PZC Packet 01-06-2009 (2)VON
C o L 0 R A D 0
WORK SESSION (5:00pm — 5:30pm)
Town of Avon Planning & Zoning Commission
Meeting Agenda for January 6, 2009
Avon Town Council Chambers
Meetings are open to the public
Avon Municipal Building / One Lake Street
I. Discussion of Regular Meeting agenda items.
It. Western Sage PUD Monument Sign Approval — Questions from the Applicant
III. Riverfront Mockup Removal
REGULAR MEETING (5:30pm)
Call to Order
It. Roll Call
III. Additions and Amendments to the Agenda
IV. Conflicts of Interest
V. Consent Agenda
• Approval of the December 16, 2008 Meeting Minutes
• Resolution No. 08-09, A Resolution Recommending Approval of the Swift Gulch
Rezoning Application — heard on December 16, 2008
VI. PUD 8[ Preliminary Subdivision: Red House Annexation Parcel — (CONTINUED PUBLIC
HEARING)
Property Location: Lots 1-2, Red House Exemption Plat / 38361 Highway 6
Applicant: Rick Pylman, Pylman and Associates /Owner: Vail Corporation
Description: The applicant and property owner, the Vail Corporation, represented by Rick
Pylman of Pylman and Associates, is proposing a new Planned Unit Development (PUD) for a
development site currently located in unincorporated Eagle County and zoned Commercial
Limited (CL) under the County's zoning regulations. After review and comments from the
Commission, this item was tabled from the December 16, 2008 Planning and Zoning
Commission hearing.
VII. Other Business
VIII. Adjourn
Posted on January 2, 2008 at the following public places within the Town of Avon:
• Avon Municipal Building, main lobby
• Avon Recreation Center, main lobby
• Alpine Bank, main lobby
• Avon Public Library
• On the Internet at httD://www.avon.orq / Please call (970) 748.4030 for directions
s1
AVON
C O L O R A D O
WORK SESSION
Main Street Construction Update
Town of Avon Planning & Zoning Commission
Draft Meeting Minutes for December 16, 2008
Avon Town Council Chambers
Meetings are open to the public
Avon Municipal Building / One Lake Street
Description: Justin Hildreth, Town Engineer, gave an update to the Planning Commission
of the anticipated construction schedule and construction documents for the Main Street
project.
Discussion of Regular Meeting agenda items.
REGULAR MEETING
Call to Order
The meeting was called to order at 5:33 pm.
IL Roll Call 1_71�
Commissioner Roubos was absent and C&
Item VIIB.
III. Additions and Amendments to the Agem
Commissioner Struve recommended that tl
heard first, sincerno other\applicants
Commissioners were in agreement with the
IV. Conflicts of Inter
There were -no coi
V. Consent Agenda
VI
�VY r
imissioner Green arrived late, during Final Design
'Item VIIB (Perdzok Residence) be
at the start of the meeting. All
Approval of the November 18; 2008 Meeting Minutes
Resolution No. 08-07, A' Resolution Recommending Approval of the Comprehensive
.,Plan Amendment related to the 'Red House' Parcel
Commissioner. Goulding moved to approve the Consent Agenda
seconded the motion/ It was approved as written with a 5-0 vote.
Sign Design Application .
Western Sage PUD Monument Sign
and Commissioner Struve
Property Location: Lots 1-5, Western Sage PUD / 5203 Longsun Lane
Applicant. I Owner. Ted Leach, Western Sage Partners, LLC
Description: The application proposes a 5'-6° tall ground mounted freestanding sign
constructed of Sandstone and stone veneer. The sign will be adjacent to and thereby
demarcate the private drive at the end of the Longsun Lane cul-de-sac. i
Discussion: Jared Barnes presented Staffs report. Commissioner Evans asked the applicant
why the Commission should approve the sign and the motivation behind the sign.
1
Ted Leach approached the podium and responded that they explored the idea of providing
monuments at each house, but felt that one sign at the cul-de-sac would be a more
appropriate as a project entrance with added landscaping pursuant to the Design Guidelines
and the Sign Code.
The Commission discussed the nature of the sign design and other properties in the
subdivision with similar signage. Commissioner Green suggested a different approach to the
sign design to signify the name of the project and add the word "enclave". The applicant and
staff stated that the drive, which is the sole access for five (5) single-family properties, is
privately owned and plowed/maintained by the private association for those properties.
Action: Commissioner Goulding motioned to approve the sign with the condition that the
language °private driven be removed.
The motion was seconded by Commissioner Struve. The motion passed with a 6-0 vote.
VII. Final Design Review
A. Beowulf Residence
Property Location: Lot 7, Western Sage PUD / 5771 Wildridge Road East
Applicant: Julio Spinnato, Studio Spinnato, Inc: / Owner. Beowulf Lot 7 LLC
Description: Follow-up to conditions of approval,from November 18, 2008 me ti g.
Discussion: Matt Pielsticker gave a brief presentatiori highlighting relevant details contained
his Staff Report.
Julie Spinnato, on behalf of the property owners, gave a visual presentation using the projector
and computerized images to illustrate the changes she made to -tier design since receiving
input from the Commission on November 18,_2008N_ ,
Commissioner Evans asked about the change, in. light ni ` Julie Spinnato responded that it was
based on the client's.desires. '
y
Commissioner Prince asked for the exact numbers of sconces and landscape lighting that
were shown ori the building and site plan. Julie Spinnato outlined the exact numbers and
locations of eacfi'typ'e on the proposed site.
Commissioner Evans' -asked -if -the conces could be changed to Night Sky Compliant fixtures.
Julie Spinnato responded that if the'building code would allow it she would be fine with it.
Commissioner Evans asked about the secondary roof material, metal standing seam. Buzz
Reynolds stated that there were numerous examples of the metal roof throughout Wildridge.
Matt,P�ielsticker added that the color was Energy Star approved for reflectivity. Commissioner
Evans "questioned the'need for it when an asphalt shingle roof is acceptable with the 4:12 roof
pitch.
Commissioner Green. stated that the light fixtures need to be Night Sky Compliant.
Commissioner Evans asked if he would make that a condition if he made a motion.
Commissioner Grer6d responded that he would. Commissioner Green stated that he also had
concerns about the colors for the building. He stated that it wouldn't fit in with the warm colors
of the neighborhood.
