoning Commission Meeting
Case #MJR19005
Project type Major Development Plan
Public Hearing Required
Legal Description Lot 2A Buck Creek Subdivision
Zoning Planned Unit Development (PUD)
Address 168 Walking Mountains Lane
Prepared By David McWilliams, Town Planner
Staff Report Overview
This staff report contains one application for consideration by the PZC: Major Development Plan with
Design Review for three new proposed employee housing buildings.
Summary of Request
Brian Sipes (the Applicant) proposes three dorm-style employee housing buildings for the Walking
Mountains site on Lot 2A. The identical buildings are 2 stories, 2,452 square feet, off-center gabled
roofs, and all located east of Walking Mountains Lane. Two are roughly located perpendicular to
Walking Mountains Lane and the lower building is located roughly parallel to the road. The buildings
are wood framed and have color and architecture style that match the existing buildings within the PUD.
The application also includes parking spaces in front of the buildings and minimal landscaping.
Buildings will not have any gas appliances or heating, in an effort to move away from petrochemicals.
Solar panels are tentatively proposed, to be included at a later date. The project is phased, and Walking
Mountains has full funding for one (1) building and possibly two (2). The applicant has stated that after
planning approval, the northernmost (left, below) building will be fully built. All three foundations will
probably be laid at once as a cost cutting method. Staff has reservations about this, but the issues may
be able to be addressed at building permit through the first condition.
Public Notice
Notice of the public hearing was published in the September 6 edition of the Vail Daily in accordance
with Sec. 7.16.020(d) of the Avon Development Code. Mailed notice is not required for this application
type.
Property Description
The Buck Creek PUD is divided into 5 lots:
Lot 1A and 1B are occupied by the Joint
Public Safety building and the Medical
Office building, Lot 2A has a parking lot
and is slated for residential uses (currently
being applied for); Lot 2B has a
conservation easement; Lot 3 contains the
Walking Mountains Science Center and
accessory buildings; Lot 4 is a parking lot;
and Lot 5 has education facilities. In 2018,
a PUD amendment was approved allowing
for the Employee Housing Units proposed
September 17, 2019 PZC Meeting – Walking Mountains Employee Housing
in this application. The PUD includes some Development Standards (height, setbacks, parking, etc.), but
most of the design characteristics are subject to the Avon Municipal Code (AMC).
Planning Analysis
Allowed Use and Density: The property is zoned PUD and is permitted to have dwelling units,
employee housing, parking, schools, public assembly, and public education facilities
Lot Coverage, Setback and Easements: The proposed buildings comply with the property setbacks
and easements (Attachment B, A0.1). The development seeks to preserve a stand of trees north and east
of the buildings.
Building Height: The maximum building height permitted for this property is 45 feet. Staff did not
require an exact calculation and estimates the buildings to be roughly 25 feet tall.
Parking: The PUD speaks to clustering parking (located north of the dorms, 40 spaces) off-site.
Compliant parking will be built on site, including one handicap van space. The PUD requires one (1)
space per dwelling unit under 2,500 square feet and 2 spaces for multi-family guests. Snow storage
locations are missing on the site plan and their inclusion before building permit is a suggested condition
of approval to the application.
Design Standards Analysis
Landscaping: The buildings are proposed to be minimally landscaped. The lot is covered with
cottonwoods and has a riparian area behind the units. A few trees need to be removed for safety and for
the building footprints (Attachment B, A0.2). Staff suggests a condition to verify that no nesting birds
occupy the trees before removing them. All disturbed areas are proposed to be seeded with native
grasses. Staff did not require a landscape unit calculation because the site would surely exceed any
requirements due to the number of mature trees preserved. While the landscape plan lacks a completed
Planting Plan (with hydrozones, Landscape Unit count, landscape area coverage calculation, and
irrigation plan) staff is hesitant to require the elements due to the existing site conditions and proposed
minimal landscaping of sprayed native grasses. Staff suggests an approved site disturbance line be
verified by staff before a building permit will be issued.
A pedestrian pathway is proposed to connect the site to the parking lot and the rest of the campus. Will
either be crusher fines or concrete at grade with the adjacent grade similar to the path that connects the
parking lot to the rest of the campus.
