PZC Packet 090208 (2)a
-�
AV ON
C O L O R A D O
SITE TOUR (5:00pm — 5:15pm)
Town of Avon Planning & Zoning Commission
Meeting Agenda for September 2, 2008
Avon Town Council Chambers
Meetings are open to the public
Avon Municipal Building 1400 Benchmark Road
Description: Walk down Main Street with Britina Design Group for final review.
WORK SESSION (5:15pm — 5.300m)
Description: Discussion of Regular Meeting agenda items. Open to the public.
REGULAR MEETING (5:30pm)
I. Call to Order
II. Roll Call
III. Additions and Amendments to the Agenda
IV. Conflicts of Interest
V. Consent Agenda
VI.
VII
• Approval of the August 19, 2008 Meeting Minutes
Approval of Resolution 08-06, Recommending Denial of the 'Avon 21' PUD Application
for Lots 21, 65A, 65B, Tract Q, and Parcel TK -3, Block 2, Benchmark at Beaver Creek
Subdivision
Main Street Final Review
Description: Justin Hildreth, Town Engineer, and the professional design team hired to
implement the public way improvements piece of the Town Center West Investment Plan (the
Plan), pursuant to the provisions of Title 12, Avon Municipal Code (AMC) and the
Implementation section of the Plan, will provide a presentation of the finalized drawings and
materials of Main Street.
Final Design Review
Sutter Residence
Property Location: Lot 12, Block 4, Wildridge Subdivision / 5712 Wildridge Road East
Applicant / Owner: Ryan Sutter
Description: This lot will be accessed off of Wildridge Road East and the proposed residence
will measure approximately 6,370 sq. ft. including the garage area. The building is designed
with gabled roofs and utilizes stucco, stone, wood shingles and wood siding on the exterior
walls.
VIII. Other Business
IX. Adjourn
Posted on August 29, 2008 at the following public places within the Town of Avon:
• Avon Municipal Building, main lobby
• . Avon Recreation Center, main lobby
• Alpine Bank, main lobby
• Avon Public Library
On the Internet at httD./Iwww.avon.oro / Please call (970) 748.4030 for directions
;,, 411 Town of Avon Planning & Zoning Commission
- Draft Meeting Minutes for August 19, 2008
AVON Avon Town Council Chambers
Meetings are open to the public
C o L o R A D 0 Avon Municipal Building / 400 Benchmark Road
WORK SESSION (5:OOpm — 5.30pm)
Description: Discussion of Regular Meeting agenda items. Open to the public.
REGULAR MEETING (5:30pm)
Call to Order
The meeting was called to order at approximately 5:40 pm.
II. Roll Call
All Commissioners were present.
III. Additions and Amendments to the Agenda
There were no additions or amendments to the Agenda.
IV. Conflicts of Interest
Commissioner Evans disclosed a potential conflict with Item VII, Timeshare East Sketch
Design Review.
V. Consent Agenda
Approval of the July 15, 2008 Meeting Minutes
Commissioner Prince made a correction to the last bullet point of Other Business, to restate
that what he said was "blight", and not "abandoned". The correct legal description will also be
mentioned for this item. Commissioner Struve made two additional corrections: Item VIII, "the
new trees will be planted as soon possible" to correct "as close as possible;" and Item VI, to
strike his name from the motion as opposed.
Commissioner Goulding moved to approve the consent agenda, as amended. The motion
passed unanimously.
VI. Final Design Review
Speculative Residence
Property Location: Lot 113, Block 1, Wildridge Subdivision / 2070 Beaver Creek Point
Applicant., TAB Associates / Owner. BBG Investments, LLC
Description: Sketch Design review for a single-family residence on a Beaver Creek Point
property. The structure measures approximately square feet and will utilize wood siding, stone
and stucco on the exterior walls.
Discussion: Jared Barnes presented Staff's report and highlighted the discussion items from
the July 15, 2008 Sketch Design review meeting. Jared continued to discuss the report, and
clarified the recommended motion.
Bill Nutkins, representing TAB and Associates, presented a new drawing to the Commission
showing a complete building elevation as viewed from the public right-of-way. He discussed
changes to the Landscape Plan since first review.
Commissioner Green questioned what changes have taken place, if any, since Sketch Design
review. Bill responded that the entrance has been modified in response to comments received
with respect to the roof form above the garage. The square footage has been reduced since
sketch design as well
Commissioner Goulding questioned if there was a way to ensure that the trees will be varied
sizes, instead of all either 6' evergreens or 2" aspen trees. Todd cautioned that the height of
the structure was close to the absolute maximum allowable height, and that he did not want to
see the applicant back in months with a requested change.
Commissioner Green questioned why the limits of disturbance were shown so far east of the
house. The applicant responded that this was due to the steepness of the lot, and the finished
grade contours dictate the limits of disturbance boundaries.
Action: Commissioner Goulding moved to approve the Final Design plan for Lot 113, with staff
conditions 1-4, and the condition that the additional landscaping comments related to tree size
and rabbit brush numbers be incorporated into a new landscape plan; and the light fixture will
be resubmitted to staff for approval. Commissioner Roubos seconded the motion and it
passed with a unanimously.
VII. Sketch Design Review
Timeshare East
Property Location: Lot 1, Riverfront Subdivision / 42 Riverfront Lane
Applicant Aleksandr Sheykhet / Owner: Jim McIntyre, Starwood Vacation Ownership
Description: Sketch Design application for the 'Timeshare East' property The design includes
two buildings separated at grade: Building East (E), and Building Riverside (R). There are 74
units proposed in the two buildings. The East building is the taller of the two building and
includes 58 2 -bedroom units, each with the ability to have a lock -off unit. The Riverside
building is positioned between the East building and the Riverfront recreation path. This
building contains the remaining 16 2 -bedroom units, also with the ability to have lock -offs.
There is no Commercial land use proposed with this phase of development.
Discussion: Matt Pielsticker presented the Staff Report. He highlighted the height, uses, and
overall design of the two buildings. Staff pointed out the specific guidelines from the Riverfront
Guidelines that specifically discuss Lot 1, the subject lot. Matt also pointed out the
encroachments onto neighboring lots.
Commissioner Green asked if the mock-up is apart of this application, or if it is a separate
issue. Staff pointed out that these are two separate issues that deal with the same property.
Commissioner Prince clarified that Timeshare West is the building directly to the west of the
Westin Building.
Commissioner Roubos asked Staff about their lot coverage table. Staff clarified that if this
project were approved as submitted there would only be 0.25 acres of remaining building
footprints for future development on Lots 5, 6, and 7.
Commissioner Green asked for clarification on the encroachments. Matt Pielsticker went
through the reduced plan sets to point out the sheets and where the encroachments were on
the roof plans. ;4"_
Jim McIntyre, Starwood Vacation Ownership (SVO), clarified the mock-up issue. He clarified
that the request was made of East West Partners and not SVO. He also clarified that they had
no opinion on whether it should be moved or not.
Commissioner Green stated that this is a discussion that should occur after the application is
discussed.
Jim McIntyre stated that for final design he will ensure that there are no building
encroachments. He also discussed the identical materials proposed. Between the Hotel and
Timeshare building there are over 40 different materials, colors, and textures and more
variation could be visually chaotic. He also wants to state that the building designs help their
clients understand that the two buildings are related. Jim McIntyre also believes that the Hotel
is to be the grand statement on the site, while the SVO buildings are intended to flank,
support, and enhance the hotel so that the entire PUD area comes across as a good
composition.
Chuck Madison, East West Partners, stated that the original PUD review contemplated that
these three buildings, Timeshare East, Timeshare West, and the Westin Hotel, are to be the
village center while rest of the buildings are to be a departure from the architecture seen on
the buildings.
Commissioner Roubos questioned the meaning of the 'village center' comment made by
Chuck Madison. Mr. Madison responded that the village center is to be meant in the context
of a similar architecture vernacular and roofing materials.
Commissioner Prince asked if the two Timeshare buildings are intended to be identical or
similar. Chuck and Jim both responded that the detailing is the same and colors are the same
but due to the massing they will appear different. The use of stone on the east and north sides
of Timeshare East will help create differentiation between the two buildings.
Commissioner Green asked staff if they evaluated the parking for this lot with comparison to
the PUD. Staff said they did and it is currently in compliance.
Chuck Madison stated that the site coverage numbers are the first time he had heard of it.
Matt Pielsticker responded that it was more intended to inform the Commission of the buildout
process and how much site coverage is left for the PUD. Commissioner Green thanked staff
for bringing that information forward.
Commissioner Lane stated he has no issues with the architecture and colors that are provided;
he stated that his concern is going to be the materials. He went further and questioned the
use of a six story stone element. He said that he would prefer that the stone be carried
through out the bottom two stories of the building instead of carried up six stories on one
element. He clarified that this comment was only an opinion.
Jim McIntyre stated that a majority of guests would be accessing these buildings through an
underground passage for check-in purposes.
Commissioner Lane questioned the fiber cement board material on the north elevation. He
also asked if the metal material used on Timeshare West is used on this building.
Alexander Sheykhet responded that the board is not metal and that the metal material is used
in the reveals and between windows.
Commissioner Lane stated that he would like to see the materials play out better, and he
would like to see the colors applied to each elevation at Final Design.
Commissioner Prince stated that he has no comments.
Commissioner Roubos stated that the building appeared to be an apartment building. She
stated that she can't see the variations on this building. Jim McIntyre stated that she should
be able to visualize that when they submit for final design.
Commissioner Roubos said that when she views this design the word 'monotonous' comes to
mind.
Commissioner Struve said he would not be in favor of this design if it bookended (along with
Timeshare West) the Westin Hotel, but he would be in favor of the design bracketing the
Westin Hotel. He also said the entry on the north elevation needs to be more prominent. He
also commented on the flatness of the river building elevations, and the roof plans.
Jim McIntyre stated that they originally had more variations, but were directed by the master
architect that it needed to be simplified.
Commissioner Struve also commented that the chimneys appeared to be out of scale on the
River Building.
Commissioner Prince questioned the distance from the River Building to the bike path.
Aleksandr said that he would check to see and report back.
Commissioner Goulding commented on the architectural hierarchy. He was sensitive to the
architectural character due to the prominence of these buildings as viewed from Avon Road
and 1-70.
Commissioner Goulding also commented there has been no discussion with respect to LEED,
and the need for an effort for LEED qualification. He commented that he would allow staff to
provide him with compliance confirmation of the requirements of roof plane variation. He also
stated that these buildings are not overly attractive and appear to be monolithic. He stated
that the East building appears to be very monolithic.
Commissioner Goulding stated that he would have concerns if the exact same materials and
colors were made in the same manner. He stated that the East Elevation doesn't give him that
"Wow" factor that makes a person want to enter this project.' He stated that the massing of all
elevations need to be studied as they do not appear to have a great amount of variation —
especially the East and North elevations.
Commissioner Green stated that he agrees with Commissioner Goulding's comments. He
clarified comments made earlier that the two Timeshare buildings can be complementary but
certainly not identical. He also stated that color isn't the only item that differentiates two
buildings. He commented that the entry elevation, from Avon Road, does lacks a great
amount of interest. He stated that the elements on that elevation appear to be generic and do
not provide much uniqueness.
Commissioner Green wants to see how all three of these buildings come together. He stated
that three dimensional views would be a great addition to this review.
Commissioner Prince really wants to focus on the elevation of the buildings as viewed from
Avon Road.
Commissioner Lane questioned the finish materials for the Fireplace vents. The applicant
stated that they would be painted to match adjacent materials.
Action: No formal action necessary as this is a Sketch Review.
The Commissioners then discussed the Mock-up issue. Commissioner Green asked his fellow
Commissioners whether it can be removed or moved.
Commissioner Goulding stated that if there are areas of the Mock-up that have been applied to
the building he would be fine for the Mock-up to be removed if all the materials have been
applied to the Timeshare West building.
Commissioner Struve will not vote to remove the Mock-up for the Timeshare West building.
He is fine with removing the Lodge and the Westin mock-ups, but he would only support a
move to the Mock-up for Timeshare West.
_rr
Chuck Madison requested that he be allowed to talk with his team and have this discussion
Tabled and discussed at a later meeting.
Action: The Commission took no formal action with respect to the Mockup.
VIII. Harry A. Nottingham Park Master Plan
Property Location: Tract G, Benchmark at Beaver Creek Subdivision
Description: Pedro Campos, representing Vail Architecture Group, is presenting the Draft
Harry A. Nottingham Park Master Plan. The plan outlines future work and timelines for
improvements to Nottingham Park as well as current costs associated with those
improvements.