Commissioner Lane stated that he was concerned with the light fixtures as well, and agreed
with Commissioner Green's comments. He also had concerns about the metal roof and how it
meets the asphalt shingle roof. Mr. Lane also had concerns with the colors of the building.
Commissioner Prince stated that the outdoor lights are a concern of his as well. Julie
{Spinnato asked if the removal of the recessed cans would be acceptable. Scott stated that he
would prefer the fully cutoff design.
Commissioner Struve stated that his concern is also the light fixtures.
6
Commissioner Goulding stated that he agreed with the previous comments.
Commissioner Evans stated that a Night Sky Approved light fixture would be needed instead
of the sconces.
Buzz Reynolds stated that he understood the comments and stated that he would work with
staff to meet this requirement.
Action: Commissioner Green moved to approve Lot 7, Western Sage, as revised, with the
condition that the wall sconces and any other exterior light meet or beat the Night Sky
Compliance rating and Staff will review the revised lighting plan prior to building permit.
Commissioner Goulding seconded the motion and it passed 6-0..,
B. Perdzock Residence
Property Location: Lot 83, Block 4, Wildridge Subdivision /
Applicant: Langenwalter Architects / Owner. John & Janet F
Description: Review of a single-family residence on-aad
Road East. The proposal is for a 34' maximum height, and
with stucco and stone veneer siding. A Sketch Design
reviewed at the August 5, 2008 Planning and2ohing Com
Discussion: Jared Barnes highlighted staffs report ;and
during the previous sketch design review of this project: T
the Engineering Department were mentioned. Jared Barne
storage areas if a guardrail were to be.required for this pr
building materials are provided, an"d the proposed colors
sensor must also be added to the landWaape.plant ,
Road East
uplex zoned property on Wildridge
the structuress composed primarily
application for. this property was
mission meeting.
,the :deliberations -that took place
he drainage issues brought forth by
s expressed concern with the snow
operty. He stated that at least two
are'
earth tone in nature. A rain
Jared Barnes mentioned that Staff is f6commehding-tabling this application due to conflicts
with Sections A -D of the Design Guidelines./If the Commission were to approve the project,
Jared Barnes recommended that the Commission utilize the ten (10) staff recommended
conditions, minus condition.number 7. `y
Commissioner Lane, questioned the light fixture proposed, and if it meets the night sky
ordinance. Staff responded"th"at it did appear to meet the Design Guidelines.
Com missioner-Prince 'questioned -the -min sensor note and if more would be required than is
shown" on -sheet L1. Jared Bames responded that this item was overlooked, and the rain
sensor note provided"would'be sufficient.
The -applicant, Kathy. Langenwalter, addressed the Commission. She began by speaking to
the"cdmmissioner concerns that were brought up during sketch review, such as the apparent
lack of stone on the building; she mentioned that more has been added. Wood has been
added on the garage 'doors at the Commission's request, and the entrance ridge is now
centered `-,Commissioner Green wanted to know if a Chevy Suburban could get out of the
middle car garage with'a two point turn. The response was affirmative.
Kathy Langenwalter continued by demonstrating that the required snow storage can be
provided at 201/o, without the need to redesign the driveway and avoid interfering with the
guardrail. Commissioner Struve questioned what type of guardrail will be used, and Kathy
Langenwalter stated that it would be a typical °highway" type design. Kathy mentioned that a
French drain would be utilized for drainage out of the driveway.
The applicant brought up the fact that the neighboring property owner also used a retaining
wall in the abutting easement and that the owners of this property desire to use the same
retaining wall layout and resulting encroachment.
Ms. Langenwalter mentioned the light fixture, and stated that the wattage is up to the owners
A broader lighting discussion between Commissioners ensued. Commissioner Prince
questioned the number of lighting fixtures on the building.
Commissioner Goulding feels that most of the previous discussion points have been
addressed. However, he questioned the varied use of materials on other elevations of the
building — in particular, the elevations other than the north. Ms. Langenwalter discussed the
rationale for using the large areas of stucco including maintenance related issues and
ecological reasons.
Commissioner Goulding reiterated his concern with how the exeterior materials are applied to
the building. He felt that the north elevation met the intent of the guidelines, but others did not.
Commissioner Struve felt that the sketch comments have been addressed, and it meets the
design guidelines. He did have an issue with the wattage of the light bulbs.
Commissioner Prince felt that the structure did fit in with the neighborhood and the lighting did
need to be addressed.
Commissioner Lane also believed that the west, south; and east elevations and the materiality
needed to be addressed. The lighting was also apparent conflict for Commissioner Lane.
The applicant responded that the elevations:are.broken up, and stepped in appearance to
avoid the appearance of one material. Kathy Langenwalter. felt that the materials do meet
what the guidelines ask for, and the structure is,.compatible with the neighborhood. She
explained that budget issues were also a concern to the owners with other building materials.
Commissioner Green was in general -agreement with the concerns expressed by the other
Commissioners. He showed appreciation for how the applicant responded to some of the
previous concerns. `� ` "�. I/
Commissioner Prince pointed out the landscaping,cii the south side and felt that increased
landscaping is warranted. Kathy Langenwalter responded that the view shed is a concern
when placing more landscaping on this elevation of the building.
Commissioner Evans expressed issue with the quantity and type of lighting proposed. He felt
that a Dark%Sky, compliant fxture should "6e -,used, given the number of fixtures. He
understands Commissioner�Goulding's comments on materiality, but felt that it did meet the
minimuum.guidelines.\',
Action: -Commissioner Struve moved t appove the Final Design Application for Lot 83, Block
4; .Wildridge Subdivision: first three conditions as stated in staffs report; condition #4 - light
fixtures are no larger than 40, watCincandescent or equivalent; staff will review full -cutoff
options, and conditions ##9 and #10 as drafted in the report.
Motion dies with no second.
CommissionerPrince moved to approve with conditions #1, #2, #3, #4 (and that #5 has
already been, addressed by the applicant); #6, #9, and #10 from staffs report; and the
maximum 40`watt bulbs for lighting with Dark Sky Ordinance approved fixtures; and revised
landscaping on south side of the structure will be approved by Staff with an increased number
of plantings.
Commissioner Green seconds the motion.
Commissioner Evans discussed the motion, and questioned if condition #6 could be removed.
Commissioner Prince was in agreement with the revised motion to remove condition #6, and
Green was in agreement.
The motion passed with 4-2 vote.