Building Design, Building Materials and Colors: The primary exterior building materials are wood
siding and metal siding on the front near the entrance porch. Colors compliment the colors of adjacent
buildings and were reviewed for conformance with Sec. 7.28.090(j)(4)(viii), Building Materials, and
determined to comply with the design standards. All materials are of high quality and compliment
Avon’s built landscape.
Roof Material and Pitch: The roof material and pitch were reviewed for compliance with Sec.
7.28.090(d)(3) Roofs. The applicant is proposing a 9:12 and 4:12 gabled roof pitch, with a 3:12 metal
shed roof above a porch that gables on either end of the buildings. According to Sec. 7.28.090(j)(4)(v)(c),
roofs are required to, “break the linear aspects of building with architectural features, such as…
variations in roof form and parapet height,”. PZC should carefully assess whether the application
satisfies this requirement, especially given the repetitive nature of the identical design.
September 17, 2019 PZC Meeting – Walking Mountains Employee Housing
Exterior Lighting: The only lighting presented is walkway bollards of a style already approved by
PZC. Staff suggests a condition for any additional lighting to be reviewed by staff before building
permit.
Major Development Plan & Design Review - Review Criteria
§ 7.16.080(f), Development Plan
1. Evidence of substantial compliance with the purpose of the Development Code as
specified in §7.04.030, Purposes;
Staff Response: The Application complies with the applicable purposes outlined in the Development
Code. It particularly addresses Purpose (f), which states, “Provide a planned and orderly use of land,
protection of the environment and preservation of viability, all to conserve the value of the investments
of the people of the Avon community and encourage a high quality of life and the most appropriate use
of land throughout the municipality.”
Purpose (l) states, “Promote architectural design which is compatible, functional, practical and
complimentary checking to Avon's sub-alpine environment.” PZC should carefully weigh whether the
repeated design suitably matches the Walking Mountains’ campus aesthetic, and that of the town as a
whole.
2. Evidence of substantial compliance with §7.16.090, Design Review;
Staff Response: This Major Design and Development Plan Application should be assessed for
compliance with the Design Review criteria of the Development Code, fund below. The Design Review
section seeks quality development and structures that are visually harmonious with their site and
surrounding vicinity. Conformance with this code section is discussed below and in Staff Analysis.
3. Consistency with the Avon Comprehensive Plan;
Staff Response: The site is in the Gulch Area District (District 6 of the Comprehensive Plan). This
district includes principles that encourage development to reflect the standards of Town Center, limit
building heights to be compatible with landforms and surrounding development and reduces
development intensity when traveling north on Buck Creek road.
This Application is also consistent with the Goals and Policies section, including the following:
Policy C.1.2: Ensure compatible architectural features between adjacent buildings.
Policy C.3.2: Support and promote cultural activities such as theater, concerts in the park, school
activities, festivals and special events.
Policy D.3.2: Capitalize on recreational and cultural assets and heritage. Facilitate the creation of new
cultural and recreational attractions.
4. Consistency with any previously approved and not revoked subdivision plat, planned
development, or any other precedent plan or land use approval for the property as
applicable;
Staff Response: The application is in conformance with the accompanying requirements of the PUD
zoning and the Development Code.
5. Compliance with all applicable development and design standards set forth in this
Code, including but not limited to the provisions in Chapter 7.20, Zone Districts and
Official Zoning Map, Chapter 7.24, Use Regulations, and Chapter 7.28, Development
September 17, 2019 PZC Meeting – Walking Mountains Employee Housing
Standards; and
Staff Response: The analysis contained in this staff report addresses all applicable Development Code
standards.
6. That the development can be adequately served by city services including but not
limited to roads, water, wastewater, fire protection, and emergency medical services.
Staff Response: Staff sent the proposed development is to the Eagle River Water and Sanitation District
for review of the property’s’ water allocation and sewer placement under Buck Creek. No response has
been heard. The sewer must cross the creek and may require a 401 Permit under the Clean Water Act,
before building approval. Staff suggests that these confirmations are reviewed before a building permit
is issued. The proposal can be served by all other Town and special district services.
§7.16.090(f), Design Review
1. The design relates the development to the character of the surrounding community; or,
where redevelopment is anticipated, relates the development to the character of Avon
as a whole;
Staff Response: The Application proposes a design that relates to the character of the surrounding
community and the campus atmosphere of the Walking Mountains Science School.