Discussion: Commissioner Evans asked what the current status is and what the goals of this
meeting are.
Matt Gennett stated that Pedro Campos will be walking the Commission through the Master
Plan and that the goals are to get a recommendation for the Master Plan areas and what the
future plans for improvements are.
Pedro Campos, Vail Architecture Group (VAg), outlined the proposal and what he wanted from
this meeting. He asked for approval of the direction the plan is heading and the hierarchy of
the proposed improvements.
Sherry Dorward stated that she wanted to ensure that all proposed improvements are wanted
and that the proposed five year timeframe is acceptable.
Sherry Dorward and Pedro Campos outlined the proposed zones and stated that the zones
were broken up due to common uses.
Pedro Campos stated that Zone A is the Common Green. He presented a sketch of the
envisioned improvements.
Commissioner Prince questioned the rotary shown on the sketch near the Recreation Center.
Justin Hildreth commented that the rotary is contemplated in the West Town Center Plan, but
is not a part of the current Lake Street Improvements. He went further to state that a future
Recreation Center Master Plan would propose improvements in that specific area.
Pedro Campos presented the proposed Main Street Extension sketch and the Sport/Special
Event Area sketch. He pointed out that the Special Event Area contemplated a few more
buildings of a similar character that could help enhance the lake edge.
Pedro Campos presented the sketch for the Lake Edge and Path. Sherry Dorward stated that
this sketch would be best envisioned where the sand beach currently sits. Pedro Campos
presented the second sketch for the Lake Edge. Here he highlighted the paths more high
speed use and its meandering qualities.
Commissioner Prince asked if the trees were intended to be planted throughout the edge
between the path and the fence. Sherry Dorward responded that plantings would be placed in
scattered spaces, but not throughout because there could be locations where a new fence
could be highlighted.
Pedro Campos presented Zone C. He stated that one good option would be to move the
current playground facilities to the east toward the Recreation Center.
Commissioner Evans questioned the need for the second proposed play area in Zone D. He
asked that a greater amount of equipment be placed on the east side and that it be focused in
one area.
Commissioner Struve stated that due to the phasing this does have to be an immediate
decision and the decision could be delayed.
Pedro Campos stated that these comments were contemplated and that maybe and
alternative playground area would be a better option. He presented a few options including
one that incorporated the ditch, another which was theme oriented, another was a winter used
park, and the final was a climbing space. Pedro Campos also stated that this area could be
focused for a younger age group.
Commissioner Prince, Roubos, and Evans all stated that the letter submitted by a home owner
of one of the neighboring properties wished for the second (western) play area to be removed.
Commissioner Green stated that this area should be primarily used for open space, but a
secondary play area use.
Pedro Campos stated that portals or gateways are a needed asset to signify entrance into the
park. He showed a few sketch options of what these entrance gateways could be.
Zone E was presented next and Pedro Campos highlighted the future need for facilities for this
park. He stated that due to the existing buildings in this area, that this would be the most
functional space for the need for improved facilities.
Pedro Campos followed with a brief overview of Zone F. Sherry Dorward stated that this is a
much later zone and the zone would be redeveloped to highlight a two path system.
The final zone, Zone H, was presented as a future redevelopment site with many potential
uses.
Sherry Dorward presented the proposed phasing plan.
Eric Heidemann asked that the Commission to focus on the phasing and priorities.
Commissioner Evans stated that he feels that Zones A and C should be the top priorities given
the proximity to other current and near future public improvements. Commissioners Green
and Roubos agreed with Commissioner Evans' comments. Commissioner Roubos also stated
that she felt as though Zone C would be the highest priority.
Commissioner Goulding pointed out that a new Pump House fagade is an improvement that is
a lower priority, but within a high priority zone. He would suggest that within specific Zones,
the list of improvements be further prioritized to help Staff and Council budget for construction.
Paul Anderson, Avon Resident, asked if a dog park was left out of this park. Sherry Dorward
stated that the dog park was left out of the plan due to the high intensity of other uses.
Action: No formal action is necessary. This plan will be presented to Council at their August
26th meeting.
IX. Avon 21 PUD Zoning Application — CONTINUED PUBLIC HEARING
Property Location: Lots 21, 65A, 65B, Tract Q, and Parcel TK -3, Block 2, Benchmark at
Beaver Creek Subdivision / 62, 68, and 182 Benchmark Road
Applicant/ Owner: Brian Judge, Orion Development
Description: The applicant, Pedro Campos of the Vail Architecture Group, representing the
owner of the property, EAH, LLC, is proposing a new Planned Unit Development (PUD) and a
concurrent Preliminary Plan for Subdivision on a new development site comprised of the
properties listed above, which are currently zoned Town Center (TC). The proposed PUD is
envisioned to be comprised of three new buildings configured and designed as a
contemporary, mixed-use development including retail space, office space, residential and
lodging uses. This item was tabled from the August 5, 2008 meeting, following the review of
the financial analysis performed by Stan Bernstein and Associates.
Discussion: Pedro Campos began his presentation by reviewing Criteria number 2, the
conformity with the overall design theme of the Town, sub -area recommendations, and design
guidelines of the Town. He explained that there is no unified design theme for the Town.
Commissioner Goulding brought up the notes from the July 15, 2008 meeting regarding this
review criterion. He cited conflicts with specific elements of the East Town Center (ETC)
District Plan that were brought forth at previous hearings. Commissioner Evans was in
agreement that the application appeared to conflict with the ETC plan.
Brian Judge approached the podium to address the Commissioner comments. He explained
that there are clearly variations between this proposal (i.e. roof pitches) and the adopted
guidelines of the Town. He felt that this all comes down to tradeoffs in the end.
Mr. Judge requested feedback on the specific criteria, instead of 'agreeing to disagree' on this
criterion. Pedro continued the presentation by beginning to step through the individual
planning principles from the ETC Plan.
Commissioner Struve explained the background and development of the ETC Plan, and the
intentional 'scaling down' of this district compared to the West Town Center and Main Street
area. Pedro responded that the buildings do step back, consistent with the recommendations
borne out of the ETC plan. He showed on the building elevations where the buildings
intentionally step back on the second, fourth, and sixth floors.
Brian Judge explained his philosophy behind the sense of place created by this development,
and its relationship to surrounding developments, both existing and potential future
redevelopment. He explained his frustration that after six public meetings, he is finally starting
to hear comments for the first time.
Commissioner Evans opened the meeting for public comment. No comments were received
Commissioner Goulding reviewed his notes. He pointed out, for example when looking at
criterion number two, there are apparent discrepancies related to height, form, affordable
housing, views and implementation when the proposal is compared to the design guidelines.
Mr. Goulding highlighted his concern with the affordable housing mitigation. These are not
deal killers, he said; however, he wanted to better understand the benefits.
Brian Judge explained that they were requesting approximately 99 additional dwelling units;
therefore, approximately 12% of the additional units requested would be "professional's units."
Mr. Goulding continued by narrowing down his perceived public benefits with this
development: a redevelopment of a much needed area of Town, some affordable housing
mitigation, the creation of a public plaza, and the realignment of the public way. He did not
feel that the benefits presented outweighed the other potential impacts. Mr. Goulding voiced
concern with the lack of compliance with staff's (Public Works and Engineering) concerns that
were already raised, the potential phasing, tenant relocation, and the general construction
impacts to the Town such as tower cranes and contractor parking. He did not feel that these
impacts have been adequately addressed.
Commissioner Struve highlighted his primary concerns: height, mass and articulation, low
pitched roofs, phasing, the disruption to the other Town business and residents, and the lack
of attainable housing.
Commissioner Roubos was in agreement with Commissioner Goulding with the opinion that
parking, height, massing, density, rooflines, preservation of view corridors, employee housing,
phasing, precedent to other redevelopment, and existing businesses are all ongoing issues.
She disagreed that the roofline is not flat as represented. Ms. Roubos felt that these issues
have been expressed at past meetings and this was not the first time these issues were
raised. She disagreed with the applicant.
Commissioner Prince expressed a concern with the flat appearance of the roofline. He felt
that planning principles were the focus up to this meeting. Commissioner Prince echoed the
other Commissioners' concerns that were already raised. He liked the feel of the pedestrian
plaza and mall space; however, the overall height of the structures remains a great concern.
Commissioner Lane voiced concerns with the phasing and attainable housing. He voiced
concerns with phasing and massing. He questioned whether or not written design guidelines
specifically tied to this development are appropriate. Matt Gannett explained that this is a
typical requirement for Planned Unit Developments. Commissioner Lane liked the 'flavor' of
the depictions, but would like a verbal background.
Commissioner Green did not have issues with the architecture, but continues to struggle with !
the scale of the development as it relates to surrounding development and existing
businesses Under Land Use, the scale and intensity of development is a struggle to agree
with under these circumstances.
When the ETC plan was developed, the tenant size mix of local businesses in the area was
focused upon and this proposal might lose some of the tenant mix currently available in the
area. Mr. Green continued to explain his perceived conflict with the policy that is to "ensure
each development contributes to a healthy jobs balance mix for the Town."
Another cited policy that Commissioner Green felt this application conflicts with is "to promote
a wide range of residential uses." He stated that if you consider condo-tels and timeshare,
fractional units, and 12 professional units a wide range than yes, you would meet this criterion.
He did not feel that this development met this specific requirement.
Mr. Green continued to point out that "vertical and horizontal mixed use to respond to
changing market conditions." In concept this is mixed use. But when you look at the
sustainable model, this plan might meet today's needs, but fails to deal with future land use
desires in 30 years.
Commissioner Green continues to struggle with how to get.around the public benefits of the
project, in relation to the character of the Town of Avon. He questioned whether or not the
character and height of the development is compatible with existing and planned uses, and the
image of Avon.
Commissioner Green continued to highlight the workforce housing program, and the struggle
to properly address this issue. He felt that the architecture and density could probably be dealt
with, but the other issues remain. Mr. Green felt the public benefit is the issue at hand.
Commissioner Evans did not agree with the comment made by Commissioner Green that the
architectural approach was "appropriate. Commissioner Evans reiterated all of the previous
concerns raised by the Commission including phasing, the financial aspects related to
phasing, and employee housing. He felt that it lacks adherence to the Town's vision of height,
bulk, massing, and use of flat roofs. The residential impacts, traffic study results, and the ratio
of public benefits are all concerns.
Commissioner Evans went through all of the Comprehensive Plan's Goals and made the
determination of either conformance or not. Goal A.1 Collaborate with Eagle County, adjacent
municipalities, and other agencies to implement this plan and to ensure Avon's needs and
goals are being met - Does not meet.
Goal B.1 Provide a compact urban form - Yes, this application appears to meet. Goal B.2
Provide a distinct physical and visual separation between Avon and its surrounding
communities that preserves the natural beauty of the surrounding mountains and the Eagle
River valley— No.
Goal CA Provide a balance of land uses that offers a range of housing options, diverse
commercial and employment opportunities, inviting guest accommodations, and high quality
civic and recreational facilities, working in concert to strengthen Avon's identity as both a year-
round residential community and as a commercial, tourism and economic center.— he did not
feel that the range is there. Goal C.2 Ensure that Avon continues to develop as a community
of safe, interactive, and cohesive neighborhoods that contribute to the Town's overall
character and image.— this does not meet this goal based on the ETC plan. Goal C.3 Use
mixed-use development to create a more balanced, sustainable system of land uses — this
application meets this goal. Goal CA Encourage sustainable commercial development that
enhances Avon's overall economic health, contributes to the community's image and
character, and provides residents and visitors with increased choices and services — Until we
see a functional phasing plan, this application does not contribute to the economic health of
the Town.
Goal D.1 Ensure that development and redevelopment is compatible with existing and planned
adjacent development and contributes to Avon's community image and character— based on
the ETC plan, Commissioner Evans felt that this application does not comply. Goal D.2
Create community gateways and streetscapes that reflect and strengthen Avon's unique
community character and image— this application does meet this Goal. Goal D.3 Develop new
and continue to enhance existing cultural and heritage facilities, events, and programs that
strengthen Avon's community character and image — he felt that this Goal is not applicable.
Goal E.1 Ensure that there is a positive environment for small businesses— Commissioner
Evans felt that this application utterly failed to demonstrate compliance with this Goal.
Goal F.1 Achieve a diverse range of quality housing options to serve diverse segments of the
population — fails to meet. Commissioner Evans felt that Goal G.3 is not applicable, but that it
does meet Goal G.4 and Goal G.5.
