Res. 99-14 L5 NTST PUDTOWN OF AVON
PLANNING & ZONING COMMISSION
RESOLUTION NO. 99-14
SERIES OF 1999
A RESOLUTION RECOMMENDING TO THE TOWN
COUNCIL OF THE TOWN OF AVON APPROVAL OF A
PUD DEVELOPMENT PLAN AND DEVELOPMENT
STANDARDS, FOR LOT 5, NOTTINGHAM STATION PUD,
TOWN OF AVON, EAGLE COUNTY, COLORADO.
WHEREAS, Maurice and Nancy Nottingham have applied for a PUD
Development Plan for Lot 5, Nottingham Station Subdivision, and
WHEREAS, after notices required by law, a public hearing was held by the
Planning & Zoning Commission of the Town of Avon, at which time the
applicant and the public were given an opportunity to express their opinions and present
certain information and reports regarding the proposed zone change and PUD
Development Plan, attached hereto as Exhibit "A," and
WHEREAS, pursuant to Section 17.20.110.H. of the Avon Municipal Code, the
Planning & Zoning Commission has considered the following design criteria:
1. Conformity with the Avon comprehensive plan goals and objectives;
2. Conformity and compliance with the overall design theme of the Town, the sub -area
design recommendations and design guidelines adopted by the Town;
MTSERVERTILE SERVER\P&Z\Resolutions\ Res_99\99-14lot5nottinghamstation.doc
3. Design compatibility with the immediate environment, neighborhood, and adjacent
properties relative to architectural design, scale, bulk, building height, buffer zones,
character, and orientation;
4. Uses, activity, and density which provide a compatible, efficient, and workable
relationship with surrounding uses and activity;
5. Identification and mitigation or avoidance of natural and/or geologic hazards that
affect the property upon which the PUD is proposed;
6. Site plan, building design and location and open space provisions designed to produce
a functional development responsive and sensitive to natural features, vegetation and
overall aesthetic quality of the community;
7. A circulation system designed for both vehicles and pedestrians addressing on and
off-site traffic circulation that is compatible with the Town transportation plan;
8. Functional and aesthetic landscaping and open space in order to optimize and
preserve natural features, recreation, views and function;
9. Phasing plan or subdivision plan that will maintain a workable, functional and
efficient relationship throughout the development of the PUD. The phasing plan shall
clearly demonstrate that each phase can be workable, functional and efficient without
relying upon completion of future project phases;
10. Adequacy of public services such as sewer, water, schools, transportation systems,
roads, parks, and police and fire protection;
11. That the existing streets and roads are suitable and adequate to carry anticipated
traffic within the proposed PUD and in the vicinity of the proposed PUD.
NOW, THEREFORE, BE IT RESOLVED, THAT the Planning & Zoning
Commission hereby recommends to the Town Council of the Town of Avon, Eagle
County, Colorado to approve the PUD Development Plan and Development Standards for
Lot 5, Nottingham Station Subdivision, as described on the attached Exhibit A, based
upon the following findings:
MTSERVERTILE SERVERT&z\Resolutions\Res_99\99-14lot5nottinghamstation.doc
1. That the PUD is consistent with goals and objectives of the Town's Comprehensive
Plan, is compatible with surrounding neighborhood and is consistent with the public
interest.
2. That the PUD development plan and development standards complies with each of
the Town of Avon's PUD design criteria and that this proposed development is
consistent with the public interest.
Subject to the following conditions:
1. The existing shed that encroaches into the 25 foot front yard setback shall be removed
from the property and all inoperable vehicles and materials stored outside, with the
exception of firewood, ,shall be remoxed or stored inside within 60 days of approval
of the PUD ordinance by Town Council".
2. That the project title be changed to Lot 5, Nottingham Station PUD.
ADOPTED THIS 20th DAY OF JULY, 1999
Signe
110,
�2� —
Date: "t ZU
&ns.Chair
Atte
Greg Macik, Secretary
Date:
\\NTSERVER\FILE SERVER\P&Z\Resolutions\Res_99\99-141ot5nottinghamstation.doc
G G,