PZC Minutes 05-17-2005 (2)"�1� Town of Avon Planning & Zoning Commission Meeting
'gRoAMinutesjrO�i
C O V O No May 17, 2005
5:00 pm — 5:30 pm Commission Work Session
I. Call to Order
The meeting was called to order at 5:35 pm.
II. Roll Call
All Commissioners were in attendance with the exception of Commissioner Struve.
III. Additions and Amendments to the Agenda
Item VIII, A, Final Designs, Ruther Duplex, Property Location: Lot 5, Block 4, Western Sage
Subdivision; Item VIII, B, Wells Fargo Drive Through (appealed by Council and remanded
back to the Commission for further consideration), Property Location: Lot 22A, Block 2,
Benchmark at Beaver Creek Subdivision; Item IX, Sign Design — Comfort Inn, Property
Location: Lot 73-74, Block 2, Benchmark at Beaver Creek Subdivision; Item X, Minor Projects,
A, 3rd Floor Addition, Property Location: Lot 12B, Block 1, Wildridge Subdivision; and Item B,
Final Design Changes, Property Location: Lot 68, Block 3, Wildridge Subdivision were moved
to Consent Agenda
IV. Conflicts of Interest
There were no conflicts of interest.
V. Consent Agenda:
A. Approval of the May 3rd, 2005 Planning & Zoning Commission Meeting Minutes.
B. Item VIII, A, Final Designs, Ruther Duplex, Property Location: Lot 5, Block 4, Western
Sage Subdivision.
C. Item VIII, B, Wells Fargo Drive Through (appealed by Council and remanded back to the
Commission for further consideration), Property Location: Lot 22A, Block 2, Benchmark at
Beaver Creek Subdivision.
D. Item IX, Sign Design — Comfort Inn, Property Location: Lot 73-74, Block 2, Benchmark at
Beaver Creek Subdivision.
E. Item X, Minor Projects, A, 3d Floor Addition, Property Location: Lot 12B, Block 1, Wildridge
Subdivision.
F. Item B. Final Design Changes, Property Location: Lot 68, Block 3, Wildridge
Subdivision.
Commissioner Karow motioned for approval of the Consent Agenda and Commissioner
Smith seconded the motion. All commissioners were in favor with Commissioner Didier abstaining
due to his absence at the meeting.
VI. Comprehensive Plan Update
Description: Staff to introduce Rebecca Leonard from Design Workshop as the new consultant for the
duration of the Comprehensive Plan Update. No action required.
Tambi Katieb introduced Rebecca Leonard from Design Workshop to the Commission.
Ms. Leonard approached the podium to discuss her background and qualifications. She discussed
the current plan and its benefit to the Town of Avon. Commissioner Evans questioned Ms. Leonard
on the comments provided to date and its inclusion in the Comprehensive Plan. Commissioner Evans
mentioned that the Comp Plan to date is currently mediocre and would prefer the Plan to be "glued"
together more tightly. Commissioner Smith voiced that the plan needed wording to more reasonable
and concepts need more organization. Ms. Leonard asked the Commission regarding their thoughts
on the Plan. Commissioner Karow mentioned that the verbiage is watered down, an end goal is not
apparent in the Plan, and it needs to reflect the Steering Committee and Commission's concepts. It
was voiced that the momentum was here, but, it needs to be reorganized and the interest is in Ms.
Leonard's perception on the Plan.
Ms. Leonard suggested that a few work sessions with the Commission would be valuable to guide the
reorganization. Commissioner Evans mentioned that the Comp Plan should be easy to use, inclusive
of the other plans in Avon, and it shouldn't be loaded with personal opinion. Commissioner Karow
mentioned that clarity in the Plan with its goals and direction would be beneficial. Ms. Leonard
suggested that the Plan be amendable by the different sections and have the plan devised to
accommodate.
VII. Special Review Use Application (Public Hearingl
Property Location: The Confluence PUD
Applicant. Beaver Creek Resort Company of Colorado
Description: The applicant, Beaver Creek Resort Company, is requesting a Special Review Use
(SRU) Permit for the operation of a temporary rodeo on the property known as 'The Confluence".
This use is proposed for a temporary basis (9 nights) beginning on the evening of June 23rd.
The site is proposed with a rodeo arena surrounded by grand stands on the north and south side as
well as extra chutes and pens for the livestock on the east side. Parking is provided on-site for:
participants, food vendors, retail vendors, special event staff and volunteers, and a limited number
(25) of VIP guests. This application is similar to the SRU permit approved the past two years for the
Rodeo Series on the same property.