Goal H.1 Protect Avon's unique natural setting and its open spaces. — in some aspects it does
meet this Goal, but due to the proposed height it may not meet this in other areas.
Goal 1.1 Provide an exceptional system of parks, trails, and recreational programs to serve the
year-round leisure needs of area residents and visitor— he feels that plaza could be considered
open space and therefore could meet this. Goal 1.2 Coordinate and collaborate with
surrounding jurisdictions and agencies to develop seamless recreational opportunities — not
applicable in his mind.
Goal J.1 Utilize this comprehensive plan in all town dealings including capital planning,
operation/maintenance of facilities, and programming of events — he noted that applicant
states that the proposal meets this Goal. Goal J.2 Ensure cost effective provision and
development of public facilities and services. — Commissioner Evans felt that this Goal is
addressed with the Engineering Staffs concerns.
He continued to review the 12 PUD review Criteria and the redevelopment standards based on
current zoning. Commissioner Evans felt that, in the end, Criteria 2 Conformity and
compliance with the overall design theme of the town, the sub -area design recommendations
and design guidelines adopted by the town — this application does not meet; Criteria 3 Design
compatibility with the immediate environment, neighborhood, and adjacent properties relative
to architectural design, scale, bulk, building height, buffer zones, character, and orientation —
does not meet; Criteria 4 Uses, activity, and density which provide a compatible, efficient, and
workable relationship with surrounding uses and activity — meets. Criteria 5 Identification and
mitigation or avoidance of natural and/or geologic hazards that affect the property upon which
the PUD is proposed — is not applicable, Criteria 6 Site plan, building design and location and
open space provisions designed to produce a functional development responsive and
sensitive to natural features, vegetation and overall aesthetic quality of the community —
appears to meet; Criteria 7 A circulation system designed for both vehicles and pedestrians
addressing on and off-site traffic circulation that is compatible with the town transportation plan
— yes; Criteria 8 Functional and aesthetic landscaping and open space in order to optimize and
preserve natural features, recreation, views and function — yes; Criteria 9 Phasing plan or
subdivision plan that will maintain a workable, functional and efficient relationship throughout
the development of the PUD. The phasing plan shall clearly demonstrate that each phase can
be workable, functional and efficient without relying upon completion of future project phases—
Does not meet the intent, based on the financial model produced at the last meeting; Criteria
10 Adequacy of public services such as sewer, water, schools, transportation systems, roads,
parks, and police and fire protection — not demonstrated yet; Criteria 11 That the existing
streets and roads are suitable and adequate to carry anticipated traffic within the proposed
PUD and in the vicinity of the proposed PUD — until traffic study is complete and engineering
signed off it has not been met; Criteria 12 a) The application demonstrates a public purpose
which the current zoning entitlements cannot achieve - there isn't anything that could not be
achieved that the current zoning already permits; Criteria 12 b) Approval of the zoning
application provides long term economic, cultural or social community benefits that are equal
to or greater than potential adverse impacts as a result of the changed zoning rights - does not
meet; Criteria 12 cl The flexibility afforded in approval of the zoning application will result in
better siting of the development, preserving valued environmental and cultural resources, and
increasing the amount of public benefit consistent with the community master plan documents
- yes, based on plaza and roadways; however, the zoning application is not necessary for
these improvements.
In total, Commissioner Evans felt that the application conflicted with 8 of the 12 mandatory
PUD review criteria.
Matt Gennett recommended tabling to the September 16`" meeting instead of the September
2nd meeting to give the applicant adequate time to provide outstanding information, such as
architectural design guidelines, and to respond to technical concerns raised by other
department; and to give Planning Staff time to review such material. Brian Judge explained
his frustration with the process, the comments received, the lack of direction throughout the
process, and the inability to complete his slide presentation.
Action: Commissioner Green moved to table the application to the September 2nd, 2008
meeting in order to further discuss the comments. Commissioner Struve seconded the motion
and all commissioners were in favor. The motion passed unanimously with a 6-0 vote.
Commissioner Goulding was absent.
The motion and resulting action were then further discussed. Mr. Judge did not feel that he
could cure all of the issues that were expressed during the public hearing by the September
2nd meeting. He requested a vote at this time and to reconsider the motion. Commissioner
Evans questioned his fellow Commissioners to see if anybody would like to entertain a
reconsideration of the action to table.
Commissioner Green motioned to reconsider the motion that had already been approved. The
motion was seconded, and the motion to overturn the previous motion to table passed with a
5-1 vote.
A discussion continued relating to the ability to vote on the application tonight, and bring forth
a resolution memorializing the comments made during the hearing.
New Motion: Commissioner Roubos made a motion to recommend DENIAL of the. PUD, as
submitted, to the Town Council based upon the findings that this application does not meet the
12 PUD Criteria listed in 17.20.110 (AMC), with further documentation to be provided at the
September 2"d meeting via resolution. The motion was seconded by Commissioner Struve.
The motion to DENY passed with a 5-1 vote.
X. Other Business
• Community Survey to be handed in by Friday.
• Thursday Open House for Main Street Design
• Water District and painting
• PUD Process discussion
• Evans may be late or absent for the September 2, 2008 meeting
XI. Adjourn r
The meeting was adjourned at approximately 10:45pm.
a
TOWN OF AVON
PLANNING & ZONING COMMISSION
RESOLUTION No. 08-06
A RESOLUTION RECOMMENDING DENIAL TO TOWN
COUNCIL OF THE PLANNED UNIT DEVELOPMENT (PUD)
AMENDMENT APPLICATION FOR LOTS 21, 65A, 65B, TRACT
Q, AND PARCEL TK -3, BLOCK 2, BENCHMARK AT BEAVER
CREEK, TOWN OF AVON, EAGLE COUNTY, COLORADO
WHEREAS, Pedro Campos of the Vail Architecture Group, representing the owner of
the property, EAH, LLC, has applied for a PUD Amendment for Lots 21, 65A and 656;
Tracts Q & R; And Parcel No. TK -3, Benchmark at Beaver Creek Subdivision, pursuant
to Section 17.20.110 of the Avon Municipal Code; as presented in the original
application dated February 6, 2008; and
WHEREAS, Pursuant to the pertinent noticing procedures required by law, the Planning
and Zoning Commission of the Town of Avon held public hearings on June 3, 2008,
June 17, 2008, July 1, 2008, July 15, 2008, August 5, 2008, and August 19, 2008; at
which time the applicant was given an opportunity to present their proposal for a new
PUD and hear the feedback from both the Commission and members of the public, in
addition to the written comments from Staff regarding this PUD request; and
WHEREAS, The Planning and Zoning Commission considered the following criteria
when evaluating this application:
1. Conformance with the Town of Avon Comprehensive Plan Goals and
Objectives.
2. Conformity and compliance with the overall design theme of the town, the
sub -area design recommendations and design guidelines of the Town.
3. Design compatibility with the immediate environment, neighborhood, and
adjacent properties relative to architectural design, scale, bulk, building height,
buffer zones, character, and orientation.
4. Uses, activity, and density which provide a compatible, efficient, and
workable relationship with surrounding uses and activity.
5. identification and mitigation or avoidance of natural and/or geologic hazards
that affect the property upon which the PUD is proposed.
6. Site plan, building design and location and open space provisions designed
to produce a functional development responsive and sensitive to natural features,
vegetation and overall aesthetic quality of the community.
7. A circulation system designed for both vehicles and pedestrians addressing
on and off site traffic circulation that is compatible with the Town Transportation
Plan.
8. Functional and aesthetic landscaping and open space in order to optimize
and preserve natural features, recreation, views and function.
9. Phasing plan or subdivision plan that will maintain a workable, functional, and
efficient relationship throughout the development of the PUD. The phasing plan
shall clearly demonstrate that each phase can be workable, functional and
efficient without relying upon completion of future project phases.
10. Adequacy of public services such as sewer, water, schools, transportation
systems, roads, parks, and police and fire protection.
11. That the existing streets and roads are suitable and adequate to carry
anticipated traffic within the proposed PUD and in the vicinity of the proposed
PUD.
12. That the PUD or amendment to PUD requested provides evidence of
substantial compliance with the following public purpose provisions, as outlined
in Section 17.28.085 of the Avon Municipal Code (as follows):
Zoning applications
The Town shall consider the following public benefit criteria when evaluating
zoning applications:
(1) The application demonstrates a public purpose which the current zoning
entitlements cannot achieve. T
(2) Approval of the zoning application provides long-term economic, cultural
or social community benefits that are equal to or greater than potential
adverse impacts as a result of the changed zoning rights.
(3) The flexibility afforded in approval of the zoning application will result in
better siting of the development, preserving valued environmental and
cultural resources and increasing the amount of public benefit consistent with
the community master plan documents.
WHEREAS, Section 17.20.110(h) of the Avon Municipal Code states the following:
It shall be the burden of the applicant to demonstrate that submittal material and the
proposed development plan comply with each of the following design criteria or
demonstrate that one (1) or more of them is not applicable, or that a particular
development solution consistent with the public interest has been achieved; and
WHEREAS, after holding a public hearing at their August 19, 2008 meeting, the
Planning & Zoning Commission made the following findings with respect to the subject
application:
1. The application fails to demonstrate compliance with the applicable twelve (12)
principle PUD design criteria, as required by Title 17.20.110(h) of the Avon
Municipal Code, and as further detailed in the meeting minutes from the August
19, 2008 hearing which are a part of the materials packet for the September 2,
2008 meeting.
2. The applicant has failed to prove to the Commission that the submittal material
and the proposed development plan comply with each applicable PUD design
criteria, or that a development solution consistent with the public interest is
available for any given conflict with a specific criterion.
NOW, THEREFORE, BE IT RESOLVED, the Planning and Zoning Commission of
the Town of Avon, Colorado, hereby recommends that the Avon Town Council deny
the PUD Amendment application for Lots 21, 65A and 65B; Tracts Q & R; And Parcel
No. TK -3, Benchmark at Beaver Creek Subdivision, Town of Avon, Eagle County
Colorado, with the findings set forth herein. „r
ADOPTED AND REAFFIRMED THIS 2nd DAY OF SEPTEMBER 2008
Signed.
Chair
Attest:
Secretary
Date:
Date:
,T,.
Memo
To: Town of Avon Planning and Zoning Commission
From: Justin Hildreth, P.E., Town Engineergty (-
Date: August 28, 2008
Re: Avon Main Street Streetscape Improvements— Presentation of Final Design
Summary: The Main Street project consists of a new road from Avon Road to the east portal of Harry A.
Nottingham Park in the current location of the pedestrian mall. The project will also include utility, drainage,
and roadway work on the area immediately east of the Avon Public Library, and will consist of a shared
vehicular/pedestrian roadway that prioritizes public gathering spaces, plazas, and unimpeded pedestrian
movements. The streetscape design follows guidelines and concepts set forth in the Town Center West
Investment Plan.
Britina Design Group (Britina) will present the final design for the streetscape, which is included as Exhibit A.
The meeting will start with a presentation by Britina and then the Avon Planning and Zoning Commission will
be given a tour of the site. Following the tour, Britina will complete the presentation and request approval of
the final design.
Chronology
• August 14, 2007: The Town Center West Investment Plan and Avon Urban Renewal Plan is adopted
by the Town Council, forming the Avon Urban Renewal Authority
• March 11, 2008: American Civil Constructors is awarded the construction contract for Lake Street
• Match 25, 2008: Britina Design Group is awarded the design contract for Main Street Streetscape
Improvements
Public Process
• May 22,2008: Joint Public Open House with the Nottingham Park Master Plan
• May 29, 2008: First stakeholder meeting for the Main Street Design Project
• July 9, 2008: Second stakeholder group meeting presenting two design options
• July 10, 2008: Second public open house presenting two design options
• July 15, 2008: Planning and Zoning Commission hearing presenting the preliminary design options
• July 22, 2008: Avon Urban Renewal Authority hearing presenting the preliminary design options
• August 13, 2008: Third stakeholder meeting presenting preliminary final design
• August 13, 2008: Second Planning and Zoning Commission hearing presenting preliminary final
design
• August 21, 2008: Third public open house presenting the preliminary final design
• August 26, 2008: Avon Urban Renewal Authority hearing approving the final design
Stakeholder Grouo
In order to collaboratively create a better design and detail for the Main Street Streetscape, Britina formed a
stakeholder group comprised of public officials, local business owners, library representatives, adjacent
property owners, property managers, community representatives, and Town of Avon staff, including
members from the Engineering, Community Development, Recreation and Public Works departments. There
have been three meetings with the group, the first to present the project and gain initial feedback, the second
to select design themes for the project, and the third to present a preliminary final design.
