PZC Res. No. 04-34TOWN OF AVON, COLORADO
RESOLUTION NO. 04-34
SERIES OF 2004
A RESOLUTION ESTABLISHING A SCHEDULE OF FEES FOR BUILDING,
MECHANICAL, PLUMBING AND GRADING PERMITS ISSUED BY THE TOWN OF
AVON, EAGLE COUNTY, COLORADO
WHEREAS, the Town Council has enacted ordinances establishing standards relating to
the issuance of permits for building, mechanical, plumbing and grading work in the Town of
Avon; and
WHEREAS, the Town Council wishes to establish A Fee Schedule for such permits.
NOW, THEREFORE, BE IT RESOLVED BY THE TOWN COUNCIL OF THE TOWN
OF AVON, COLORADO:
Section 1. The Town Council hereby adopts the following Fee Schedule for issuance
of building, mechanical, plumbing and grading permits.
Section 2. FEE SCHEDULE
1. Plan Review Fees: The plan review fee for building, commercial plumbing and
commercial mechanical permits shall be 65% of the permit fee associated with the work.
2. Building Permit Fees:
TOTAL VALUATION
$1.00 to $500
$501 to $2,000
$2,001 to $25,000
$25,001 to $50,000
$50,001 to $100,000
$100,001 to $500,000
$500,001 to $1,000,000
$1,000,001 and up
3
TABLE I -A — BUILDING PERMIT FEES
FEE
$26.00
$26.00 for the first $500 plus $3.40 for each additional $100, or
fraction thereof, to and including $2,000
$77 00 for the first $2,000 plus $15.50 for each additional $1,000, or
fraction thereof, to and including $25,000
$433.50 for the first $25,000 plus $11 15 for each additional $1,000,
or fraction thereof, to and including $50,000
$712.25 for the first $50,000 plus $7 75 for each additional $1,000, or
fraction thereof, to and including $100,000
$1,099.75 for the first $100,000 plus $6.20 for each additional
$1,000, or fraction thereof, to and including $500,000
$3,579.75 for the first $500,000 plus $5.25 for each additional
$1,000, or fraction thereof, to and including $1,000,000
$6204.75 for the first $1,000,000 plus $4.05 for each additional
$1,000, or fraction thereof
Mechanical Permit Fees:
(a) New Work. As part of a new building, the mechanical permit fees shall be
fifteen percent (15%) of the building permit fee, and shall be collected
with the building permit fee. The actual permit will not be issued until the
owner or responsible party representing the mechanical contractor has
signed the applicable permit and it is on file at the Town of Avon
Community Development Department.
(b) Other Work. For other work, the fee shall be based upon the actual value
of the work, and calculated as in the above, Table 1-A Building Permit
Fees.
4. Plumbing Permit Fees:
(a) New Work. As part of a new building, the plumbing permit fees shall be
fifteen percent (15%) of the building permit fee, and shall be collected
with the building permit fee. The actual permit will not be issued until the
owner or responsible party representing the plumbing contractor has
signed the applicable permit and it is on file at the Town of Avon
Community Development Department.
(b) Other Work. For other work, the fee shall be based upon the actual value
of the work, and calculated as in the above, Table 1-A Building Permit
Fees.
5. Grading Permit and Grading Plan Review Fees:
All grading permit fees and grading plan review fees shall be based on the total
direct hourly cost to the Town of Avon plus an administrative fee of fifteen
percent (15%). This cost shall include supervision, overhead, equipment, hourly
wages and fring benefits of the employees involved.
6. Electrical Permit Fees:
(a) An Electrical Plan Review Fee for Commercial Projects will be assessed at
sixty-five percent (65%) often percent (10%) of value established for the
Building Permit and calculated as in the above, Table 1-A Building Permit
Fees.
(b) All other electrical permit fees are administered by the State of Colorado
Electrical Board in accordance with the C.R.S., Section 12-23-77.
Resolution No 04-34 Permit Fees
Page 2 of 3
Additional Fees:
The following specific fees shall be collected for the applicable permits:
(a) Re -inspection fees for all trades when a correction has not
been made prior to recalling the inspection $100.00
(b) For removal or demolition of a building, per inspection $ 55.00
(c) Inspections outside of normal business hours
(Minimum 2 hours) $ 55.00 per hour
(d) Plan Review Fees for I" Building of a group of identical buildings: A
Plan Review Fee for the I" building shall be based upon the value and fee
asset forth in TABLE 1-A —BUILDING PERMIT FEES above. For each
additional building of an identical type the plan review fee shall be fifty
percent (50%) of the plan review fee for the first building of that type.
ADOPTED THIS 1q'-' DAY OF Sa (1�e (Yl.�f 2004.
ATTEST: >
Pat t Mc enny, To4 C '
erl1,
TOWN COUNCIL
TOWN OF AVON, COLORADO
a Q)'A 4 �
Albert D. Reynolds, Mayon'
Resolution No. 04-34 Permit Fees
Page 3 of 3