Q
VIII. PUD & Preliminary Subdivision: Red House Annexation Parcel — (CONTINUED PUBLIC
HEARING)
Property Location: Lots 1-2, Red House Exemption Plat 138361 Highway 6
Applicant: Rick Pylman, Pylman and Associates / Owner. Vail Corporation
Descrintion: The applicant and property owner, the Vail Corporation, represented by Rick
Pylman of Pylman and Associates, is proposing a new Planned Unit Development (PUD) for a
development site currently located in unincorporated Eagle County and zoned Commercial
Limited (CL) under the County's zoning regulations.
Discussion: Matt Gennett presented Staffs Report highlighting all,of the applications that are
currently in process for this project. He also highlighted a few,of-the modifications from the
previous submittal. Matt Gennett stated that one of the changes was to the proposed
Whitewater Park viewing platform on the river. Instead, the applicant has proposed a path
leading east, under the bridge to a new kayak drop-in location Non the north east edge of the
property. , '�4 IN �
Commissioner Evans asked if all of the referrals re"podded. Matt Gennett stated that not all
have been received and outlined those received.ttius far. `
Commissioner Evans asked about the Ietteijeceived from °the Avon Histori al\Committee. He
stated that a letter would not be acceptable�as-a nomination for Historical' designation.
Commissioner Green questioned the letter and the relocation of the building.' Commissioner
Evans stated that until a parcel goes through the proper process it shouldn't be discussed.
Rick Pylman, Pylman and Associates presented the team f t is with the himself representing
the applicant. He outlined the deveiopment-statistics, specifically -the number of units, size of
units, and parking for the units. �,,� `` r
Rick Pylman discussed the river setback%encroachments-on;both sides. He showed that the
largest encroachment -would be an on-grade�i2 foot -encroachment into the Beaver Creek
setback. The other encroachments max\ou{ at 10 feet and use boulder retaining walls less
than four feet in.tiei4ht. .. '
Brandt Marotta VaiCResort Development Company,'discussed the kayak park access. The
path will be three feet in.width`and.be made of crusher rock and will be underneath the bridge.
He also stated the land dedicha
ation.tfwould be given to the Town.
Gary' -Brooks,.. IA pine Engineering, stated that there was a construction and maintenance
easement. He 'stated, that there,was, an'area larger in size and it would be conveyed to the
Town and that the current easement would be vacated.
Commissioner Goulding`asked'-why the Town would be receiving a piece of land that the
developer could not develop. Rick Pylman responded that the Town asked for the land and
the developer agreed to deed it to the Town.
Commissioner Greewasked about the setbacks and how the correspond to the land to be
deeded to the town:.Matt Gennett asked that the setbacks be shown on a survey.
1;
Brandt Marott commented on the pedestrian access. He stated that the applicants are
proposing to use flashing crosswalks. He also stated that they are proposing to enhance the
median on Highway 6. The sidewalk would be modified with a 6 foot landscape buffer and a 7
foot sidewalk.
Brandt Marott stated that the project would be sustainable. The applicants are proposing
environmental stewardship, Water treatment, Reduce Carbon Footprint, Preserve and Restore
Natural Habitat, and Water Conservation.
Brandt Marott commented on the architecture of the proposal. He stated that a new architect
has proposed a different style. Each building will be complementary but not identical. He also
stated that the two 2 -bedroom unit would be purchased after building permit is issued by prior
to the CO of the units.
Rick Pylman stated that the applicants are in agreement with the staff recommendation and
the six conditions.
Commissioner Prince asked how the people staying here would get to the Beaver Creek bus
system. Rick Pylman stated that the applicants didn't address that. He also stated that they
were more concerned with getting pedestrians into Town and the shops.
Commissioner Green questioned the Deed Restricted Housing. Brandt Marott responded that
they are proposing to buy a current built product in the Town of,Avon and lower the price
through a deed restriction and deed it to the Town for their Housing'Program.
Commissioner Green questioned the setbacks when there..is`a building envelope that is
already being proposed. Matt Gennett stated that if easements'change this allows the design
to potentially change. Commissioner Evans stated that they don't want that to happen and
they would prefer to have a building envelope instead of•a setback.
The Public Hearing was opened and closed due to no person wanting to comment.
Commissioner Goulding liked the new Kayak access. He\did state that 'kfeet'could not be
wide enough and that a slightly larger path `would 'be better.`.�He did ask who owns the land
under the bridge. Justin Hildreth stated that it was'owned"by`t10-1
he Town.
Commissioner Goulding stated that there is a different material used for road crossings and
asked if the applicant was going tc `use -that. Rick Pylman responded that they were not going
to do that. Commissioner Goulding stated'that he would lik`e,tiNee both of the crosswalks but
he knows that it could be possible on the Avon Road crosswalk. He stated that the Avon Road
crosswalk needs to be consistent with the rest of the Town crosswalks.
Commissioner Goulding stated that the nice-sidewalk'is� great on their property, but once you
get to the bridge the -sidewalk is very uninviting. He is. most concerned with that pedestrian
access. Commissioner Green, asked whaWresponsibility the developer has to fix a problem
something similar to what Commissioner Goulding is asking for. Commissioner Goulding
stated that he wassolely identifying a problem and that this problem is being created by the
development on this'property.. , w.~
Commissioner`Gouldirig�commented`that'the proposed Housing Program should reflect
something out -of tfie need area as outlined by the most recent Housing Needs Assessment
anis deed restricting it so that it addresses a need.
�Cominissioner Struve stated that. he agrees that the bridge needs to be fixed but it is not the
sole issue of the developer. He stated that he would love to see the applicant participate. He
appreciates that the architecture is a great step.
Commissioner Prince echoed Commissioner Goulding's comments on the Attainable Housing
proposed. He,also,agreed that the crosswalks need to be compliant with the Town's standard.
Commissioner Lane has the same concerns on the Attainable Housing. He is excited about
the new architecture and wants to see how the sustainability is going to be incorporated.
Commissioner Green had concerns about the patios extending into the setbacks. He wants to
make sure the landscaping and revegetation of those areas are done correctly. He would
prefer to see a building envelope over setbacks. He feels that sustainability needs to address
the energy consumption and viewing Architecture 2030 regulations would be beneficial.
Commissioner Evans stated that sustainability is paramount. He doesn't care what
sustainable organization you go with because the means do not justify the ends. He would
love to see a process that heads to an end result. The result could be a reduction of energy
and the applicant needs to outline the processes to meet that goal. Commissioner Evans also
Q
agrees with the AMI comments Commissioner Goulding brought up. He doesn't think it is the
developer's responsibility to fix the bridge.