Avon Main Street Streetscape Improvements
August 27, 2008
Page 2 of 12
Public Outreach
One joint public meeting in conjunction with the Harry A. Nottingham Park Master Plan and two public
meetings dedicated to Main Street have also been held. Approximately 20 to 30 people attended each of the
public open houses.
Avon Arts Council
In addition to the stakeholder group, Britina has been meeting with the Avon Arts Council to facilitate public
art selection. It is anticipated that the public art will be incorporated into several of the plaza areas and into
the actual streetscape design. Artists are currently preparing concepts for presentation to the Avon Arts
Council at the end of September. The final art selection shall occur at the end of October.
Background: As an overview, the West Town Center District was envisioned to be the 'heart' and
central gathering place of the Avon community, and reinforce the future role of the district outlined in
the Town of Avon Comprehensive Plan:
"Social, cultural, intellectual, political, and recreational gatherings occur in this district. In
addition, the district acts as the common ground between the full-time residents, part-time
residents and destination guests through diverse retail and entertainment opportunities. The
West Town Center District will be an intensely developed mixed-use, pedestrian -oriented area
that serves as the primary focus for residential and lodging development within the overall
Town Center."
As part of the West Town Center plan implementation, the Town of Avon has begun several important
reconstruction efforts within the district, including completion of Avon Station, the realignment of Benchmark
Road (Lake Street), and the on-going master planning and conceptual design efforts for Harry A. Nottingham
Park. The Main Street streetscape is the next project funded and undertaken by the Avon Urban Renewal
Authority, and will serve as a catalyst for the development contemplated in the adopted planning documents.
Discussion: Main Street is perhaps the most critical public infrastructure project undertaken in Avon since the
Avon Road roundabouts and will serve as the main attraction and public gathering space in the Town Center
West District. Success of this project is critical, and the design relatively complex, due to private property
owners bordering much of the site, fixed building entry grades, vacant lots, and numerous existing and future
utilities, including water, sanitary sewer, storm sewer and the Metcalf irrigation ditch.
Two options, A and B were presented to the Public, Stakeholders, Planning and Zoning Commission and
the Town Council. The majority at all of the meetings preferred the Option A design. As a Result, Main
Street's final design is grounded in the forms and elements of the preliminary 'Option A' design. As
such, it is a playful, narrative walk through the history, culture and forms of the Avon community and
the physical forms of the valley floor. The soft, rounded elements of the design create a quiet, gentle
and informal experience, punctuated by whimsical art pieces that illustrate the history, culture and
landscape of Avon. In order to incorporate a modern aesthetic, the embracing forms of the design are
'carved' and 'polished' to reflect a sophisticated interpretation of the natural landscape.
Avon Main Street Streetscape Improvements
August 27, 2008
Page 3 of 12
Although the final design is largely based on the theme and design of 'Option A', elements of the
refined design also draw from 'Option B'. For example, the connection between the Library and
Recreation Center, the more direct route of 'Option B' was preferred, and therefore, the overall design
of 'Option A' was adjusted to incorporate this layout. Aesthetically, the final design reflects a refined
version of the natural, rounded forms of preliminary 'Option A' and its graceful vocabulary of rough,
real materials adapted and shaped into an elegant and sophisticated palette.
The design focuses on the five center or plaza spaces outlined in the Town Center West Investment Plan
including Lake Street/Main Street Plaza, Library/Recreation Center Plaza, Sheraton/Seasons Piazza, Lettuce
Shed Plaza and the Eastern Gateway at Benchmark Road. The Lake Street/Main Street Plaza is designed to
connect Main Street with Harry A. Nottingham Park and includes stone seating walls, a water feature and an
overlook of the Park. The Library/Recreation Center Plaza is designed as a transitional space that connects
the Recreation Center to the Library and retains space for the Librarys programming. This space contains an
art feature, terraced landscaped garden and an overlook to Beaver Creek. The Seasons/Sheraton Plaza is
envisioned to be a piazza and the primary gathering area for Main Street. It will include art integrated into
the streetscape, decorative lighting and plenty of moveable tables and chairs. Lettuce Shed Plaza is
envisioned to be the meeting and orienting place for Main Street because of the movement from the
Riverfront Subdivision, gondola and Avon Station to Main Street. It will include Rush lighting and an artist
designed fire pit. The eastern gateway is the primary transition and entryway from Avon Road. It will contain
a gateway art feature designed to announce Main Street. Also, Lettuce Shed Lane will contain landscaping
and historical elements relating to Avon's history.
Avon West Town Center District Investment Plan
In attempt to address the concerns of the Planning and Zoning commission communicated at the August 13,
2008 hearing, Staff correlated the Main Street design to the applicable sections of the Avon West Town
Center District Investment Plan (Investment Plan). The Residential, Commercial and Industrial Design Review
Guidelines do not apply to Public Improvements in the Right -of -Way. Section II of the Investment Plan
includes the design guidelines of the Avon West Town Center District. The design guidelines are primarily for
the existing and future buildings in the Avon Town Center District Area, including Lot 61, The Seasons, Avon
Center, The Sheraton, Parking Structure, Town Hall and Nottingham Inn. There are several guidelines in
Section B -District Wide, Section C -Streets and Public Spaces and Section D -Public Signage that apply to the
Main Street project. The following outlines the relevant sections of the Investment Plan and explains how the
Main Street design complies with and exceeds the guidelines in the Investment Plan.
B.4 Civic Art
Civic art can provide visitors as well as residents with multiple and layered expressions of a history and culture
that is unique to a place.
The West Main Street civic art program has gone hand-in-hand with the overall streetscape design. As a
result, the proposed Civic Art program exceeds the requirements outlined in the Investment Plan. From the
beginning of the design process, the project team art consultant, McGrath and Braun, has worked with both
Avon Main Street Streetscape Improvements
August 27, 2008
Page 4 of 12
the project team and the Avon Arts Council to determine the location, feel, design and character of the West
Main Street public art.
By integrating public art from the beginning of the design process, our team has benefited from a
comprehensive approach to the art of Main Street. Not only do we have significant public art pieces at each
center along the street, we also have allowed the public art process to infuse the entire streetscape design
with an artistic feel and character.
Eastern Gatewav
The Eastern Gateway will identify West Main Street with a grand presence and will be easily visible from Avon
Road. The gateway will set the tone of the street by utilizing sustainable and indigenous materials where
possible. The piece will incorporate a variety of textures and materials making it visually and tactually
interesting from all angles, day and night, and in all seasons.
Lettuce Shed Lane History Panels
These interpretive panels will be placed along the length of the Lettuce Shed Lane pedestrian walk, the
primary north -south corridor used by visitors to Avon. The panels will illustrate Avon's history from early
times to modern day, providing residents and visitors a sense of context for Avon as a unique place.
Lettuce Shed Lane Plaza
Intended as an outdoor "living room," this piece will act as both a focal point along the street and as the
"hearth" for the plaza space. This fire -based piece will refer to Avon's history as well as look to Avon's future
by incorporating sustainable and indigenous materials where possible.
Seasons/Sheraton Plaza
The Seasons / Sheraton Plaza art piece will provide the central focal point for the plaza. While primarily a
horizontal piece, elements such as columns, boundary towers and festoon lighting will emphasize and enclose
the piece.
Library and Recreation Center Pedestrian Corridor
This installation will create a colorful, punctuated, multi -piece passageway for pedestrian traffic that is
interesting in day, night and all seasons. Based on whimsical references to Avon's stories, symbols and
history, the art will use bright colors, variety of textures and approachable scale to attract children and adults.
Library Roundabout
Capitalizing on the interplay between the Library and the name of the Town, this playful installation will
juxtapose "A"'s depicted in a variety of typefaces and colors to form a tower structure. The "A" tower will act
as the centerpiece to the library roundabout and the visual terminus to the Library & Rec Center Plaza
pedestrian walk. The "A" tower is well located because it relates library users and the letter A for Avon.
Nottingham Plaza Water Feature
The Nottingham Plaza water feature will be the iconic western gateway to Main Street, while also serving as a
playful gathering space, overlook to the park, and performance area. The water feature will incorporate
materials from the Eastern Gateway, such as stone and metal, and provide a changing series of water and
Avon Main Street Streetscape Improvements
August 27, 2008
Page 5 of 12
lighting depending on the events and seasons. The water feature will be designed to have substance so that
is has a presence in the winter months, when it is not operating.
B.5 Character Misrepresentations and "Theme" Environments
The Investment Plan proposes a modern mountain aesthetic instead of literal interpretations or mimicry of
Victorian architecture, mining vernacular, and architectural styles found primarily in the European Alpine
environs. For the West Main Street project, the design team has embraced the Town of Avon standard of
using materials that are authentic and high quality, and apply them in a design that is a modern
representation of a traditional Colorado mountain aesthetic.
The primary streetscape material is a local Colorado stone with a warm palette of brown, gold, red and buff.
This stone is used to highlight the central gathering spaces of the streetscape, and will be installed in the
ground plane, the vertical bollard elements and the public art pieces. Moving away from the central
gathering spaces, the materials continue to reinforce the rich colors of the native stone, done in both pavers
and colored concrete.
Overall, the West Main Street design draws from the natural, rich palette of materials indigenous to Colorado,
and applies these in a fresh and modern aesthetic.
B.6 Important Public Views
From the beginning of the West Main Street design, our team has been aware of the significant public views
identified in the Investment Plan. The final design highlights and reinforces these views.
View West across Nottingham Park toward Bellvache Ridge and the Benchmark Lake
Looking West across Nottingham Park, the view is framed and highlighted by a public art feature/fountain
that rises up on either side of the central plaza. In the center of the sculpture, the water element acts as an
interactive feature whose transparency allows the view to take precedence.
Library & Recreation Center view to Beaver Creek and Rockv Cliff
In order to frame the view to the mountain at the Library and Recreation Center, the central pathway
between the two uses was aligned along the view corridor axis. Public art panels on either side of the
pathway help to channel and reinforce and complement the view.
Lettuce Shed Lane View to Westin. Beaver Creek and Rockv Cliff
In order to reinforce the view corridor along Lettuce Shed Lane, the final design creates an open frame
toward the mountain. All streetscape elements hug the sides of the corridor, which not only preserves the
view, but also allows for much-needed screening of the service area of the Seasons property.
Eastern Gatewav View to Main Street, Rockv Cliff and Beaver Creek
Creating an interesting, inviting and dynamic view into the redeveloped Main Street was one of the primary
goals of the streetscape design. By placing the public art element in line with the Main Street axis, as well as
Avon Main Street Streetscape Improvements
August 27, 2008
Page 6 of 12
creating a large and open public plaza around the element, both auto and pedestrian visitors will have a view
into the redeveloped streetscape and the surrounding mountain resort landscape.
B.7 Solar Orientation and Shading Exposure
Flexibility is the key to achieving a streetscape experience that is comfortable during all times of the year. For
the West Main Street design, we have several layers of outdoor seating, each of which can be used
comfortably in both cold and warm weather. In order to help inform our awareness of solar exposure along
the street, our team completed a shade study of the site during each season and throughout the day. The
final placement of benches, chairs and other outdoor seating was informed by the shade study data.
In the cold months, we have specified movable outdoor chairs and benches that can be repositioned
throughout the day to take advantage of sun exposure. In addition, we have designed fixed stone benches in
the open green spaces that will be shaded by deciduous trees in the summer, but will allow the warm rays of
the sun to heat the space and material during the cooler winter months. The chosen street furniture also
takes climatic comfort into consideration by using a sustainable wood material on the bench seats, which will
be cooler in the summer and warm and comfortable in the cooler months.
During warmer weather outdoor seating to is positioned utilize the natural shade of trees to provide a cool
and sun -protected place to rest.
8.8 Water Resources
The Investment Plan requires stringent management of stormwater runoff to reduce surface water
pollution, prevent flooding and conserve potable water. Numerous best management practices are
included in the Main Street project to meet these requirements.
Stormwater Manaeement Plan
The stormwater management plan includes the local drainage facilities required to drain the proposed
roadway. As part of the water quality design, hydrodynamic separation systems will be used to remove
sediment and total suspended solids. This is the same method used to treat the water quality on Lake
Street. The historic drainage patterns of the Main Street corridor and the public storm sewer outfall will
be maintained.