2. The design meets the development and design standards established in this Development
Code; and
Staff Response: The design is either compliant with the development and design standards contained
in the Development Code.
3. The design reflects the long-range goals and design criteria from the Avon
Comprehensive Plan and other applicable, adopted plan documents.
Staff Response: Applicable adopted plans include the Avon Comprehensive Plan and provisions of the
Development Code. The design has been evaluated for conformance with these plans and staff has
determined the proposed design meets the requirements as proposed.
Staff Recommendation for MJR19005 Major Design & Development Plan:
Staff recommends approving the Major Development Plan application for Lot 3 Buck Creek Subdivision
with the following findings and conditions:
Findings:
1. The application is complete;
2. The application provides sufficient information to allow the PZC to determine that the
application complies with the relevant review criteria;
3. The proposed application was reviewed pursuant to §7.16.080(f), Development Plan,
§7.16.090(f), Design Review. The design meets the development and design standards
established in the Avon Development Code;
4. The application complies with the goals and policies of the Avon Comprehensive Plan;
5. No extra demand for public services is made by the application; and
6. The design relates the development to the character of the surrounding community.
Conditions:
1. The applicant will demonstrate that any foundation poured will be properly frost protected
during the winter months;
September 17, 2019 PZC Meeting – Walking Mountains Employee Housing
2. Snow storage shall be shown for the parking areas;
3. Verify that no nesting birds occupy the trees before removing them;
4. A site disturbance line shall be approved by staff prior to issuance of a building permit;
5. Exterior lighting shall be approved by staff before a building permit is issued; and
6. Sewer and Fire review as outlined in the staff report shall be completed before a building
permit will be issued.
Recommended Motion:
“I move to approve Case #MJR19005, an application for Major Design and Development Plan for
Lot 2A Buck Creek Subdivision together with the findings and conditions recommended by staff.”
Exhibits
A. Application Materials
B. Design & Development Plans
Page 1 of 2
3 September 2019
Planning and Zoning Commission
And Planning Director
Town of Avon
75 South Frontage Road
Vail, Colorado 81657
RE: Walking Mountains Science Center Employee Housing – Major Development Plan Narrative
Dear planning commissioners and director,
We are submitting for approval the attached major development plan application for employee housing
units on lot 2A of the Walking Mountains Campus pursuant to the Amended Buck Creek PUD.
Walking Mountains has long wished to house longer term staff on campus. Plans for housing were part of
the approval for the original campus in the location where the Borgen Precourt Sustainability Center now
resides. The new proposed housing will be located near the entrance of the campus and within closer
walking distance to the town of Avon.
The project is proposed to be built in phases as donations permit. Currently funds existing to build one
building and possibly 2. The units are of simple massing and utilize the same materials as existing campus
buildings to promote a unified campus theme. The massing is meant to recall the shape of the Mountain
Discovery Center and the rhythm of the roofs at the original campus.
Each unit will house 6 bedrooms each with their own bathroom along with generous common spaces and
storage tailored to the lifestyle of the graduate students that these units will house. When fully built out,
this project will provide living space for 18 employees and allow expansion of the graduate fellowship
program.
On August 16th we attended a pre-application conference with town planning staff and discussed the type
of application, schedule, and requested submittal information. We agreed that the material board could
consist of images of the existing campus materials we wished to match. After the meeting we adjusted the
porch roof pitch to meet the 3:12 town standard.
Specific findings related to the town and amended Buck Creek PUD development standards:
• Lot 2A is 2.3 acres (100,318.8 sf) and includes wetlands and significant mature riparian
vegetation. The main parking lot for the campus is also on this lot as is the existing access road.
• The developable area is 50,463.2 sf after the removal of wetlands, road and sewer easements and
setbacks from the lot area. We are proposing only 4,906.8 sf of building site coverage which is
9.7% of the developable area.
• The project is the appropriate density and scale for the site. Although one additional building could
be built on the site, it would require the removal of many of the existing trees including all of those
currently between the open meadow and existing parking lot. We propose three buildings that are
sited to work with the existing tree canopy and minimize the loss of trees.
