This application is for final design approval for Building I of Lot 4, Nottingham Station
Subdivision. Buildings A -H have already received final design review approval. The amended
Nottingham Station PUD was approved by P&Z and Council in 1996. Building I is the last
phase of the Canyon Run project. It includes eight units and a 2 car garage. The building design
has been slightly revised to have garden level type units rather than full walk -outs on the lower
level.
Design Review Considerations
According to the Commission's Procedures, Rules & Regulations, Section 6. 10, the Commission
shall consider the following items in reviewing the design of this project:
1. Conformance with the Zoning Code and other applicable regulations of the Town.
The PUD establishes the zoning requirements including height, setbacks, building placement,
landscaping and open space requirements for the property. The building appears to generally
be in conformance with the approved PUD. The building height falls within the 49 feet
maximum allowed by the PUD. The eastern building envelope distance needs to be revised
to match the PUD. All bearings and distances need to be provided and match the PUD
building envelope. The plan needs to show the phasing line for the landscape improvements.
The slopes on the east side of the building exceed 2:1.
2. The suitability of the improvement, including type and quality of materials of which it is to be
constructed and the site upon which it is to be located.
The buildings have been designed as part of the overall PUD. The buildings use the same
materials, stucco and wood siding, and asphalt shingles to complement the other buildings
on-site.
3. The compatibility of the design to minimize site impacts to adjacent properties.
The building design complements the other buildings on site and was originally planned as
part of the overall PUD including Lot 3 to the north. The site will be compatible with
adjacent properties. The adjacent property owner to the east has expressed a concern
Town of Avon Community Development aMnsbi.doc
PO Box 975, Avon, CO 8162
(970)949-4280 Fax 949-9139 Fax modem 949-4279
Building I, Lot 4, Nottingham Station Subdivision, Final Design Review, page 2
July 1, 1997 Planning & Zoning Commission meeting
regarding the fishing access trail, which is shown on the original plans dead ending into his
property. The applicants have agreed to provide a stairway to the east of Building I that
would route the trail back up to the bike trail adjacent to Hurd Lane. It is staff's
understanding that the neighbor, Maurie Nottingham, has agreed to dedicate an easement, if
necessary for the construction of the stairway. The applicant should also provide signs
indicating the trail location and routing trail users away from Mr. Nottingham's property. A
formal easement dedication will be necessary for the stairway construction on Mr.
Nottingham's property.
4. The compatibility of the proposed improvements with site topography.
The revised building requires minimal grading and is compatible with the site topography.
5. The visual appearance of any proposed improvement as viewed from adjacent and neighboring
properties and public ways.
The site will be landscaped as approved with the original PUD. The buildings present an
attractive appearance from the road.
6. The objective that no improvement be so similar or dissimilar to others in the vicinity that
values, monetary or aesthetic will be impaired.
The buildings use the same building materials with slightly different roof lines and siding
patterns to complement the buildings already approved within the PUD.
7. The general conformance of the proposed improvements with the adopted Goals, Policies and
Programs for the Town of Avon.
The multi -family development is in conformance of the designation for multi -family
development and with the PUD approved for the site and is in conformance with adopted
Goals, Policies, and Programs for the Town of Avon.
Staff Recommendation
Staff recommends approval with conditions.
Recommended Motion
I move to approve final design plans for Building I, Lot 4, Nottingham Station, as depicted on
plans dated received June 10, 1997 and June 27, 1997 with the following conditions:
1. Indicate landscaping to be installed with this building phase (including irrigation system).
2. Slopes be revised to conform to 2:1 maximum. Final grading to be approved by staff.
3. All bearings and distances be added to match the building envelope.
4. Fishing trail/soft path will be routed back up to Hurd Lane: final location and construction
plans to be approved by staff.
5. If fishing trail/soft path is located off-site, an access easement shall be obtained from
property owner.
6. Signage be provided identifying trail location and routing trail users away from private
property.
7. Ridgeline building elevations be revised for consistent labeling between site plan sheet and
building elevation sheets.
Town of Avon Community Development aMnsbi.doc
PO Box 975, Avon, CO 8162
(970)949-4280 Fax 949-9139 Fax modem 949-4279
Building I, Lot 4, Nottingham Station Subdivision, Final Design Review, page 3
July 1, 1997 Planning & Zoning Commission meeting
If you have any questions regarding this project or any planning matter, please call me at 949-
4280 (extension 131), or stop by the Community Development Department.
Respectfully submi ed, —
Karen Griffith, A e
Town Planner
Town of Avon Community Development a:\4nsbi.doc
PO Box 975, Avon, CO 8162
(970) 949-4280 Fax 949-9139 Fax modem 949-4279
Building I, Lot 4, Nottingham Station Subdivision , Final Design Review, page 4
July 1, 1997 Planning & Zoning Commission meeting
Planning & Zoning Commission Action
❑ Approved as submitted
❑ Denied
Approved with conditions (noted below)
❑ Tabled
❑ Withdrawn by applicant
Conditions of approval, reasons for tabling or withdrawal of application, or basis for denial (refer
to code or guidelines by number):
_'D Pi U r t-rN. I k-1111,111:1, te l - V
ign
d-
) r,
Date 77
Andrew Karow, Ch
Att t:
Date
ue Railton, Secretary
Town of Avon Community Development a:\4nsbi.doc
PO Box 975, Avon, CO 8162
(970) 949-4280 Fax 949-9139 Fax modem 949-4279