Stormwater Best Management Practices
The surface treatment for Main Street is proposed to consist of pavers and concrete that will include an
underdrain system that will direct any runoff that penetrates the surface to the public storm sewer
through the underdrain. The underdrain extends to the northern plant beds where runoff drains
through the soil and functions like a porous landscape detention best management practice.
Avon Main Street Streetscape Improvements
August 27, 2008
Page 7 of 12
C.1 Utilities
As required in Section C.1 of the Investment Plan, all utilities along Main Street are located in either
unobtrusive underground vaults or within raised planting beds, screened by vegetation. Some examples of
low visibility utility applications along Main Street are the plug outlets located at or below grade in tree grates
and covered at the bottom of light fixtures. In addition, concert -level electrical service will be available at the
Sheraton/Season's Plaza, and the Nottingham Park Plaza — hidden in raised planting beds or underground
vaults. In some cases, low profile pedestals may be located with planting and screened. Transformers and
other large above -ground utility structures are prohibited on Main Street and will be located on the
peripheral of the project and screened by landscaping.
Throughout Main Street, the utilities were designed to accommodate both daily and special event needs in a
manner that is unobtrusive yet comprehensive. At the West end and the Sheraton plaza, electrical
disconnects for staging with be incorporated into the hardscape features.
C.2 Paving Materials
Section C.2 of the Investment Plan requires pavement materials that include brick, concrete unit pavers,
stone pavers, and/or concrete with additives such as sandblasted texture, unique scoring patterns and
color. Asphalt is not permitted on Main Street, Lettuce Shed Lane or Avon Station. Natural materials,
such as stone, are being used throughout the design in various applications including paving, seating,
columns, public art pieces and landscape areas. For example, several types of stone paving have been
specified to enhance each plaza space. The seat walls and retaining walls are faced and capped with
stone and the on -street planters are contained by a low stone curb. Stone beams will be placed in the
planting bed bands and will serve as natural benches. In addition, stone and wood mulch are proposed
for all planting beds. Finally, the design incorporates extensive landscape enhancements in the form of
trees, planting beds (shrubs, ornamental grasses and perennials), planter pots with annuals and turf
areas.
Local Stone Paving
At each plaza space on West Main Street, a variety of natural stone paving material is specified. In
addition, stone is being specified for bollards, seat walls, columns and natural benches. Because this
stone material will need to coordinate with the stone used by artists for elements like the Eastern
Gateway sculpture and the Harry A. Nottingham Park fountain, the design team have been working
closely with the selected artists to find a local quarry that can supply the most attractive, durable and
desirable regionally available stone product.
Concrete Pavers
In addition to stone paving, concrete pavers are specified at each plaza space. We have specified two
(2) color combinations, alternating as the pattern radiates away from each plaza center. The pavers
mimic cobble and come in a variety of sizes to create random ashlar pattern. To further the "piazza"
feel of the Seasons/Sheraton plaza, the concrete pavers are organized in a circular pattern. The
concrete pavers are supplied locally and were chosen for their durability and character.
Avon Main Street Streetscape Improvements
August 27, 2008
Page 8 of 12
Colored Concrete Paving
The majority of the remaining paving areas will be paved with colored concrete. Scored, integral
colored concrete with a broom finish is specified for the roadway areas. Scored, integral colored
concrete with a sand finish is specified for the sidewalks connecting the plaza spaces and patio spaces
adjacent to existing buildings. Several additional integral colored concrete bands with sand finish
radiate from each plaza space, enhancing the ground plane and providing a separation between various
types of paving.
C.3 On -Street Parking
Section C.3 of the Investment Plan encourages on -street parking to compliment the necessary commercial
and residential components of the area and to serve as a buffer between moving traffic and the pedestrian
environment. On -street parallel parking is provided on the north side of Main Street except in the plaza
areas.
C.4 Grading
As specified in Section C.4 of the Investment Plan the grading has created smooth transitions for a safe
pedestrian experience and comfortable accessibility for the elderly and disabled. The grading is
designed to minimize its prominence so that Main Street appears to be flat and comfortable despite the
20 feet of grade differential from the Eastern Gateway to the Harry A. Nottingham Park Plaza.
Gradinz and Stormwater Runoff
The grading directs runoff to drain overland to either the northern plant beds or the curb inlets located
along the southern Main Street flowline. Runoff is then conveyed by the public storm
sewer downstream to the Eagle River.
The northern plant beds are equipped with an underdrain system that provides porous landscape
detention, a best management practice that removes sediment and debris prior to entering the storm
sewer system. In addition, we are proposing to use a hydrodynamic separation system, such as
Stormceptor or Vortechs, is proposed to remove trash, sediment and the total suspended solids from
the stormwater in the public storm sewer system.
Nottingham Park
At the interface between West Main Street and Nottingham Park, the slight change in elevation between the
Park and the street is used to create a sense of `overlook' between the two areas. Both the main plaza space
and the side seat walls gradually embrace the slope and use it to create a series of terraced seating areas
along each side of the main plaza space.
Library/Rec Center
There is an existing drop in grade between the Library and the Rec Center. In the redeveloped streetscape,
this change in grade was considered when choosing the pathway between the two uses, so that the final
Avon Main Street Streetscape Improvements
August 27, 2008
Page 9 of 12
pathway orientation was plotted to ensure the most gradual slope. In addition, the grade change between
the redeveloped streetscape and the sunken library plaza was formalized with a wall and railing that permits
the Library to have an at -grade outdoor plaza protected with a wall and fence.
Central Public Plaza
In the Season's/Sheraton Plaza, careful consideration of the grades allows the main plaza space to appear flat
and open, without obvious grading or central drains. In our experience, plaza spaces require minimal grade
changes in their central gathering areas to be successful, and we have ensured all plaza spaces are carefully
graded to appear smooth and flat.
Foundation Walls
No additional foundation walls are exposed in the West Main Street project area.
C.6 Pedestrian Corridors, Paths, Steps and Ramps
The Main Street streetscape design functions as a large pedestrian -only plaza, with cars having secondary
importance to people, as specified in Section C.6 of the Investment Plan. As such, the entire streetscape is
designed to have the look and feel of a plaza space, including the roadway surface, which utilizes colored and
textured concrete in varying bands of color that mimic the appearance of a large sidewalk space.
Curb and Gutter
Although the Investment Plan calls for Main Street to be without curb and gutter, the final design allows for
curb and gutter in some sections of the street. This change was instituted to allow for adequate drainage and
snow removal within the project area and has been approved the Avon Urban Renewal Authority.
Steps and Ramps
In order to increase the accessibility of Main Street, ramps were used to make changes in grades wherever
possible, and between all significant public spaces. Where steps are needed, they are designed to have a
wide, shallow appearance that is visually elegant and more accessible than a traditional -height riser and
tread. The roadway ramps to meet the plaza grades as an additional traffic calming measure while keeping
the plaza spaces at a uniform grade for the pedestrians.
C.7 Walls, Fences and screening
Stone seating walls are used throughout the streetscape to provide seating and grade retention. In some
areas, these walls are carved from slabs of natural stone, and in others, they are faced with a natural stone
product with rich texture per Section C.7 of the Investment Plan.
The fences that will be required in the Library/Recreation Center Plaza and potentially along Lot B will match
the Avon Station fence, and complies with Section C.7 of the Investment Plan.
Additional care has been taken to have the design screen existing back door facilities for some of the
buildings. For instance Lettuce Shed Lane has been designed so that the historical panels and landscaping
screen the utilities and loading dock of the Seasons.
Avon Main Street Streetscape Improvements
August 27, 2008
Page 10 of 12
C.8 Street Furnishings
The Main Street design utilizes a palette of street furnishings that reinforce the overall aesthetic of the
redeveloped streetscape and complies with the guidelines outlined in Section C.8 of the Investment
Plan. The following specified street furnishings are also constructed of recycled materials, where
appropriate:
Benches (both freestanding and carved stone slab)
Bear -Proof Trash Receptacles
Moveable Cafe Chairs and Tables
Game Tables
Stone Bollards
Combination Ski Racks/Bike Racks/Newspaper Racks
Planter Pots
Decorative Tree Grates
C.9 Plant Material
In order to minimize the amount of imperivious surfaces along West Main Street, planters, trees, lawns
and planting beds were placed throughout the spaces. Within these 'green' areas, native, hardy and
drought -tolerant plants that are also beautiful and visually interesting across seasons are specified. All
plant material and location of plantings that have been specified complies with Section C.9 of the
investment plan.
Irrigation
In those areas that require irrigation, low-water drip systems have been specified. This includes the on -
street planter pots, which will be irrigated with an internal drip system that will reduce maintenance
costs and water use. The planting beds will be irrigated with an automated low-water drip system.
The lawn areas will be planted with a low-water rhizome turf -type tall fescue, which provides a durable,
green turf area suitable for activity while demanding far less water than bluegrass. The lawn areas will
be irrigated with an automated spray system. Amended native topsoil will be utilized rather than
imported material.
Street Tree Caliper
The caliper of the trees will range from 3" to 4", depending on the species and location per Section C.9
of the Investment Plan.
C.10 Lighting
Creative and artistic lighting is proposed through the Main Street design in addition to the standard Avon
West Town Center District standard street lighting fixture. All of the lights will have timers and shut -offs to
ensure they are only light when required and are compliant with the Avon Night Lighting Ordinance.
Avon Main Street Streetscape Improvements
August 27, 2008
Page 11 of 12
True Calor Rendering
All lighting will have a CRI of greater than 70 wherever possible, which will provide true color rendering of
people, materials and streetscape details.
LED Lighting
Currently all landscape accent lights, and in -grade lighting will be specified as LED sources.
Seasonal Lighting
Street trees will have LED holiday lighting attached. In addition, the additional LED fixtures along the street
will have the ability to display seasonally -appropriate colors.
C.11 Activities and Special Events
All of the major plazas and public activity spaces provide access to electricity for special events. Electrical
outlets are proposed for each tree and adequate power will be provided at the Harry A. Nottingham Park
Plaza and the Sheraton/Seasons Piazza space. Main Street is designed to be cosed to accommodate large
events such as fairs, markets and festivals.
Also, The following elements are located in each plaza:
Eastern Gatewav
Interactive public art feature
Lettuce Shed Plaza
Fire Pit
Integrated Seating
Season's/Sheraton Plaza
Game Tables
Moveable Chairs and Tables
Interactive Art Feature in Paving
Library/Rec Center Plaza
Children's Library Garden
Open Green Play Hill
Public Art Panels
"A" Sculpture
Nottingham Park Plaza
Interactive Water Sculpture
Performance Area
Avon Main Street Streetscape Improvements
August 27, 2008
Page 12 of 12
C.12 Carts and Vendors
Areas for vending carts have been created along the pedestrian pathways between each plaza space.
Electricity will be available for the vending carts. In addition, we recommend movable vending carts be
permitted in the Season's/Sheraton Plaza until the adjacent properties have been developed.
C.14 Snow Removal and Storage
At the August 26, 2008, Avon Urban Renewal Authority hearing, Staff received direction to minimize
snowmelt while attempting to implement it in an environmentally responsible manner. Therefore, the
snowmelt system for Main Street will connect to the Waste Heat Recovery project from the Avon
Wastewater Plant. The current schedule for the Waste Heat Recovery project is for the design to be
completed in 2009 and the facility be constructed in 2010. Thus the Public Works Department will need to
manually remove snow for at least one winter season until such a facility is established. The Public Works
Department will be requesting special equipment to remove the snow to protect the streetscape design. The
Streetscape design and snowmelt areas will be designed to have snow storage and snow accumulation areas
while still providing for a safe pedestrian experience. Furnishings and other site fixtures will be enhanced by
snow accumulation.
Section D. Public Signage
The public signage guidelines in Section D of the Investment Plan provide detailed guidelines for exterior
way -finding and establish a controlled program for the Town Center district. Avon Station and Lake Street
projects follow the public signage guidelines and have set the color palate and sign design. The signs
proposed for the Main Street -project are of identical design, including the color and masonry, to the signs at
Avon Station and Lake Street.
Recommendations:
Approve the Main Street final design because it complies with the Avon West Town Center District
Investment Plan.
