12-19-2005 ERW&SD Service AgreementSERVICE AGREEMENT
This agreement is made and entered into this ��day of eEcF14 ,✓2005 by and between Eagle River Water &
Sanitation District whose address is 846 Forest Road, Vail Colorado, 81657 (hereafter know as "ERW&SD") and the Town
of Avon whose address is P.O. Box 1726, 500 Swift Gulch Road, Avon, Colorado, 81620 (hereafter designated as
"Contractor').
RECITAL
In consideration of the obligation of ERW&SD to pay the Contractor as herein provided and in consideration of the other
terms and conditions hereof, the parties agree as follows:
Contractor Services: Contractor will, during the term of this Agreement, provide:
(a) Routine maintenance and preventive maintenance ("Routine Maintenance") of the ERW&SD vehicles
and equipment. Service will be performed on approximately 49 vehicles and 15 pieces of equipment,
although the number of vehicles and equipment serviced may be increased or decreased in
ERW&SD's sole discretion; provided, the combined number of vehicles and equipment shall not
exceed 75 without the approval of Contractor. Routine Maintenance will be performed at least every
4,000 miles or 250 hours of use. Routine Maintenance shall consist of those services outlined in
Exhibit A attached hereto.
(b) Repair and replacement work as requested by ERW&SD ("Repair and Replacement"). No payment
for any Repair and Replacement shall be due unless ERW&SD has approved of such charges.
Services may be commenced with verbal approval by ERW&SD of a written estimate submitted by
Contractor. Repair and Replacement includes, without limitation, transmissions repairs, engine
repairs, rear end repairs and any other work or repairs exceeding $2,000.00. ERW&SD
acknowledges that subcontractors will perform certain repair work. Contractor shall be responsible
for assuring that all such subcontracted work will be performed promptly and in accordance with the
terms and conditions of this Agreement.
(collectively the "Services")
2. Facilities: Contractor represents that its facilities are in good repair and adequately equipped and
that it has a sufficient staff to perform all work in a timely manner. All Routine Maintenance shall be
completed within 24 hours of any vehicle being brought to Contractor's facility.
3. Compensation: In consideration of Contractor's services during the term of this Agreement,
ERW&SD will pay Contractor the shop rate of $90.00 per hour for Routine Maintenance and Repair
and Replacement. Materials and sublet work shall be charged at cost plus ten percent. Invoice shall
be issued by the 10`" of each month for services performed the previous month. Payment shall be
remitted within ten (10) days of receipt of invoice. Contractor's washing facilities may be used by
ERW&SD. Contact TOA for current wash rates. Contractor's Fueling Facilities may be used by
ERW&SD. The cost of Unleaded Gasoline and Diesel Fuel will be at the Contractor's cost plus ten
percent.
4. Terms and Termination: This Agreement will be effective as of January 1, 2006 and will terminate
on December 31, 2006 unless either party fails to substantially perform the duties and obligations in
accordance herewith. In such an event, the other party may terminate this Agreement upon seven
(7) days written notice to that party, unless that party cures the breach within the seven (7) day
remedy period. Either party may terminate this Agreement without cause upon 30 Days written
notice.
5. Relationships and Taxes: The relationship between the parties is that of independent contracting
parties, and nothing herein shall be deemed or construed by the parties hereto or by any third party
as creating a relationship of principal and agent or partnership, or of a joint venture between the
parties. Contractor shall be solely responsible for any tax, withholding or contribution levied by the
Federal Social Security Act. Contractor is not entitled to unemployment compensation or other
employment related benefits, which are otherwise made available by ERW&SD to its employees.
Contractor shall provide ERW&SD an original of its Form W-9 (Request for Taxpayer Identification
Number of Certification).
6. Warranty: Contractor shall perform all Services in a prompt, efficient and workmanlike manner.
Contractor shall promptly correct any defective work. This warranty shall be in lieu of all other
warranties, express or implied. Contractor's sole liability hereunder, whether in tort or in contract, is
expressly limited to the warranty provided for herein.
7. Assignment: Contractor's duties hereunder requires particular expertise and skills, and may not be
assigned to any third party without the expressed written consent of ERW&SD, and any attempt to do
so shall render this Agreement null and void and no effect as respects the assignee (s) and shall
constitute an event of default by Contractor.
