PZC Minutes 100698October 6, 1998, Record of Proceedings
Town of Avon Planning and Zoning Commission
The Town of Avon Planning and Zoning Commission regularly meets at 6:00 p.m. on the first
and third Tuesday of each month, in the Avon Council Chambers, Avon Municipal Building, 400
Benchmark Road, Avon, CO 81620. Meeting agendas are posted at least 72 hours in advance of
the meeting in the following locations:
Avon Municipal Building lobby;
Avon City Market lobby;
Avon Recreation Center lobby;
Avon Transportation Center
Commission Members
Mike Dantas
Chris Evans, Chair
Anne Fehlner, Vice Chair
Paul Klein
Greg Macik
Sue Railton, Secretary
Agenda
I. Call to Order
Staff Members
Karen Griffith, Town Planner
Beth Salter, Recording Secretary
George Harrison, Planner
Mike Matzko, Community Development Director
Commissioner Evans called the meeting to order at 6:05 P.M.
II. Roll Call
All Commissioners were present.
III. Additions and Amendments to the Agenda
Lot 5, Block 4, 5774 E. Wildridge Rd. Wildridge - Color Modification, added as Consent
Agenda item B.
Lot 57, Block 1, 2355 Saddleridge Loop, Wildridge - Color Modification, added as Consent
Agenda item C.
Lot 57, Block 1, Color Modification
Lot 5, Block 4, Wildridge, Color Modification
IV. Conflicts of Interest
None
Planning & Zoning Commission Meeting Minutes
October 6, 1998
V. Consent Agenda
Page 2 of 4
A. Approval of the September 20, 1998, Planning & Zoning
Commission Meeting Minutes
B. Lot 5, Block 4, Wildridge Subdivision - Color Modification
C. Lot 57, Block 1, Wildridge Subdivison - Color Modification
Motion
Commissioner Fehlner moved to approve the consent agenda as amended. Commissioner
Dantas seconded. The motion passed unanimously.
VI. Public Hearing
A. Lot B, Avon Center at Beaver Creek Subdivision
Project Type: Preliminary Rezoning from Town Center to Planned Unit
Development
Property Owner/Applicant: Shapiro Development Company
Consultant: Patrick W. Nook & Company
Address: 0130 West Beaver Creek Boulevard
Mike Matzko summarized the staff report. Shapiro Development is requesting a zone change on
Lot B, from Town Center (TC) to Planned Unit Development (PUD), because of the limitations
of the existing TC zone district, including height, density, allowed uses, building setbacks and
parking requirements.
Lot B is a 1.67 acre site currently providing surface parking for both the Avon Center and the
Alpine Bank buildings. The site is west of and adjacent to the Avon Center building, and has
frontage on the Avon Pedestrian Mall and on West Beaver Creek Boulevard. It shares its western
border with Lot C.
The general form proposed would include a new 7 -story tower, connected to the existing Avon
Center building by an extended one -and two level mixed use commercial building (13,072
square feet of restaurant and 10,789 square feet of retail); and a 152 -space parking garage that
shares a common access with the proposed Lot C development.
PUD zoning is proposed in order to allow a maximum 90 foot building height (the current
maximum is 80 feet); reduced building setbacks; and a modified parking standard.
Preliminary PUD review allows the Planning & Zoning Commission to review the project's
basic elements and to provide more specific feedback to the applicant. Preliminary approval does
not bind the Commission or the Town to grant final approval.
Commissioner Railton asked why the solar study was needed for this project.
Mr. Matzko said the solar study would be applied when Lot B gets to the development plan
stage. This study ties in with the view corridor studies.
Motion:
Commissioner Railton moved to grant Preliminary PUD approval for the project as proposed,
with the following conditions:
Planning & Zoning Commission Meeting Minutes Page 3 of 4
October 6, 1998
1. The applicant commits to participation, on a pro -rata basis, in a Downtown Plan that will
incorporate a parking study to determine a revised downtown -parking standard.
2. A solar study should be provided to demonstrate the effect of shading on adjacent buildings
and outdoor spaces.
3. A Preliminary Subdivision Plan must be approved prior to Final Design approval to clarify
the project's ownership patterns.
