L5 BC MJR18003 AEC18004 WM BuildingPLANNING AND ZONING COMMISSION
FINDINGS OF FACT AND RECORD OF DECISION Avon
COLO X00
DATE OF DECISION: April 3, 2018
TYPE OF APPLICATION: Major Development Plan & Alternative Equivalent Compliance
PROPERTY LOCATION: Lot 2A, 2B, 3 and 5 Buck Creek
FILE NUMBER: #MJR18003 and #AEC18004
APPLICANT: Stephanie Lord -Johnson
CASE #MJR18003
This Record of Decision is made in accordance with the Avon Development Code
("Development Code") §7.16.080(c):
DECISION: Approval of the development plan with the following findings and conditions:
FINDINGS:
1. The development application is complete.
2. The development application provides sufficient information to allow the reviewing
authority to determine that the development application complies with the relevant
review criteria.
3. The development application complies with the goals and policies of the Avon
Comprehensive Plan.
4. The demand for public services or infrastructure exceeding current capacity is
mitigated by the development application.
S. The proposed application was reviewed pursuant to §7.16.080(0, Development
Plan, §7.16.090(f), Design Review. The design meets the development and design
standards established in the Avon Development Code.
6. The design relates the development to the character of the surrounding community.
7. The design reflects the long-range goals of the Avon Comprehensive Plan.
CONDITIONS:
1. The site plan shall be updated showing the pedestrian path at lower parking lot.
2. Snow storage shall be shown for all parking areas.
3. The missing landscaping elements elaborated in the staff report and by the PZC shall
be presented to PZC prior to issuance of the building permit; additional landscape
elements to include:
a. Rockery vs. wall
b. Rain gardens
c. Bioswales
d. Crevasse garden
e. Porous pavement
4. ERSWD and Fire review shall be completed before a building permit will be issued.
5. The pedestrian path between the parking lot and the upper campus is required to
be completed before a TCO is issued for the building.
PZC Record of Decision: #MJR18003 & AEC18004 Page 1 of 2
6. The path between the parking area and Walking Mountains Lane will be
constructed within 2 years of CO issuance.
7. Retaining wall under south stairway will include treatment (i.e. mural or vertical
metal siding)- to be approved by staff.
8. Stairs on north side of building be curvilinear in one steady arch.
CASE #AEC18004
This Record of Decision is made in accordance with the Avon Development Code
("Development Code") §7.16.120(b):
DECISION: Approval of the development plan with the following findings and conditions:
FINDINGS:
1. The development application is complete.
2. The development application provides sufficient information to allow the reviewing
authority to determine that the development application complies with the relevant
review criteria.
3. The development application complies with the goals and policies of the Avon
Comprehensive Plan.
4. The demand for public services or infrastructure exceeding current capacity is
mitigated by the development application.
5. The proposed application was reviewed pursuant to §7.16.080(0, Development
Plan, §7.16.090(f), Design Review, and §7.16.120 Alternative Equivalent
Compliance.
6. The AEC results in benefits to the community that is equivalent to or better than
compliance with the subject standard.
7. The AEC and resultant roof forms result in less impact on adjacent properties than
would occur through compliance with the specific requirements of the Code by
limiting projecting roof forms.
CONDITION:
1. The solar panels on the roofs are required to be installed before a TCO is issued for
the building.
THESE FINDIONIGS OF FACT AND RECORD OF DECISION ARE HEREBY APPROVED:
BY: DATE:
C Cha on
PZC Record of Decision: #MJR18003 & AEC18004 Page 2 of 2