8. Waiver: Failure to insist upon strict compliance with any terms, covenants, and/ or conditions hereof
shall not be deemed a waiver of such term, covenant, or condition, nor shall any waiver or
relinquishment of any right or power hereunder at any time or more times be deemed a waiver or
relinquishment of such right or power at any other time or times.
9. Benefit: The terms, provisions, and covenants contained in this Agreement shall apply to, inure to
the benefit of and be binding upon the parties hereto and their respective heirs, successors in
interest, and legal representatives except as otherwise herein expressly provided.
10. Situs and Severability: The laws of the State of Colorado shall govern the interpretation, validity,
performance and enforcement of this Agreement. If any provision of this Agreement shall be held to
be invalid or unenforceable, the validity and enforceability of the remaining provisions of this
Agreement shall not be affected thereby.
11. Modification: This Agreement contains the entire agreement between the parties, and no
agreement shall be effective to change, modify, or terminate in whole or in part unless such
agreement is in writing and duly signed by the party against whom enforcement of such change,
modification, or termination is sought.
EXECUTED this day day of r r,, 2005.
Eagle Rive ater & rotation i
By:
EXECUTED this 10 day of 11,200
WORK _ _ . _. ._..... . _
"A" PM
Preventive Maintenance
Inspection
EXHIBIT A
FREQUENCY m __. RATE
4,000 miles or
250 hours
$90.00 hr.
Plus parts &
sublet
"Annual" every 12months $90.00 hr.
Preventive Maintenance Plus parts &
Inspection sublet
NOTE: Included as a part of Exhibit A is the vehicle listing applicable to this agreement as of
December 1, 2004.
AVON BEAVER CREEK EQUIPMENT LIST BY DEPARTMENT Page 1
Program FMG210 DEPARTMENT: 11 - EAGLE RIVER WATER & SANITATION DISTRICT Date 12/05/05
Release S.z Time 15:35
--DATE-- LICENSE- ---DEPR--- --MAINT--- -YTD-- --MILES HAS-- M
EQUIP# YR ---MAKE--- --MODEL--- CLASS ---SERIAL NUMBER-----ACQRD-- -NUMBER- ---COST--- --VALUE--- ---LTD---- -MILES BSG -FY CURRNT T
100W
00
TOYOTA
PICKUP
L4P
4TAPM62N3YZ663922
08/27/03
900AOS
14231.00
0.00
3265.29
17785
87356
105141 M
lOSW
02
CHEVROLET
UTILITY
H4U
1GBJK34I82E159491
08/27/03
743GFV
48958.00
0.00
4695.18
4576
8082
12658 M
low
05
TOYOTA
CAMRY
L2A
4T1BF30K95U097673
01/04/05
TEMP
25000.00
0.00
1019.96
21676
237
21913 M
110W
01
TOYOTA
PICKUP
L4P
STEPM62NOlZB16352
08/27/03
589DV0
17422.00
0.00
1507.77
6600
33946
40546 M
115W
02
TOYOTA
PICKUP
L4P
5TEPM62N12Z069796
08/27/03
310GFV
17100.00
0.00
1351.74
6624
16992
23616 M
120W
03
CHEVROLET
UTILITY
H4U
1GCHK29U43E268068
08/27/03
430HON
27609.00
0.00