Attachments:
Exhibit A- Main Street Streetscape Improvements Final Design
Turf
Steps
Newspaper Rack
Sunken Library Plaza
Retaining Wall with Railing
Library & Rec Center Plaza
Art Feature
A" Sculpture -Art Feature
Bench -Type B
Concrete Paving -Type C
Concrete Paving -Type B
Deciduous Shade Tree
Stone Paving -Type C
Concrete Paving -Type D
Concrete Pavers -Type C
Concrete Pavers -Type
Lettuce Shed Lane -Art Feature
Wayfinding Feature -
Concrete Pavers -Type A -
Concrete Pavers -Type B -
Concrete Paving -Type E -
Pedestrian Light Fixture -
Concrete Paving -Type A -
Stone Seat Wall
Nottingham Plaza
Water Feature
Planter Pot -Type C
Gateway Signage
Trash Receptacle
Stone Bollards
Planter Pot -Type B
Tree Grate -Type A
Planter Pot -Type A
Concrete Paving -Type A
Stone Paving -Type B
Decorative Column with
Festoon Lighting
Movable Tables & Chairs
Concrete Pavers -Type E
Concrete Pavers -Type F
Seasons - Sheraton Plaza
An Feature
Stone Paving -Type A
Tree Grate -Type B
Adirondack Chairs
Lettuce Shed Focal Point -
An Feature
Rush Lighting Feature
Wayfinding Feature
Planting Bed
Bench -Type A
Bike Racks
Concrete Paving -Type F
Ornamental Tree
Stone Bench
Eastern Gateway -
Art Feature
Existing Tree
Wayfinding Feature
THE TOWN OF West Main Street
AVON STREETSCAPE IMPROVEMENTS
Library & Rec Center Plaza -
Lettuce Shed Plaza
Awn West Main Street - View West
l
4ilk
ea�c Oaf Wu �
s.miSF, ii w.
�4 1
Nottingham Park Plaza
Awn West Male Street - View East
Eastern Gateway
"'"w"'
OF West Main Street
AVONSTREETSCAPE IMPROVEMENTS
Gateway Wayfnding Sign
/— Deciduous Shade Tree
Stone Paving -TypeA
�— Nottingham Plaza Water Feature
Steps into Park
Turf Lawn
1
Stone Seat Wall
Concrete Paving -Type A
Concrete Paving -Type B
Concrete Pavers -Type D
Concrete Pavers -Type C
Bike Racks
— Gateway Wayfinding Sign
Planter Pot -Type B
Planter Pot -Type C
Pedestrian Light
Lake Avenue Street Treatment
Stone Paving -Type A
Nottingham Park Water feature
Bench -Type B --�
THE TOWN Of West Main Street
AVONSTRE' 1 SCA IMPROVEMENTS
Deciduous Tree
Ornamental Tree
Library & Rec Center
An Feature
Planter Pot -Type C
Stone Bollard
Tree Grace -Type B
Concrete Pavers -Type C
Concrete Pavers -Type D —
Concrete Pavers -Type C
Concrete Paving -Type C —
Stone Bench in Terraced Lawn —
Stone Paving -TypeA
Concrete Pavers -Type C
Concrete Pavers -Type D
Concrete Paving -Type C
Pedestrian Light
Trash Receptacle
Planter Pot -Type B
Stone Ballard
Stone Planter Curb
THE TOWN OF I West Main Street
AVON I STREETSCAPE IMPROVEMENTS
ti
IN
Bench -Type A
Stone Paving -Type A
Concrete Pavers -Type F
Concrete Pavers -Type E
OrnamentalTree
Raised Pedestrian Crossing
Concrete Planter Splash Strip
Concrete Paving -Type A
Trash Receptacle
Festoon Lighting
Decorative Column
Seasons ! Sheraton Plaza Art Feature
Movable Tables and Chairs
E4
THE TOWN OF West Main Street
AVON STREP F S C A P E
E
Decorative Column
�`
` •-
�,....� ' `
Deciduous Tree
.r
'
Stone Bollards
Seasons - Sheraton Plaza Art Feature
—
- --
Festoon Lighting
t
f
--
Planter Seat Wall
7
—
Planter Pot -Type B
..r
ti
IN
Bench -Type A
Stone Paving -Type A
Concrete Pavers -Type F
Concrete Pavers -Type E
OrnamentalTree
Raised Pedestrian Crossing
Concrete Planter Splash Strip
Concrete Paving -Type A
Trash Receptacle
Festoon Lighting
Decorative Column
Seasons ! Sheraton Plaza Art Feature
Movable Tables and Chairs
E4
THE TOWN OF West Main Street
AVON STREP F S C A P E
7
60 0 e
Interpretive Art Panels
Concrete Pavers -Type A
Concrete Pavers -Type B
Art Planter Seat Wall
Trash Receptacle
Planter Pot -Type B
Planter Retaining Wall
Lettuce Shed Focal PointAm Feature
Adirondack Chairs – -
OrnarrentalTree
Bench -Type A
�— Stone Bollards
Deciduous Tree
Concrete Paving -Type A
Concrete Paving -Type C
Concrete Paving -Type B
Adirondack Chairs
Lettuce Shed Foul Point Art Feature
Stone Paving -Type A
Concrete Pavers -Type C
skrAnn
� � MMI 4 M!I ry ✓•IUNN 14e
Wq NIlW 1NlNl Rlj
THE TOWN Of I West Main Street
AVONI STREETSCA IMPROVEMENTS
I
Concrete Paving -Type C
Concrete Paving -Type B -A
Concrete Pavers -Type C _
Concrete Paving -Type A
Planter Pot -Type B
Bicycle Racks
Concrete Paving -Type B
Stone Bench
Planting Bands
THE TOWN OF
AYO N
Pedestrian Light
Turf Lawn
Gateway Wayfnding Sign
Ornamental Tree
Stone Bench
Eastern Gateway -Art Feature
Deciduous Shade Tree
;KOW
3
•N A ,
,, ftft ,.
Concrete Paving -Type B
Planter Pot -Type B
Concrete Pavers -Type D
Concrete Pavers -Type A
West Main Street
STREETSCA;
a
■ �t
iG
pn
u
`
stn
n
a
t� as
map
mon
Pedestrian Light
Turf Lawn
Gateway Wayfnding Sign
Ornamental Tree
Stone Bench
Eastern Gateway -Art Feature
Deciduous Shade Tree
;KOW
3
•N A ,
,, ftft ,.
Concrete Paving -Type B
Planter Pot -Type B
Concrete Pavers -Type D
Concrete Pavers -Type A
West Main Street
STREETSCA;
a
The numbers identifying the pi materials picNred below
correspond to both the site plan on this banner as weH as to the
colored site plan banner, where applicable.
Stone Paving - Type A
M oiar slate ant n azhlar pxttem.
Stone Paving - Type B
Multi -odor sarvlaori cu[ in yenning
bond pattern.
Stone Paving - Type C
Mdi--color PaWMY r rmdom
co i, patten.
Sam
Concrete Paver- Canl:rele Paver- Concrete Paver -
Type A Type B Type C
"Avon RM Bli "Three Tone Br « "Ao n &.,dCi
Twr8led Ve , w pavers T=ned Vere pacers canes pa. in nindsn
in rardc uhiarpaztem. in random asNar pattern. pattern.
Concrete Paver - Concrete Paver - Concrete Paver -
Type D Type E Type F
'Mirecnta Ris`Turcded "AArnn Blend "Cobble "Mini Ris" Cabbie
Vextian piersn rutlnn snres pavers in cri we pass n crt.nr
asNar pane, patter, pstten
Concrete Paving - Concrete Paving - Concrete Paring -
Type A Type B Type C
"lbrve Gdd'Colored NO Grande" coWnid "Carbde" Coloed
concrete with hght concrete vnth sindsape crncri with sand• -•y
brown finish. finish. Posh.
Concrete Paving - Concrete Paving - Concrete Paving -
Type D Type E Type F
'1e .. Cdn d 'Con." Coin Star&rl grey conocse
orcrete vmh sandsrepe ri w :int with ligf[ boom finch
finch bro-yn fineh.
rvornxcr++w
..._, IA`,
THE TOWN Of West Main Street
AVONSTREETSCAPE IMPROVEMENTS
The numbers identifying the site fumishings pictured below
correspond to both the site plan on this banner as well as to the
colored site plan barvmr, where applicable.
Bench - Type A Bench - Type B
'Arzatn' 13 f berch wrth by ea� bench w
woad mat aM dw wood seat and olrre
powdercoated frame paAmowed frame.
Adrandock Chairs
Spelak seating A LetWre
Shed Lane Focal Pont
h wAble Tabble; & QIaLa
At Seasons Shmtan Plain -
"Park Centre" cries,
Tree Grate - Type A
Trac Brute -
,ONO "Gast non.
T�wB
Iw
„Flat Rainbow'
BeY-prent Miesh
Cast nn.
Rawl
With az y&
,.
logo.
Planter Pots -
Types A -C
Bicycle Rack
"Rig' Sr mless
Steel
Newapaw flack
1�M1
11
8
;'
4
Stoics Bogard Stone Phuder Curb Stone Veneer w
m
"Oklahami
THE TOWN OF West Main Street
MON STREETSL < 'R�
Tenant Directory & Events Sign
!
Pedestrian
Directional Sign
4 Vehicular
Directional Sign
a
Pedestrian Directional Sign
K Pedestrian Pedestrian Sign
Directional Sign with Clock
s
N
�y
N
Avon Main Street Signage Family
The signs represented below depia [he majority of the Avon Main Street Signage Farnily as outlined in the West Town Center investment Ran.
Some, or all, of these signs wall appear within the Awn West Main Sb eet
Streetscape Improvxocems project, based on need
iu
ll ll _
THE TOWN OF •
West Main Street
AVON STREETSCAPE :.,_- V'EMENTS
Eastern Gateway Art Piece
The Eastern Gateway will identify West Main Street with a grand
presence and will be easily visible ii Avon Road. The gateway
will set the tone of the street by utilizing sustainable and
indigenous materials where
possible. The piece will
incorporate a variety of
textures and materials
malting it visually and
tactually interesting from all
angles , day and night. and in
all seasons.
THE TOWN Of
Nottingham
The Nottingham Plaza water feaure will be the iconic western gateway to
Main Street while also serving as a playful gathenng space, overlook to the
pad, and performance area. The water feature will incorporate materials
from the Eastern Gateway, such as stone and metal, and provide a
LLchanging series of water and lighting depending on the events and seasons.
!� 45
a
LibraryCorridor
This installation will create a
colorful, punctuated, multi -piece
passageway for pedestrian traRc
that is interesting in day. nit and all
seasons. Based on whimsical
references to Avon's stories,
symbols and history, the art will
use bright colors, variety of
textures and approachable scale to
attract children and adults.
4 Library Roundabout
Capitalizing on the interplay between the
Library and the name of the Town, this
playful installation will juxtapose'A"'s
depicted in a variety of typefaces and
colors W form a tower strveiure. The _
thetower will act as the centerpiece to
the library roundabout and the visual
temonus to the Library & Rec Cerner
Plaza pedestrian walk
(5 Seasons / Sheraton Plaza Art Piece
The Seasons / Sheraton Plaza art
piece will provide the central focal
point for the plaza. While
primanly a horizontal piece,
elements such as columns,
boundary towers and festoon
lighting will emphasize and
enclose the piece.
ra Lettuce Shed Lane Plaza
Intended as an outdoor"limng =m;'this piece will act as both a focal pant
along the street and as the "hearth" for the plaza space. This fire -based
piece will refer m Avon's history as well as look to Avon's future by
incorporating sustarable and indigenous materials where possible.
Lettuce Shed Lane History Panels
These Interpretive panels will be placed along the length of Lettuce Shed
Lane pedestrian walk the armory condor used by v hors w Avon. The
panels will illustrate Avon's history from niny times to modem day, providing
nesidents and visitors a sense of context forAvan as a unique place.
The numbers identifying the light fixtures pictured below correspond
to both the lighting plan on this banner as well as to the colored site Night Lighting
plan banner, where applicable.
Step & Seat Wall Lighting
Stone Bench &
Wall Planting
Lighting
Ballard Uplights
Art Wall Panels
'SnoW Light
Beams
Win vu,d cmopy opnon.
Plaza Tree Uphghts
Paving Marker
Lights
Festoon Lighting
.lush Lighting Future
f: nth coiaid I,Jued moral paces.