Jim Funk, Beaver Creek Resort Company, approached the podium to address commission concerns.
Security was mentioned and addressed. Jean Dennison approached the podium and mentioned that
Brooks and Dunn are playing in Beaver Creek Resort on July 28 (Thursday) and the Rodeo will
perform on the following Friday night (July 29).
No Comments by the Public.
OPEN PUBLIC HEARING
CLOSED PUBLIC HEARING
Commissioner Karow motioned for approval of Item VII, Special Review Use Application, Property
Location: The Confluence PUD, Applicant. Beaver Creek Resort Company of Colorado, with
Commissioner Savage seconding the motion. All commissioners were in favor.
VIII. Final Designs
A. Ruther Duplex
Property Location: Lot 5, Block 4, Western Sage Subdivision
Applicant. George Ruther
Description: The applicants, George and Amy Ruther, are proposing a single-family residence on this
.92 -acre property. This is a downhill lot accessed off the end of Longsun Lane on a private driveway.
The total floor area of the residence is 3,378 square feet with a maximum building height of 33.8'.
Proposed materials include wood siding, stone veneer, composite roofing and corrugated metal
roofing. A sketch design for this duplex was reviewed at the Commission's February 1", 2005
meeting.
Moved to Consent Agenda.
B. Wells Fargo Drive Through (appealed by Council and remanded back to the Commission
for further consideration)
Property Location: Lot 22A, Block 2, Benchmark at Beaver Creek Subdivision
Applicant: Greg Gastineau
Description: The applicant is proposing a final design for a canopy and associated drive through lanes
for a drive up banking facility. On April 19"', 2005 the Planning and Zoning Commission conditionally
approved a Final Design Plan for a remodel to Building C in the Chapel Square PUD. The Commission's
decision was appealed by Council on May, 10d' and remanded back to the Commission for further
consideration.
Moved to Consent Agenda after a lengthy work session discussion by the commissioners.
IX. Sign Design — Comfort Inn
Property Location: Lot 73-74, Block 2, Benchmark at Beaver Creek Subdivision
Applicant. Bruce Allen, Precision Sign Co.
Description: The applicant, Bruce Allen, is proposing to retrofit all three existing signs for the Comfort
Inn hotel on West Beaver Creek Boulevard. The application proposes to replace both building
mounted signs with new pan -channel lettered signs, and also proposes to replace the panel of the
freestanding sign.
Moved to Consent Agenda.
X. Minor Projects
A. 3rd Floor Addition
Property Location: Lot 12B, Block 1, Wildridge Subdivision
ApplicanbOwner. Chadd Ziegler
Description: This application proposes to add a third story to an existing half of a duplex in Block 1 of
the Wildridge PUD. The existing home has been referred to as the "earth home" and is accessed off
Saddleridge Loop. The application proposes to match the existing materials and architectural style of
the structure.
Moved to Consent Agenda.
B. Final Design Changes
Property Location: Lot 68, Block 3, Wildridge Subdivision
Applicant: Bernard Weber
Description: This application proposes changes in the Final Design approval for the duplex currently
under construction on Wildridge Road West. Design changes include: roof pitch from 8:12 to 6:12 on
primary ridgelines, roof pitch from 6:12 to 3:12 utilizing corrugated metal roofing. A material change is
also proposed for the west elevation from stone to stucco for a portion of the structure.
Moved to Consent Agenda.
XI. Other Business
Commissioner Didier brought up the parking of RV's in the Wal-Mart parking lot and the discussion
revolved around Town restrictions for such parking. Comments revolved around Town code, 3 day
duration is permitted by Wal-Mart to park there and public viewpoint of policing the parking lot.
Tambi Katieb mentioned to the commission that Lot C has been brought in for PUD Amendment and
. f.
may be deemed complete in two to three weeks. Commissioner Evans mentioned that Design
Workshop was hired on for the Town Core/Main Street development. Lot 61 has been purchased and
the new owners will be examining the PUD and perhaps amending it. Condemnation proceeding is
continuing in negotiation and issue is with quantity of parking. Design Workshop will be examining a
parking structure for Avon. The Gates at Beaver Creek continues on its way and are on -schedule for
the June 300' deadline. Confluence PUD will be holding two open houses for public feedback in the
first two weeks in June.
XII. Adjourn
Commissioner Savage motioned to adjourn; Commissioner Karow seconded the motion. All
Commissioners were in favor. The meeting was adjourned at 6:35 pm.
Respectfully submitted,
Ruth Weiss
Recording Secretary
APPROVED:
Chris Evans
Chairman
Terry Smith
Secretary