• 2 of the oldest trees existing show signs of distress and rotten heartwood and one is leaning
toward the proposed development. These and a small pod of medium aged trees are all that we
believe will be removed to accommodate this development.
Attachment A
Page 2 of 2
• The amended PUD requires 1 parking space per unit for residential units less than 2,500 sf. Our
units are 2,452.1 gsf therefore our three units require only 3 parking spaces. However we are
proposing 6 parking spaces for practicality.
• The landscaping proposed will be as natural as possible with the goal to return the site as close to
its meadow state as possible. The existing meadows at the campus are important wildlife habitat
unique from the forested areas and therefore new trees are not suggested by the naturalists.
• The disturbed cottonwood trees will be monitored by an arborist who has already evaluated the
site and the proposed site plan. Planting new cottonwood trees is not advised because the existing
grove is linked via the existing root system and consists of 3-5 family units. Because they are not
connected at the roots, new introduced trees will compete with the existing families and will cause
unnecessary stress to the grove. Left alone the existing grove will grow where the habitat best
allows. This approach and method is scientifically grounded and supported by the mission of the
science center to work with nature.
• Exterior building materials will match existing campus materials including the wood siding, metal
standing seam roofing and corrugated metal wall panels. Window cladding will match the original
campus dark bronze with infill stucco accents of the same color.
• Building height is significantly lower than the PUD allows. The PUD allows 45’ and we are
proposing buildings less than 30’ in height. The dimension provided on sheet A4.1 is taken at the
worst downhill point to the highest point on the ridge and is more conservative than the town
calculation method yet we are still under the allowable building height by more than 15’.
We hope that you will agree that these buildings serve an important need for Walking Mountains and they
have been designed to be of an appropriate scale and with a sensitivity to their natural surroundings. We
are excited to present them to you for consideration and to break ground this fall!
Thank you!
Sincerely,
Brian Sipes, AIA, LEED AP
Sipes Architects
Attachment A
Attachment B
Attachment B
Attachment B
Attachment B
Attachment B
Attachment B
Attachment B
TRACT BB
10.00'BUCK
C
R
E
EK
BUCK
C
R
E
EK10.00'BUCK
C
R
E
EKWWWWWWW
W
W
W