Commissioner Evans asked Matt Gennett what the next steps were. Matt Gennett responded
that the next step would be to ask Staff to come back with a Resolution that memorializes the
comments made at this meeting.
Commissioner Goulding stated that he wanted the applicant to propose steps that may not
cost the applicant a penny but would tell the town how to improve the bridge. He stated that
many of the potential conditions would need to be readdressed instead of becoming
conditions.
Commissioner Goulding asked his fellow Commissioners if they felt the current Town of Avon
Design Guidelines would be strong enough to hold the applicant to the standards shown in the
sketch. . ,
Action: Commissioner Goulding moved to table Item
first January meeting. Commissioner Struve second(
IX. Rezoning—(PUBLIC HEARING)
Property Location: Lots 1A & 1 B, 2, and Tr,
ApplicantlOwner. Jennifer Strehler, Dept of
X.
..Red House Annexation Parcel to the
re motion and,it passed 6-0.
Road
portation Director
11
Descriotion: The Town of Avon is proposing to reione .four parcels of land, which together
encompass the Swift Gulch Public Works and Transportation facility. The current zoning is
Planned Unit Development (PUD)PUD for the subject properties. This application would
rezone "Government, Park, and Employee Housing (GP&)".. According to the Avon
Municipal Code, the GPEH zone dist rict'is,"rntended to provide stes for parks, community
centers, park and recreation facilities, `water storage treatment and distribution systems, fire
station, governmental facilities and publicland/or.pn'vate housing units for Avon area
employees.° A _
,fir �. '� •� � s
Discussion: Matt.Pielsticker presented Staffs Report and highlighted the four review criteria
for a rezoning:pursuant to Title"l7, AMC.
Jennifer Strehler, 'Public Works .Director representing the Town, presented a slideshow
outlining.the_P,urpose and Benefits of the proposed zone change and accompanying materials
to support the proposal
Commissioner Green asked if a subdivision was being asked for. Matt Pielsticker said that a
Subdivision process would be separate from this application.
Commissioner Evans'asked if there are any allowed uses by the PUD that are not allowed by
GPEH zoning. Jennifer Strehler said that the fueling station was one, but that the Zoning
Administrator could deem that it is acceptable.
Commissioner Evans opened and closed the Public Hearing due to nobody wanting to
respond.
Action: Commissioner moved to approve Item IX. Rezoning — Lots 1A, 1B, 2, and Tract AA
with the findings listed in Staffs Report. Commissioner Green seconded the motion and it
passed 6-0.
Other Business
The commissioners mentioned that there was a sign on Metcalf Road which was not
approved for Maximum Comfort Pool and Spa.
XI. Adjourn
The meeting was adjourned at 9:40 PM.
TOWN OF AVON �7
L
P ANNING AND ZONING COMMISSION AVO N
C O L O R A D O
RESOLUTION NO. 08-09
A RESOLUTION RECOMMENDING APPROVAL TO
THE TOWN COUNCIL OF THE REZONING
APPLICATION FOR LOTS 1A, 111, 2, SWIFT GULCH
ADDITION, AND TRACT AA, MOUNTAIN STAR,
TOWN OF AVON, EAGLE COUNTY, COLORADO
WHEREAS, The Town of Avon Municipal Code Section 17.28 outlines the procedures
for the rezoning of real property in the Town of Avon;
WHEREAS, The Town of Avon Public Works and Transportation Department filed an
application to rezone the following Town of Avon owned parcels of land from Planned
Unit Development (PUD), to Government, Park, and Employee Housing (GPEH):
Lot I A & Lot 1 B, A Resubdivision of Lot 1, Swift Gulch Addition
Lot 2, Swift Gulch Addition
Tract AA — Second Amendment, Mountain Star Filing No. 2;
WHEREAS, Pursuant to the pertinent noticing procedures required by law, the Planning
and Zoning Commission of the Town of Avon held a public hearing on December 16,
2008; at which time the Planning and Zoning Commission was given the opportunity to
hear both feedback and input from Town Staff and members of the public;
WHEREAS, The Planning and Zoning Commission considered the following review
criteria when evaluating this application:
(1) Is the proposed rezoning justified by changed or changing conditions in the
character of the area proposed to be rezoned?
(2) Is the proposed rezoning consistent with the Comprehensive Plan?
(3) Is the proposed use compatible with the surrounding area or uses?
FAI'lanning & Zoning CommissionlResolutions\20081Res 08-0SSwia Gulch Remning.doe
(4) Are adequate facilities available to serve development for the type and scope
suggested by the proposed zone?; and
WHEREAS, at the December 16, 2008 regular meeting, the Town of Avon Planning and
Zoning Commission voted unanimously to approve the application citing the following
findings:
(1) The proposed rezoning is consistent with the Town of Avon Comprehensive
Plan;
.(2) The proposed rezoning is compatible with the surrounding land -uses; and,
(3) There are adequate facilities available to serve this development for the type
and scope suggested by the proposed zone: GPEH.
NOW, THEREFORE, BE IT RESOLVED, that the Planning and Zoning Commission of
the Town of Avon hereby recommends APPROVAL of the application to rezone said
properties from the zoning designation of PUD, to GPEH.
ADOPTED AND REAFFIRMED THIS 6th DAY OF JANUARY, 2009
SIGNED:
Chris Evans, Chair
ATTEST:
Phil Struve, Secretary
Date:
Date:
FAManning & Zoning CommissionUtaolutions12008%cs 08-0BSwift Gulch Remning.doc
V. _f/r`
AVON
Memo C 0 L o R A D o
To: The Planning and Zoning Commission
From: Matt Gennett, AICP, Planning Manager
Date December 16, 2008 Planning and Zoning Commission Meeting
Re: Red House PUD and Preliminary Plan for Subdivision Applications
At their December 16, 2008 meeting, the Planning and Zoning Commission tabled the
Red House PUD and Preliminary Plan for Subdivision applications stating the applicant
needed to return in order to address, in more detail, the following items:
1. The Proposed Attainable Housing Mitigation Plan;
2. Feasibility of Expanded Improvements for Pedestrian Access to Town Center East,
3. General Methods of achieving `Sustainability" (LEEDS, "Green"Architecture, etc.);
4. Use of a Building Envelope versus Setbacks,
5. Crosswalk Improvements and Materials, and,
6. Possible Widening of Proposed Kayaker Access Path.
The applicant and property owner, the Vail Corporation, and their representative, Rick Pylman
of Pylman and Associates, are prepared to address each of these items during the January 6,
2009 hearing of the Planning and Zoning Commission.