Of Art Feature
.Multi -Color Tree Lighting
THE TOWN OE West Main Street
AVONSTREL SCA .JVEMENTS
Staff Report
FINAL DESIGN PLAN
c0 L O R A D O
September 2, 2008 Planning & Zoning Commission meeting
Report date August 29, 2008
Project type Single Family Residence
Legal description Lot 12, Block 4, Wildridge Subdivision
Zoning 2 Units — PUD
Address 5712 Wildridge Road East
Introduction
The applicant, Ryan Sutter, has submitted a Final Design application for a single family
residence with an attached accessory unit over the garage on Lot 12, Block 4 of the
Wildridge Subdivision. The lot will be accessed off of Wildridge Road East and the
proposed residence will measure approximately 6,370 sq. ft., inclusive of the garage
area. The building is designed with gabled roofs with asphalt shingles and corten metal
roofing and utilizes stone, wood shingles, vertical wood siding and horizontal log siding
on the exterior walls.
As proposed, the structure appears to contain two dwelling units, which is technically
allowed per the zoning on the lot. The second residence is located above the garage
and is called out on the plans as the Guest House. The Guest House is considered a
second dwelling unit since it contains cooking facilities and is designed to be
independent of the primary dwelling unit. The applicant is representing that this unit's
interiors will only be roughed in during the construction of the residence and that it will
be finished at a later date. However, since the applicant is applying for a single-family
residence and given the regulations of the building code regarding proper structural
separtation, Staff will require that the kitchen in the Guest House be removed to ensure
that a single family residence is proposed.
Included with this report are a vicinity map (Exhibit A), Color Board and Light fixture
specification sheet (Exhibit B), and reduced plan sets with a site plan, floor plans, and
elevations (Exhibit C).
Review History
In 2001, the owner of the property applied for and received approval for a PUD
Amendment for the subject property. The PUD Amendment changed the zoning on the
lot from a maximum density of one (1) dwelling unit to two (2) dwelling units.
In 2006, a Final Design application was approved for an 8,400 square foot duplex
residence. The approved plan had a similar site layout with the driveway access from
the southern corner of the lot and the residence placed in the northern two-thirds (2/3)
Town of Avon Community Development (970) 748-4030 Fax (970) 949-5749
Lot 12, Block 4, Wildridge Subdivision — Sutter Residence Final Design
September 2, 2008 Planning & Zoning Commission Meeting Page 2 of 8 AYON
of the lot. The approved plan also used numerous engineered retaining walls
throughout the site and had a limited landscaping plan.
At the Commission's March 4, 2008 meeting, the Sketch Design review took place for
this property during which several comments were made related to the following design
issues: the dificullty of the site, the amount of retaining walls proposed, and the lack of
natural landscaping.
Design Review Considerations
According to the Town of Avon Residential, Commercial. and Industrial Desian Review
Guidelines, Section 7, the Commission shall consider the following items when
reviewing the design of this project:
1. The conformance with setbacks, massing, access, land use and other
provisions of the Town of Avon Zoning Code.
• Allowed use: The proposed residential use is permitted given the duplex - PUD
zoning.
• Density. The lot is zoned for a duplex residence and the single family density is
appropriate.
• Lot Coverage: Maximum site coverage allowed under the Wildridge PUD is fifty
percent (50%). The project is in compliance with the PUD, proposing nineteen
percent (19%) lot coverage.
• . Setbacks: The setbacks for the property are typical for Wildridge with a twenty-
five foot (26) wide front yard setback and ten foot (10') wide side yard building
setbacks. The subject lot does not contain a rear yard setback since the side
yard setbacks intersect at a point in the rear of the lot. Even though the building
is within all required setbacks, an Improvement Location Certificate (ILC) will be
required to document the exact location to ensure no encroachments occur.
• Easements: A Utility and Drainage Easement of seven and one-half feet (7.5') in
width borders both of the side property lines on the north and south, while a ten
foot (10') wide Slope Maintenance, Drainage, and Snow Storage Easement
borders the east side of the property. It is not advised to place landscaping
within platted easements; however, it is the owners responsibility if this
landscaping requires removal and replacement in the future.
• Building Height: The proposed residence measures approximately thirty four feet
and nine inches (34'-9") at its tallest point which complys with the zoning code's
maximum height of thirty five feet (35'). Even though the building is within the
maximum height allowed under zoning, an Improvement Location Certificate
(ILC) will be required to document the exact location to ensure its compliance.
• Grading/Drainage: All existing and proposed grades are indicated on the site
plan.
• Parking: This project, when viewed as a duplex residence, requires five (5)
parking spaces (two (2) per unit under 2,500 sq. ft. / three (3) per unit over 2,500
sq. ft). As stated earlier in this report, the applicant will be required to remove the
Town of Avon Community Development (970) 748-4030 Fax (970) 949-5749
Lot 12, Block 4, Wildridge Subdivision — Sutter Residence Final Design mw
September 2, 2008 Planning R Zoning Commission Meeting Page 3 of 8 AEON
kitchen from the Guest House to comply with a single family residence design,
which in turn will reduce the parking requirements by two (2) spaces. The result
is a need for three (3) parking spaces and the applicant has proposed a total of
four (4) parking spaces, two (2) interior and two (2) exterior spaces, which do
meet the parking requirements.
2. The general conformance with Goals and Policies of the Town of Avon
Comprehensive Plan, and any sub -area plan which pertains.
The project complies with the Town of Avon Comprehensive Plan.
3. Whether adequate development rights exist for the proposed improvements.
Adequate development rights exist on the property for a single family residence.
4. The Final Design plan is in general conformance with Sub -Sections A through
D of the Residential. Commercial, and Industrial Desiqn Guidelines.
A. Site Development:
o Site Design: The Design Guidelines put emphasis on site layout design
and state that structures should blend in with natural settings and limit the
need for extensive site grading and slope retention. The site is steep and
uphill that contains a platted non -developable area in the northern portion
of the property and significant topographical change along the lower
portion of the lot. This lot will require special consideration to the site
design, grading and drainage, use of retaining walls, and treatment of
exposed slopes.
The applicant has provided a site plan that builds the proposed residence
into the hill side. Due to the steepness of the lot, the applicant has
proposed a large number of retaining walls that will all need to be
engineered. Although the proposed residence doesn't step up the lot as
the guidelines would suggest the applicant has proposed to pull the
residence as far east as possible.
The Guidelines state that all disturbed areas should be revegetated with
native seed. The applicant intends to restore disturbed areas with
vegetation as shown on the landscape plan and discussed later in this
report. Staff recommends that the applicant use revegetation matting on
all steep slopes to ensure vegetation growth.
o Site Access: Access to the site is provided with a twelve foot (12') wide
driveway from Wildridge Road East. The applicant is representing that the
driveway meets the maximum grade requirements by stating a ten percent
(10%) grade is used for a majority of the driveway. The balance of the
driveway meets the four percent (4%) maximum for the first twenty feet
(20') adjacent to the roadway and parking areas.
Staff does have concerns about the drivway's ability to meet the four
percent (4%) maximum grade adjacent to the roadway. Staff
recommends that the site plan provide spot elevations to prove that the
design meets the requirements. Staff also has concerns about the
Town of Avon Community Development (970) 748-4030 Fax (970) 949-5749
Lot 12, Block 4, Wildridge Subdivision — Sutter Residence Final Design
September 2, 2008 Planning & Zoning Commission Meeting Page 4 of 8 MR
driveway adjacent to the garage and the apparent drainage into the
garage. Staff would recommend that the applicant revise the drawings to
ensure that there is positive grading away from the garage.
o Parking and Loading: The intent of the parking guidelines is to provide
residents and guests with suitable parking locations that are also durable
and functional. The parking requirements of this section are discussed
above in the parking zoning requirements. The material used for the
driveway is asphalt which is acceptable and it appears the applicant meets
the parking requirements.
o Site Grading: Due to the location of the proposed residence and the use
of retaining walls, the amount of site grading is minimal. The guidelines
do state the following:
Where finished grades require retaining wall placement, a series of
lower retaining walls with landscaped terraces is preferable to a
high wall with an unbroken vertical face.
The applicant is proposing to use all engineered retaining walls that
contain little space for planting beds. Staff would recommend that the
retaining walls on the west side of the driveway be stepped more to create
a greater amount of planting areas inbetween the retaining walls. As
stated earlier in this report, due to the steepness of the lot engineered
retaining walls will be required for a majority of the necessary slope
retention. Staff understands this hardship but feels that an alternative
design to the site, through modifications to the retaining walls and
landscaping plan, could result in a better aesthetic design.
The applicant is proposing retaining walls that extend beyond the property
line and into the public ROW. The guildines state that all grading work
must be contained within the property boundaries. Staff recommends that
the applicant revises their site plan to ensure that all retaining walls are
fully within their property boundaries.
o Drainage: The Guidelines have been generally met with regard to
drainage as the drainage is mostly set away from the buildings and into
the drainage easements. Staff does have concerns that the drainage from
the western portion of the lot and its lack of adequate positive drainage
away from the western portion of the structure. Staff recommends that the
applicant revise the grading plan to ensure that there is proper drainage
away form the western side of the structure.
The Guidelines require that all drainage easments remain unobstructed.
The applicant is not proposing any landscaping within the platted Drainage
easements.
Snow Removal and Storage: The project has a note designating the area
to the north and east of the driveway as snow storage areas. Although the
site plan does not contain shaded areas of snow storage, it appears that
there is plenty of space for snow to be stored. The driveway contains an
area to the east that is at least ten feet (10') in width and over one
Town of Avon Community Development (970) 748-4030 Fax (970) 949-5749
Lot 12, Block 4, Wildridge Subdivision — Sutter Residence Final Design�!!
September 2, 2008 Planning & Zoning Commission Meeting Page 5 of 8 AYBN
hundred and fifty feet (150) of length. Staff feels that this is adequate to
meet the Snow Storage requirements of the Design Guidelines.
B. Building Design:
o Building Materials and Colors: A variety of quality building materials are
proposed with this application including: Stone, wood shingles, vertical
wood siding, and horizontal log siding. The applicant has proposed
general colors for the wood siding, wood shingles, trim, and roofing
materials (Exhibit B), but the applicant has also stated his desire to use
reclaimed materials. The reclaimed materials could alter the final colors of
the building materials, therefore Staff recommends that the applicant
provide a physical color board to staff for final approval prior to issuance of
a building permit. These proposed colors do meet the Design Guideline
requirements and staff is of the opinion that they are acceptable with the
condition listed above.
o Exterior Walls, Roofs, and Architectural Interest. The building's massing is
broken up with varying building materials, wall planes, roof elevations, and
use of fenestration. The applicant has used a high quality of arichetecture
to create an interesting composition. The building utilizes a large amount
of stone as a base material with a mixture of vertical wood siding and
wood shingles on the east and south building elevations. The north and
west building elevations have minimal interest, but are acceptable due to
the lack of viasbility of the home.
The Design Guidelines don't specifically state that wood shingles are an
allowed or disallowed exterior building material, but they do state that
asphalt shingles and cements shingles are not allowed.
The proposed residence does utilize asphalt shingles and cor-ten as
roofing materials which are encouraged by the Design Guidelines. The
proposal also includes the use of solar panel on a portion of the roof area.
The Guidelines do not contemplate the use of solar panels, but staff feels
that they are acceptable due to depictions on the elevations of flush
mounted panels.
o Outdoor Lighting: The applicant has proposed to use exterior lighting on
the proposed residence (Exhibit B). Although the light fixture locations are
not called out on the plans, the light fixture proposed does comply with our
outdoor lighting ordinance.
C. Landscaping:
o Design Character: The design appears to generally comply with the intent
of the Residential Landscaping Guidelines, but could be improved to help
provide better screening for retaining walls. In terms of plantings, there
are a total seven (7) Colorado Blue Spruce trees at a height of six feet (6),
twenty four (24) Aspen trees varying from two inch (2") to three inch (Y)
calipers, fifteen (15) Buckbrush shrubs, ten (10) Snowberry shrubs, 'eight
(8) Alpine Current shrubs, six (6) Siberian Peashrubs, and eighteen (18)
Big Sage shrubs. The applicant has provided a majority of the trees to the
Town of Avon Community Development (970) 748-4030 Fax (970) 949-5749
Lot 12, Block 4, Wildridge Subdivision — Sutter Residence Final Design �
September 2, 2008 Planning & Zoning Commission Meeting Page 6 of 8 MON
south of the proposed residence and staff feels that some of those
planting could be moved to the east of the retaining walls to help provide a
greater level of screening. The applincant has provided shrub planting in
the beds created between the retaining walls. Staff would recommend
that a more mature planting be used in those locations to help provide a
more immediate screening for the retaining walls.