WWWWEXISTINGPOLELIGHT, TYP.EXISTINGPOLELIGHT, TYP.18023C-0EXISTING SITE CONDITIONS PLAN0 08.30.19 ISSUED PLANNING REVIEWTOWN OF AVON, CONO.ISSUEPROJECT:JOB NO.SHEET NO.JURISDICTION:NOTES:1. TOPOGRAPHY AND PROPERTY LINES SHOWN ARE BASED ONTOPOGRAPHIC AND PLAT SURVEY PREPARED BY KIPP LANDSURVEYING. REFERECE PLAT SURVEY DATED 12.20.16.2. PARKING LOT SHOWN IS BASED ON CONSTRUCTION DRAWINGSPREPARED BY KERRIGAN ENGINEERING, INC. DATED 4.09.2018.3. REFERENCE BUCK CREEK PUD DEVELOPMENT PLAN, AMENDMENTNO. 2 FOR DEVELOPMENT REGULATIONS FOR LOT 2A.1 inch = ft.( IN FEET )GRAPHIC SCALE03030301560BUCK CREEK P.U.D. LOT 2AWALKING MOUNTAINSRESIDENTIAL UNITSBUCK CREEKBUCK CREEKSEWER EASEMENTSEWER EASEMENTWETLANDSBOUNDARY COTTON WOOD TREECANOPY LIMITPROPERTY
L
IN
ESTREAM SETBACKSTORM-WTRPONDPROPERTY LINEPROPERTY LINEPROPERTY LINEACCESS EASEMENTDRAINAGEEASEMENT
EXISTINGPARKING LOTPROPERTY LINE
PRO
P
ERTY
L
IN
ESTREAM SETBACKSTREAM SETBACKSTREAM SETBACKAttachment B
TRACT BBL=123.444,R=693.820
EXISTINGPOLELIGHT, TYP.EXISTINGPOLELIGHT, TYP.+TW 80522:15%ELELELELELK-1151-GLABANCROFTBATHSACRYLIC
K-1151-GLABANCROFTBATHSACRYLIC ELELELELELK-1151-GLABANCROFTBATHSACRYLIC
K-1151-GLABANCROFTBATHSACRYLIC
K-1151-GLABANCROFTBATHSACRYLIC
K-1151-GLABANCROFTBATHSACRYLIC
NO.ISSUEPROJECT:JOB NO.SHEET NO.JURISDICTION:1 inch = ft.( IN FEET )GRAPHIC SCALE03030301560C-1OVERALL SITE LAYOUTTOWN OF AVON, COBUCK CREEK P.U.D. LOT 2AWALKING MOUNTAINSRESIDENTIAL UNITS180230 8.30.19 ISSUED FOR PLANNING REVIEWEXISTINGPARKING LOTWETLANDSBOUNDARYDRAINAGE EASEMENTBUCK CREEK RO
A
D
SEWER EASEMENTCOTTON WOOD TREE CANOPY LIMITBLDG 1BLDG 2BLDG 3PROPERTY LINEPROPERTY LINEPROPERTY
L
INE
PROPERTY LINESTORM-WTRPONDSTREAM SETBACKPROPERTY LINEP
RO
P
E
R
T
Y
L
I
N
EBUCK CREEKBUCK CREEKPROPERTY LINEPROPERTY L
INE
PROPERTY LINELOT 2A BUCKCREEK PUDNOTES:1. TOPOGRAPHY AND PROPERTY LINES SHOWN ARE BASED ON TOPOGRAPHIC AND PLATSURVEY PREPARED BY KIPP LAND SURVEYING. REFERECE PLAT SURVEY DATED 12.20.16.2. PARKING LOT SHOWN IS BASED ON CONSTRUCTION DRAWINGS PREPARED BY KERRIGANENGINEERING, INC. DATED 4.09.2018.3. REFERENCE BUCK CREEK PUD DEVELOPMENT PLAN, AMENDMENT NO. 2 FORDEVELOPMENT REGULATIONS FOR LOT 2A4. PROPOSED SIDEWALK PATHS SHALL BE 4' WIDE MINIMUM. THE ACCESSIBLE PATH TOBUILDING 1 SHALL BE CONSTRUCTED IN ACCORDANCE WITH ADA STANDARDS. THEACCESSIBLE ROUTE SURFACE SHALL BE PAVED PER LANDSCAPE PLAN REQUIREMENTS.5. DRAINAGE SWALES THROUGH BUILDING SITE SHALL BE ROUTED THROUGH VEGETATEDSWALES PRIOR TO DISCHARGE TO CREEK. DRAINAGE FROM THE PARKING AREAS ISINTENDED TO DRAIN TO THE EXISTING STORM WATER POND AT THE LOW END OF THE SITE.6. THE CREEK SHALL BE PROTECTED FROM DIRECT STORM WATER RUNOFF DURINGCONSTRUCTION AND PRIOR TO DEVELOPING MATURE LANDSCAPE BY UTILIZING BESTMANAGEMENT INCLUDING SILT FENCE AND STRAW BALE BARRIERS, AND STORM INLETWADDLES.SEWER EASEMENTWA
L
K
I
NG
MO
U
N
T
A
I
N
S
L
A
N
E
LOT 2B BUCKCREEK PUDAttachment B
N81° 40' 18"E45.03' (P)N5
2
°
2
1
'
1
3
"
E
1
3
0
.
5
6
'
(
P
)N73° 50' 48"E56.47' (P)N81° 40' 18"E45.03' (P)N5
2
°
2
1
'
1
3
"
E
1
3
0
.
5
6
'
(
P
)N73° 50' 48"E56.47' (P)WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWEXISTING POLE LIGHT, TYP.7531753075327531753075287529+
3
0
.