5491.58
20347
39242
59589 M
125W
99
STERLING
DUMP TRUCK
HTD
2FZNEWDB7YAF21809
08/27/03
0706YM2
74678.00
0.00
1940.65
0
9950
9950 M
130W
95
CHEVROLET
UTILITY
H4U
1GCFK24K7SZ281918
08/27/03
13164YM
14663.00
0.00
1690.03
6521
90290
96811 M
135W
99
STERLING
DUMP TRUCK
HTD
2FZNNWDB4XAF06621
08/27/03
681YM2
73638.00
0.00
5027.55
646
17649
18295 M
140W
95
CHEVROLET
UTILITY
H4U
1GCFK24K7SZ281272
08/27/03
13166YM
14633.00
0.00
7318.91
18569
87311
105880 M
145W
93
FORD
L9000
HTT
1FDYU90X2PVA00440
08/27/03
079YMB
50434.00
0.00
6836.04
453
49161
49614 M
150W
95
FORD
DUMP TRUCK
HTD
1FDYU90X7SVA75806
08/27/03
581AMI
47016.00
0.00
4473.80
1143
34060
35203 M
155W
O1
TOYOTA
PICKUP
L4P
STEPM62NOlZB20580
08/27/03
590DV0
14623.00
0.00
2356.62
19193
71000
90193 M
15W
05
CHEVY
PICK UP
HTS
1GCEK19ZOSZ252891
04/12/05
TEMP
30500.00
0.00
2031.43
20103
1
20104 M
165W
02
TOYOTA
PICKUP
L4P
5TEPM62N7TZ085422
08/27/03
354GFV
16821.00
0.00
2846.26
19727
45223
64950 M
170W
98
CHEVROLET
PICKUP
L4P
1GCEK19R4WE214945
08/27/03
16083YM
19929.00
0.00
1297.78
0
95341
95341 M
180W
95
CHEVROLET
UTILITY
H4U
1GCFK24K2SZ282068
08/27/03
13165YM
14663.00
0.00
1480.00
3898
92116
96014 M
185W
96
TOYOTA
PICKUP
L4P
4TAPM62NITZ176193
08/27/03
1944YM
17368.00
0.00
1950.20
4380
59138
63518 M
190W
03
TOYOTA
PICKUP
L4P
STEPM62N53Z250935
08/27/03
411HO0
17062.00
0.00
3651.46
22034
23560
45594 M
195W
03
TOYOTA
PICKUP
L4P
STEPM62N13Z253511
08/27/03
414H00
17062.00
0.00
1920.11
8401
19568
27969 M
200W
03
CHEVROLET
UTILITY
H4U
1GCHK29U73E264791
08/27/03
432HON
25434.00
0.00
3935.50
20337
39663
60000 M
205W
02
FORD
UTILITY
H4U
1FDSF31S42EC96716
08/27/03
493GFV
31000.00
0.00
3553.61
7231
36900
44131 M
20W
00
TOYOTA
CAMRY
L2A
4T1BF22K3YU105455
08/27/03
313AJS
20596.00
0.00
1456.52
4074
68416
72490 M
210W
91
CHEVROLET
UTILITY
H4U
1GCFK24K9ME214554
08/27/03
1337YN
12885.00
0.00
1601.11
6827
81660
88487 M
215W
97
VACTOR/FOR
JET TRUCK
HJT
1FDZW96M9WVA08688
08/27/03
569YM2
110900.00
0.00
16520.69
392
5571
5963 H
220W
00
TOYOTA
TRUCK 4X4
L4P
4TAPM62N3YZ662933
08/27/03
901AOS
14231.00
0.00
2176.09
14095
69247
83342 M
225W
03
TOYOTA
TRUCK 4X4
L4P
5TEPM62N73Z251746
08/27/03
412H00
17062.00
0.00
287.22
4033
5607
9640 M
230W
03
TOYOTA
TRUCK 4X4
L4P
STEWM72N63Z242148
08/27/03
470HON
19600.00
0.00
1069.37
10587
9650
20237 M
235W
97
TOYOTA
TRUCK 4X4
L4P
4TAWN72NSVZ307983
08/27/03
13725YM
17683.00
0.00
1347.74
0
93002
93002 M
240W
95
CHEVY
5-10 TRUCK
L4P
1GCDT14ZIS8250522
08/27/03
122BOYM
11442.00
0.00
1786.70
4163
91262
95425 M
245W
03
TOYOTA
TRUCK 4X4
L4P
STEWM72NX3Z243416
08/27/03
471HON
19600.00
0.00
1810.43
10286
18942
29228 M
250W
94
CHEVY
3/4UTILITY
L4U
IGCFK24KBRE230185
08/27/03
6907YN
14847.00
0.00
1544.47
1940
68001