4. Employee Housing must be added to the proposal.
Commissioner Klein seconded. The motion passed unanimously.
B. Lot C, Avon Center at Beaver Subdivision
Project Type: Rezoning from Town Center to Planned Unit Development
Property Owner: Vail Associates Investments, Inc.
Applicant: Victor Mark Donaldson Architects
Address: 0160 West Beaver Creek Boulevard
Mike Matzko summarized the staff report. Vail Resorts, Inc. (VRI) is requesting a zone change
on Lot C, from Town Center (TC) to Planned Unit Development (PUD), because of the
limitations of the existing TC zone district, including height, density, allowed uses, building
setbacks and parking requirements.
The site is currently undeveloped, and is located north of the Seasons at Avon and the Pedestrian
Mall; shares a common border with Lot B on the east; and is bounded by Beaver Creek
Boulevard on the north and by Benchmark Road on the west.
PUD zoning would allow a mixed-use development including lodging, time share, commercial,
office, restaurant, and employee housing units. The proposed development standards include
increased density, more allowed uses, increased building height, decreased setbacks, increased
site coverage, and reduced parking requirements. The Development Standards included with the
staff report replace Section II of the application dated September 4.
The applicant is requesting a two step review and approval process, largely because of the timing
constraints imposed by the choice of financing mechanism through formation of two special
districts consists of two steps:
1. Lot C would be changed from TC Zoning to PUD, which would establish new limits on
density, building height and bulk, parking, and allowed uses.
2. Development Plan approval would require a separate application and review process, and
would define the locations, size and general design of the buildings, as well as site layout,
access and circulation.
Mr. Matzko said that although staff supported the zone change in concept, staff and the applicant
were in agreement that it would be appropriate for the Commission to review the project, hold
the public hearing, and table action until the October 20 meeting.
Public Hearing
Michelle Page representing Beaver Creek West said the last time the Town pushed a project
through was the Seasons, which was left standing empty for years. She said some clients
considered buying a home within the Town under the Town's current plans, but now refuse to
purchase anything under the proposed plans. She compared approving a PUD without a plan
with approving a loan with out a financial statement
Planning & Zoning Commission Meeting Minutes Page 4 of 4
October 6, 1998
Dave Nelson manager of the Comfort Inn said he is happy to see this coming to a finale. He said
he would like to have some clarification of the building heights that are being proposed.
Mr. Donaldson proposed that the heights of the building be related to the Seasons and the Avon
Center building. They are requesting to up to 120 feet in building height on 15,000 square feet of
the site (about 10.5% of the buildable area); up to 100 feet in height on 30,000 square feet of the
site (21 %), with the remainder being limited to 80 feet. Less than 2/3 of the buildable area would
be less than what the Avon Center and the Season is today.
Mr. Nelson said most of the visitors that come to Avon come to escape to an urban environment.
In addition, parking is a concern. Currently parking is not an issue to the Comfort Inn but with
the building that is being proposed he can foresee it becoming an issue.
Bob Law on the Board of the Lodge at Avon Center Home Owners Association said they are
concerned about the building heights.
Brian Woodell said that as a citizen concerned for the future Avon, he supports the development
of Lot C and the Confluence site. The proposals are in keeping with the Town's Comprehensive
Plan. He said he supports these projects for the following reasons: 1). The Avon Transportation
plan and the approval of these projects will force the town to resolve some the past problems in
relation the access and transportation within the town. 2). This project will bring additional bed
base, and help the economic vitality of Avon. The addition of more office and retail space and
parking will benefit the West Side and create the Town Core as stated in the Town's
comprehensive plan.
Commissioner Railton said the proposed PUD is worded in such a way that the building could be
changed.
Michael Sheldon said they have learned from the public and the staff the building height is large
concern. He said whatever measurement criteria is worked out in the guidelines the building
cannot ever be higher.
Commissioner Macik said his concern is the definiton of height and the massing. He asked
about the employee housing for lot C.
Mr. Donaldson said that they have discussed with staff whether or not these employee -housing
units would be on or off site, but said further discussion with staff was still needed.