0EXIST. STORMWATER POND7527BLDG No. 1BLDG No. 2T.O.PLYWD EL 7528.0'ELELELELELELELELELELELELELELELELPAVED PATHPAVED PATH
STREET CUT28.0+752675257524+22.04" SEWER SERVICE, GRAVITY DRAIN @ 2.0%7522+24.075267525752424.3+inv. 7520.0inv. 7519',APPROX.K-1151-GLABANCROFTBATHSACRYLIC
K-1151-GLABANCROFTBATHSACRYLIC ELELELELELELELELELELELELELELELELELBLDG No. 3T.O.PLYWD EL 7524.3'25.5+7523+25.0753375327527+27.032.5+(2)1.25" WATERSERVICE TAPsSTREET CUTK-1151-GLABANCROFTBATHSACRYLIC
K-1151-GLABANCROFTBATHSACRYLIC
K-1151-GLABANCROFTBATHSACRYLIC K-1151-GLABANCROFTBATHSACRYLIC
753334.0++32.3+32.432.5+752975303
0
.
0
++27.3+27.4752818.0+26.0+26.5+1.25" WATERSERVICE TAP+24.27525
4" SEWER SERVICE, GRAVITY DRAIN @ 2.0%4" SEWER SERVICE, GRAVITY DRAIN @ 2.0%el
e
c
t
&
d
a
t
a
s
e
r
v
i
c
e
swaleT.O.PLYWD EL 7532.5'EXIST. MOUNTABLE CURB TO REMAINBLDG STRUCT LIMIT
B
L
D
G
S
T
R
U
C
T
L
I
M
I
T 75347533+31.6 RIM32.8++31.8+31.58+31.48
+
3
1
.
1
2
+
3
1
.
2
2
+
3
1
.
4
4ACCESS ROU
TE 2% MAX.BLDG STRUCT LIMIT BLDG STRUCT LIMIT
NO.ISSUEPROJECT:JOB NO.SHEET NO.JURISDICTION:1 inch = ft.( IN FEET )GRAPHIC SCALE0101010520C-2SITE GRADING DRAINAGE AND UTILITIES PLANTOWN OF AVON, COBUCK CREEK P.U.D. LOT 2AWALKING MOUNTAINSRESIDENTIAL UNITS180230 8.30.19 ISSUED FOR PLANNING REVIEWWALKING MOUNTAINS LANE
PARKING LOTSTREAM SETBACKWETLANDS BOUNDARYLOT LINEDRAINAGE EASEMENTBUCK CREEK ROAD
SEWER EASEMENTCOTTON WOODTREE CANOPY LIMITEXIST. SEWER MAINBUCK CREEKNOTES:1. THE BUILDING STRUCTURE LIMIT LINE IS ESTABLISHED FROM ACOMBINATION OF STREAM SETBACK, SEWER EASEMENT, WETLANDS BOUNDARY ANDDRIVEWAY EASEMENT.Attachment B
September 17, 2019 PZC Meeting - Nottingham Park Fitness Court Fence Page | 1
Staff Report
Case #MNR19026 Nottingham Park Fitness Court Fence
September 17, 2019 Planning & Zoning Commission
Project type Minor Development Plan
Address Nottingham Park
Location
Prepared By
Tract G, Block 2, Benchmark at Beaver Creek Subdivision
David McWilliams, Town Planner
Staff Report Overview
This staff report contains analysis of the fence and landscaping design around the new fitness court
for consideration by the PZC.
Background and Summary
The addition of a fitness court in Nottingham Park has led to issues of unaccompanied minors
using the structure as a play area. To segregate the court from the rest of the park, staff is proposing
a new split rail fence be placed around the area, with a gate at the current sidewalk entrance. The
fence will be a rough-cut wood two rail split rail around the concrete pad, and the gate will be a
crisscrossed wooden gate with a latch. Shrubs (varieties listed in attachment A, page 3) are
proposed to surround the fence in order to minimize visual impact of the project and fitness court.
Sketch of the completed project.
The fitness court was installed after the Recreation Department was awarded a grant for the project.
Staff presented the project to Town Council and received permission for its placement in its current
location. Since, issues of horseplay and dangerous behavior have occurred. The solution presented
is not intended to remove all issues, but to be a positive act for which a user must open a signed
gate in order to gain access to the space.
September 17, 2019 PZC Meeting - Nottingham Park Fitness Court Fence Page | 2
Process
In compliance with Section
#7.12.040, the Planning and Zoning
Commission shall conduct a public
hearing prior to acting on this
design review application. The
final decision rests with PZC.