Attached to this memorandum as Exhibit A are two sheets submitted by the applicant to
address their proposed sustainability methodologies, and Exhibit B is the original Staff Report
from the December 16, 2008 Commission hearing which does not include all of the
attachments thereto. Staffs recommendation, as stated in the December 16 report cited
above, has remained unchanged.
Attachments:
Exhibit A: Sustainable Architectural and Site Features (2 pages)
Exhibit B: Staff Report dated December 12, 2008
d al4io-S
0
3F
11)
Al
.,
.,
Exhibit B
AVON
Staff Report COLORADO
Zoning — PUD / Preliminary
Subdivision Applications &
Comprehensive Plan Amendment
December 16, 2008 Planning & Zoning Commission Meeting
Report date December 12, 2008
Project type Planned Unit Development (PUD) &
corresponding applications
Legal description Lots 1 and 2, Red House Exemption Plat
Current zoning Eagle County, Commercial Limited (CL)
Address 038361 Highway 6, Avon Area, Eagle County
Project Summary
The applicant and property owner, the Vail Corporation, represented by Rick Pylman of
Pylman and Associates, is proposing a new Planned Unit Development (PUD) on a
development site currently located in unincorporated Eagle • County and zoned
Commercial Limited (CL) under the County's zoning regulations. The proposed PUD
entails concurrent applications for a Specific Amendment to the 2006 Town of Avon
Comprehensive Plan, a Preliminary Plan for Subdivision, and the execution of an
Annexation which is currently in -process and has met the prerequisite eligibility
requirements.
The "Red House" property is currently comprised of two separately defined parcels of
land, legally described as Lots 1 and 2, Red House Exemption Plat, Eagle County,
Colorado, and the Vail Corporation owns both lots. The defined boundaries of Lot 1
encompass 0.387 acres of land adjacent to Highway 6, and Lot 2 contains 1.054 acres
contiguous to the southern bank of the Eagle River.
As noted above, the two subject lots of the PUD proposal have not been annexed into
the Town of Avon and are currently under the land use jurisdiction of Eagle County.
However, an annexation petition was filed in accordance with the applicable State
Statutes and has been found in "Substantial Compliance" via resolution by Council, and
the annexation will proceed forward concurrently with the Comp'Plan amendment,
zoning and subdivision applications.
It is important to note the applicant has revised their application submittal to
accommodate requests made by both staff and the Commission as follows: the existing
kayak park pedestrian easement will be vacated and a parcel of land adjacent to the
river on the subject property, as depicted in Attachment E, shall be conveyed to the
Town thereby providing the Town ownership of the entire south edge of the river; instead
of the walkway down to a whitewater park viewing area, a new footpath from the existing
put -in to the southwest of the property running east along the river adjacent to the
subject site will be created; an improved pedestrian connection along Avon Road and
Highway 6 in the form of a new seven foot (7') wide sidewalk with a six foot (6) wide
landscape buffer to provide a safer and more aesthetically pleasing walking experience;
and, the applicant has provided more detail regarding the attainable housing plan to
mitigate the employee generation associated with this development (Attachment Q. The
property owner will buy two two-bedroom units on the free market and reduce the price
based on the AMI range and relative affordability of each one (i.e. if one is bought at a
price affordable for a household eaming140% of the AMI, it will be resold at a price
affordable for households eaming 120% of the AMI with a deed restriction in place to
cap the maximum price it could be sold for again in the future).
Staff Recommendations
Regarding the application for a specific amendment to the 2006 Town of Avon
Comorehensive Plan, Staff recommends the Planning and Zoning Commission Approve
Resolution No. 08-07 (Attachment B) with the finding that it meets the four criteria for
such an amendment as discussed at the November 18, 2008 meeting of the
Commission.
Staff recommends the Commission forward a recommendation of Approval with
Conditions to the Avon Town Council of the applicant's request to rezone the subject
property to a new PUD designation, and the concurrent Preliminary Plan for Subdivision,
with the finding that the application meets the pertinent twelve (12) criteria for a PUD
subject to the following conditions:
1. The property owner shall design and construct, at its sole expense, the path
improvements along the riverside shore, as described in the letter from Rick
Pylman of Pylman & Associates dated December 10, 2008 and depicted on the
revised plans (Attachment E). These improvements shall be reviewed and
approved by the Town and completed prior to the issuance of a Temporary
Certificate of Occupancy;
2. The property owner shall convey to the Town, in fee simple, the River Tract, as
more specifically described in Attachment E (Conceptual Parcel Plan). The River
Tract shall be conveyed prior to issuance of a building permit;
3. The property owner shall provide an affordable housing plan, which provides for
a minimum of two deed -restricted, two-bedroom offsite units. The terms and
conditions of the housing plan shall be reviewed and approved by the Town
Council concurrent with the approval of the Annexation and Development
Agreement;
4. A minimum of fifteen (15) Single Family Equivalencies (SFEs) shall be conveyed
to the Town, in accordance with Chapter 16.24 of the Avon Municipal Code;
5. The form and content of the PUD Development Plan shall be reviewed and
approved by staff prior to Council review; and,
2
6. Except as otherwise modified by this approval, all material representations made
by the applicant or applicant representatives in this application and in public
hearings shall be adhered to and considered binding conditions of approval.
Should the Commission choose to follow Staffs recommendation and impose the
conditions of approval listed above, Staff will return to the Commission at their next
regularly scheduled hearing with a resolution to memorialize this decision.
Background
The Red House Parcel development site is 1.44 acres in area and is mainly at the
approximate level of Highway 6 and Avon Road with steeply sloped banks down to
Beaver Creek and the Eagle River. The site contains sections of both the Eagle River
and Beaver Creek in areas below the annual high water mark. The Town of Avon
considers °Buildable Area" to be land area that is not underwater, does not contain
public rights-of-way or areas in excess of forty percent (40%) slope. Therefore, after
subtracting the area of those pieces of land presently underwater from the total 1.44
acres of the subject property, the resultant buildable area equals 1.164 acres. Portions
of the existing river bank on the proposed development site have been impacted by
previous uses. Weeds and non-native plants grow rampantly along the upper level of
the riverbank. The site has likewise been affected by construction of the Avon Road
roundabout and Bob the Bridge when a small piece of land legally described as Parcel
TK -14 was separated from the subject property to accommodate public utilities relocated
due to the road project. The Highway 6 access to the site was reconfigured during
construction of the roundabout as well. During the summers of 2007 and 2008, the
applicant's property served as the access and staging for the construction of the Avon
Whitewater Park. A crane pad was constructed on the property during the Whitewater
Park project work and remains on the site at present. Also during this timeframe, a small
piece of the property, including a segment of the riverbank from the flat area down to the
edge of water was disturbed. A reclamation plan for the impacted part of the riverbank
was implemented and appears to be in the initial stages of vegetative growth.