According to the applicant, all trees would meet the minimum size
requirements as prescribed by the Design Guidelines: 6' minimum height
for evergreens, 2" minimum caliper for deciduous trees, and 5 gallon
minimum for shrubs. The proposal appears to meet the Guidelines'
requirements for landscaped area and irrigated area.
o Irrigation/Watering: The applicant is not proposing any perminant
irrigation and will only temporarly irrigate the planting beds to help ensure
initial growth. It appears that the applicant has meet the requirements of
this section of the Design Guidelines.
o Retaining Walls: There are numerous retaining walls proposed with this
site design. All of the retaining walls do not comply with the non -
structurally designed retaining walls that are encouraged by the Design
Guidelines. It appears that the applicant has provided a structurally
designed retaining wall and staff will require that the designs be stamped
by a Structural Enginneer and that the Engineer provide calculations to the
Engineering Department prior to issuance of a building permit.
The applicant is proposing to use a mixture of stone veneer retaining walls
and boulder retaining wall which are both acceptable. The applicant has
not committed to using a specific type of stone veneer and staff would
recommend that the stone veneer on the retaining walls match the stone
used on the proposed residence.
As stated earlier in this report, Staff would recommend that the retaining
walls, specifically those to the west of the driveway provide more stepping
to create a greater amount of area for mature plantings.
5. The compatibility of proposed improvements with site topography, to
minimize site disturbance, orient with slope, step building with slope, and
minimize benching or other significant alteration of existing topography.
The lot has a steep uphill slope that requires a good amount of slope retention. With
that in mind, Staff is of the opinion that the proposed improvements do limit the
amount of site disturbance. Staff does have one concern, the plans do not show
limits of site disturbance fencing on the north, south, or east sides of the
development. Staff recommends that the applicant revise the construction
management plan to ensure that there is limits of site disturbance completely
surrounding the proposed development.
6. The appearance of proposed improvements as viewed from adjacent and
neighboring properties and public ways, with respect to architectural style,
massing, height, orientation to street, quality of materials, and colors.
Town of Avon Community Development (970) 748-4030 Fax (970) 949-5749
Lot 12, Block 4, Wildridge Subdivision — Sutter Residence Final Design ,o.
September 2, 2008 Planning & Zoning Commission Meeting Page 7 of 8 AVON
The applicant has proposed high quality materials and earth tone colors that should
make this project visually compatible with the surrounding environment. The
property is adjacent to open space to the north and a developed lot to -the south.
Staff feels that the proposed improvements are compatible with the surrounding
area.
7. The objective that no improvement be so similar or dissimilar to others in the
vicinity that monetary or aesthetic values will be impaired.
No monetary or aesthetic values will be impaired with the proposed improvements.
8. The general conformance of the proposed improvements with the adopted
Goals, Policies and Programs for the Town of Avon.
The project is in general conformance with the Town's adopted goals and policies
and is a use by right per the Wildridge Subdivision.
Staff Recommendation
Staff is recommending Tabling of this Final Design application for a single family
residence on Lot 12, Block 4, Wildridge Subdivision due to inconsistancies with sections
A -D of the Residential Design Review Guidelines.
If the Commission chooses a recommendation of Approval, Staff would recommend the
following conditions be included:
1. The title block of all sheets be revised to use the proper Legal description of Lot
12, Block 4, Wildridge Subdivision;
2. Sheets A-010 and A-012 be revised to remove the Stepped Boulder Retaining
Wall note that points to the proposed residence;
3. The Construction Management Plan (Sheet A-012) be revised to ensure limits of
disturbance fencing completely surrounding the proposed improvements;
4. The Floor Plans (Sheet A-102) be revised to remove the kitchen facilities from
the Guest House;
5. Revise the Site Plan (Sheet A-011) to provide spot elevations for the driveway to
ensure positive grading and drainage away from the garage and to ensure the
maximum slope requirements are met;
6. Revise the Site Plan (Sheet A-011) to ensure all retaining walls are fully within
the property boundaries;
7. The Landscaping Plan be revised to provide better screening for the retaining
walls and more mature plantings;
8. The Landscaping Plan be revised to provide revegetation matting on all steep
slopes to ensure growth of the revegetated areas;
9. All Retaining Walls over four feet (4) in height be revised to reflect a non-
structural wall or a detail be added so that the design receives a stamped
approval from a Colorado Licensed Professional Structural Engineer and that all
required calculations be received and approved by the Town Engineer;
10.The applicant provide staff with physical samples of all colors for all materials,
especially reclaimed materials prior to approval of any colors or materials;
11.The retaining walls to the west of the driveway be revised to provide more
stepping and landscaping to better screen the walls; and
Town of Avon Community Development (970) 748-4030 , Fax (970) 949-5749
Lot 12, Block 4, Wildridge Subdivision — Sutter Residence Final Design
September 2, 2008 Planning & Zoning Commission Meeting
Page 8 of 8pV0N
12. Except as otherwise modified by this approval, all material representations made
by the applicant or applicant representatives in this application and in public
hearings shall be adhered to and considered binding conditions of approval.
Recommended Motion
1. "1 move to table the Final Design application for a single family residence on Lot
12, Block 4, Wildridge Subdivision to a following meeting, due to the
inconsistancies between the application and section A -D of the Residential
Design Review Guidelines."
If you have any questions regarding this project or any planning matter, please call me
at 748-4023, or stop by the Community Development Department.
Respectfully submitted,
J Barnes
Planner I
Exhibits:
A. Vicinity Map
B. Color Board and Light Fixture Specification Sheet
C. Reduced Plan Sets
Town of Avon Community Development (970) 748-4030 Fax (970) 949-5749
� 'rl
1
The exterior siding of the guest house (above the garage) will be as shown below with the trim being the
same as on the main house. The window frames on this house will also be dark brown.
The exterior lighting will be sconces as shown below. The Great Outdoors Wall Sconce by Minka Lavery.
8990 -61 -PL, Part #: 2324177. Width: 7.5, Height: 19.75", Projection: 12.25'
zizz szz meal oo m nu oa SNOZIHOH lV8fll3311HOHV
I
Y
µ
U
IM
1 \ E
N�a319 �
-r
opeaoloo 'uony
uo!S!n!pgnS 96plapl!M - Z L fol
21311ns visa X1'8 NV.QJ
JOJ 03uap!SO�J MON y sn nv a
90 19119
LSI -.t
4N V*IJ
O
0
OZ /I uL9ld nS a
`o
g m
oa_
X O E��
\ V 1U O—N��_NN0000
OOOOOOOONNNN
rri ' a r r r Q¢QQQQQ¢QQQ¢
V �
l�
OZS
C2
V
n
n
n
z�
N
g m
oa_
X O E��
\ V 1U O—N��_NN0000
OOOOOOOONNNN
rri ' a r r r Q¢QQQQQ¢QQQ¢
/'
r� /\�\�.,,
`�` V
(ZSOB p?'S„i„pO 11'I;ZIIZ%Og Od SNOZWOH lVNn1O311HO?JV
es
OpeJoloO 'uony
uolSlnlpgnS ebpljpl!M - Z L lol
21311ns d1S12j18 NVAl l
BOJ WuaplSO�f mON y
o
sn �tva
90/91/90
4N P -Old
N
bulb ugsuo)
0
�. _ ..•;I ..;/,'i i i�,_, 1-r.,l'. a �” � _ -�*YJ . 1
V
F d
Hs
o
sn �tva
90/91/90
4N P -Old
N
bulb ugsuo)
0
�. _ ..•;I ..;/,'i i i�,_, 1-r.,l'. a �” � _ -�*YJ . 1
J e - `UOhd
- - ope�alo� uolslhlpQ�S a6p!aPl!M- ZG
N ,�nl� Fav 311(15
ao� aoUap�sa� MaN�-
—
` 1
� d
// (j.1e jL
l_f _____ ___ _ ___ __ __ __ _ __ _ __ ___�M.bt`l Zt OtB_i_;._; _Y__ __ _ _ /__-1__,
d
90/91190 -
ui
0
U)
0
0-
0
0�
a.
SNOZWOH IV2IMDKIH�a� OPP10100 i 'UOAV
UOISIA1pqnS 96p!jpl!M - Z 6 101
�Mins ViSNiR NVA�J
iI 101 GOUGPS8� MON V
M
ui
Z
< ogLL
LU
9 P- z
It U-
qw-
CIJ
N
"0-.t7 CO
C?
0 z (S w
00<0
< g o
0 M z U-
ww W 0
< o z o<
M W LU a 't LL z
w W W
w z T
z0
LL
x
F- Wo 0 LL
w
w 0
w
W Z
-j w
OO
0
"t LL
_ J
-- .0-,Z - .0-.9 -
ui,j Y 0 Y
8do<o
a ozo
LU
M zo Q� O� Of
cr 0 CLDU Z<
<
cr Of
Wo <>Oz<
0 z W CO -J
wz-j
Stu wwo2ww F-- — LL
z 0, W gzw
080co< 0
zo LL
co it z
L
XLL w LL, 0 W 0 2 < CLO<
Z W
W -j U- 0
MI
W
Cif
0
:;z I
0 > Q z L)
0 00<
M. WWW
0 an z 'm LL < 0
co
3:WW <
< w 0 Z D�
W
.Lu >2 uj 0� w g
(!) w
zo�w
t- r uj ly
0 om� <
z 0 ca
W LL w 0
X
LU
LO
T—
z
0
LLI
U)
z
0
C)
W
U)
std V -4-A
suoIJ995 Ilem WIUIOF�
sag
191190
\7 3
U)
W
Q o
m
SNOZ180H i"nIO311"",v
Op2J010o i i 'UOAV .
uo!s!nlpgnS abpupl!M - Z l lol
21311ns visa V NVAl
BOJ 90uapls@8 mON y
90/91/90 J
UPIJ "J0 lanai . gMOI
'N'a�01d
0
Q
0
oa SNOZIHOH WWiD IHO21V Op2J0!0o I I `UOAV
p«szzle,6,
uo!s!n!pgns aBp!aPl!M - Zl 101
213ii s ` isi1 ji'R N`d�l J
SOI aoUap!sa�{ MON y
LJ
31'-6'
19 .6*
l
12'- 0'
t '(1'
0
4j 1L S1 S
s C
I ®® 111
®®
z
l r -A n
coru�
ON VIOId
0
- o
-- 54 ut?ld "J° 19^91 u!eW _ Q
90191190
—_ - v�;r,_, w+_:i1: y,r,
w o: wn,o„i LixiLe xoa oa SNOZWOH IV8010311HONV
e012 SL2 �pL6�
I
opeloloo , 'uony
uoisinipgnS OBpupl!M - Zl jol
�1311ns VISNi'R NVAl
SOI OOuapisO�l MON y
°N V*IJ
WIJ JOOJ� lanai aaddn
y o
soe oo'senwo u'zua xoe oa SNOZ180H lv8nl3311H38V
zz szz mmi r—I
opeaoloo `uony
uoisinipgnS 96pupl!M - Z[ jol
21311ns ` iSNI'8 NVAJ J
JOI aouapisa�l MON y
I
-llT:
H nN g fad
suoIJen91I o
— lquiplin� 15el ' ail -'°N Q
90191190
l0m C �
� t0 O
a m a ago
i
o „„„z.oaod SNOZNOHl"%3311HOW OpBJOI0D I I IUOAV
eoasi<uis�„ ��
uo!s!n!pgng 96piJpl!M - Z L lol
21311ns ViSNi V NVA1 l
JOJ aouap!sa�l MaN y
nl }
°NV "d
UOlqe^911 o
buippno gSaM ? Vi°S
90191190 a
_rn�n)v`d3�r-."I in.,J c.o. .ry,.: uvsA—:-r.,\J
do
J
N
J
a y
J a p
C
�
IF—
�
°Im
a
(0
a
C
a
I
I
F
F
I
.0
.o -.se
€
�
I
�
m
nl }
°NV "d
UOlqe^911 o
buippno gSaM ? Vi°S
90191190 a
_rn�n)v`d3�r-."I in.,J c.o. .ry,.: uvsA—:-r.,\J
SNOZIHOH WIORIHO"v
opejoloo 'UOAV
I
U01SIAipqnS 96p!jpl!M - Z -N V*J
jol S
2J311ns ViSNi V NVAJ
BOJ 80u9l)!sa� mON V
L 90191190
is
ue oo sninoo ;a'nzuzxoe oe SN021iJOH lV2ff11�311H�aV OPBU0100 I 'UOny .,
P4 S abpijpliM-Z61 l
21311ns `d1S12j1'8 NVM3
JOI aouaP!Sa-d MGN y — s1 �, 9A1g99dsa9d -'IN
m
90191190 0