Planning Analysis
The fence design should be
analyzed according to Avon
Municipal Code section
7.28.080(2), which reads, in part:
(i) Compatibility. Walls
and fences shall be
architecturally
compatible with the style, materials and colors of the principal buildings on the same
lot. If used along collector or arterial streets, such features shall be made visually
interesting by integrating architectural elements, such as brick or stone columns,
varying the alignment or setback of the fence, softening the appearance of fence lines
with plantings or through similar techniques. A fence or wall may not consist of a solid,
unbroken expanse length of more than fifty (50) feet.
(ii) Materials:
A. Stone walls or brick walls with a stone or cast stone cap, treated wood fences,
decorative metal, cast iron fences, stucco walls and stone piers are encouraged.
Solid walls and fences are permitted only in rear and side yards. Retaining walls
are permitted where required for grading purposes. Hedges may be used in the
same manner and for the same purposes as a fence or wall.
B. Fences used in front yards shall be at least fifty percent (50%) open. Allowable
fences are split rail, wrought iron, picket or other standards residential fences of
a similar nature approved by the Director.
C. Solid fences shall be constructed to meet the wind design criteria of the adopted
International Building Code, using a basic wind speed of ninety (90) miles per
hour.
D. Other materials may be incorporated in fences and walls and may be approved
by the Director.
(iv) Height Limitations.
A. No more than forty-two (42) inches high between the front building line and the
front property line. For corner lots, front yard fence regulations shall apply to
both street sides of lot.
B. No more than forty-two (42) inches high if located on a side yard line in the
front yard, except if required for demonstrated unique security purposes.
C. No more than five (5) feet high for an opaque privacy fence located on a rear
property line or on a side yard line in the rear yard.
September 17, 2019 PZC Meeting - Nottingham Park Fitness Court Fence Page | 3
D. No more than six (6) feet high for opaque privacy fences that are located directly
adjacent to and integrated with the architecture of the house or connected to a
courtyard.
Staff Response: The proposed fence will
be visually unobtrusive due to its design
and surrounding shrubs. The park has
several examples of split rail fences, and
the aesthetic is compatible with the park
use. The unique security issues of the area
require such a fence. The fence would be
at least 50% “open” by definition as a split
rail design and not more than forty-two
inches in height, in compliance with the
height limitations.
Planning Commission Review Criteria
The Planning and Zoning Commission shall consider the following items in reviewing proposed
designs:
(1) Evidence of substantial compliance with the purpose of the Development Code
as specified in Section 7.04.030, Purposes;
Staff Response: The design reinforces an orderly use of land within the Park; the style is
complimentary to Avon’s sub-alpine environment. The design promotes the health, safety,
and welfare of Park users, and the materials are of high quality.
(2) Evidence of substantial compliance with Section 7.16.090, Design review;
Staff Response: Responses to the Design Review Criteria is below.
(3) Consistency with the Avon Comprehensive Plan;
Staff Response: The design does not explicitly meet any goals of the Comprehensive Plan or
Master Plan for Harry A. Nottingham Park but screens and protects an established use within
the park, which are generally supported by the plans.
(4) Consistency with any previously approved and not revoked subdivision plat,
planned development or any other precedent plan or land use approval for the
property as applicable;
Staff Response: The plan is consistent with all land use approvals.
(5) Compliance with all applicable development and design standards set forth in
this Code, including but not limited to the provisions in Chapter 7.20, Zone
Districts and Official Zoning Map, Chapter 7.24, Use Regulations and Chapter
7.28, Development Standards; and
Staff Response: As noted, the design is compliant to all applicable development and design
standards.
September 17, 2019 PZC Meeting - Nottingham Park Fitness Court Fence Page | 4
(6) That the development can be adequately served by city services, including but
not limited to roads, water, wastewater, fire protection and emergency medical
services.
Staff Response: The fence does not require any additional services.
7.16.090(f) Review Criteria.
The PZC and shall apply the following review criteria for the basis of recommendations and
decisions on design review:
(1) The design relates the development to the character of the surrounding community;
or, where redevelopment is anticipated, relates the development to the character of
Avon as a whole;
(2) The design meets the development and design standards established in this
Development Code; and
(3) The design reflects the long range goals and design criteria from the Avon
Comprehensive Plan and other applicable, adopted plan documents.