Commissioner Fehlner said the building height guidelines couldn't be the same for the
Confluence Site. As regards to parking she would like to see this compare with the Town
Standards. The allowed uses fit well with the Towns Plans. As for the bulk she said she was not
sure how to review this, as the plans are one dimension She said she would like to see a 3-D
concept of the buildings.
Motion
Commissioner Dantas moved to table the PUD Zoning application for Lot C to the October 20,
1998, Planning and Zoning Commission meeting, and to forward the application to the Town
Council for first reading on October 13, 1998. Commissioner Klein seconded. The motion
passed 5 to 1 with Commissioner Railton opposing.
C. The Confluence
Project Type: Establishment of Planned Unit Development Zoning
Property Owner: Vail Associates Investments, Inc.
Planning & Zoning Commission Meeting Minutes Page 5 of 4
October 6, 1998
Applicant: Victor Mark Donaldson Architects
Address: 0160 West Beaver Creek Boulevard
Mike Matzko summarized the staff report. Vail Resorts, Inc. (VRI) is requesting PUD zoning on
the Confluence site, which was annexed to the Town of Avon on August 25, 1998. State statute
requires zoning within 90 days of annexation.
The 18.9 -acre parcel is currently a surface parking lot and construction staging area. It is
bounded on the south by the Eagle River, the east by Avon Road, the north by the railroad right-
of-way, and the west by the Eagle River Consolidated Water & Sewer District.
PUD zoning would allow a dense, mixed-use development including lodging, commercial,
restaurant, conference center, transportation facilities and employee housing units. The
development standards attached to the staff report replaces Section II of the application dated
September 4.
As with the Lot C application, VRI is requesting a two step review and approval process:
3. PUD Zoning. This establishes limits on density, building height and bulk, parking, and
allowed uses.
4. Development Plan Approval. This determines the locations, size and general design of the
buildings, as well as site layout, access and circulation.
Staff recommended that the project be tabled to the October 20th meeting to work out final
details and complete a final review of the project. It is our opinion that the approval criteria have
been met, provided additional studies and the more detailed PUD guide addresses issues raised in
the staff report.
Mr. Donaldson representing Vail Resorts Development Company said he is proposing to become
town center zoning. The primary considerations that they are asking for are 30 units per acre per
developable acre. That is 15.2 acres, which translates to 456 whole dwelling units. This can be
broken down into a mixture of hotel and dwelling units. There will be a total of 1368 hotel
rooms. They are proposing a substantial structured parking in conformance with the
comprehensive plan recommendations. He said they are proposing pedestrian connection into
the town center. The location remains to be worked out. Mr. Donaldson said they are proposing
400 public parking spaces. This is in addition to the parking requirements for the hotel use. He
presented plans of the Confluence site and photos taken from the Seasons building to the
Commission.
Brian Woodell said he wanted the project to be moved to the next level.
Commissioner Macik asked about the bridge (to Highway 6).
Mr. Donaldson said this bridge was to help with the circulation of the traffic.
Commissioner Dantas said the plans were helpful. Liked the fact that the applicant was willing
to respect the 75 -foot river setback.
Michael Sheldon outlined the short and long term schemes of the confluence site. He said there
is a possibility in the future to build an additional level to the parking structure, adding 400
spaces.
Mr. Donaldson said a 2 -bedroom unit would have 2.1 parking spaces.
Commissioner Railton asked if would be Beaver Creek's or the Town's responsibility to
transport people to the ski resort.
Planning & Zoning Commission Meeting Minutes Page 6 of 4
October 6, 1998
Michael Sheldon said the Town of Avon would provide bus transportation.
Motion
Commissioner Railton moved to table the PUD Zoning application for the Confluence, to the
October 20, 1998, Planning and Zoning Commission meeting, and to forward the application to
the Town Council for first reading on October 13, 1998. Commissioner Klein seconded. The
motion passed unanimously.
VII. Other Business
None
Adjourn
Commissioner Dantas moved to adjourn. Commissioner Macik seconded. The meeting
adjourned at 8:50 P.M.
Respectfully Submitted,
Beth Salter
Recording Secretary
Mike Dantas
Chris Evans
Anne Fehlner
Paul Klein
Greg Maci
Sue Railton ./� .�--