The proposed PUD development standards and allowed uses are very similar to those
found in the existing Residential Medium Density (RMD) zoning designation found in
Title 17 of the Avon Municipal Code (AMC). The following development standards
proposed by the applicant reflect what is stated in RMD Zone District.
"The Red House° PUD Development Standards:
A. Proposed Uses:
The proposed uses for the site include residential townhomes as an Allowed Use
and Residential Bed and Breakfast and Home Occupation as a Special Review
Use.
B. Density:
The allowed density shall be fifteen (15) dwelling units
C. Building Height:
Maximum building height shall not exceed forty-eight (48) feet
D. Maximum site coverage:
Fitly (50) %
E. Minimum landscape area:
,.
Twenty rive (25)%
F. Setbacks -
Front: Twenty five (25) feet.
Rear. Ten (10) feet.
Stream: Thirty feet (30) feet for buildings, per plan for on grade patios and
second floor balconies.
The conceptual plan for the Red House Parcel depicts fifteen (15) townhome units in
three separate buildings on the 1.164 buildable acres for an overall proposed density of
12.8 units per buildable acre. Two of the proposed units are approximately 2,300 square
feet.
The Red House Parcel is presently under the jurisdiction of Eagle County as it is not
within the incorporated municipal boundary of the Town of Avon and, as such, it is zoned
"Commercial Limited (CL)" via the Eaole Countv Land Use Regulations. The Eagle
Countv Land Use Regulations contain the following description of the CL Zone District:
Commercial Limited (CL). The purpose of the Commercial Limited (CL) zone
district is to provide for the range of commercial uses needed to meet the daily or
frequent shopping needs of neighborhood residents in the immediate area. Uses
permitted in this zone district are limited to those listed under the retail,
restaurant, personal services and office categories of the use schedule.
The land uses presently allowed on the site include retail stores, banks, carwashes,
medical and professional offices, and restaurants. The property is encumbered by
several utility easements, including significant water and sewer transmission lines that
affect site planning considerations of the parcel. Any change in use of the Red House
Parcel will likely require access improvements that will result in the elimination of left
turns in and out of the site. This type of change to the access would negatively affect the
viability of commercial operations on the site. After reviewing these site considerations
and upon analyzing multiple conceptual design scenarios, the applicant and their
representatives derived the proposed site plan design and general layout of the project.
The townhome residences are designed as three separate buildings: a four-plex and a
five-plex along the Eagle River and Beaver Creek frontage, and a six-plex building on
the interior portion of the lot. Ten of the units are three-bedroom, two car garage homes
of approximately 2,300 square feet; and the remaining five townhomes are three
bedroom, one car garage units of approximately 1,700 square feet in size. The typical
layout of these three story homes consists of the garage and a bedroom on the ground
level, with kitchens, dining and living rooms situated on the second floor topped off with
two bedrooms and a bathroom on the third level.
Due to the steepness riverbank slopes, the previously disturbed areas range from
eighteen to twenty-two feet above the average high water mark The design of the
riverside units depicts ground -level patios encroaching anywhere from three to eleven
feet (3'-11') into the thirty-foot (30') setback from the Eagle River. The patios are at -
grade and could include a loose -stacked boulder wall design not to exceed three to four
feet (3'-4') in height. The area atop the riverbank does is not riparian or a natural
wetland. The proposed landscape plan appears to have been crafted in an attempt to
reclaim and foster vegetative growth upon the disturbed areas within the stream setback
which could restore the land to a more natural -looking condition.
4
Emolovee Housino
The 2005 Eagle County Nexus Update is the dataset used to forecast employee
generation rates associated with residential development ("residential linkage"). The
nexus report utilizes a formula to calculate new residential development employee
generation figures based upon the unit size which indicates that the Red House Parcel
would generate 2.55 Full Time Equivalent employees under the proposed development
scenario. The aforementioned figure is generated as follows: Unit sizes of 1,500-1,999
generate 0.15 FTE employees per unit. Unit sizes of 2,000-2,499 generate 0.18 FTE
employees per unit. The Red House Parcel includes five units within the first size range
and ten within the latter which equates to the following:
5 units x 0.15 per unit = 0.75; 10 units x 0.18 per unit = 1.8; Total FTE employees = 2.55
The 2008 Eagle County Nexus Update assumes that there are 1.8 employees per each
employee household. In order to calculate the actual housing unit demand the FTE
number is divided by 1.8 to determine the employee unit demand generated by any
particular residential proposal. The employee household demand therefore equates to
1.4 households when this formula is applied to the Red House parcel. It is the intent of
the applicant to provide for an equivalent of two two-bedroom units in an off-site location
within the Town of Avon. Please see the attached letter from Rick Pylman dated
December 10, 2008 (Attachment E).
Process
Annexation
The initial step in this process was the landowner submitting a -valid Petition for
Annexation request to the Town of Avon. On May 13, 2008 the Avon Town Council
adopted Resolution No. 08-16, Series of 2008, finding that the landowner petition was in
substantial compliance with the applicable Colorado State Statutes. On June 24, 2008
the Avon Town Council adopted resolution No. 08-21, which determined that the Red
House Parcel meets the eligibility requirements for annexation. These findings include
the fact that there is at least one-sixth boundary contiguity with the Town and that the
area is urbanized and is capable of being integrated into the Town. This step gives the
Town of Avon jurisdiction to accept and review land use applications for lands that are
not technically within the boundaries of the Town. The Annexation, Comprehensive Pan
Amendment, Subdivision and PUD applications will now run concurrently and may be
formally voted upon at different hearings. The property will not be formally annexed into
the Town until and unless the Subdivision and PUD applications are approved. The
formal annexation will include an Annexation Ordinance and an Annexation and
Development Agreement by Ordinance.