Staff Response:
The design relates to the character of the campus and the community, meets the development
standards of the code, and reflects the goals of the Avon Comprehensive Plan, and staff suggests
approval of the application.
Recommended Motion:
“I move to approve Case #MNR19026, an application for a fence around the fit court at
Nottingham Park, Tract G, Block 2, Benchmark at Beaver Creek Subdivision, with the findings
listed in Staff’s report.”
Recommended Findings:
1. The application is complete;
2. The application provides sufficient information to allow the PZC to determine that the
application complies with the relevant review criteria;
3. The proposed application was reviewed pursuant to §7.16.080(f), Development Plan,
§7.16.090(f), Design Review. The design meets the development and design standards
established in the Avon Development Code;
4. The application complies with the goals and policies of the Avon Comprehensive Plan;
5. No extra demand for public services is made by the application; and
6. The design relates the development to the character of the surrounding community.
Attachments:
A. Design Memo and follow-up email
Attachment A, 1
TO: Eric Heil, Town Manager CC: Gary Padilla, Justin Hildreth, John Curutchet
FROM: Lance J. Richards, Director, Human Resources
RE: Risk Management for the Fitness Court
DATE: August 16, 2019
SUMMARY:
The Fitness Court which was recently completed has proven to be a very attractive play area for children.
Unfortunately, the design of the Fitness Court makes it potentially dangerous for small children to be
playing there. At several concerts this Summer, we have found unattended children playing on the
equipment, and engaging in potentially dangerous actions. In some cases, I’ve actually witnessed parents
dropping off kids at the Fitness Court and telling them to “just play here.”
For those events, we have ended up closing the Court for the evening, wrapping it in Police tape.
During our recent CIRSA walking audit, the Auditor said that we must get a fence of some sort around it, as
well as signage. Appropriate signage has already been ordered and received.
ANALYSIS:
The Fitness Court cannot be moved further away from the playground, so we must create some mitigation
to our risks with this. This mitigation must ensure that appropriate use continues unimpeded, but that
children are not “dropped off” in the area by parents. Signage will be an important component of reducing
the Town’s risk exposure.
FINANCIAL CONSIDERATIONS:
The already received signs cost $270. Split rail fence estimates online suggest an installed cost of $4000-
5000. Shrubs around the perimeter will likely cost another $1000. Finally, it will be necessary to relocate
components of our existing irrigation system. It is likely that Public Works can complete this work fully in-
house.
RECOMMENDATION:
As of this writing, we have surrounded the Fitness Court with bike-rack barriers, and signs have been tie-
wrapped to the barriers on all three sides.
I recommend that we plan and install a split rail fence (sample pictures attached) around the three sides of
the Fitness Court, with a gate where the concrete entrance path is. We should place our new signs on the
two non-gated sides, and the third sign directly on the gate.
I also recommend, in the interim, that we continue to monitor the Fitness Court during Nottingham events,
and be ready to close it if parents refuse to parent.
Attachment A, 2
Split rail fence; rails will be rough-hewn. A rough hewn fence would look like this:
Entrance gate for Fitness Court
Attachment A, 3
Email Correspondence from Staff:
Drew and Joe,
Thanks for your time today discussing shrubbery for the fence around the fitness court. I wanted to verify the
information we discussed.
You indicated your five recommendations were (not in any order):
• Purple Pillar Rose of Sharon Hibiscus (hibiscus syriacus)
• Seven Son Flower (heptacodium miconicides)
• Cornelian Cherry Dogwood (cornus mas)
• Coralburst Crabapple (malus coralburst)
• Adirondack Crabapple (malus Adirondack)
Your criteria for these were:
• Indigenous to Colorado
• Hearty enough to endure both summer drought conditions, as well as heavy snow accumulations
• Will thrive in both shade and sun, as parts of the fitness court get both
• Strong enough to endure the heavy pruning necessary to maintain them at or below fence line
• Will tolerate a mulch bed and irrigation-source water
• Will be aesthetically pleasing throughout its’ seasonal cycles
Lance J. Richards, SPHR, IPMA-SCP, SHRM-SCP, GPHR, SPHRi
Director, Human Resources and Risk Management
Town of Avon
970.748.4005 (D) | 970.471.6621 (M)
@lancejrichards
www.avon.org