69941 M
25W
O1
TOYOTA
CAMRY
L2A
4T1BF22K6IU967820
08/27/03
TEMP
21176.00
0.00
1389.96
5031
41723
46754 M
260W
01
GMC
TV VAN 4X4
LV
1GTHG39G61162064
08/27/03
516FRS
1000000.00
0.00
1569.10
2332
10358
12690 M
265W
91
FORD
DUMP TRUCK
HTD
1FDYW82A1MVA21708
08/27/03
697YM2
47812.00
0.00
4573.79
2624
64097
66721 M
270W
90
FORD
L8000 DUMP
HTD
1FDYW82A9LVA37900
08/27/03
347YM2
37533.00
0.00
6388.89
651
68000
68651 M
280W
03
CHEVY
UT.PLOW4X4
H4U
1GCHK24U43E264156
08/27/03
431HON
33508.55
0.00
745.56
7358
5647
13005 M
285W
96
GMC
UT.PLOW4X4
H4U
1GDGK24R4TZ530948
08/27/03
18544YM
15294.00
0.00
8379.58
21978
87841
109819 M
295W
96
GMC
3/4UTIL4X4
H4U
1GDGK24R1TZ530955
08/27/03
18543YM
15294.00
0.00
5706.24
9711
56122
65833 M
300W
97
TOYOTA
TRUCK 4X4
L4P
4TAPM6ZNXVZ314283
08/27/03
14476YM
14338.00
0.00
1205.53
0
98900
98900 M
305W
97
CHEVY
UT.PLOW4X4
H4U
1GBGK24R3VZ253740
08/27/03
14788YM
23240.51
0.00
12508.44
11270
69110
60380 M
30W
99
CHEVROLET
5-10 BLAZE
L4U
1GNDT13W8XK199917
08/27/03
EMG5728
19935.00
0.00
1960.91
5585
84007
89592 M
310W
97
CHEVY
UTILITY4X4
L4U
1GBGK24R6VZ254252
08/27/03
14790YM
20900.51
0.00
2708.49
12031
50842
62873 M
315W
97
CHEVY
UTILITY4X4
L4U
1GBGK24R7VZ254387
08/27/03
14789YM
20900.51
0.00
2149.58
3971
47112
51083 M
320W
99
CHEVY
UTILITY4X4
H4U
1GCK24USXE241910
08/27/03
23742YM
24630.48
0.00
4984.44
1780
85170
86950 M
330W
99
FORD -F550
FLUSHER4X4
HJT
1FDAF57F7XEA46122
08/27/03
24209YM
34952.00
0.00
5833.55
1698
19068
20766 M
340W
03
CHEVY
UTILITY4X4
H4U
1GCHK24U43E266117
08/27/03
429HON
24797.49
0.00
4000.07
19770
29337
49107 M
350W
00
GMC
3/4UTIL4X4
H4U
1GDGK24UlYZ292004
08/27/03
903AOS
26934.00
0.00
7203.90
12918
72082
85000 M
35W
03
CHEVROLET
PICKUP
L4P
1GCEK14TO3Z288886
08/27/03
410H00
18799.00
0.00
1323.94
12077
23923
36000 M
360W
00
GMC
3/4UTIL4X4
H4U
1GDGK24UXYE335066
08/27/03
904AOS
24432.00
0.00
6544.18
15158
77820
92978 M
IL ' Y
AVON BEAVER CREEK
EQUIPMENT LIST BY DEPARTMENT
Page
2
Program
FMG210
DEPARTMENT: 11
- EAGLE RIVER WATER 6 SANITATION DISTRICT
Date
12/05/05
Release
5.z
Time
15:35
--DATE--
LICENSE-
--- DEPR---
--MAINT---
-YTD--
--MILES HRS-- M
EQUIP#
YR ---MAKE---
--MODEL---
CLASS
---SERIAL NUMBER----
-ACQRD--
-NUMBER-
---COST---
--VALUE---
---LTD----
-MILES
BEG -FY
CURRNT T
400W
99 MULTI -QUIP
GENERATOR
HMSC
4AG6U2034XCO28313
08/27/03
YM01437
84211.00
0.00
0.00
0
100
100 M
405W
99 MULTI -QUIP
GENERATOR
HMSC
4AG6U2036XCO28314
08/27/03
YM01436
84211.00
0.00
0.00
0
100
100 M
40W
99 CHEVROLET
5-10 BLAZE
L4U
1GNDT13W2XK200768
08/27/03
EMG5727
19935.00
0.00
4820.13
9814
76802
86616 M
410W
99 ONAN
GENERATOR
HMSC
1S9AP1127XC241267
08/27/03
LO96611
30750.00
0.00
0.00
0
100
100 M
415W
99 ONAN
GENERATOR
HMSC
1S9HP1422XC241266