Comorehensive Plan Amendment
Although the subject property is not located within the Town's municipal boundaries, the
2006 Future Land Use Map recognized the property for its annexation potential and
thereby designated the subject property as Civic/Public use. The Civic/Public
designation is intended to contain uses related to community services, such as a fire
station, school, community centers, hospitals, municipal centers, recreation centers,
police stations, and municipal maintenance yards. Each proposed public use would be
5
evaluated separately in terms of its land area and topographical constraints, as well as
compatibility with adjacent uses.
The applicant is requesting a "Specific Amendment" to change the future land use
designation from Civic/Public to Residential Medium Density, which is intended to
provide sites for multi -family dwellings at a density of no less than 7.5 and no greater
than 15 dwellings units per acre.
Amendment criteria: The following criteria shall be used by the Planning and Zoning
Commission and Town Council when considering a Comprehensive Plan amendment
proposal:
1. Include justification for proposed change;
2. Be in conformance with the Plan's overall vision and its supporting goals and
policies;
3. Be compatible with existing and planned surrounding land uses; and
4. Not result in excessive detrimental impacts to Avon's existing or planned
infrastructure system.
Given the justification stated by the applicant for the proposed change, which is the
original designation was meant to accommodate a use no longer being contemplated on
the subject property (fire station) staff agrees the amendment request is justified. The
request for amendment also is in conformance with the overall vision, supporting goals,
and vision of the plan; and is compatible with existing and planned surrounding land
uses. Staff also does not foresee any excessive detrimental impacts to the Town's
existing or planned infrastructure systems.
In consideration of the criteria listed above and the following pertinent Planning
Principles excerpted from the Town of Avon Comprehensive Plan, Staff is
recommending approval of the Speck Comprehensive Plan Amendment request made
by the applicant.
District 6: U.S. Highway 6 Gateway Corridor
Planning Principles:
• Enhance the U.S. Highway 6 right-of-way as a landscaped boulevard/parkway to
provide a sense of arrival and departure for those traveling to and from Avon and to
strengthen Avon's overall community image and identity.
• Limit development of south side of U.S. Highway 6 to guest service facilities near
the Village Road intersection and to neighborhood supporting commercial near the
Prater Lane intersection.
• Strengthen the association between the Town and Beaver Creek through
compatible streetscape elements, efficient access, and cooperative visitor information
center.
• Encourage screening of ski area parking areas and other accessory uses.
• Create strong pedestrian connections to the Confluence and the East Town
Center Districts.
• Site buildings of various sizes (but smaller than those found in the West Town
Center District) to maximize sun exposure, protect views, break up building bulk, and
prevent a canyon effect on Highway 6.
• Minimize cut areas and preserve areas of steep slopes. Buildings should be built
into the hillside and stepped up with rising topography to reduce their dominance above
U.S. Highway 6.
• Ensure that vehicular access points align with existing roads and create clean
intersections.
• Consider buildable area when determining an appropriate scale and density for
development.
Enhance river access to the future whitewater park.
Subdivision
The site currently consists of two separate parcels of land legally described as Lots 1
and 2, Red.House Exemption Plat. The site is bisected on an east -west bias by the
common property line of these two parcels. The intent is to eliminate this common
property line, creating one single parcel of land. In order to accomplish that -action a
Preliminary and Final Plat Subdivision approval will be required. This report and the
accompanying plans include all required information to review the Preliminary Plan
request.
Surrounding Land Uses:
The existing land use and zoning for the surrounding properties are as follows:
• North: Whitewater Park Viewing Area / Open Space (OS)
• South: Highway 6 & Entrance to Beaver Creek / NA
• West: River Put -in / Open Space (OS)
• East: Riverside Subdivision / PUD Open Space (OS)
This application is a noticed public hearing with written notice provided to property
owners within 3G0' of the subject property. To date staff has received no public
comments regarding the applicant's requests. In addition to the required public notice,
staff has transmitted the application material to the following agencies, with their
comments summarized below:
Eaale Countv School District Comments
To date, staff has not received a response to our request for comments.
Eaole River Water and Sanitation District
The applicant has been working with the District and Authority on water allocation.
Colorado Deoartment of Transoortation
To date, staff has not received a response to our request for comments.
7
Eagle Countv Planninq Department
Eagle County did not have specific referral comments related to this application.
Eaqle Countv Fire Protection District
To date, staff has not received a response to our request for comments.
Colorado Department of Wildlife
To date, staff has not received a response to our request for comments.
Eaqle County Health Services District
To date, staff has not received a response to our request for comments.
ECO Trails
To date, staff has not received a response to our request for comments.
Avon Historic Preservation Advisory Committee
A letter to the Commission dated November 17, 2008 was received by Planning from
Karen Nagel asking that serious consideration be given to relocating the Red House
structure to another location and using it in an adaptive manner. The applicant
commissioned a study of the structure by a qualified expert which determined the
historic significance of the original structure was lost upon changes to features such as
the window penetrations and multiple add-ons over the course of its existence.
PUD Process
Property in Avon may be zoned as one of the traditional zone districts found in the Town
Land Use Regulations or may be zoned through a PUD process. As this property has
not been within the Town boundary there has been no Town of Avon zone district
assigned to the property. The application of zoning is a necessary step in the annexation
process.
The PUD process gives the Town of Avon control over the review process and allows
the applicant and the Town to work together to establish site-specific design and
development controls for the property. Staff is not making a formal recommendation to
the Commission with respect to the PUD application and the applicable PUD Design
Criteria. The following are the criteria to be used by Staff, Commission, and Council
when reviewing and making a formal decision regarding a PUD application
(17.20.110(h)):
1. Conformance with the Town of Avon Comprehensive Plan Goals and
Objectives.
2. Conformity and compliance with the overall design theme of the Town, the
sub -area design recommendations and design guidelines of the Town.
3. Design compatibility with the immediate environment, neighborhood, and
adjacent properties relative to architectural design, scale, bulk, building height,
buffer zones, character, and orientation.
4. Uses, activity, and density which provide a compatible, efficient, and
workable relationship with surrounding uses and activity.
5. identscation and mitigation or avoidance of natural and/or geologic hazards
that affect the property upon which the PUD is proposed.
6. Site plan, building design and location and open space provisions designed
to produce a functional development responsive and sensitive to natural features,
vegetation and overall aesthetic quality of the community.
7. A circulation system designed for both vehicles and pedestrians addressing
on and off site traffic circulation that is compatible with the Town Transportation
Plan.