08/27/03
LO96612
44750.00
0.00
0.00
0
100
100 M
420W
00 FORK LIFT
4000LB
FL
N/A
08/27/03
N/A
0.00
0.00
0.00
0
100
100 M
425W
98 JD LOADER
624H
HL
DW624HX565220
08/27/03
YM0597
122550.00
0.00
723.02
0
100
100 M
430W
90 JD LOADER
624E
HL
DW624ED530950
08/27/03
YM0597
95258.00
0.00
2702.27
146
2586
2732 M
435W
97 JD SKID ST
8875
HL
M08875X030602
08/27/03
N/A
30000.00
0.00
5549.35
0
305
305 M
440W
96 JD BACKHOE
710D
HB
T0710DJ822727
08/27/03
YM01294
112954.00
0.00
11763.47
3265
160
3425 M
445W
93 JENZ
SHREDDER
HMSC
V174934
08/27/03
YMO816
109489.00
0.00
0.00
0
100
100 M
45OW
00 JD SKID ST
FIELD OPS
HL
KV0260A261613
08/27/03
N/A
0.00
0.00
6262.24
82
523
605 M
SOW
96 TOYOTA
4 RUNNER
L4U
JT3HN66R2T0016511
08/27/03
EMD4133
24265.00
0.00
6578.98
16410
111358
127768 M
55W
01 TOYOTA
CAMRY
L2A
4T1BF22K11U127136
08/27/03
640DVX
25000.00
0.00
1583.21
13564
67251
80815 M
5W
97 TOYOTA
CAMRY
L2A
4TIEF22K2VU032588
08/27/03
EME5810
20486.00
0.00
2181.29
6093
75130
81223 M
600W
86 HMD 2W
6" PUMP
HMSC
1D44293C0
08/27/03
E84562
0.00
0.00
0.00
0
100
100 M
605W
99 BROCK
6" PUMP
HMSC
1B9CPO811WB276150
08/27/03
YM01426
21524.00
0.00
167.76
0
29
29 M
60W
04 TOYOTA
CAMRY
L2A
4T1BF32K94U073403
05/21/04
518-JUM
0.00
0.00
1912.76
9447
20763
30210 M
610W
00 TRVL-VAC
VLV BOX CL
HMSC
30000136
08/27/03
304AVE
0.00
0.00
2067.74
4
156
160 M
75W
03 TOYOTA
CAMRY
L2A
4T1BF32KX3U045544
08/27/03
352HOM
21385.00
0.00
1908.37
15780
32312
48092 M
7W
99 MQ,KOMATSU
PORT GEN
GEN
1338419 (GENERATOR)
08/27/03
YM01436
19935.00
0.00
919.57
0
15
15 H
8W
99 ONAN/CUMNS
PORT GEN
GEN
D990B98877
08/27/03
L096611
19935.00
0.00
1784.00
98
7
105 H
9W
99 ONAN/CUMNS
PORT GEN
GEN
D990899518
09/01/99
L096612
19935.00
0.00
2688.26
90
11
101 H
ERWSD
O1 1
1
MSC
EAGLE RIVER WATER
08/27/03
1
0.00
0.00
16017.49
0
2600
0 M
MSC11
01 1
1
MSC
EAGLE RIVER WATER
08/27/03
1
0.00
0.00
15901.30
0
0
0 M
WGEN1
00 GEN
GEN
GEN
86879 AVON WW PLANT
05/06/04
N/A
0.00
0.00
0.00
0
10
10 H
WGEN2
00 GEN
GEN
GEN
1338420 AVON WW ODOR 05/06/04
N/A
0.00
0.00
0.00
0
10
10 H
WGEN3
00 GEN
GEN
GEN
060597378933 DOWD JU
05/06/04
N/A
0.00
0.00
0.00
0
10
10 H
WGEN4
00 GEN
GEN
GEN
602610 EDWARDS WWP
05/06/04
N/A
0.00
0.00
0.00
0
10
10 H
WGENS
00 GEN
GEN
GEN
LD -95351 VAIL WWP
05/06/04
N/A
0.00
0.00
0.00
0
10
10 H
WGEN6
00 GEN
GEN
GEN
D990901995 AVON DRIN
05/06/04
N/A
0.00
0.00
0.00
0
10
10 H
WGEN7
00 GEN
GEN
GEN
E020369566 EDWARDS
D 05/06/04
N/A
0.00
0.00
0.00
0
10
10 H
WPUMPI
00 PUMP
6"
HWP
635501 EDWARDS WWP
05/06/04
N/A
0.00
0.00
0.00
0
10
10 H
* DEPT
TOTALS:
ITEMS
83
COST
$3,219,741
DEPRECIATED VALUE
$0
MAINTENANCE (LTD)
$263,949
MTHLY CHG + INSUR.
AMT
$0
MILES DRIVEN
(YTD)
506797
HOURS DRIVEN
(YTD)
/ ITEMS
580 /
12
OTHER METER USED (YTD)
/ ITEMS
0 /
0