B. Functional and aesthetic landscaping and open space in order to optimize
and preserve natural features, recreation, views and function.
9. Phasing plan or subdivision plan that will maintain a workable, functional, and
efficient relationship throughout the development of the PUD. The phasing plan
shall clearly demonstrate that each phase can be workable, functional and
efficient without relying upon completion of future project phases.
10. Adequacy of public services such as sewer, water, schools, transportation
systems, roads, parks, and police and fire protection.
11. That the existing streets and roads are suitable and adequate to carry
anticipated traffic within the proposed PUD and in the vicinity of the proposed
PUD.
12. That the PUD or amendment to PUD requested provides evidence of
substantial compliance with the following public purpose provisions, as outlined
in Section 17.28.085 of the Avon Municipal Code (as follows):
Zoning applications
The Town shall consider the following public benefit criteria when evaluating
zoning applications:
(1) The application demonstrates a public purpose which the current zoning
entitlements cannot achieve.
(2) Approval of the zoning application provides long-term economic, cultural
or social community benefits that are equal to or greater than potential
adverse impacts as a result of the changed zoning rights.
(3) The flexibility afforded in approval of the zoning application will result in
better siting of the development, preserving valued environmental and
cultural resources and increasing the amount of public benefit consistent with
the community master plan documents.
As stated in the Staff Recommendation on Page 2 of this report, Staff has determined
that all the pertinent criteria have been meet with the current application materials or will
be met upon the implementation of the recommended conditions of approval.
0
If you have any questions regarding this project or any other planning matter, please call
me at 7484002, or stop by the Community Development Department.
Respectfully submitted,
Matthew R. Gennett, AICP
Planning Manager
Attachments
A: Vicinity Map
B: Resolution No. 08-07
C: Letter from the Avon Historic Preservation Advisory Committee
D: Letter and revised application materials from the applicant (December 10, 2008)
10
WN
WIN
§b6m
.1
Exhibit B
RESOLUTION NO. 08-07
A RESOLUTION TO MAKE SPECIFIC
AMENDMENTS TO THE 2006 TOWN OF AVON
COMPREHENSIVE PLAN AND SETTING FORTH
DETAILS IN REGARD THERETO
WHEREAS, Appendix E of the 2006 Town of Avon Comprehensive Plan ("the Plan")
sets forth procedures and criteria for amending the Plan as follows:
Amendment Criteria: The following criteria shall be used by the Planning and
Zoning Commission and the Town Council when Considering a Comprehensive
Plan amendment proposal. The proposed amendment shall:
1. Include a justification for the proposed change;
2. Be in conformance with the Plan's overall vision and its supporting
goals and policies;
3. Be compatible with existing and planned surrounding land uses; and
4. Not result in excessive detrimental impacts to Avon's existing or
planned infrastructure systems.
WHEREAS, the applicant has requested a specific amendment to the Town of Avon
Future Land Use Map, from a Civic/Public designation to a Medium Density Residential
designation;
WHEREAS, the current Future Land Use Map designation of the subject properties,
"Civic/Public" is no longer appropriate given changes of need related to land uses in the
area since the Comprehensive Plan was adopted in February 2006; and
WHEREAS, compliance with the Amendment Criteria detailed above has been fully
demonstrated as detailed in the cover Staff Memorandum attached hereto;
WHEREAS, on December 2, 2008, the Town of Avon Planning and Zoning
Commission voted unanimously to approve the proposed amendment to the 2006 Town
of Avon Comprehensive Plan.
NOW, THEREFORE, BE IT RESOLVED, that the Planning and Zoning Commission of
the Town of Avon recommends approval of the proposed specific amendment to the 2006
Town of Avon Comorehensive Plan via this Resolution, signed on December 16, 2008.
ADOPTED THIS 16" DAY OF DECEMBER, 2008
Signed:
Date:
Chris Evans, Chair
Attest:
Date:
Phil Struve, Secretary
Exhibit C
November 17, 2008
Planning and Zoning Commission
Town of Avon, Colorado
PO Box 975
Avon, CO 81620
Dear Members of the Planning and Zoning Commission,
The Avon Historic Preservation Committee has been actively
researching the history and historical significance of the house known as the
Red House and Barn which are located at -the northeast quadrant of the
Highway 6/Avon Road roundabout. Based on research conducted by Ron
Sladek of Tatanka Historical Associates, Fort Collins, Colorado, we are
confident that the Red House and Barn is a historic site that merits inclusion
in the Historic Inventory governed by the Town of Avon Ordinance No. 08-
04.
The Red House and Barn appear to have been constructed by its first
owner, Frank Moody, between 1890 and 1905. Frank Moody proved up his
homestead filing for the property. In 1905 he received a patent from the US
General Land Office for a 40 acre parcel including the grounds now
occupied by the Red House and Barn. Frank and Alice S. Moody sold that
40 acre parcel to Stephen A. Bivans in 1905. A log building on the land was
converted by Bivans into a general store (now in Eagle) and the couple lived
in another house, the Red House, located across the road from the store.
Bivans was notably the town postmaster, a position that commonly went to a
prominent store owner. In 1908 Bivans sold the 40 acre parcel and
subdivided it into two parcels, separating the Red House and the Barn for the
first time. The Red House parcel was sold to Henry Nelson and the Barn
parcel to Ernest Steinmann. Over the years the Red House parcel was
owned by J.F. Owings and Company, an offshoot of the Owings Lumber
Company. In 1935 the Avon Lettuce Growers Association relinquished any
claim to the house parcel to Lawrence D. Lewis. A small portion of the
property was transferred to the State Highway Department by Lewis in
1948. In 1981 WMCO Rentals acquired by court decree the house parcel
and in the same year sold it to Vail Associates who own it at the present
time.
The Red House is an early remnant of the community of Avon dating
back to around 1900 if not a decade earlier. The building is in good
condition although it was heavily altered by Vail Associates in 1982. The
small original home can be seen in the 1-1/2 story, southeastern portion of
the building found there today. This was expanded in 1982 through the
construction of one story wood frame additions to the north and west.
The original portion of the house has a steep side -gabled roof with boxed
eaves and wood shingles.
The Avon Historic Preservation Committee recognizes the
significance of the Red House and does not want to see the structure
demolished. We ask that you seriously consider relocating the Red House to
another site in the town of Avon with adaptive reuse.
Thank you for your consideration in this matter.
Sincerely yours,
Karen R. Nagel, PhD
Avon Historic Preservation Committee